S06 RFI Questions and Answers 523-24-004 Fire Door and Damper Repairs.docx
DOCX document 15 KB Posted
- Attached to
- Z2DA--523-24-004 Fire Door and Damper Repairs
- Solicitation number
- 36C24124B0013
About this file
This document contains questions and answers regarding federal contract number 36C24124B0013 for fire door and damper repairs at a Department of Veterans Affairs medical center. The contractor should make reasonable efforts to make non-accessible dampers accessible and document any that cannot be, as they are not part of future renovations. Containment is only required in patient care areas per the project criteria and requirements appendix. Off hours including weekends and evenings are available for work, though the medical center is typically open from 6am to 5pm.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S06 Bldg 1 Fire Doors.zip | ZIP file | |
| 36C24124B0013 0003.docx | DOCX document | |
| RFI Questions and Answers 523-24-004 Fire Door and Damper Repairs Amendment 0003.docx | DOCX document | |
| S06 Bldg 1 Life Safety Compilation.pdf | ||
| S06 Site Visit Sign In Sheet.pdf | ||
| 36C24124B0013 0002.docx | DOCX document | |
| S06 Bid Opening Conference Line 36C24124B0013.docx | DOCX document | |
| S06 WD MA20230001 12.08.2023.pdf | ||
| S06 468301-VA Boston Healthcare System Inspection Report v1 February 2022.pdf | ||
| S06 2022 VA_Jamaica_Plain_Fire_and_Smoke_Damper_Total_Inventory._-_Feb_11_2022 (2).pdf | ||
| 36C24124B0013 0001.docx | DOCX document | |
| 36C24124B0013_1.docx | DOCX document | |
| S02 PCRA 523-24-004 NOV 03 2023.pdf | ||
| S02 SOW 523-24-004.docx | DOCX document | |
| S02 Fire Door List 523-24-004.xlsx | XLSX spreadsheet | |
| S02 WD MA20230001 10.20.2023 .pdf | ||
| S02 Damper List 523-24-004.pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions and Answers 523-24-004 Fire Door and Damper Repairs
IFB 36C24124B0013
1. Question: Accessibility of Non-Accessible Dampers For dampers that are currently non-accessible, what level of effort is expected to make them accessible? Is there a plan to address these as part of future improvements or renovations?
Answer: Contractor should make reasonable efforts and then document ones which cannot be made clear. They are not part of future renovations.
2. Question: Containment Requirements:
Is containment required throughout the entire facility, or only in patient care areas?
Answer: Refer to PCRA.
3. Question: Work Hours and Scheduling:
What are the allowed working hours for this project? Are weekends and evenings available for work?
Answer: Off hours are available. Hospital is open 6am-5pm.