This document provides specifications for subsurface preparation for floor finishes for the renovation of 9B for surgery and diagnostic care at the Syracuse VA Medical Center. Key details include calcium aluminate cement-based self-leveling underlayment to achieve substrate repair, leveling, and a smooth surface for flooring installation. Moisture remediation coating is not required. Specified tests include compressive strength, flexural strength, and bond strength. The related federal contract opportunity is a 100% service-disabled veteran-owned small business set-aside for the $1-5 million renovation project, including 19 offices, 2 bathrooms, and hallway upgrades. Bids are due by early October 2019, and payment and performance bonds are required along with a 20% bid bond submitted with the bid.
36C24219B0058 0003 RFI#2 - 2019-10-31 - 09 05 16 - Subsurface Preparation for Floor Finishes.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24219B0058-0004001.pdf | ||
| 36C24219B0058-0004002.pdf | ||
| 36C24219B0058-0004000.docx | DOCX document | |
| 36C24219B0058-0003000.docx | DOCX document | |
| 36C24219B0058-0003007.pdf | ||
| 36C24219B0058-0003005.pdf | ||
| 36C24219B0058-0003001.pdf | ||
| 36C24219B0058-0003002.pdf | ||
| 36C24219B0058-0003004.pdf | ||
| 36C24219B0058-0003003.pdf | ||
| 36C24219B0058-0002006.pdf | ||
| 36C24219B0058-0002007.pdf | ||
| 36C24219B0058-0002004.docx | DOCX document | |
| 36C24219B0058-0002005.pdf | ||
| 36C24219B0058-0001003.pdf | ||
| 36C24219B0058-0001000.docx | DOCX document | |
| 36C24219B0058-0001002.pdf | ||
| 36C24219B0058-0001001.docx | DOCX document | |
| 36C24219B0058-004.pdf | ||
| 36C24219B0058-003.pdf | ||
| 36C24219B0058-001.docx | DOCX document | |
| 36C24219B0058-002.pdf | ||
| 36C24219B0058-000.docx | DOCX document |
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Renovation of 9B for Surgery and Diagnostic Care Line Project No. 528A7-19-704
Department of Veterans Affairs – Syracuse VAMC 100% Specifications – 06/10/19
09 05 16 - 1
SECTION 09 05 16
SUBSURFACE PREPARATION FOR FLOOR FINISHES
PART 1 - GENERAL
1.1 DESCRIPTION
This section specifies subsurface preparation requirements for areas to receive the installation of ALL flooring. This section includes removal of existing floor coverings, floor leveling and repair as required.
1.2 RELATED WORK
A. Section 07 92 00, JOINT SEALANTS.
B Section 09 65 19, RESILIENT TILE FLOORING Section 09 67 23.50, RESINOUS
(Epoxy Terrazzo) FLOORING (RES-5)
1.3 SUBMITTALS
A. Product Data:
1. Underlayment Primer
2. Cementitious Self-Leveling Underlayment
1.4 DELIVERY AND STORAGE
A. Deliver materials in containers with labels legible and intact and grade-seals unbroken.
B. Store material to prevent damage or contamination.
1.5 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
B. American Society for Testing and Materials (ASTM):
D638-10
(2010) Test Method for Tensile Properties of Plastics
D4259-88
(2012)
Standard Practice for Abrading Concrete to alter the surface profile of the concrete and to remove foreign materials and weak surface laitance.
C109/C109M
-12
(2012)
Standard Test Method for Compressive Strength of
Hydraulic Cement Mortars (Using 2-in. or [50-mm] Cube
Specimens) Modified Air Cure Only
D7234-12
(2012)
Standard Test Method for Pull-Off Adhesion Strength of
Coatings on Concrete Using Portable Pull-Off Adhesion
Testers.
E96/E96M -
(2012)
Standard Test Methods for Water Vapor Transmission of
Materials
F710-11
(2011)
Standard Practice for Preparing Concrete Floors to
Receive Resilient Flooring
VHASYRBREWEA
Typewritten Text Revision dated 10/31/19 -RFI #2
09 05 16 - 2
F1869-11
(2011)
Standard Test Method for Measuring Moisture Vapor
Emission Rate of Concrete Subfloor Using Anhydrous
Calcium Chloride
F2170-11
(2011)
Standard Test Method for Determining Relative Humidity in
Concrete Floor Slabs Using in situ Probes
C348-08
(2008)
Standard Test Method for Flexural Strength of Hydraulic-
Cement Mortars
C191-13
(2013)
Standard Test Method for Time of Setting of Hydraulic
Cement by Vicat Needle
PART 2 - PRODUCTS
2.1 MOISTURE REMEDIATION COATING – NOT USED
2.2 CEMENTITIOUS SELF-LEVELING UNDERLAYMENT
A. System Descriptions:
1. High performance self-leveling underlayment resurfacer. Single component, self-leveling, cementitious material designed for easy application as an underlayment for all types of flooring materials.
It is used for substrate repair and leveling.
