This solicitation is for steam trap replacements at two Department of Veterans Affairs facilities in West Haven and Newington, Connecticut. The solicitation number is 36C24122B0010 and seeks replacement of steam traps according to specifications in the attached Invitation for Bid. Bids are due by August 12, 2022. The work includes removing and replacing approximately 200 steam traps across the two locations. The contract will be a firm-fixed price award made to the responsible bidder submitting the lowest price. The Veterans Health Administration within the Department of Veterans Affairs is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24122B0010 0003.docx | DOCX document | |
| 36C24122B0010 0002_1.docx | DOCX document | |
| S06 Attachment HazMat Report Newington.pdf | ||
| S02 Attachment Instructions to Offerors for Steam Trap Replacements West Haven and Newington.docx | DOCX document | |
| S06 Attachment Site Visit Sign In Sheet.pdf | ||
| 36C24122B0010 0001.docx | DOCX document | |
| S02 VHA Supplemental Contract Requirements for Combatting COVID-19.pdf | ||
| 36C24122B0010_1.docx | DOCX document | |
| S02 Wage Determination Newington CT20220021 06032022.pdf | ||
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| S02 Specifications Steam Trap Replacements.pdf | ||
| S02 Wage Determination West Haven CT20220001 060322.pdf | ||
| S02 VA Newington - 2020 COMPLETE SURVEY REPORT - Copy.pdf | ||
| S02 Final SOW Steam Trap Replacements 5-27-2022.pdf | ||
| S02 VA West Haven - 2020 COMPLETE SURVEY REPORT - Copy.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME II
ASBESTOS CONTAINING MATERIAL &
LEAD CONTAINING PAINT
SURVEY REPORT
BUILDING 5
VISN 1
West Haven VA Medical Center
950 Campbell Avenue West Haven, Connecticut
Project No. 2009023.006
September 16, 2011
5 Alfred Circle Bedford, MA 01730-2318
Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info@mabbett.com www.mabbett.com
© 2011, Mabbett & Associates, Inc.
West Haven VAMC - Building 5 September 2011 ©2011, Mabbett & Associates, Inc. Page i West Haven Building 5 Rpt Final 9-16-11.doc
ACKNOWLEDGMENT
This Asbestos Containing Materials (ACM) and Lead Containing Paint (LCP) Building Survey Report was prepared for the Veterans Affairs (VA) New England Healthcare System (VISN 1) in accordance with established scope of work as defined in Contract Number VA241-P-1653.
The information presented herein is based on the facts and information conveyed to or received by the Mabbett & Associates, Inc. (M&A) Team during the preparation of this report.
If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.
This individual building report within Volume II, which contains building specific lead and asbestos findings, is part of the Comprehensive VAMC Lead and Asbestos Survey Report consisting of the following Volumes:
Volume I - General
Chapter 1 - Introduction and Executive Summary Chapter 2 - Asbestos Operations & Maintenance (O&M) Plan Chapter 3 - Asbestos Containing Materials (ACM) Survey Tables Chapter 4 - Lead Containing Paint Survey Tables
Volume II – Individual Building Reports
Individual Building Reports Chapters including:
Cover page with building number Building narrative summary Floor plans Relevant asbestos findings for the building Relevant lead containing paint findings for the building Relevant photos
Volume III – Appendices and Supporting Data
Appendix A - Asbestos Laboratory Analysis Reports and Laboratory Certifications Appendix B - Inspector Field Data Sheets/Chains-of-Custody Appendix C - Personnel Certifications & Licenses Appendix D - XRF Performance Characteristics/Calibration Records Appendix E - Lead Laboratory Analysis Reports and Laboratory Certifications (If Applicable)
Volume IV – HUD Residential LBP Reports (If Applicable)
©2011, Mabbett & Associates, Inc. Page ii West Haven Building 5 Rpt Final 9-16-11.doc
This report was prepared by the following Mabbett & Associates, Inc. Team personnel:
ENVIROMED SERVICES, INC.
John Luby Project Manager EnviroMed Services, Inc.
Connecticut Asbestos Inspector 000281 Connecticut Management Planner 000281
This report has been reviewed and approved by:
MABBETT & ASSOCIATES, INC.
Robert K. McKinley, MPH, CIH, LIH Director of Industrial Hygiene Services
©2011, Mabbett & Associates, Inc. Page iii West Haven Building 5 Rpt Final 9-16-11.doc
TABLE OF CONTENTS
Description Page
1.0 INTRODUCTION & EXECUTIVE SUMMARY
2.0 BUILDING DESCRIPTION
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
3.2 Analytical Methodology
3.3 Summary of Asbestos Containing Materials (ACM) Findings
4.0 LEAD SCREENING SURVEY
4.1 Screening Survey Methodology
4.2 Summary of Lead Screening Survey Findings
5.0 LIMITATIONS
6.0 CLOSING REMARKS
6.1 Asbestos
6.2 Lead Containing Paint
Tables Table 1 – Specific Inaccessible Areas Table 2 – Summary of Positive ACM Samples Table 3 – Summary of Positive XRF Measurements Table 4 – Summary of ACM Building Results, including negative results.................. Appendix A Table 5 – Summary of XRF Measurements............................................................... Appendix B
Figures Figure 1 – Asbestos Survey Summary Plan – Building 5 – Basement Figure 2 – Asbestos Survey Summary Plan – Building 5 – First Floor Figure 3 – Asbestos Survey Summary Plan – Building 5 – Second Floor Figure 4 – Asbestos Survey Summary Plan – Building 5 – Third Floor Figure 5 – Lead Survey Summary Plan - Building 5 – Basement Figure 6 – Lead Survey Summary Plan - Building 5 – First Floor Figure 7 – Lead Survey Summary Plan - Building 5 – Second Floor Figure 8 – Lead Survey Summary Plan - Building 5 – Third Floor
Appendices Appendix A – Table 4, Summary of ACM Building Results, including negative results Appendix B – Table 5, Summary of XRF Measurements Appendix C – Representative Photographs of ACM Appendix D – Representative Photographs of Non-Intact Lead Containing Paint
©2011, Mabbett & Associates, Inc. Page 1 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
1.0 INTRODUCTION & EXECUTIVE SUMMARY
Mabbett and Associates, Inc. (M&A), with EnviroMed Services, Inc. (EnviroMed) as sub-contractor, performed surveys for suspect asbestos containing building materials (ACM) and screenings of suspect lead containing paint (LCP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 950 Campbell Avenue, West Haven, CT, under Contract VA241-P-1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed in July 2010 by appropriately credentialed personnel as required. Collected suspect ACM samples were submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using positive stop methodology and transmission electron microscopy (TEM) where indicated. When necessary, paint chip samples were collected and submitted to a certified analytical laboratory for lead content analysis using atomic absorption spectroscopy. The survey effort involved the collection or screening of the following samples, resulting in the following conclusions:
356 bulk samples for suspect ACM were collected in this building.
