This solicitation notice is for project number 528A7-19-704 to renovate approximately 5,450 square feet of the 9th floor at the Syracuse VA Medical Center located in Syracuse, New York. The renovation will create new offices, a housekeeping closet, breakroom, and upgrade existing bathrooms and a conference room. Work includes new paint, flooring, ceiling, tile, and bathroom fixtures. The estimated value is between $1 million to $5 million. Payment and performance bonds are required along with a 20% bid bond. The NAICS code is 236220 with a small business size standard of $36.5 million. This is a 100% set-aside for certified service-disabled veteran-owned small businesses registered in the System for Award Management and VetBiz databases. Firms must self-perform 15% of the work and provide an EMR rating with their bid. Unless extended, the full invitation for bid will be posted on www.fbo.gov on or about October 6, 2019.
36C24219B0058 0003 RFI#2 - 2019-10-31 - 10 22 19 - Demountable Partitions.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219B0058-0004001.pdf | ||
| 36C24219B0058-0004002.pdf | ||
| 36C24219B0058-0004000.docx | DOCX document | |
| 36C24219B0058-0003006.pdf | ||
| 36C24219B0058-0003000.docx | DOCX document | |
| 36C24219B0058-0003007.pdf | ||
| 36C24219B0058-0003005.pdf | ||
| 36C24219B0058-0003001.pdf | ||
| 36C24219B0058-0003002.pdf | ||
| 36C24219B0058-0003004.pdf | ||
| 36C24219B0058-0002006.pdf | ||
| 36C24219B0058-0002007.pdf | ||
| 36C24219B0058-0002004.docx | DOCX document | |
| 36C24219B0058-0002005.pdf | ||
| 36C24219B0058-0001003.pdf | ||
| 36C24219B0058-0001000.docx | DOCX document | |
| 36C24219B0058-0001002.pdf | ||
| 36C24219B0058-0001001.docx | DOCX document | |
| 36C24219B0058-004.pdf | ||
| 36C24219B0058-003.pdf | ||
| 36C24219B0058-001.docx | DOCX document | |
| 36C24219B0058-002.pdf | ||
| 36C24219B0058-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovation of 9B for Surgery and Diagnostic Care Line Project No. 528A7-19-704
Department of Veterans Affairs – Syracuse VAMC 100% Specifications – 06/10/19
10 22 19 - 1
SECTION 10 22 19
DEMOUNTABLE PARTITIONS
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Demountable glazed partitions with opaque panels and / electrical power and communications services.
2. Demountable opaque panel partitions with electrical power and communications services.
1.2 RELATED REQUIREMENTS
A. Acoustical Insulation: Section 07 21 13, THERMAL INSULATION.
B. Glass Doors: Section 08 14 00, INTERIOR WOOD DOORS.
C. Door Hardware: Section 08 41 13 Aluminum Door Frames and Storefronts.
D. Glass: Section 08 80 00, GLAZING.
E. Infill Panel Color: Section 09 06 00, SCHEDULE FOR FINISHES.
F. Wall Covering: Section 09 72 31, POLYPROPYLENE FABRIC WALL COVERING.
G. Electrical Devices and Wiring: Division 26, ELECTRICAL.
H. Communications Devices and Wiring: Division 27, COMMUNICATIONS.
1.3 APPLICABLE PUBLICATIONS
A. Comply with references to extent specified in this section.
B. American National Standards Institute (ANSI):
1. A208.1-09 - Particleboard.
2. A208.2-09 - Medium Density Fiberboard (MDF) For Interior
Applications.
C. Architectural Woodwork Institute (AWI):
1. AWS-14 - Architectural Woodwork Standards.
D. ASTM International (ASTM):
1. A653/A653M-15 - Steel Sheet, Zinc Coated (Galvanized) or Zinc Iron
Alloy Coated (Galvannealed) by the Hot Dip Process.A1008/A1008M-15 -
Steel, Sheet, Cold Rolled, Carbon, Structural, High Strength Low
Alloy, High Strength Low Alloy with Improved Formability, Solution
Hardened, and Baked Hardenable.