B. Products: Subject to compliance with applicable fire, health, environmental, and safety requirements for storage, handling, installation, and clean up. Gypsum-based products are unacceptable.
C. System Characteristics:
1. Wearing Surface: smooth
2. Thickness: Ranging from feathered edge to 1”, per application.
Applications greater than 1” require additional 3/8” aggregate to mix or as recommended by manufacturer.
D. Underlayment shall be calcium aluminate cement-based, containing
Portland cement. Gypsum-based products are unacceptable.
E. Compressive Strength: Minimum 4100 psi in 28 days in accordance with
ASTM C109/C109M.
F. Flexural Strength: Minimum 1000 psi in 28 days in accordance with ASTM
C348
G. Dry Time: Underlayment shall receive the application of floor coverings in 16 hours.
H. Primer: compatible and as recommended by manufacturer for use over intended substrate
I. System Components: Manufacturer's standard components that are compatible with each other and as follows:
1. Primer:
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
09 05 16 - 3
a. Resin: copolymer
b. Formulation Description: single component ready to use.
c. Application Method: Squeegee and medium nap roller.
All puddles shall be removed, and material shall be allowed to dry, 1-2 hours at 70F/21C.
d. Number of Coats: (1) one.
2. Grout Resurfacing Base:
a. Formulation Description: Single component, cementitious self-leveling high-early and high-ultimate strength grout.
b. Application Method: colloidal mix pump, cam rake, spike roll.
1) Thickness of Coats: Per architectural scope, 1” lifts.
2) Number of Coats: More than one if needed.
c. Aggregates: for applications greater than 1inch, require additional 3/8” aggregate to mix.
2.3
PART 3 - EXECUTION
3.1 ENVIRONMENTAL REQUIREMENTS
A. Maintain ambient temperature of work areas at not less than 16 degree C
(60 degrees F), without interruption, for not less than 24 hours before testing and not less than three days after testing.
B. Maintain higher temperatures for a longer period of time where required by manufacturer's recommendation.
C. Do not install materials when the temperatures of the substrate or materials are not within 60-85 degrees F/ 16-30 degrees C.
3.2 SURFACE PREPARATION
A. Existing concrete slabs with existing floor coverings:
1. Conduct visual observation of existing floor covering for adhesion, water damage, alkaline deposits, and other defects.
2. Remove existing floor covering and adhesives. Comply with local, state and federal regulations and the RFCI Recommended Work
Practices for Removal of Resilient Floor Coverings, as applicable to the floor covering being removed.
Property Test Value
Compressive Strength
ASTM C109/C109M
2,200 psi @ 24 hrs
3,000 psi @ 7 days
Initial set time
Final Set time
ASTM C191
30-45 min.
1 to 1.5 hours
Bond Strength
ASTM D7234
100% bond to concrete failure
09 05 16 - 4
B. Concrete shall meet the requirements of ASTM F710 and be sound, solid, clean, and free of all oil, grease, dirt, curing compounds, and any substance that might act as a bond-breaker before application. As required prepare slab by mechanical methods. No chemicals or solvents shall be used.
C. General: Prepare and clean substrates according to flooring manufacturer's written instructions for substrate indicated.
D. Prepare concrete substrates per ASTM D4259 as follows:
1. Dry abrasive blasting.
2. Wet abrasive blasting.
3. Vacuum-assisted abrasive blasting.
4. Centrifugal-shot abrasive blasting.
5. Comply with manufacturer's written instructions.
E. Repair damaged and deteriorated concrete according to flooring manufacturer's written recommendations.
F. Verify that concrete substrates are dry.
G. Prepare joints in accordance with Section 07 92 00, JOINT SEALANTS and material manufacturer’s instructions.
H. Tolerances: Subsurface shall meet the flatness and levelness tolerance recommended by the floor finish manufacturer. Tolerance shall also not to exceed 3/16” deviation in 10’. As required, install underlayment to achieve required tolerance.
I. Other Subsurface: For all other subsurface conditions, such as wood or metal, contact the floor finish or underlayment manufacturer, as appropriate, for proper preparation practices.
3.3 MOISTURE REMEDIATION COATING: NOT USED
3.4 CEMENTITOUS UNDERLAYMENT:
A. Install cementitious self-leveling underlayment as required to correct surface defects, floor flatness or levelness corrections to meet the tolerance requirements as detailed in the specifications, provide a smooth surface for the installation of floor covering.
B. Mix and apply in accordance with manufacturer's instructions. Apply self-leveling underlayment without cold joints. The entire floor shall be continuous.
3.5 PROTECTION
A. Prior to the installation of the finish flooring, the surface of the underlayment should be protected from abuse by other trades by the use
VHASYRBREWEA
Rectangle
VHASYRBREWEA
Callout Revised 10/31/19 RFI #2
09 05 16 - 5 of fire rated plywood, tempered hardwood, or other suitable protection course
3.6 FIELD QUALITY CONTROL
A. Where specified, field sampling of products shall be conducted by a qualified, independent testing facility.
- - - E N D - - -