Based on laboratory analysis of suspect ACM, 51 of the collected samples contained asbestos greater than 1%.
719 XRF analyzer screening measurements of building surfaces were taken in this building.
Based on XRF screening measurements, 419 of the screening measurements revealed concentrations of lead in paint that exceeded 0.1 milligram per square centimeter (mg/cm2).
This building report consists of a summary of findings, floor plans that indicate positive sample locations, detailed analytical findings for the specific surveyed building materials, and photos of LCP greater than 1.0 mg/cm2 and in non-intact condition. Laboratory certificates of analysis and field data sheets for this building report are available in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 5 was a four-story Business Office and Research Administration Building built in 1916, renovated in 1990, and occupied approximately 55,470 square feet.
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
A visual screening inspection was conducted to identify locations of suspect ACM throughout the building by state licensed asbestos inspectors. Only areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey. However, areas that remained inaccessible to the survey team are indicated in Table 1 below.
©2011, Mabbett & Associates, Inc. Page 2 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Table 1 – Specific Inaccessible Areas West Haven VA Medical Center, Building 5
Building Floor Room
No.
Reason Area Was Inaccessible and Survey
Impacts, If Applicable
There were no inaccessible areas identified during this survey.
Other general areas that were inaccessible or where the survey was limited to visual observation only are identified below:
• Within walls • Within fire doors
• Enclosed pipe/duct chases • Inside mechanical equipment/ductwork
• Above fixed drywall or plaster ceilings without access panel
Due to these access restrictions, ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas.
Bulk samples were collected of suspect ACM in accordance with US Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) and VISN 1 approved M&A VISN 1 Survey Program Standard Operating Procedure (SOP). Roofing materials were not sampled, unless otherwise indicated, in order to maintain applicable warranties. Bulk suspect ACM sampling was conducted according to the following sampling plan:
(a) Surfacing material:
(1) At least three bulk samples shall be collected from each homogeneous area that is 1,000 ft2 or less.
(2) At least five bulk samples shall be collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.
(3) At least seven bulk samples shall be collected from each homogeneous area that is greater than 5,000 ft2.
(b) Thermal system insulation:
(1) At least three bulk samples shall be collected from each homogeneous area of thermal system insulation.
(2) At least one bulk sample shall be collected from each homogeneous area of patched area of thermal system insulation.
(3) Sufficient samples shall be collected from elbows and fittings to determine if it contains ACM.
(4) Bulk samples shall not be collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.
©2011, Mabbett & Associates, Inc. Page 3 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
(c) Miscellaneous material:
(1) At least one bulk sample shall be collected from each homogeneous area that is less than 100 ft2.
(2) At least three bulk samples shall be collected from each homogeneous area that is greater than 100 ft2.
3.2 Analytical Methodology
The collected bulk samples were submitted under chain of custody procedures to EnviroMed Services, Inc. (EnviroMed) of Meriden, CT. EnviroMed is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200858-0). Bulk samples were analyzed with polarized light microscopy (PLM) using EPA Method 600/R-93/116. When required, sample results that revealed trace concentrations (greater than 0% but less than or equal to 1%) of asbestos by PLM were analyzed using transmission electron microscopy (TEM) analysis. Duplicate bulk samples were submitted for PLM analysis to ProScience of Woburn, MA. ProScience is accredited by AIHA and participates in the NVLAP (Lab Code 200090-0). A summary table containing the duplicate bulk sample results is provided in Volume I, Table 5. Copies of the laboratory accreditations are included in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.
Bulk sample results are summarized in Table 4 – Summary of ACM Building Results. The EPA, Occupational Safety and Health Administration (OSHA), and the State of Connecticut Department of Public Health (DPH) define any material that contains greater than one percent (>1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of >1% asbestos.
3.3 Summary of Asbestos Containing Materials (ACM) Findings
3.3.1 Data Tables, Laboratory Results, and Field Notes
Collected bulk samples confirmed by the analytical laboratory to contain >1% asbestos are listed in Table 2 - Summary of Positive ACM Samples. Samples analyzed by PLM containing trace levels of asbestos, defined as greater than 0% but less than 1%, are listed in Table 4 with the TEM analysis results. Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report includes copies of the laboratory certificates of analysis (including duplicate samples) and Inspector Field Data Sheets.
©2011, Mabbett & Associates, Inc. Page 4 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Table 2 - Summary of Positive ACM Samples
Sample No.
Sample Location
ACM
Location(s)
Description of Material
Percent and Type of Asbestos
Condition Estimated Quantity
VISN 1
RISK
Hazard Category
1-4* 7A 7B 7C
B18 Records B18 9"X9" Black Vinyl Floor Tile w/white streaks
6% Chrysotile
Good
290 SF
8A 8B 8C
B18 Records B18
Mastic with 9"X9" Black Vinyl Floor Tile w/white streaks
5%
290 SF
12A 12B 12C
B8 B5 B9
Rooms B5, B5a, B5b, B5c, B6, B7, B8, B9, B14, B17, B24, B25, B25A, B26
Duct Insulation 8%
Damaged
2200 SF
13A 13B 13C
B18 B5 B9
Rooms B1, B2, B4, B5, B5a, B5b, B5c, B6, B7, B8, B9, B10, B14, B15, B18, B19, B21, B23, B24, B25, B25A, B26
Pipe Insulation - Mag
20%
1000 LF
14A 14B 14C
B18 B5 B9
Rooms B1, B2, B4, B5, B5a, B5b, B5c, B6, B7, B8, B9, B10, B14, B15, B18, B19, B21, B23, B24, B25, B25A, B26
Pipe Elbow w/Mag
100 LF
14% Amosite
15A
15B 15C
B21
B9
Rooms B1, B2, B4, B5, B5a, B5b, B5c, B6, B7, B8, B9, B10, B14, B15, B18, B19, B21, B23, B24, B25, B25A, B26
Pipe Elbow w/Air Cell
40%
50 LF
16A 16B 16C
Exterior Exterior
Window Frame Hard Caulk
4%
4200 LF
18A 18B
Exterior Exterior Door Frame Hard White Caulk
3%
60 LF
©2011, Mabbett & Associates, Inc. Page 5 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Table 2 - Summary of Positive ACM Samples
Sample No.
