This is Amendment 0002 to solicitation 36C24125Q0062, which provides answers to submitted questions regarding the Close and Infill Underground Vaults project at Togus VA Medical Center in Maine. The amendment extends the offer submission deadline to February 28, 2025 at 3:00 PM EST.
The Q&A clarifies several technical aspects of the project: the underground structure is estimated at 40,000 cubic feet; contractors must provide unit pricing for flowable fill, gravel, and alternative fill options; no previous VA investigation has been conducted on the vault; contractors are responsible for obtaining environmental permits; the check valve removal is not in scope; stacks can be removed or infilled; and the site should be left as undisturbed as possible. The work requires adherence to specification 01 57 19 Temporary Environmental Controls, and contractors must submit an Environmental Protection Plan. The project involves investigating the structure's condition and providing a report on infill feasibility before proceeding with the actual infill work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24125Q0062 0001.docx | DOCX document | |
| Site Walk Sign in Sheet.pdf | ||
| Wage_Determination_Heavy - ME20250022.pdf | ||
| SOW Attachment - Local Requirements.pdf | ||
| SOW Attachment - Specifications Package.pdf | ||
| SOW Attachment - PIV Badge Template.pdf | ||
| SOW Attachment - Seasonal Influenza with Vaccines.pdf | ||
| SOW final 12-19-24.docx | DOCX document | |
| 36C24125Q0062_Solicitation.docx | DOCX document | |
| SOW Attachment - Structure Location Map.pdf | ||
| SOW Attachment - Togus Campus Map .pdf | ||
| 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.docx | DOCX document | |
| PCRA.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 02-21-2025 402-24-001 Department of Veterans Affairs Network Contracting Office 1 VAMC Togus 1 VA Center Augusta
ME
04330
To all Offerors/Bidders
36C24125Q0062
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 02-28-2025 3PM EST x
1. The purpose of this amendment is:
a. To publish answers to RFI's submitted for RFQ 36C24125Q0062.
SEE ATTACHED DOCUMENT
36C24125Q0062
RFI QUESTION AND ANSWERS
Q1. What is the type of fill to be used?
A1. Per SOW contractor is to provide a Report to also include the feasibility of infilling the underground structure with gravel, flowable fill or an alternative type of fill to prevent structure collapse. The VA has no preference on fill type. Type of fill must prevent underground structure from collapsing.
Q2. Is the intent to remove the visible Check Valve protruding through the ground?
A2. Removal of check valve is not included in scope of work.
Q3. Would it be acceptable to fill the vault with sand?
A3. Contractor may provide sand as a potential fill option in their findings report.
Q4. There is an abutting stream to this location. Would there be permitting issued for this to work to be completed near it and if so, who would be handling that.
A4. Contractor will be held to Specification 01 57 19 Temporary Environmental Controls. Required permits would need to be submitted by the subcontractor with their Environmental Protection Plan.
Q5. Without knowing the size of the vault, how are we supposed to provide a cost for filling it? Can an approximate amount be provided for bidding purposes until a further investigation is completed?
A5. VA rough measurements estimate the structure to be 40,000 cubic feet.
Q6. Has the VA done any investigation into the vault (scoping it with a camera, etc). Please provide any information available.
A6. VA has not done any investigation into the vault.
Q7. Will pricing the infill of the vault be a contract modification?
A7. Please provide unit pricing for flowable fill, gravel and any other proposed alternative fill.
Q8. Are the stacks to be removed once the vault is filled?
A8. Stacks may be removed or infilled as well.
Q9. Is the site to be left undisturbed as preexisting or is there site restoration involved?
A9. VA requests site to be left as undisturbed as possible.