This document includes an asbestos abatement plan drawing and a pre-solicitation notice for a roof replacement project.
The asbestos abatement plan drawing provides details for removing asbestos-containing materials, including roof flashing, caulking and mastic, to facilitate replacing the roof on Building 1 at the VA Medical Center in Brooklyn, New York. The roof replacement project will include installing a new liquid applied roofing system along with associated work like roof drain strainers and parapet wall repairs. Prospective offerors must be verified Service-Disabled Veteran-Owned Small Businesses. The estimated construction cost ranges from $1 million to $2 million. The pre-solicitation notice indicates the solicitation will be issued on or about March 2, 2020 via beta.SAM.gov and responses are restricted to SDVOSBs approved as NAICS code 238160 for roofing contracting. The agency is the Department of Veterans Affairs Veterans Health Administration VISN 2.
36C24220B0024 ASB-1A Asbestos Removal Plan- Bld 1 Roof.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24220B0024-0003000.docx | DOCX document | |
| 36C24220B0024-0002000.docx | DOCX document | |
| 36C24220B0024-0002002.pdf | ||
| 36C24220B0024-0002001.pdf | ||
| 36C24220B0024-0001000.docx | DOCX document | |
| 36C24220B0024-012.pdf | ||
| 36C24220B0024-003.pdf | ||
| 36C24220B0024-009.pdf | ||
| 36C24220B0024-004.pdf | ||
| 36C24220B0024-010.pdf | ||
| 36C24220B0024-007.pdf | ||
| 36C24220B0024-013.pdf | ||
| 36C24220B0024-006.pdf | ||
| 36C24220B0024-005.pdf | ||
| 36C24220B0024-008.pdf | ||
| 36C24220B0024-002.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
BUILDING 1 ROOF
AutoCAD SHX Text Date
AutoCAD SHX Text Drawing No.
AutoCAD SHX Text Project No.
AutoCAD SHX Text of
AutoCAD SHX Text Dwg.
AutoCAD SHX Text Department of
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text Approved: Division Chief
AutoCAD SHX Text Approved: Service Director
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text
BROOKLYN, NEW YORK
AutoCAD SHX Text Checked
AutoCAD SHX Text Location
AutoCAD SHX Text Drawn
AutoCAD SHX Text Project Title
AutoCAD SHX Text Building Number
AutoCAD SHX Text
ASBESTOS REMOVAL PLAN
AutoCAD SHX Text Replace Roof Building 1
AutoCAD SHX Text P.C.
AutoCAD SHX Text S.F.
AutoCAD SHX Text K.V.
AutoCAD SHX Text P.C.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 630A4-17-406
AutoCAD SHX Text 5-15-18
AutoCAD SHX Text
ASB-1A
AutoCAD SHX Text
PLANNING & DESIGN
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text %%uSPECIAL INSTRUCTIONS
AutoCAD SHX Text
1. This job description is intended as a reference guide only and does not
AutoCAD SHX Text relieve the contractor of any Federal regulation requirements. The
AutoCAD SHX Text asbestos abatement contractor is required to apply for and/or utilize the
AutoCAD SHX Text existing applicable variances provided by the City of New York, Department
AutoCAD SHX Text of Environmental Protection.
AutoCAD SHX Text adhered to.
AutoCAD SHX Text All local and federal regulations regarding visible emissions shall be strictly
AutoCAD SHX Text and/or safety railing as described in OSHA 1910.28 and OSHA 1910.23.
AutoCAD SHX Text
2. As necessary all asbestos abatement personnel shall utilize life lines
AutoCAD SHX Text indicated on the drawing and described in contract specifications.
AutoCAD SHX Text The enclosed and lockable asbestos waste dumpster shall be located at the
AutoCAD SHX Text
3. Contractor shall construct a personal and waste decontamination unit as
AutoCAD SHX Text rear of the building as shown on the drawings.
AutoCAD SHX Text
4. Contractor shall provide an emergency exit and ensure that workers can
AutoCAD SHX Text safely exit the roof in the event of an emergency.
AutoCAD SHX Text function during normal operating hours.
AutoCAD SHX Text
5. Contractor shall critical barrier every vent on the roof and subsequently
AutoCAD SHX Text uncover these vents at the end of each shift. The facility must
AutoCAD SHX Text
6. The asbestos abatement shall be performed between the hours of 4:30pm
AutoCAD SHX Text and 11:00pm. Monday through Friday unless otherwise notified.
AutoCAD SHX Text
7. Contractor shall place critical barriers on all roof drains prior to the
AutoCAD SHX Text commencement of any removal work.
AutoCAD SHX Text roofing materials to be removed. This measure is to protect uncontaminated
AutoCAD SHX Text
8. Contractor shall place and tape securely poly drop cloths adjacent to the
AutoCAD SHX Text roofing from becoming contaminated by foot traffic and adjacent removal work.
AutoCAD SHX Text generator(s) with ground faults outlets. Water connections will be provided
AutoCAD SHX Text
9. Contractor shall provide all electrical power by means of portable electrical
AutoCAD SHX Text by the VA at the nearest source.
AutoCAD SHX Text Contractor through the VA Engineer.