Sample Location
ACM
Location(s)
Description of Material
Percent and Type of Asbestos
Condition Estimated Quantity
VISN 1
RISK
Hazard Category
1-4*
21B 21C
B5 B9
B21 B5 B9
Pipe Insulation - Air Cell
30%
500 LF
56A 56B 56C
361 361 Yellow Linoleum w/Stone Pattern
2%
84 SF
57B 57C
361 361 Glue w/Yellow
Linoleum w/Stone Pattern
84 SF
58A 58B 58C
360A
Rooms 306, 360, 360A, 371
Green Linoleum Stone Pattern
728 SF
60A 60B 60C
Rooms 361, 362, 363, 363A, 364, 365, 366, 367, 368, 369, 370, Corridor 3-4, 3-5
Brown Linoleum, Stone Pattern
1300 SF
61A 61B 61C
Rooms 361, 362, 363, 363A, 364, 365, 366, 367, 368, 369, 370, Corridor 3-4, 3-5
Glue w/Brown Linoleum, Stone
Pattern
1300 SF
93A 93B 93C
Rooms 107, 109, 117, 118, 118A, 119, 120, 122, 123, 124, 140
9"X9" Green Vinyl Floor Tile
2280 SF
105A 105B 105C
139E 139E Black Mastic under Carpet
240 SF
106A 106B 106C
Rooms 219, 215, 234, 235, 237, 239, 241
Mastic w/12"x12" Vinyl Floor Tile Gray w/White
Specks
1232 SF
111A 111B 111C
Exterior Exterior Window Frame Caulk, Old Hard
White
4200 LF
Footnotes: SF - Square Feet LF - Linear Feet
* The VISN 1 hazard assessment scale 1 – 4 is a relative indicator of the risk and need for response/remediation. (1) Represents the highest priority (e.g. removal or encapsulation) where as a (4) represents the lowest priority (monitor as part of 6 month O&M program). The rating, assigned by an Asbestos Management Planner, takes into account: condition, friable
vs. non-friable, accessibility, occupancy (e.g. continuous, intermittent or occasional and patients/staff/visitors), potential for air erosion, potential for vibration damage, potential for disturbance / damage (e.g. exposed and in an accessible location), and potential for water damage.
©2011, Mabbett & Associates, Inc. Page 6 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
3.3.2 Photographs
Representative photographs of identified ACM are provided in Appendix C of this report.
3.3.3 CADD Drawings
The location of each collected bulk sample and its abridged sample ID is shown on the CADD drawings in the Figures Section of this report. The sample ID on the drawings has been abridged (by excluding the individual room number from the full sample ID) for aesthetic purposes. Each positive ACM sample location is colored red and marked with an asterisk (*), while positive stops are marked with two asterisks (**). Collected bulk samples that were not positive are identified solely by the abridged sample ID. Building areas containing ACM have been indicated with hatching to identify the location of the identified ACM.
4.0 LEAD SCREENING SURVEY
4.1 Screening Survey Methodology
The M&A Team completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 703A XRF (serial number 7712). The XRF instrument was calibrated at the frequency specified in the SOP.
4.2 Summary of Lead Screening Survey Findings
4.2.1 Data Tables
As specified by VISN 1, a description of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2, the VISN 1-specified threshold, have been included in Table 3 below:
Table 3 - Summary of Positive XRF Measurements Above VISN1-Specified Threshold of >0.1 mg/cm2
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2748 FIRST 124
PLASTER
WALL
SOUTH - C INTACT WHITE 0.15
2749 FIRST 124
WOOD DOOR
CASING
EAST - B
Not Intact-
POOR
WHITE 0.13
2752 FIRST 124 WOOD DOOR SOUTH - C INTACT WHITE 0.28
2753 FIRST 124
METAL
RADIATOR
WEST - D INTACT WHITE 0.16
2754 FIRST 124
METAL DOOR
CASING
SOUTH - C INTACT TAN 5.5
2755 FIRST
WEST
CORRIDOR
PLASTER
WALL
NORTH - A INTACT BEIGE 0.12
©2011, Mabbett & Associates, Inc. Page 7 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2756 FIRST
WEST
CORRIDOR
METAL
RADIATOR
SOUTH - C
Not Intact-
POOR
BEIGE 0.8
2757 FIRST
WEST
CORRIDOR
METAL
RADIATOR
WEST - D INTACT BROWN 6.1
2759 FIRST 123
PLASTER
WALL
NORTH - A
Not Intact-
POOR
WHITE 0.13
2762 FIRST 123
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
WHITE 5
2765 FIRST
CORRIDOR
METAL
FIREHOSE
CLOSET