2. B209-14 - Aluminum and Aluminum Alloy Sheet and Plate.
3. B209M-14 - Aluminum and Aluminum Alloy Sheet and Plate (Metric).
VHASYRBREWEA
Text Box Revision dated 10/31/19 -RFI #2
10 22 19 - 2
4. B221-14 - Aluminum and Aluminum Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes.
5. B221M-13 - Aluminum and Aluminum Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes (Metric).
6. C612-14 - Mineral Fiber Block and Board Thermal Insulation.
7. D1187/D1187M-97(2011)e1 - Asphalt-Base Emulsions for Use as
Protective Coatings for Metal.
8. C1396/C1396M-14a - Gypsum Board.
9. E84-15b - Standard Test Method for Surface Burning Characteristics of Building Materials.
10. E90-09 - Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements.
11. E119-15 - Standard Test Methods for Fire Tests of Building
Construction and Materials.
E. Hardwood Plywood & Veneer Association (HPVA):
1. HP-1-09 - Hardwood and Decorative Plywood.
F. Master Painters Institute (MPI):
1. No. 18 - Primer, Zinc Rich, Organic.
G. National Association of Architectural Metal Manufacturers (NAAMM):
1. AMP 500-06 - Metal Finishes Manual.
H. National Electrical Manufactures Association (NEMA):
1. LD3-05 - High-Pressure Decorative Laminates (HPDL).
I. National Fire Protection Association (NFPA):
1. 70-14 - National Electrical Code.
2. 101-15 - Life Safety Code.
3. 265-15: Fire Tests for Evaluating Room Fire Growth Contribution of
Textile or Expanded Vinyl Wall Coverings on Full Height Panels and
Walls.
4. 286-15 - Fire Tests for Evaluating Room Fire Growth Contribution of
Textile or Expanded Vinyl Wall Coverings on Full Height Panels and
Walls.
J. UL LLC (UL):
1. 1784-04(2009) - Air Leakage Tests of Door Assemblies and Other
Opening Protectives.
http://www.madcad.com/library/ASTM-C612-14/ http://www.madcad.com/library/ASTM-C612-14/
10 22 19 - 3
1.4 PREINSTALLATION MEETINGS
A. Conduct preinstallation meeting at project site minimum 30 days before beginning Work of this section.
1. Required Participants:
a. Contracting Officer's Representative.
b. VA Interior Designer.
c. Contractor.
d. Installer.
e. Manufacturer's field representative.
f. Other installers responsible for adjacent and intersecting work, including gypsum board and acoustic ceiling.
2. Meeting Agenda: Distribute agenda to participants minimum 3 days before meeting.
a. Installation schedule.
b. Installation sequence.
c. Preparatory work.
d. Protection before, during, and after installation.
e. Installation.
f. Terminations.
g. Transitions and connections to other work.
h. Other items affecting successful completion.
3. Document and distribute meeting minutes to participants to record decisions affecting installation.
1.5 SUBMITTALS
A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Submittal Drawings:
1. Show size, configuration, and fabrication and installation details.
2. Show partition layout including locations of doors, glass, and opaque panels, and locations of each type and finish.
3. Show maximum accessory weights partitions can support.
C. Manufacturer's Literature and Data:
1. Description of each product.
2. Demountable partition panels, doors, and hardware indicating manufacturer recommendation for each application.
3. Installation instructions.
10 22 19 - 4
4. Warranty.
D. Samples:
1. Exposed Finish Items: 150 mm (6 inches) long for framing members, 300 mm (12 inches) square for glass and finished opaque panels, each type and color.
a. Submit quantity required to show full color and texture range.
E. Certificates: Certify each product complies with specifications.
1. Show electrical components are UL Listed for specified application.
F. Qualifications: Substantiate qualifications comply with specifications.
1. Manufacturer with project experience list.
2. Installer with project experience list.
G. Operation and Maintenance Data:
1. Care instructions for each exposed finish product.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications:
1. Regularly manufacturers specified products.
2. Manufactured specified products with satisfactory service on five similar installations for minimum five years.
B. Installer Qualifications:
1. Regularly installs specified products.
2. Installed specified products with satisfactory service on five similar installations for minimum five years.
C. Mockups:
1. Erect mockup of one complete room indicated on drawings. Include framing, glass panels, opaque panels, doors and power and communications devices illustrating every required system component.
