Back Flow Inventory 11082023.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
J041--SUBJECT* Steam, Plumbing and HVAC Service Contract Bedford VA Medical Center
Solicitation number
36C24126Q0134
Issued by

About this file

This is a Back Flow Inventory spreadsheet documenting backflow prevention devices installed across multiple buildings at the Bedford VA Medical Center as of November 8, 2023. The inventory includes 80+ individual backflow preventers distributed across buildings numbered 2 through 82, with most concentrated in Buildings 2, 3, 10, 78, and 82. Each entry contains the building number, room or location, model number (primarily LF009, LF909, and 009 series variants), and serial number. Most devices are installed in mechanical rooms, basements, penthouses, and HVAC/plumbing system locations such as boiler plants, chilled water systems, domestic hot water lines, and condensate return systems. Several entries lack complete data, including missing inspection dates, pass/fail status, and comments sections, indicating incomplete documentation for certain devices in buildings 2, 4, 7, 12, 22, 78A, 78, and 82.

This inventory directly supports the Bedford VA Medical Center's Steam, Plumbing and HVAC Service Contract (Solicitation 36C24126Q0134), which seeks a qualified contractor to maintain and repair HVAC, steam systems, and plumbing infrastructure at the medical center in Bedford, MA and a secondary location in Lowell, MA. The backflow prevention devices documented in this spreadsheet are critical components of the facility's water and steam systems that require regular inspection, maintenance, and potential repair under the service contract. This set-aside solicitation for Service-Disabled Veteran-Owned Businesses (SDVOSBs) under NAICS code 238220 indicates that successful contractors will need to be familiar with and capable of servicing the wide range of backflow preventer models and configurations maintained throughout the facility.

View the file

Other files

File Type Posted
Chapel HV-2a.jpg JPG image
Chapel HV-2.jpg JPG image
Chapel HV-3.jpg JPG image
220711 plumbing Insulation.docx DOCX document
36C24126Q0134_3.docx DOCX document
36C24126Q0134_2.docx DOCX document
61 cond pump1.jpg JPG image
B7-FB Ventilating _11463.pdf PDF
61 chiller steam1.jpg JPG image
61 cond pump2.jpg JPG image
61 hall wrong material.jpg JPG image
78 Insulation.pdf PDF
61 chiller cw1.jpg JPG image
61 B16.jpg JPG image
61 chiller cw2.jpg JPG image
B7-Attic Heating and Ventilating Color _11469.pdf PDF
B7-F2 Heating and Ventilating _11466.pdf PDF
B7-FB Ventilating _11462.pdf PDF
36C24126Q0134_1.docx DOCX document
78 pump.pdf PDF
B7-F1 Heating and Ventilating _11465.pdf PDF
B7-F2 Heating and Ventilating _11467.pdf PDF
B7-Attic Heating and Ventilating _11468.pdf PDF
B7-F1 Heating and Ventilating _11464.pdf PDF
Backflow Testing Schedule.pdf PDF
bfimform.pdf PDF
36C24126Q0134.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bldg #Room/LocationDate InspectedPass/FailModelSerial #Comments
80Exterior Hot boxLF909M10T16701
Avenue RExterior Hot box909264152
Avenue RExterior Hot boxLF909002293
Avenue RBedford Green house MH
1BasementLF909010365
2Hallway9572MB-0127
2Hallway9572MB-0127
2B06LF909001027
2B06LF909001027
2B06 (Hydronic)LF009M3QT395253
2B06 (Dental)
2B06(below steam valve)LF009M3QTRP295253
2B08LF009RP12217
2PenthouseLF009QTRP130599
2Old Hydronic Penthouse
2226LF909QT066286
2Tunnel Cage
2263 (Top)LL009QT279508
2263 (Bottom)LF009QT281516
2PenthouseLF009M3QT130593
2Penthouse HVAC unitLF0009QTRP203645
3B01LF009EP12215
3B08LF909010454
3B28 (high)LF089M9RP2219286
3B24 Chilled water009QT17354
3B24 (high)9092TRPZ641382
3100 warehouseLF719QT10604
3Kitchen DishwasherLF719QT10604
3Kitchen DishwasherLF719QT10604
4B14E (Med Air)
4B14E (Med Pump)
4Cage B20LF90917050
4B21009M2QT195679
5B01LF009RP12215
5B01LF719QT10871
6B08LF009RP12217
6Penthous (make up water)LF909QT021289
7B19 (Domestic Hot Water)
7B19LF00911887
8B09BLF909RP024226
9B03ALF909011783
9B06 (High)007M1QT235217
10AC RoomLF009M3QT104129
10B01ELF909022426
102nd Floor (STAIR #2)009-M3QT338288
10B02ALF009M3QT140129
10Outside Room SPDLF009M2QT264141
10Outside Room SPDLF009M2QT259064
12Basement (Main )LF909011454
12Basement ( filter system)LF909017454
12Basement (mop sink)
121st Floor (mop sink)
122nd Floor (mop sink)
13BasementLF909024236
14BasementLF909024239
15BasementLF909024235
16BasementLF909024232
17BasementLFD09M3QT284384
17Basement957RPTH2938
2005ALF007M2QT02452
22Boiler Plant
22Boiler Plant
33ClosetLF909M10T021434
61B16 (High)LF 009 M2QT217255
61B11LF 00912220
62B23009M2164766
62B23 (High)
70BasementLF90921743
70BasementLF009M2QT167778
78b2 (Domestic Hot Water)
78Mech Room
78Penthouse (SPD Heat X)009M2QT401298
78B2009M2QT249845
78B2 (Up High)009M3QT309261
78B2LF009M2QT291308
78B2LF90925083
78AB34LF909RP024240
78AB23LF909024240
78AAbove Theatre
78ACanteen ( by dishwasher)
802LF 909010367
81110LF909024228
82Basement909207942
82Pool FeedLF909010366
82Mech Room007M1QTA46432
82Mech Room845A46432

File details come from the government source that posted it. Updated .