WEST - D INTACT RED 1
2770 FIRST
CORRIDOR
WOOD DOOR
CASING
SOUTH - C INTACT BLUE 0.6
2775 FIRST 139
WOOD
WINDOW
CASING
SOUTH - C INTACT WHITE 4.7
2776 FIRST 139
WOOD
WINDOW
CASING
EAST - B
Not Intact-
POOR
WHITE 6.8
2779 FIRST 139
METAL
RADIATOR
EAST - B INTACT WHITE 0.17
2780 FIRST
CORRIDOR
METAL
RADIATOR
EAST - B INTACT WHITE 1.3
2781 FIRST 125c
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 2.5
2782 FIRST 125c
PLASTER
WALL
SOUTH - C INTACT WHITE 0.11
2788 FIRST c-125
METAL
ELECTRICAL
BOX MOUNT
EAST - B INTACT GRAY 0.19
2791 FIRST c-125
WOOD
WINDOW
CASING
SOUTH - C
Not Intact-
POOR
WHITE 2.6
2792 FIRST c-125
METAL
RADIATOR
SOUTH - C
Not Intact-
POOR
WHITE 0.4
2793 FIRST
EAST
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
NORTH - A INTACT RED 1.7
2794 FIRST
EAST
CORRIDOR
PLASTER
WALL
NORTH - A INTACT BEIGE 0.23
2796 FIRST
EAST
CORRIDOR
METAL
RADIATOR
SOUTH - C
Not Intact-
POOR
WHITE 2
2798 FIRST 131
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
WHITE 4.1
2802 FIRST 129a METAL PIPE NORTH - A INTACT BEIGE 3
2803 FIRST 129a METAL PIPE NORTH - A INTACT BEIGE 2.6
2804 FIRST 129a METAL PIPE NORTH - A INTACT BEIGE 2.8
2805 FIRST 129a METAL PIPE SOUTH - C INTACT BEIGE 3.6
©2011, Mabbett & Associates, Inc. Page 8 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2807 FIRST STAIR 1
METAL STAIR
BALUSTER
NORTH - A
Not Intact-
POOR
BEIGE 9.8
2808 FIRST STAIR 1
METAL STAIR
STRINGER
NORTH - A
Not Intact-
POOR
BEIGE 11.3
2809 FIRST STAIR 1
METAL STAIR
NEWEL POST
NORTH - A
Not Intact-
POOR
BEIGE 13.2
2810 FIRST STAIR 1
METAL
CEILING
WEST - D
Not Intact-
POOR
BEIGE 4.4
2811 FIRST STAIR 1
METAL STAIR
RISER
WEST - D
Not Intact-
POOR
BLACK 15.8
2812 FIRST STAIR 1
METAL STAIR
BASEBOARD
NORTH - A
Not Intact-
POOR
BLACK 21.8
2813 FIRST STAIR 1
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 0.3
2814 FIRST STAIR 1
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 0.26
2815 FIRST STAIR 1 METAL PIPE WEST - D INTACT WHITE 0.27
2819 FIRST 101
METAL STAIR
STRINGER
NORTH - A INTACT WHITE 5.6
2820 FIRST 101
METAL STAIR
RISER
NORTH - A
Not Intact-
POOR
BLACK 3.3
2821 FIRST 101
METAL STAIR
BASEBOARD
NORTH - A
Not Intact-
POOR
BLACK 5.5
2822 FIRST 101 METAL WALL NORTH - A
Not Intact-
POOR
WHITE 0.25
2824 FIRST 101
WOOD
WINDOW
CASING
NORTH - A INTACT WHITE 3.9
2829 FIRST 101 METAL DOOR NORTH - A INTACT GRAY 0.5
2831 FIRST
NORTH 1
CORRIDOR
METAL
FIREHOSE
CLOSET
WEST - D INTACT RED 0.6
2834 FIRST 103
PLASTER
ELECTRICAL
BOX MOUNT
EAST - B
Not Intact-
POOR
WHITE 0.14
2839 FIRST 117
PLASTER
WALL
NORTH - A INTACT WHITE 0.7
2840 FIRST 117
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
WHITE 0.4
2842 FIRST 118
WOOD
WINDOW
CASING
EAST - B INTACT WHITE 0.26
2843 FIRST 118
WOOD
WINDOW SASH
EAST - B INTACT WHITE 0.4
2848 FIRST 115
PLASTER
WALL
WEST - D INTACT WHITE 0.9
©2011, Mabbett & Associates, Inc. Page 9 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2849 FIRST
NORTH 2
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
EAST - B INTACT WHITE 0.4
2851 FIRST
NORTH 2
CORRIDOR
METAL
FIREHOSE
CLOSET
WEST - D INTACT RED 0.4
2852 FIRST
NORTH 2
CORRIDOR
METAL DOOR NORTH - A
Not Intact-
POOR
RED 0.8
2853 FIRST 113 METAL DOOR EAST - B INTACT RED 0.4
2857 FIRST
CORRIDOR
WOOD DOOR
CASING
SOUTH - C
Not Intact-
POOR
GRAY 1.8
2858 FIRST
CORRIDOR
WOOD DOOR
CASING
NORTH - A
Not Intact-
POOR
GRAY 1.6
2861 FIRST 112a
METAL
RADIATOR
NORTH - A INTACT WHITE 0.5
2863 FIRST 112a
WOOD SHELF
SUPPORT
SOUTH - C INTACT WHITE 2.3
2866 FIRST 112B METAL DUCT SOUTH - C INTACT WHITE 0.12
2870 FIRST 112B
METAL AC
UNIT
WEST - D INTACT WHITE 0.3
2872 FIRST 112B
WALLBOARD
WALL
SOUTH - C INTACT WHITE 0.22
2873 FIRST 112B METAL PIPE SOUTH - C INTACT WHITE 0.7
2876 FIRST STAIR 108
METAL STAIR
NEWEL POST
NORTH - A
Not Intact-
POOR
WHITE 11
2877 FIRST STAIR 108
METAL STAIR
HANDRAIL
NORTH - A
Not Intact-
POOR
WHITE 3.9
2878 FIRST STAIR 108
METAL STAIR
BASEBOARD
NORTH - A
Not Intact-
POOR
BLACK 12.8
2879 FIRST STAIR 108
METAL STAIR
RISER
EAST - B