2. Approved mockup may remain as part of completed work.
1.7 DELIVERY
A. Deliver products in manufacturer's original sealed packaging.
B. Mark packaging, legibly. Indicate manufacturer's name or brand, type, color, production run number, and manufacture date.
C. Before installation, return or dispose of products within distorted, damaged, or opened packaging.
1.8 STORAGE AND HANDLING
A. Store products indoors in dry, weathertight conditioned facility.
10 22 19 - 5
B. Protect products from damage during handling and construction operations.
C. Coordinate delivery with construction schedule to avoid storage or double handling of the integrated prefabricated interior construction partition assemblies and solutions.
1.9 FIELD CONDITIONS
A. Environment:
1. Work Area Ambient Conditions: HVAC systems are complete, operational, and maintaining facility design operating conditions continuously, beginning 48 hours before installation until
Government occupancy.
B. Field Measurements: Verify field conditions affecting demountable partition fabrication and installation. Show field measurements on
Submittal Drawings.
1.10 WARRANTY
A. Construction Warranty: FAR clause 52.246-21, "Warranty of
Construction."
B. Manufacturer's Warranty: Warrant demountable partitions including doors, hardware, and accessories against material and manufacturing defects.
1. Warranty Period: 10 years.
PART 2 - PRODUCTS
2.1 SYSTEM DESCRIPTION
A. Demountable Partition System:
1. Assembly: Factory unitized; non-progressive permitting assembly and disassembly beginning at any point within system allowing reconfiguration, addition, or removal.
2. Mounting: Floor and ceiling anchored.
3. Configuration: Double-faced.
4. Panels: See drawings.
5. Panels: Glass and opaque; wood, fabric.
a. Enzo Coplanar extrusion panels, with Infection Prevention
Gasket in a curvilinear model.
VHASYRBREWEA
Text Box rectilinear model.
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
10 22 19 - 6
b. Applied Rubber Cove Base – 6” Cove Base with Schluter Strip Cap, and Enzo optifiller.
6. Doors: Glass; and sliding.
7. Services: Electrical power and communications service at each workstation and other locations shown on drawings with wiring concealed in demountable partition system; accessible for future expansion and reconfiguration.
8. Accessories: Accommodate attachment of millwork, furniture, storage, lighting, and other fixtures and fittings without damaging demountable partition components.
2.2 SYSTEM PERFORMANCE
A. Design demountable partitions complying with specified performance:
1. Load Resistance:
a. Lateral Loads: 240 Pa (5 psf) uniform load.
b. Deflection of Solid Walls: 1/120 of span maximum.
c. Deflection of Glass Walls: 1/175 of span maximum.
2. Fire Resistance: Panel Surface Burning Characteristics: When tested according to ASTM E84.
a. Chromacoat on FR MDF Flame Spread Rating: 25 maximum.
b. Writeaway Film on FR MDF Flame Spread Rating: 15 maximum
c. Class A fabric on MA Board w/FR Backer (v3 - Tackable) Fire Spread
Rating: 25 Maximum.
d. Chromacoat on FR MDF Smoke Developed Rating: 10 maximum.
e. Writeaway Film on FR MDF Smoke Developed Rating: 65 maximum.
f. Class A fabric on MA Board w/FR Backer (V3 – Tackable) Smoke
Developed Rating: 40 Maximum.
3. Room Fire Growth Contribution: Comply with NFPA 101 when tested to
NFPA 286.
4. Sound Transmission: ASTM E90; 43 STC, maximum.
5. Door Air Leakage Rate: UL 1784; 0.015424 cu. m/s/sq. m
(3.0 cfm/sq. ft.) maximum for doors in smoke partitions.
