S02 - 523A4-22-017 Final SOW.docx
DOCX document 78 KB Posted
- Solicitation number
- 36C24124B0020
About this file
This statement of work outlines requirements for a kitchen site preparation project at the VA Boston Healthcare System West Roxbury VA Medical Center. The contractor will provide all labor, materials, coordination, and utilities installation to complete the site preparation work, install new kitchen equipment as per provided drawings and specifications, support temporary relocation of existing equipment, and commission all new equipment. The contractor must arrange phasing, obtain all necessary approvals, follow safety and infection control plans, use containment methods for above-ceiling work, and complete the project within 180 days of notice to proceed. The related federal contract opportunity posting provides solicitation details for project 523A4-22-017 Kitchen Site Preparation at the same location, including a solicitation number and agency point of contact information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - MA WD 01-19-24.txt | TXT text file | |
| BID OPENING Information.docx | DOCX document | |
| Attachments.pdf | ||
| WR Temp Kitchen .docx | DOCX document | |
| 36C24124B0020 0001.docx | DOCX document | |
| S04 - Site Visit Sign in Sheet.pdf | ||
| Kitchen Site Prep RFIs 1-37.docx | DOCX document | |
| 36C24124B0020.docx | DOCX document | |
| S02 - WR FS Layout.pdf | ||
| S02 - MA WD 12-8-2023.txt | TXT text file | |
| S02 - PCRA.pdf | ||
| S02 - Cut Sheets.pdf | ||
| S02 - ICRA.pdf | ||
| S02 - P6 Primavera Spec.docx | DOCX document | |
| S02 - Revised Specifications.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Boston Healthcare System West Roxbury VA Medical Center 1400 VFW Parkway West Roxbury, MA 02132
STATEMENT OF WORK
Project # 523A4-22-017 Kitchen Site Preparation West Roxbury
1.0 INTRODUCTION
This project primary includes the site preparation for new kitchen equipment for Nutrition Food & Services and installation of VA purchased new kitchen equipment as per the VA provided drawings and specifications. The Contractor shall provide all the necessary labor, materials, coordination including coordination drawings to complete the site prep work, new kitchen equipment installation and connect all utilities to ensure new kitchen layout is fully operational.
· Work includes to support the temporary relocation/protection/removal of existing kitchen equipment and installation of new kitchen equipment as per the design drawings and specifications.
· The site preparation shall include demo of existing utilities as needed and installation of new drain lines, water, gas, electric, and any other utilities to ensure functionality of new kitchen layout.
· Furnish and install electrical-ins to accommodate new kitchen equipment layout as per the electrical coordination drawings provided by the contractor. Based on coordination drawings, the contractor shall furnish and install all circuit breakers, panels, conduits, cables, junction boxes and relocate electrical outlets as needed to meet specifications for new kitchen equipment layout.
· The site prep work also includes providing labor and material for new lighting, and new ceiling tiles, specifically, Armstrong kitchen zone ceiling tiles, Armstrong prelude stainless steel grid for tiles and any other related work.
· The contractor must plan/make arrangements for phasing and schedule work with VA Engineering to make sure the kitchen is fully operational during the construction period. The contractor is responsible for moving and rearranging existing kitchen equipment (two stackable oven cabinets, refrigerators, hot well table etc.) as requested to keep the kitchen operational in hybrid model. The contractor is required to provide temporary electric hook up and/or utilities as needed to keep the kitchen equipment functional.
· Site work should also include card access from the front door entrance to the kitchen.
· The contractor shall perform all manufacturer recommended tests, commission all new and existing equipment and provide training to VA staff to ensure proper operation and function. The training shall be coordinated with VA staff at minimum two weeks (14 days) in advance.
· Remove barriers, clean, repair and restore existing surfaces, finishes, etc. to original conditions.
Work to be performed at VAMC West Roxbury in accordance with the Statement of Work, Specifications, Drawings, Federal, State, and Local Codes.
After Contract Award the Contractor is required to provide a Payment Bond, a Performance Bond, Insurance certificate, a Schedule of Values, and a Realistic Construction Schedule within 10 days. Once received and confirmed, the period of performance for the above-mentioned project will begin with a Notice to Proceed (NTP) issued at a Pre-Construction Meeting (Pre-Con) and shall not exceed 180 days after NTP. This period of performance includes 30 days for all submittals to be approved prior to beginning construction. As part of this solicitation the General Contractor (GC) shall submit an electronic PDF preliminary schedule showing the methodology for accomplishing the project within the period of performance.