Not Intact-
POOR
BLACK 9.3
2880 FIRST STAIR 108
METAL STAIR
STRINGER
EAST - B INTACT WHITE 7.7
2884 FIRST STAIR 108
PLASTER
CEILING
EAST - B
Not Intact-
POOR
WHITE 0.5
2885 FIRST STAIR 108
PLASTER
CEILING
EAST - B
Not Intact-
POOR
WHITE 6.6
2895 SECOND
EAST
CORRIDOR
PLASTER
WALL
NORTH - A INTACT WHITE 0.3
2901 SECOND
EAST
CORRIDOR
PLASTER
CEILING
NORTH - A INTACT WHITE 0.7
2902 SECOND
EAST
CORRIDOR
METAL
RADIATOR
NORTH - A
Not Intact-
POOR
WHITE 0.3
2904 SECOND
EAST
CORRIDOR
WOOD
WINDOW
CASING
SOUTH - C INTACT WHITE 0.4
2905 SECOND
EAST
CORRIDOR
WOOD
WINDOW SASH
SOUTH - C INTACT WHITE 0.4
2906 SECOND
EAST
CORRIDOR
WOOD DOOR WEST - D INTACT WHITE 0.19
©2011, Mabbett & Associates, Inc. Page 10 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2907 SECOND
EAST
CORRIDOR
METAL DOOR
CASING
WEST - D INTACT WHITE 7.2
2908 SECOND
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
NORTH - A INTACT WHITE 0.29
2909 SECOND
CORRIDOR
PLASTER
WALL
SOUTH - C INTACT WHITE 0.21
2911 SECOND
CORRIDOR
METAL PIPE NORTH - A INTACT WHITE 0.6
2912 SECOND
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
NORTH - A INTACT WHITE 0.3
2914 SECOND
WEST
CORRIDOR
METAL
RADIATOR
SOUTH - C INTACT WHITE 0.4
2915 SECOND
WEST
CORRIDOR
METAL
BASEBOARD
SOUTH - C INTACT BLACK 8.1
2916 SECOND
WEST
CORRIDOR
METAL
BASEBOARD
SOUTH - C
Not Intact-
POOR
BLACK 6.1
2917 SECOND
CORRIDOR
METAL
BASEBOARD
SOUTH - C INTACT BLACK 0.5
2919 SECOND
WEST
CORRIDOR
PLASTER
CEILING
NORTH - A INTACT WHITE 0.6
2920 SECOND
WEST
CORRIDOR
WOOD
WINDOW
CASING
SOUTH - C INTACT WHITE 0.17
2921 SECOND
WEST
CORRIDOR
WOOD
WINDOW SASH
SOUTH - C INTACT WHITE 0.5
2922 SECOND
WEST
CORRIDOR
WOOD
WINDOW JAMB
SOUTH - C INTACT WHITE 0.12
2923 SECOND
WEST
CORRIDOR
WOOD DOOR EAST - B INTACT BLUE 0.18
2924 SECOND
WEST
CORRIDOR
METAL DOOR
CASING
EAST - B INTACT BLUE 6.6
2926 SECOND STAIR 1
METAL
RADIATOR
EAST - B INTACT WHITE 0.7
2928 SECOND STAIR 1 METAL PIPE EAST - B
Not Intact-
POOR
BLACK 1.3
2929 SECOND STAIR 1
METAL
BASEBOARD
EAST - B INTACT BLACK 8.9
2931 SECOND STAIR 1
METAL STAIR
NEWEL POST
WEST - D
Not Intact-
POOR
WHITE 8.7
2932 SECOND STAIR 1
METAL STAIR
BALUSTER
WEST - D
Not Intact-
POOR
WHITE 10
2933 SECOND STAIR 1
METAL STAIR
STRINGER
WEST - D
Not Intact-
POOR
WHITE 9.9
2934 SECOND STAIR 1
METAL STAIR
RISER
WEST - D
Not Intact-
POOR
BLACK 11.5
2935 SECOND STAIR 1
PLASTER
WALL
WEST - D
Not Intact-
POOR
WHITE 0.15
2936 SECOND STAIR 1
METAL STAIR
BASEBOARD
WEST - D
Not Intact-
POOR
BLACK 13.4
©2011, Mabbett & Associates, Inc. Page 11 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2939 SECOND STAIR 1
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 0.5
2940 SECOND STAIR 1
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 0.24
2945 SECOND STAIR 1
PLASTER
WALL
EAST - B INTACT WHITE 0.11
2947 SECOND STAIR 1
METAL STAIR
BASEBOARD
SOUTH - C INTACT BLACK 0.15
2949 SECOND STAIR 1
METAL DOOR
CASING
WEST - D
Not Intact-
POOR
BLUE 3.5
2950 SECOND STAIR 1
METAL STAIR
RISER
WEST - D
Not Intact-
POOR
BLACK 3.6
2951 SECOND
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
EAST - B INTACT RED 0.15
2952 SECOND
CORRIDOR
METAL
RADIATOR
EAST - B INTACT WHITE 0.15
2955 SECOND
CORRIDOR
METAL
BASEBOARD
WEST - D INTACT BLACK 0.22
2956 SECOND
CORRIDOR
PLASTER
WALL
WEST - D INTACT WHITE 0.18
2957 SECOND
CORRIDOR
PLASTER
CEILING
NORTH - A INTACT WHITE 1.2
2958 SECOND
CORRIDOR
WOOD DOOR EAST - B INTACT WHITE 0.3
2959 SECOND
CORRIDOR
METAL DOOR
CASING
EAST - B INTACT BLUE 7.5
2960 SECOND
BATHROOM
WALLBOARD
CEILING
EAST - B INTACT WHITE 0.11
2968 SECOND 246
METAL
RADIATOR
EAST - B INTACT WHITE 0.5
2969 SECOND 246 WOOD DOOR WEST - D INTACT WHITE 0.28
2970 SECOND 246
METAL DOOR
CASING
WEST - D
Not Intact-
POOR
BLUE 8.2
2975 SECOND
CORRIDOR
METAL
BASEBOARD
NORTH - A INTACT BLACK 0.24
2976 SECOND 210
PLASTER
WALL
NORTH - A INTACT WHITE 1.9
2979 SECOND 210 METAL PIPE NORTH - A INTACT WHITE 0.18
2980 SECOND 210
METAL FIRE
SPRINKLER
PIPE
EAST - B INTACT WHITE 1.3
2981 SECOND 210
PLASTER
CEILING