2.3 MATERIALS
A. Aluminum:
1. Extruded: ASTM B221M (ASTM B221); Alloy 6063-T6.
2. Sheet: ASTM B209M (ASTM B209); Alloy 5005-H32.
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
VHASYRBREWEA
Text Box minimum
VHASYRBREWEA
Rectangle
VHASYRBREWEA
10 22 19 - 7
B. Steel: ASTM A653/A653M; Z120 or ZF120 (G40 or A40) metallic-coated.
C. Glass: See Section 08 80 00.
1. Laminated glass minimum thickness 3/8” (10mm)to ASTM C1048, Kind FT, Condition A, Type 1, Class 1 Quality q3
D. Fabric: Polyester; stain resistant and flame resistant.
E. Gypsum Board: ASTM C1396/C1396M; Type X, 16 mm (5/8 inch) thick.
F. Acrylic Sheet: In manufacturer’s standard thickness; color as indicated in Section 09 06 00, SCHEDULE OF FINISHES.
G. Panel Cores: Fire retardant types with no added urea formaldehyde.
1. Glass-Fiber Board: ASTM C612; tackable face.
2. Mineral-Fiber Board.
3. Hardwood Plywood: HPVA HP-1; with specified face veneer.
4. Medium-Density Fiberboard: ANSI A208.2, Grade M-2.
5. Particleboard: ANSI A208.1, Grade 2 M-2.
H. Acoustical Insulation: See Section 07 21 13, THERMAL INSULATION.
2.4 PRODUCTS - GENERAL
A. Basis of Design: DIRTT Walls.
B. Provide faced panels from one manufacturer and from one production run.
2.5 FRAMING
A. Framing: Extruded aluminum Roll-formed steel components including floor track, top track , vertical mullions, horizontal mullions, studs or posts, bracing, and end closures.
1. Framing Depth: manufacturer's standard.
2. Framing Height: manufacturer's standard.
B. Frame Bases: Construction matching framing with provisions for minimum
38 mm (1-1/2 inch) height adjustment and partition leveling to accommodate floor slab tolerances.
2.6 NOT USED
2.7 FACTORY UNITIZED PANELS
A. Fully factory unitize frame and panels for field assembly.
B. Laminated Glass Panel Thickness: 10 mm (3/8 inch).
C. Opaque Panel Thickness: 45 mm (1-3/4 inch).
D. Panel Widths: 610 mm (24 inches), 760 mm (30 inches), 900 mm
(36 inches).
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Rectangle
VHASYRBREWEA
10 22 19 - 8
2.8 FACTORY PARTIALLY UNITIZED PANELS
A. Factory unitize frames to receive field installed panels.
B. Tempered Glass Panel Thickness: 10 mm (3/8 inch).
C. Opaque Panel Thickness: 45 mm (1-3/4 inch).
D. Panel Widths: 610 mm (24 inches),760 mm (30 inches),900 mm (36 inches).
2.9 GLASS PANELS
A. Double Glazed Panels: Two glass panels set in perimeter framing, with air space separation.
2.10 OPAQUE PANELS
A. Metal Panels:
1. Faces: Aluminum sheet, laminated to core.
2. Core: Manufacturer’s standard.
B. Wood Panels:
1. Faces: Plastic laminate.
2. Core: medium-density fiberboard.
C. Fabric Panels:
1. Faces: Fabric.
2. Core: Medium-density fiberboard.
D. Gypsum Panels: Factory finish gypsum board.
E. Gypsum Panels: Unfinished gypsum board for field painting covering.
2.11 GLASS DOORS
A. Metal Framed Glass Doors: Sliding.
1. Framing: Aluminum; 44 mm (1-3/4 inch) thick.
B. All-Glass Doors: Sliding.
1. Fittings: Continuous rails.
2. Cladding: Aluminum.
C. Door Hardware: See Section 087100, DOOR HARDWARE.
1. Sliding Doors: Aluminum tracks with carriers and rollers, guides, and stops; adjustable height for leveling; anti-slam controlled closing function.
a. Mounting: Exposed.
2. Pulls: Cylindrical Pulls.
a. Material:
1) Aluminum.
b. Length: Full height.
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
VHASYRBREWEA
Rectangle
VHASYRBREWEA
10 22 19 - 9
c. Cross Section: 25 mm (1 inch).
d. Mounting: Back-to-back.
3. Sound, Fire and Smoke Seals: See Section 087100, DOOR HARDWARE.
2.12 WOOD DOORS – NOT USED
2.13 DOORS FRAMES
A. Door Frames: Aluminum profile to suit partition framing and doors.
2.14 POWER AND COMMUNICATIONS SERVICES
A. Back Boxes and Wiring Devices: Recessed in partition framing or panels.
See Division 26, ELECTRICAL.
