This document contains a pre-solicitation notice and related federal contract opportunity for renovations to the 9th floor of the Syracuse VA Medical Center. The renovation area will consist of approximately 5,450 square feet to create 19 single and multi-occupant offices, 1 housekeeping closet, 1 breakroom, and will upgrade 2 existing bathrooms and 1 conference room. The work includes new paint, flooring, ceiling, tile and bathroom fixtures. The 100% service-disabled veteran-owned small business set-aside contract is estimated between $1-5 million. Firms must be verified in VetBiz, self-perform 15% of work, and provide bonding and past performance ratings. The solicitation number is 36C24219B0058 and will be posted on www.fbo.gov. The work is to be administered by the Department of Veterans Affairs Veterans Health Administration Networks 2. The response deadline is not specified.
36C24219B0058 0004 36C24219B0058 0004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219B0058-0004001.pdf | ||
| 36C24219B0058-0004002.pdf | ||
| 36C24219B0058-0003006.pdf | ||
| 36C24219B0058-0003000.docx | DOCX document | |
| 36C24219B0058-0003007.pdf | ||
| 36C24219B0058-0003005.pdf | ||
| 36C24219B0058-0003001.pdf | ||
| 36C24219B0058-0003002.pdf | ||
| 36C24219B0058-0003004.pdf | ||
| 36C24219B0058-0003003.pdf | ||
| 36C24219B0058-0002006.pdf | ||
| 36C24219B0058-0002007.pdf | ||
| 36C24219B0058-0002004.docx | DOCX document | |
| 36C24219B0058-0002005.pdf | ||
| 36C24219B0058-0001003.pdf | ||
| 36C24219B0058-0001000.docx | DOCX document | |
| 36C24219B0058-0001002.pdf | ||
| 36C24219B0058-0001001.docx | DOCX document | |
| 36C24219B0058-004.pdf | ||
| 36C24219B0058-003.pdf | ||
| 36C24219B0058-001.docx | DOCX document | |
| 36C24219B0058-002.pdf | ||
| 36C24219B0058-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-31-2019 528A7-19-704 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Bldg 2 Rm D02 Syracuse
NY
13210 Department of Veterans Affairs Network Contracting Office 02 800 Irving Ave Bldg 2 Rm D02 Syracuse
NY
13210 To all Offerors/Bidders
36C24219B0058
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
18 NOV 2019 1300 EST Bldg 2 RM NG44 X Purpose of this amendment is to incorporate Request for Information (RFI) Questions and Answers A.) Incorporate attached RFI Questions and Answers B.) Incorporate revised drawings entitled RFI #3- 2019-11-05 C.) Change BID OPENING FROM 7 NOVEMBER TO READ MONDAY 18 NOVEMBER 2019 1300 EST Bldg 2 Rm NG44 ( AM&MM Conference RM) D.) All RFIS are DUE NO LATER THAN Monday 11 Nov 19 1600 EST to sandra.fisher3@va.gov AND craig.arnold@va.gov E.) All other terms and conditions remain unchanged
NOTHING FOLLOWS////////////////NOTHING FOLLOWS///////////
1. DIRTT zone box distribution is not applicable for emergency outlets. Only the non emergency outlets on the electrical plan will be able to use the zone box distribution. Please clarify if this is acceptable.
Response: This will be acceptable. Please ensure that all pathways to the plenum are hidden within the framing and do not interfere with the glass paneling system.
2. For emergency outlets, to achieve a red outlet and a red faceplate, DIRTT level 3 conventional power with green MC cable needs to be used. These will not be able to use zone box distribution and will look slightly different then the DIRTT modular power for the non emergency outlets. Please confirm this is acceptable.
Response: Response: This will be acceptable. Please ensure that all pathways to the plenum are hidden within the framing and do not interfere with the glass paneling system.
INCORPORATE ADDITIONAL CHANGES TO EXISITNG SPECIFICATIONS AND DRAWINGS :
3. On Drawing FX-101 redefine the smoke wall in B903.
4. On Drawing FA-101 redefine the smoke wall in B903 and change the location of Smoke Dampers.
5. On Drawing FA-601 Fire Alarm Riser Diagram modify the new location of the Smoke Dampers.
6. On Drawing MH-101 redefine the smoke wall in B903. Two of the Smoke Dampers have been relocated. The two 6” diameter Smoke Dampers has been removed.
6. On Drawing MI-701 detail 1 1 Variable Volume Air Terminal Unit Control Diagram revise subsection E to the VAV Box Control Sequence.
7. On Drawing MI-702 revise the control point list table.
8. On Drawing EP-101 an Electrical Panel, ECR9B-B, incorporate a to closet B909. Also, reduced in size the electrical panel ECR9B-A, in closet B909 .
9. On Drawing EL-101 additional clarification was added under the Lighting Plan General Notes to ensure that there is an extra contact for the HVAC controls.
10. On Drawing A-702 incorporate the finishes for the wooden doors.
See attached document: RFI#3 - 2019-11-05 - Drawings.
See attached document: SITE VISIT ATTENDANCE -9B.