AutoCAD SHX Text
10. Contractor shall coordinate all ACM removal with the General Roofing
AutoCAD SHX Text conveyed to the bag out facility for the double bagging process and wash
AutoCAD SHX Text
11. Contractor shall containerize all ACM and ACE at the point of removal, AutoCAD SHX Text down. ACM and ACE shall be placed in 6mil. Labeled poly waste bags
AutoCAD SHX Text (doubled bagged) or drums. Containers shall be lowered or carried to the
AutoCAD SHX Text ground. Dropped ACM or ACE is strictly prohibited.
AutoCAD SHX Text during the abatement procedure.
AutoCAD SHX Text area, therefore, ONLY trained abatement personnel are allowed on the roof
AutoCAD SHX Text
12. During the removal process the entire roof shall be considered the work
AutoCAD SHX Text of the flashing from the underside of the metal siding on the dormer(s)
AutoCAD SHX Text removed from the flashing material using a solvent. During the removal
AutoCAD SHX Text the abatement contractor to remove the flashing up to mortar joint but
AutoCAD SHX Text
13. Where the flashing enters the mortar joints it shall be necessary for
AutoCAD SHX Text not into the mortar. Any remaining asbestos containing mastic shall be
AutoCAD SHX Text it is required that extreme caution be exercised so as not to damage
AutoCAD SHX Text the siding.
AutoCAD SHX Text waste carts, etc. as required to facilitate complete asbestos removal.
AutoCAD SHX Text
14. Contractor shall provide all scaffolding, planking, steel platforms, ladders
AutoCAD SHX Text
15. All visible, exposed or raised flashing or pitch or pitch pockets are to
AutoCAD SHX Text be removed as asbestos containing.
AutoCAD SHX Text that are necessary to protect, inform and warn people of the hazard
AutoCAD SHX Text
16. Contractor shall provide signs, labels, warnings, and posted instructions
AutoCAD SHX Text from asbestos exposure as required by OSHA regulations AND VA standards..
AutoCAD SHX Text
17. Contractor shall not perform abatement work during inclement weather
AutoCAD SHX Text (heavy rains or high winds) which may impact the safety of the workers
AutoCAD SHX Text on the roof.
AutoCAD SHX Text of as indicated in contract documents, same day at the end of the work shift.
AutoCAD SHX Text
18. All debris resulting from asbestos abatement operations shall be disposed
AutoCAD SHX Text operations shall be coordinated with the VA Engineer. All egress routes
AutoCAD SHX Text
19. All routes through the building to be used during the asbestos abatement
AutoCAD SHX Text shall be properly protected and sufficiently maintained by the contractor.
AutoCAD SHX Text entire project and for the correction of same in case of an error. No extra
AutoCAD SHX Text the quantities, measurements, and any other conditions relative to the
AutoCAD SHX Text
20. Contractor shall be responsible for visiting the job site and determining
AutoCAD SHX Text compensation will be allowed due to differences between actual conditions
AutoCAD SHX Text and those indicated on the drawings. It is the owner's intent that the
AutoCAD SHX Text Contractor will remove all asbestos containing materials within the work area.
AutoCAD SHX Text
ROOFS IN CONTRACT
AutoCAD SHX Text
ROOF I:
AutoCAD SHX Text
17TH FLOOR MEC RM ROOF
AutoCAD SHX Text A. SOUTHEAST section
AutoCAD SHX Text B. MIDDLE section
AutoCAD SHX Text C. SOUTHWEST section
AutoCAD SHX Text
ROOF II
AutoCAD SHX Text
18TH FLOOR ROOF
AutoCAD SHX Text
ENTRANCE FROM ELEVATOR MAIN MOTOR ROOM
AutoCAD SHX Text
(S1-4/P1-5 ELEVATORS)
AutoCAD SHX Text
ROOF III
AutoCAD SHX Text
20TH FLOOR ROOF
AutoCAD SHX Text
ENTRANCE FROM HATCH DOOR IN IRM SECURED ROOM
AutoCAD SHX Text
ENTRANCE ON 17TH FLOOR ROOF, VIA OUTDOOR LADDER
AutoCAD SHX Text
ELEVATOR S9/10/11 MOTOR RM ROOF
AutoCAD SHX Text
ROOF IV:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
1. Contractor shall be responsible for field verifying and
AutoCAD SHX Text identifying all quantities.
AutoCAD SHX Text total square footage of the material.
AutoCAD SHX Text application. It is the contractors responsibility to verify
AutoCAD SHX Text
2. The width of the flashing mastic, and/or other ACM, varies per location and
AutoCAD SHX Text total square footage of the material.
AutoCAD SHX Text be disposed of as asbestos contaminated elements (ACE).
AutoCAD SHX Text
3. All solid flashing materials which cannot be cleaned shall
AutoCAD SHX Text
4. All visible/exposed or raised flashing or pitch or pitch pockets
AutoCAD SHX Text are to be removed as asbestos containing.
AutoCAD SHX Text 2/21/20
AutoCAD SHX Text
REV A: ADDED RAILING, MODIFIED DETAILS
AutoCAD SHX Text
100% ISSUE FOR BID
AutoCAD SHX Text
100%%% ISSUE FOR BID
AutoCAD SHX Text 2/21/20
AutoCAD SHX Text
<REV A>
| Sheets and Views |
| ASB-1A Asbestos Removal Plan- Bld 1 Roof- BID-Model |
File details come from the government source that posted it. Updated .