EAST - B INTACT WHITE 1.4
2982 SECOND 210 WOOD DOOR SOUTH - C INTACT WHITE 0.21
2983 SECOND 210
METAL DOOR
CASING
SOUTH - C
Not Intact-
BLUE 4.5
©2011, Mabbett & Associates, Inc. Page 12 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
2984 SECOND 210
METAL FIRE
SPRINKLER
PIPE
WEST - D INTACT WHITE 3
2986 SECOND 210
METAL
LOUVER
SOUTH - C INTACT WHITE 0.8
2987 SECOND
NORTH
CORRIDOR
WALLBOARD
WALL
EAST - B INTACT WHITE 0.24
2989 SECOND
NORTH
CORRIDOR
PLASTER
WALL
EAST - B INTACT WHITE 0.29
2990 SECOND
NORTH
CORRIDOR
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
TAN 0.21
2991 SECOND
NORTH
CORRIDOR
PLASTER
CEILING
SOUTH - C
Not Intact-
POOR
WHITE 0.26
2992 SECOND
NORTH
CORRIDOR
METAL
BASEBOARD
EAST - B
Not Intact-
POOR
BLACK 0.2
2996 SECOND
NORTH
CORRIDOR
METAL
ELECTRICAL
BOX MOUNT
WEST - D INTACT WHITE 0.15
3000 SECOND 212
PLASTER
CEILING
WEST - D
Not Intact-
POOR
YELLOW 0.16
3001 SECOND 212
PLASTER
WALL
WEST - D
Not Intact-
POOR
YELLOW 0.11
3002 SECOND 212
METAL FIRE
SPRINKLER
PIPE
WEST - D
Not Intact-
POOR
BEIGE 0.6
3004 SECOND 212
METAL FIRE
SPRINKLER
PIPE
EAST - B
Not Intact-
POOR
BEIGE 0.4
3005 SECOND 212 WOOD DOOR EAST - B
Not Intact-
POOR
YELLOW 0.16
3008 SECOND
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
NORTH - A
Not Intact-
POOR
RED 0.29
3009 SECOND
CORRIDOR
METAL
RADIATOR
NORTH - A
Not Intact-
POOR
WHITE 0.26
3012 SECOND
SOUTH
CORRIDOR
METAL
ELECTRICAL
BOX MOUNT
NORTH - A INTACT GRAY 0.2
3013 SECOND
CORRIDOR
METAL
ELECTRICAL
BOX MOUNT
NORTH - A INTACT GRAY 0.25
3014 SECOND
CORRIDOR
METAL
ELECTRICAL
BOX MOUNT
SOUTH - C INTACT GRAY 0.16
3021 SECOND 266
WOOD
WINDOW
CASING
SOUTH - C
Not Intact-
POOR
WHITE 3.6
3041 SECOND 278 WOOD DOOR SOUTH - C INTACT WHITE 0.4
3042 SECOND 278 WOOD DOOR WEST - D INTACT WHITE 0.24
3043 SECOND 278
METAL
RADIATOR
NORTH - A INTACT WHITE 0.4
©2011, Mabbett & Associates, Inc. Page 13 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
3045 SECOND 273
WOOD
THRESHOLD
NORTH - A
Not Intact-
POOR
BLACK 0.25
3047 SECOND 273
METAL
RADIATOR
SOUTH - C
Not Intact-
POOR
WHITE 0.5
3048 SECOND
CORRIDOR
METAL
FIREHOSE
CLOSET
WEST - D INTACT RED 0.12
3049 SECOND STAIR 235
METAL STAIR
BASEBOARD
NORTH - A
Not Intact-
POOR
BLACK 11.8
3050 SECOND STAIR 235
METAL STAIR
RISER
EAST - B
Not Intact-
POOR
BLACK 12.4
3051 SECOND STAIR 235
METAL STAIR
HANDRAIL
EAST - B
Not Intact-
POOR
WHITE 4.7
3052 SECOND STAIR 235
METAL STAIR
NEWEL POST
EAST - B
Not Intact-
POOR
WHITE 10.4
3053 SECOND STAIR 235
METAL STAIR
STRINGER
EAST - B
Not Intact-
POOR
WHITE 8.3
3054 SECOND STAIR 235
METAL
CEILING
EAST - B INTACT WHITE 9.7
3055 SECOND STAIR 235 METAL PIPE NORTH - A INTACT WHITE 0.23
3056 SECOND STAIR 235
METAL
RADIATOR
NORTH - A
Not Intact-
POOR
WHITE 0.24
3057 SECOND STAIR 235
METAL
BASEBOARD
WEST - D
Not Intact-
POOR
BLACK 7.2
3059 SECOND 234
METAL
CONDUIT
SOUTH - C INTACT WHITE 0.6
3061 SECOND 234
METAL CHAIR
RAIL
SOUTH - C INTACT WHITE 0.5
4 THIRD STAIR 1
METAL STAIR
BALUSTER
NORTH - A INTACT WHITE 6.9
5 THIRD STAIR 1
METAL STAIR
NEWEL POST
NORTH - A INTACT WHITE 9.5
6 THIRD STAIR 1
METAL STAIR
RISER
EAST - B INTACT BLACK 8.3
7 THIRD STAIR 1
METAL STAIR
BASEBOARD
SOUTH - C INTACT BLACK 5.1
8 THIRD STAIR 1
PLASTER
WALL
WEST - D
Not Intact-
POOR
WHITE 0.4
9 THIRD STAIR 1
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 0.18
16 THIRD STAIR 1 METAL DOOR EAST - B INTACT WHITE 10.9
17 THIRD STAIR 1
METAL DOOR
CASING
EAST - B INTACT GRAY 8.5
26 THIRD
CORRIDOR
PLASTER
WALL
EAST - B INTACT WHITE 0.16
29 THIRD
CORRIDOR
METAL
BASEBOARD
WEST - D INTACT BLACK 2
30 THIRD
CORRIDOR
METAL
EAST - B INTACT WHITE 0.3
©2011, Mabbett & Associates, Inc. Page 14 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
31 THIRD
CORRIDOR
METAL PIPE EAST - B INTACT WHITE 17.8
33 THIRD
CORRIDOR
METAL
FIREHOSE
CLOSET
WEST - D INTACT RED 0.2
34 THIRD
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
SOUTH - C INTACT RED 0.3
35 THIRD
CORRIDOR
PLASTER
WALL
EAST - B INTACT WHITE 0.15
36 THIRD
CORRIDOR
METAL
