Attachment A - SOV Breakdown Sample.pdf
PDF 226 KB Posted
- Attached to
- C1AZ--631-21-011 Build Elevator Tower for Building 25 A/E Design SF330 Request for Qualifications
- Solicitation number
- 36C24126Q0518
About this file
This document is an Architect/Engineer (A/E) Schedule of Value (SOV) Breakdown sample template that outlines minimum submittal requirements for a design and construction project with phased deliverables.
The SOV is organized into three primary service categories spanning the full project lifecycle. A-Services encompasses the initial design phase (15%, 35% submissions) and includes site investigation visits, QA/QC plans, narratives, field survey reports, basis of design drawings, BIM execution plans, specifications, investigation reports, HAZMAT/NESHAP assessments, design calculations, space planning data, cost estimates, and historical Section 106 reviews. B-Services covers the advanced design and construction documentation phases (65%, 90%, 100% submissions) and requires narrative updates, comprehensive drawings, full specifications, investigation reports, HAZMAT/NESHAP documentation, design calculations, space planning data, cost estimates, construction schedules, construction statements of work (SOW), preliminary contamination risk assessments (PCRA), physical security compliance reports, BIM/AutoCAD files, and submittal registers with response-to-comments documents at multiple design stages. C-Services includes project support activities such as solicitation support, document review of submittals and Requests for Information (RFIs), project meetings, VA support, commissioning, site visits, pre-final inspection/punchlist reports, final inspection/punchlist reports, and as-built/closeout documentation. All line items are designated as lump sum (LS) or hourly (HR) and (HR) rates, with the template currently showing zero prices pending contractor input. The document serves as a template for contractors to populate pricing and track scheduled totals against completed work percentages and costs to date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item
Number QTY UOM Price
Scheduled
Total
Quantity
Completed to Date
Price
Completed to Date
A - Services -$ #DIV/0! -$
A100 Site Investigation Visit, All EA -$ -$
15% Submission
A105 QA/QC Plan 1 LS -$ -$
A110 Narrative 1 LS -$ -$
A115 Field Survey Reports 1 LS -$ -$
A120 Basis of Design Drawings 1 LS -$ -$
A121
Opinion of Probable
Construction Cost 1 LS -$
A125 BIM execution plan 1 LS -$ -$
35% Submission
A300 Narrative update 1 LS -$ -$
A305 Drawings 1 LS -$ -$
A310
Specifications-Division 1 Specs
& TOC 1 LS -$ -$
A315 Investigation reports 1 LS -$ -$
A320 HAZMAT / NESHAP 1 LS -$ -$
A325 Design Calculations 1 LS -$ -$
A330 Space Planning Data 1 LS -$ -$
A335 Cost Estimate 1 LS -$ -$
A336
Historical-Section 106 Review
(if applicable) 1 LS -$
A340
QA/QC documents & Meeting minutes 1 LS -$ -$
B-Services -$ #DIV/0! -$
65% Submission
B600 Narrative update 1 LS -$ -$
B605 Drawings 1 LS -$ -$
B610 Specifications 1 LS -$ -$
B615 Investigation reports 1 LS -$ -$
B616 HAZMAT / NESHAP 1 LS -$
B620 Design Calculations 1 LS -$ -$
B625 Space Planning Data 1 LS -$ -$
B630 Cost Estimate 1 LS -$ -$
B635 Construction Schedule 1 LS -$ -$
B640 Construction SOW 1 LS -$ -$
B641 PCRA 1 LS -$
B645
QA/QC documents & Meeting minutes 1 LS -$ -$
90% Submission
B900 Narrative update 1 LS -$ -$
Description
A/E Schedule of Value (SOV) Breakdown Sample & Submittals Required (Minimum)
Attachment A
B905 Drawings 1 LS -$ -$
B910 Specifications 1 LS -$ -$
B915 Investigation reports 1 LS -$ -$
B920 HAZMAT / NESHAP 1 LS -$ -$
B925 Design Calculations 1 LS -$ -$
B930 Space Planning Data 1 LS -$ -$
B935 Cost Estimate 1 LS -$ -$
B940 Construction Schedule 1 LS -$ -$
B945 Construction SOW 1 LS -$ -$
B950 Submittal Register 1 LS -$ -$
B951
Fire/Energy 65% Response to
Comments 1 LS -$
B955
QA/QC documents & Meeting minutes 1 LS -$ -$
100% Submission
B1000 Final Narrative 1 LS -$ -$
B1005 Drawings 1 LS -$ -$
B1010 Specifications 1 LS -$ -$
B1015 Investigation reports 1 LS -$ -$
B1020 HAZMAT / NESHAP 1 LS -$ -$
B1025 Design Calculations 1 LS -$ -$
B1030 Space Planning Data 1 LS -$ -$
B1035 Cost Estimate 1 LS -$ -$
B1040 Construction Schedule 1 LS -$ -$
B1045 Construction SOW 1 LS -$ -$
B1050 Submittal Register 1 LS -$ -$
B1055
Physical Security Compliance
Report 1 LS -$ -$
B1060 BIM / AutoCAD files 1 LS -$ -$
B1064
Fire/Energy/Peer 90%
Response to Comments 1 LS -$
B1065
Final QA/QC documents &
Meeting minutes 1 LS -$ -$
C Services -$ #DIV/0! -$
C100 Solicitation Support 1 LS -$ -$
C105 Document Review (Submittals & RFIs) HR -$ -$
C110 Project Meeting HR -$ -$
C115 VA support HR -$ -$
C116 HR
C117 HR
C120 Site Visits EA -$ -$
C125 LS
C126 Final Inspection/Punchlist report 1 LS -$ -$
C130 As-built / Closeout 1 LS -$ -$
VPIH Services
Commissioning
Pre-Final Inspection/Punchlist
Report
Scheduled
Total
Completed to Date
Price
Completed to Date
-$ #DIV/0! -$
-$ #DIV/0! -$
-$ #DIV/0! -$
-$ #DIV/0! -$
A Services Total
B Services Total
C Services Total
Contract Total
File details come from the government source that posted it. Updated .