2.0 GENERAL REQUIREMENTS
1. General Contractor’s employees and sub-contractor employees shall not enter the VA Medical Center site or project site without appropriate VA issued PIV badge. See specification 01 00 00 subpar 1.5 Construction Security Requirements for more full requirements.
2. General Contractor shall furnish & post a board where directed by the Contracting Officer, VA Project Engineer (COTR) and VA Safety Specialist that includes, but is not limited to, a copy of Rates and Wages, the Davis-Bacon poster & schedules, ILSM/ICRA/GEMS/Patient Safety signed determinations, Site Specific Emergency Contact information, Construction site fire response procedures & evacuation plan, post the number of accident free days, emergency force contact information with nearest hospital including directions, etc.
3. All utility tie-ins and interruption of utility systems require prior approval and scheduling with VA Project Engineer (COTR), Engineering Manager and M&O Foreman. The GC shall submit a request to interrupt any utility systems to the VA Project Engineer (COTR) in writing at a minimum of three (3) weeks in advance of proposed interruption. See specification 01 00 00 subpar 1.6 Operations and Storage Areas for full requirements.
4. The GC shall not proceed with mobilization or construction until after Veteran Affairs’ acceptance of all required submittals and coordination drawings.
5. The GC shall follow the VHA BHS West Roxbury Project’s submittal process attached to specification section 01 00 00. The GC shall supply a master submittal list to track all required submittal items and provide the VA Project Engineer (COTR) an updated master submittal list weekly until the submittal process is completed. All submittals shall include appropriate project information, GC signature, adequate descriptive literature, catalog cuts, shop drawings and other data necessary for the Government to ascertain that the proposed equipment and materials comply with the contract document requirements. Catalog cuts submitted for approval shall be legible and clearly identify equipment being submitted (i.e., highlight, cloud, etc.). It is the GC’s responsibility to provide submittals that meet all necessary Federal, State and Local code requirements to be approved. Failure to meet these requirements are the responsibility of the contractor and do not justify a request of time extension.
6. The GC shall submit a Site Superintendent Designation Letter designating the Site Superintendent to be dedicated to this project only. The Site Superintendent shall be always physically present at the construction site (West Roxbury) there are sub-contractors present, work activities are ongoing, materials are being delivered, etc. The GC shall submit, via e-mail, a list identifying key GC personnel, their responsibilities, contact info and 24 hour/7 day per week primary and secondary contacts. Superintendent Communications: At all times during the performance of this contract, the GC’s designated Site Superintendent is to be available by cell phone. After-hours phone number shall be posted at the construction site on the required board in item #2 above.
7. Before placement and installation of work subject to acceptance checks and tests, the GC shall coordinate and notify the VA Project Engineer (COTR) in sufficient time to enable testing personnel to be present at the site in time for proper testing and field inspection. This includes notification prior to closing walls, ceilings, chases, etc. Such prior notice shall be not less than two (2) weeks unless otherwise designated by the VA Project Engineer (COTR).
8. General contractor shall coordinate in advance with VA Project Engineer (COR) regarding ALL work above ceilings in public corridors, offices, any public occupied spaces, etc. All work within interior spaces, particularly patient care buildings, including public corridors in patient care buildings, the general contractor shall utilize HEPACART (or equal) environment ceiling access containment carts with embedded negative air-machine, impeller fan, HEPA filters, and windows. No above the ceiling work shall be performed without the proper HEPACART (or equal) environment ceiling access containment carts in any interior spaces. This is a requirement for ALL work outside the negative air pressured construction partitioned area.
9. General contractor shall coordinate in advance with VA Project Engineer (COR) regarding pulling of all cabling/wiring/fiber above ceilings within all interior spaces, particularly patient care buildings, including public corridors in patient care buildings, the general contractor shall utilize HEPACART Cabling Access Point (CAP) (or equal) product in the ceiling to feed cable cleanly through a slot in the ceiling with minimal impact. This shall be installed within the HEPACART (or equal) environment ceiling access containment carts, and cabling/wiring/fiber pulling only can then be performed via the HEPACART Cabling Access Point (CAP) (or equal) product. Removal of the cabling access point shall be performed within the environment ceiling access containment cart.