BASEBOARD
EAST - B INTACT BLACK 2.5
40 THIRD
CORRIDOR
METAL AIR
VENT -
CEILING
SOUTH - C INTACT WHITE 0.4
41 THIRD
CORRIDOR
METAL
RADIATOR
EAST - B INTACT WHITE 0.5
42 THIRD
CORRIDOR
METAL PIPE EAST - B INTACT BLACK 1.3
43 THIRD LOBBY
WOOD CHAIR
RAIL
NORTH - A INTACT WHITE 0.11
44 THIRD LOBBY
PLASTER
WALL
NORTH - A INTACT WHITE 0.6
45 THIRD LOBBY
WOOD CHAIR
RAIL
EAST - B INTACT WHITE 0.15
47 THIRD LOBBY
WOOD CHAIR
RAIL
SOUTH - C INTACT WHITE 0.13
48 THIRD LOBBY
WOOD CHAIR
RAIL
WEST - D INTACT WHITE 0.18
52 THIRD LOBBY
WOOD CROWN
MOLDING
EAST - B INTACT BEIGE 0.13
53 THIRD LOBBY
METAL
BASEBOARD
EAST - B
Not Intact-
POOR
BLACK 9.1
54 THIRD LOBBY
METAL
RADIATOR
NORTH - A INTACT WHITE 0.4
55 THIRD LOBBY METAL PIPE NORTH - A
Not Intact-
POOR
WHITE 5.1
58 THIRD LOBBY
WOOD CLOSET
SHELF
SUPPORT
EAST - B INTACT GREEN 0.24
59 THIRD LOBBY
METAL DOOR
CASING
SOUTH - C INTACT WHITE 10.4
60 THIRD
EAST
CORRIDOR
WOOD
WINDOW
CASING
EAST - B INTACT WHITE 0.17
64 THIRD
EAST
CORRIDOR
WALLBOARD
WALL
SOUTH - C INTACT WHITE 0.18
67 THIRD
EAST
CORRIDOR
WALLBOARD
CEILING
SOUTH - C
Not Intact-
POOR
WHITE 0.16
68 THIRD
EAST
CORRIDOR
METAL
NORTH - A INTACT WHITE 0.6
©2011, Mabbett & Associates, Inc. Page 15 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
69 THIRD
EAST
CORRIDOR
METAL PIPE NORTH - A INTACT WHITE 0.27
70 THIRD
EAST
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
SOUTH - C INTACT RED 0.6
71 THIRD
WEST
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
SOUTH - C INTACT RED 0.5
78 THIRD
WEST
CORRIDOR
WALLBOARD
CEILING
NORTH - A INTACT WHITE 0.7
79 THIRD
WEST
CORRIDOR
METAL
RADIATOR
NORTH - A INTACT WHITE 0.7
80 THIRD
WEST
CORRIDOR
METAL PIPE NORTH - A INTACT WHITE 4
81 THIRD
WEST
CORRIDOR
METAL
BASEBOARD
NORTH - A INTACT BLACK 7.4
82 THIRD
WEST
CORRIDOR
WOOD HATCH EAST - B
Not Intact-
POOR
WHITE 3.4
83 THIRD
WEST
CORRIDOR
WOOD HATCH
CASING
WEST - D INTACT WHITE 2.1
84 THIRD
CORRIDOR
PLASTER
WALL
SOUTH - C INTACT BEIGE 0.25
88 THIRD
CORRIDOR
METAL DOOR SOUTH - C INTACT BLUE 0.8
89 THIRD
CORRIDOR
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
BLUE 2.2
90 THIRD
CORRIDOR
PLASTER
WALL
EAST - B INTACT BEIGE 1.4
91 THIRD
CORRIDOR
WALLBOARD
WALL
WEST - D INTACT BEIGE 1.8
93 THIRD
CORRIDOR
PLASTER
CEILING
WEST - D INTACT BEIGE 1.6
94 THIRD
CORRIDOR
WOOD HATCH EAST - B INTACT WHITE 2.3
95 THIRD
CORRIDOR
METAL HATCH
CASING
EAST - B INTACT WHITE 3
96 THIRD
CORRIDOR
METAL
LADDER
EAST - B
Not Intact-
POOR
GRAY 5.7
97 THIRD
CORRIDOR
METAL AIR
VENT -
CEILING
EAST - B INTACT WHITE 2.7
102 THIRD
CORRIDOR
PLASTER
WALL
SOUTH - C INTACT WHITE 2
103 THIRD
CORRIDOR
WALLBOARD
CEILING
SOUTH - C INTACT WHITE 1.6
104 THIRD
CORRIDOR
PLASTER
WALL
NORTH - A INTACT WHITE 2.1
105 THIRD
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
NORTH - A
Not Intact-
RED 1.2
©2011, Mabbett & Associates, Inc. Page 16 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
106 THIRD
CORRIDOR
METAL
RADIATOR
NORTH - A INTACT WHITE 0.4
107 THIRD
CORRIDOR
METAL PIPE NORTH - A INTACT WHITE 0.21
110 THIRD
CORRIDOR
WOOD
WINDOW
CASING
EAST - B INTACT WHITE 0.16
111 THIRD
CORRIDOR
METAL
RADIATOR
NORTH - A INTACT WHITE 0.27
112 THIRD
CORRIDOR
METAL PIPE NORTH - A INTACT WHITE 0.25
113 THIRD
CORRIDOR
METAL FIRE
EXTINGUISHER
CASING
NORTH - A INTACT RED 0.9
114 THIRD
CORRIDOR
METAL
FIREHOSE
CLOSET
NORTH - A INTACT RED 0.17
117 THIRD 362
PLASTER
CEILING
EAST - B
Not Intact-
POOR
WHITE 1.8
121 THIRD 365
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
WHITE 0.4
122 THIRD 365
PLASTER
WALL
NORTH - A
Not Intact-
POOR
WHITE 1.5
123 THIRD 365
METAL
RADIATOR
NORTH - A
Not Intact-
POOR
WHITE 0.4
124 THIRD 365
METAL CHAIR
RAIL
NORTH - A INTACT WHITE 1.8
125 THIRD 365
WOOD CROWN
MOLDING
SOUTH - C INTACT WHITE 2.1
126 THIRD 365
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
WHITE 8
127 THIRD 360a
METAL DOOR
CASING
EAST - B
Not Intact-
POOR
BLUE 5.9
130 THIRD 360a
WOOD
WINDOW
CASING
WEST - D INTACT WHITE 0.23
131 THIRD 360a
PLASTER
WALL
WEST - D INTACT WHITE 4.1
