Backflow Testing Schedule.pdf
PDF 440 KB Posted
- Solicitation number
- 36C24126Q0134
About this file
This is an inspection checklist or testing log template used to document system inspections across multiple buildings and locations. The document provides a comprehensive record-keeping framework for facility testing activities, with columns for building number, room/location, date, time, duration, pass/fail results, and comments.
The checklist covers inspections across at least 82 buildings and numerous rooms/locations, with a focus on mechanical and utility systems. Notable inspection points include exterior hot boxes, basement areas, hydronic systems, chilled water systems, domestic hot water systems, boiler plants, mechanical rooms, dishwashers, medical air and pump systems, and various other facility components. The document appears designed to track compliance testing or preventive maintenance activities across a large institutional or industrial complex, with blank fields to be completed during actual inspections. The template provides sufficient space for documenting findings across numerous locations, enabling systematic tracking of pass/fail determinations and any associated observations or issues discovered during testing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Chapel HV-2a.jpg | JPG image | |
| Chapel HV-2.jpg | JPG image | |
| Chapel HV-3.jpg | JPG image | |
| 220711 plumbing Insulation.docx | DOCX document | |
| 36C24126Q0134_3.docx | DOCX document | |
| 36C24126Q0134_2.docx | DOCX document | |
| 78 Insulation.pdf | ||
| 61 chiller cw1.jpg | JPG image | |
| 61 B16.jpg | JPG image | |
| 61 chiller cw2.jpg | JPG image | |
| B7-Attic Heating and Ventilating Color _11469.pdf | ||
| B7-F2 Heating and Ventilating _11466.pdf | ||
| B7-FB Ventilating _11462.pdf | ||
| 36C24126Q0134_1.docx | DOCX document | |
| 61 cond pump1.jpg | JPG image | |
| B7-FB Ventilating _11463.pdf | ||
| Back Flow Inventory 11082023.xlsx | XLSX spreadsheet | |
| 61 chiller steam1.jpg | JPG image | |
| 61 cond pump2.jpg | JPG image | |
| 61 hall wrong material.jpg | JPG image | |
| 78 pump.pdf | ||
| B7-F1 Heating and Ventilating _11465.pdf | ||
| B7-F2 Heating and Ventilating _11467.pdf | ||
| B7-Attic Heating and Ventilating _11468.pdf | ||
| B7-F1 Heating and Ventilating _11464.pdf | ||
| bfimform.pdf | ||
| 36C24126Q0134.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bldg # Room/Location Date Time Duration Pass/Fail Comments 80 Exterior Hot box
Avenue R Exterior Hot box Avenue R Exterior Hot box Avenue R Exterior Hot box
1 Basement 2 B06 2 B06 (Hydronic) 2 B06 (Dental) 2 Penthouse 2 Old Hydronic Penthouse 2 226 2 Tunnel Cage 2 263 (Top) 2 263 (Bottom) 3 B28 (high) 3 B24 Chilled water 3 B24 (high) 3 warehouse 3 Kitchen Dishwasher 4 B14E (Med Air) 4 B14E (Med Pump) 4 Cage 4 B21 5 B01 6 B08 6 Penthous (make up water) 7 B19 (Domestic Hot Water) 7 B19 8 B09B 9 B03 9 B06 (High)
10 B01E 10 2nd Floor (STAIR #2) 10 B02A 10 Outside Room SPD 10 Outside Room SPD
12 Basement 13 Basement 14 Basement 15 Basement 16 Basement 17 Basement 17 Basement 20 05A 22 Boiler Plant 22 Boiler Plant 33 Closet 61 B16 (High) 62 B23 62 B23 (High) 70 Basement 70 Basement 78 b2 (Domestic Hot Water) 78 Mech Room 78 Penthouse (SPD Heat X) 78 B2 (Up High) 78 B2
78A B34 78A Above Theatre 80 2 81 110 82 Basement 82 Pool Feed 82 Mech Room 82 Men's Room 82 Mech Room
File details come from the government source that posted it. Updated .