3.0 SAFETY PRECAUTIONS
1. The Contractor shall comply with all applicable Federal, State and local legal requirements regarding workers health and safety. The requirements include but are not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees.
2. Contractor shall assume the responsibility to guard against causing of fires and/or explosions and to protect Government Property.
3. The Contractor shall perform the work in a manner consistent with the area security and fire safety regulations especially regarding exits and exit way access. Utility shutdowns shall not compromise security, communication, or fire safety for occupants.
4. No flammable liquids shall be stored or used in the medical center.
5. The necessary number and appropriate types of portable fire extinguishers are required per National Fire Protection Agency (NFPA) 10 and NFPA 241. Contractor shall keep certification on site at all times of extinguisher inspections.
6. The Contractor shall receive from the COR a permit for all cutting, welding, and soldering 24 hours in advance. All permits shall be prominently displayed during all construction.
7. All necessary precautions shall be taken by the contractor to prevent accidental operation of any existing smoke detectors or sprinkler heads.
8. The Contractor shall comply with an Infection Control Risk Assessment (ICRA) which will be developed with the COR and the Infection Control Practitioner assigned to the project at the Preconstruction Conference. Multiple ICRA's may be necessary to address specific risks at various stages of the project and must be approved prior to proceeding on each phase. The Contractor shall also comply with an Interim Life Safety Measures (ILSM) & Green Environmental Management System (GEMS) which will be developed with the COR.
4.0 HAZARDOUS MATERIAL REPORTING
1. The Contractor shall maintain hazardous material inventories and material safety data sheets (MSDS) for all hazardous materials (as defined in CFR 1910.120, 40 CFR's 355, 370, & 372) to be stored and used on this Medical Center. Hazardous materials must be inventoried when received and at the project's completion. The amounts used shall be maintained for the project duration, and for the calendar year (ending 31 December).
2. Hazardous Materials Inventories, Material Safety Data Sheets and material quantities used shall be submitted to the Contracting Officer for approval.
3. In the event of a spill, Contractor shall immediately notify the Contracting Officer's Technical Representative (extension 5138) as well as the Contracting Officer. The Contractor shall be solely responsible for the expense of any cleanup of such spill, and the cleanup shall be in accordance with the applicable provisions of 40 CFR Part 761.
5.0 ENVIRONMENTAL PROTECTION
1. To provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers’ Manual EM 385-1-1, “General Safety Requirements” as well as the specific requirements stated elsewhere in the Contract Documents.
2. Contract is responsible for daily cleanup of all areas affected by construction. Construction areas in use or affected shall be returned to condition in which they were turned over or initially found. VA Housekeeping shall not be dispatched for cleaning associated with contractor construction.
3. Contractor shall take every precaution in preserving flooring, finishes, equipment, and furniture in areas of construction. Contractor shall repair or replace any damage incurred during construction at their expense.
4. Contractor shall use freight elevators for transmission of materials and personnel. Contractor shall take every precaution in preserving the elevators, including the hoist way and lobby doors, interior finishes, and shall conduct all good practices in observing lifting and motor components tolerances. Any damage incurred to any elevator component due to negligence will be repaired at expense of the contractor, within the workday of incurred damage.
6.0 SECUIRTY REQUIREMENT
1. All contractor personnel shall obtain a short-term identification badge issued by the COR or government designated representative. Such badge shall be worn by the individual and prominently always displayed while on VA Property. No employee of the contractor shall enter the project site without a valid identification badge issued by the VA. To obtain a short-term identification badge, contractor personnel shall present to the COR a valid (non-expired) photo identification issued by a US federal, state, or local government agency.
2. The Contractor shall be subject to the Federal laws, regulations, standards, and VA Directives and Handbooks regarding information and information system security as delineated in standard acquisition guidelines. Per the VA handbook 6500.6, no VA sensitive information will be transferred, shared, or stored with said vendor. As such, no additional mechanisms will be needed to ensure the protection of information.
image1.png