1. Wall Plates: For each wiring device.
B. Raceways and Power Wiring: See Division 26, ELECTRICAL.
C. Communications Wiring and Terminal Devices: See Division 27, COMMUNICATIONS.
2.15 FABRICATION
A. Fabricate demountable partitions for anchorage to floor and ceiling construction and assembly and disassembly with concealed fasteners without special tools.
1. Acoustic Seals: Provide framing perimeter continuous resilient seals.
2. Infection Control Seals: Provide framing perimenter continuous resilient seals.
B. Factory assemble glazed and opaque unitized panels.
C. Factory finish panel faces.
D. Wiring Devices: Factory installed and wired to greatest extent possible.
E. Wiring: Bundled and concealed within partition system.
2.16 FINISHES
A. Aluminum Anodized Finish: NAAMM AMP 500.
1. Clear Anodized Finish: AA-C22A41; Class I Architectural, 0.018 mm
(0.7 mil) thick.
2. Color Anodized Finish: AA-C22A42 or AA-C22A44; Class I
Architectural, 0.018 mm (0.7 mil) thick.
3. Clear Anodized Finish: AA-C22A31; Class II Architectural, 0.01 mm
(0.4 mil) thick.
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Rectangle
VHASYRBREWEA
10 22 19 - 10
2.17 ACCESSORIES
A. Channels and Brackets: Manufacturer's standard for supporting fixtures and fittings attached to demountable partition system.
B. Glazing Seals: Rigid preformed translucent plastic.
C. Glazing Sealant: Silicone; translucent. See Section 08 80 00, GLAZING.
D. Barrier Coating: ASTM D1187/D1187M.
E. Adhesives: Low -emitting, water based type recommended by adhered product manufacturer for each application.
F. Fasteners: Type 304 stainless steel.
G. Galvanizing Repair Paint: MPI No. 18.
H. Touch-Up Paint: Match shop finish.
PART 3 - EXECUTION
3.1 PREPARATION
A. Verify interior finishes, including floor, ceiling, and wall finishes, are installed and ready for Government occupancy.
B. Examine and verify substrate suitability for product installation.
C. Protect existing construction and completed work from damage.
D. Clean substrates. Remove contaminants capable of affecting subsequently installed product's performance.
E. Apply barrier coating to aluminum surfaces in contact with dissimilar metals and cementitious materials to minimum 0.7 mm (30 mils) dry film thickness.
3.2 INSTALLATION - GENERAL
A. Install products according to manufacturer's instructions and approved submittal drawings.
1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.
3.3 INSTALLATION - FRAMING
A. Assemble and erect framing members to minimize cutting, drilling and damaging perimeter construction.
B. Install framing members straight and plumb, with horizontal lines level.
10 22 19 - 11
C. Install seal to prevent light and sound transmission at connections to perimeter construction.
3.4 INSTALLATION - GLAZING
A. Install glass panels securely into gasketed framing members without damaging glass.
3.5 INSTALLATION - PANELS
A. Install panels with concealed fastening devices and pressure-fit components that do not mar floor, wall and ceiling surfaces.
B. Install panels rigid, straight, and plumb, with horizontal lines level.
3.6 INSTALLATION - DOORS
A. Hang doors plumb, level, and square to opening with uniform perimeter gap between door and frame.
B. Adjust doors for smooth operation and ability to stand stationary at any position.
3.7 INSTALLATION - POWER AND COMMUNICATIONS
A. Install power and communications wiring and wiring devices, according to manufacturer’s instructions and requirements specified in Division
26, ELECTRICAL and Division 27, COMMUNICATIONS.
3.8 CLEANING
A. Clean exposed surfaces. Remove contaminants and stains.
3.9 ADJUSTMENTS
A. Touch up damaged factory finishes.
B. Repair damaged partition finish and components and damaged floor, wall and ceiling finishes to the original conditions.
3.10 PROTECTION
A. Protect demountable partitions from construction operations.
B. Remove protective materials immediately before acceptance.