133 THIRD 360a
PLASTER
COLUMN
SOUTH - C
Not Intact-
POOR
BEIGE 6.2
134 THIRD STAIR 2
METAL
LADDER
NORTH - A
Not Intact-
POOR
BLACK 3.7
139 THIRD STAIR 2
PLASTER
CEILING
WEST - D
Not Intact-
POOR
WHITE 0.11
140 THIRD STAIR 2 WOOD HATCH NORTH - A
Not Intact-
POOR
WHITE 3.9
142 THIRD STAIR 2
METAL HATCH
CASING
NORTH - A
Not Intact-
POOR
WHITE 1.4
143 THIRD STAIR 2
METAL STAIR
HANDRAIL
NORTH - A
Not Intact-
WHITE 7.5
©2011, Mabbett & Associates, Inc. Page 17 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
146 THIRD STAIR 2
METAL STAIR
NEWEL POST
NORTH - A
Not Intact-
POOR
WHITE 7.1
147 THIRD STAIR 2
METAL STAIR
NEWEL POST
SOUTH - C
Not Intact-
POOR
BLACK 9.3
148 THIRD STAIR 2
METAL STAIR
RISER
SOUTH - C
Not Intact-
POOR
BLACK 8.7
149 THIRD STAIR 2
METAL STAIR
STRINGER
EAST - B INTACT WHITE 4.6
150 THIRD STAIR 2
METAL STAIR
STRINGER
WEST - D INTACT WHITE 7.8
152 THIRD STAIR 2 METAL DOOR WEST - D
Not Intact-
POOR
WHITE 0.4
153 THIRD STAIR 2
METAL DOOR
CASING
WEST - D
Not Intact-
POOR
BLUE 7.7
156 THIRD STAIR 2
WOOD
WINDOW
CASING
EAST - B INTACT WHITE 0.21
157 THIRD 360
METAL
COLUMN
SOUTH - C
Not Intact-
POOR
BEIGE 4.6
160 THIRD 359 METAL PIPE EAST - B INTACT WHITE 3.8
161 THIRD 359
METAL
RADIATOR
EAST - B INTACT WHITE 0.5
164 THIRD 306 METAL PIPE NORTH - A INTACT WHITE 0.29
175 THIRD 346 WOOD DOOR WEST - D INTACT WHITE 0.22
177 THIRD 346
WALLBOARD
CEILING
EAST - B INTACT WHITE 0.5
178 THIRD 302
PLASTER
CEILING
WEST - D INTACT WHITE 0.4
179 THIRD 302
WOOD CROWN
MOLDING
NORTH - A INTACT WHITE 0.19
180 THIRD 302
METAL CHAIR
RAIL
NORTH - A INTACT WHITE 0.23
181 THIRD 302 WOOD DOOR EAST - B INTACT WHITE 0.4
182 THIRD 302
WOOD CLOSET
DOOR
SOUTH - C INTACT WHITE 0.21
183 THIRD 302
WOOD CLOSET
SHELF
SUPPORT
SOUTH - C INTACT WHITE 0.22
184 THIRD 347 WOOD DOOR WEST - D INTACT WHITE 0.3
185 THIRD 347
PLASTER
CEILING
SOUTH - C
Not Intact-
POOR
WHITE 0.6
186 THIRD 347
WALLBOARD
CEILING
SOUTH - C
Not Intact-
POOR
WHITE 0.18
187 THIRD 347
METAL CHAIR
RAIL
SOUTH - C
Not Intact-
POOR
WHITE 0.3
188 THIRD 347 WOOD DOOR NORTH - A INTACT WHITE 0.24
189 THIRD 303
METAL CHAIR
RAIL
SOUTH - C INTACT WHITE 0.6
©2011, Mabbett & Associates, Inc. Page 18 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
190 THIRD 303
WOOD HATCH
CASING
SOUTH - C INTACT WHITE 0.4
193 THIRD 303 WOOD DOOR EAST - B INTACT WHITE 0.24
194 THIRD 303
WOOD CLOSET
DOOR
NORTH - A INTACT WHITE 0.11
195 THIRD 303
WOOD CLOSET
SHELF
SUPPORT
NORTH - A INTACT WHITE 0.19
197 THIRD 345 WOOD DOOR WEST - D INTACT WHITE 0.29
199 THIRD 345 WOOD HATCH WEST - D INTACT WHITE 5.6
200 THIRD 345
WOOD HATCH
CASING
WEST - D INTACT WHITE 1.3
205 THIRD ATTIC
METAL
RAILING
NORTH - A
Not Intact-
POOR
GRAY 9.2
206 THIRD ATTIC
METAL
RAILING
NORTH - A
Not Intact-
POOR
GRAY 6.3
207 THIRD ATTIC METAL I-BEAM NORTH - A
Not Intact-
POOR
RED 7.7
208 THIRD ATTIC METAL I-BEAM NORTH - A
Not Intact-
POOR
RED 10.9
209 THIRD ATTIC METAL I-BEAM NORTH - A
Not Intact-
POOR
RED 8.4
210 THIRD ATTIC METAL I-BEAM SOUTH - C
Not Intact-
POOR
RED 8.3
211 THIRD ATTIC METAL I-BEAM SOUTH - C
Not Intact-
POOR
RED 8.4
212 THIRD ATTIC METAL I-BEAM SOUTH - C
Not Intact-
POOR
RED 6.8
224 THIRD ATTIC
METAL
FIREHOSE
CLOSET
NORTH - A
Not Intact-
POOR
YELLOW 0.23
231 THIRD ATTIC
METAL
ELECTRICAL
BOX MOUNT
WEST - D INTACT GRAY 0.29
235 THIRD ATTIC METAL MOTOR WEST - D INTACT TAN 0.19
237 BASEMENT B-32
METAL DOOR
CASING
EAST - B
Not Intact-
POOR
GRAY 9.7
243 BASEMENT B-32 METAL POLE NORTH - A INTACT RED 0.9
244 BASEMENT B-32 METAL POLE NORTH - A INTACT RED 0.2
245 BASEMENT B-32 METAL POLE SOUTH - C INTACT RED 0.6
246 BASEMENT B-32 METAL BEAM SOUTH - C INTACT RED 0.9
247 BASEMENT B-32 METAL BEAM WEST - D INTACT RED 0.5
248 BASEMENT B-32 METAL BEAM WEST - D INTACT RED 0.24
252 BASEMENT B-18 METAL POLE WEST - D
Not Intact-
POOR
WHITE 0.15
253 BASEMENT B-18 METAL BEAM WEST - D
Not Intact-
WHITE 0.14
©2011, Mabbett & Associates, Inc. Page 19 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
257 BASEMENT B-18 WOOD DOOR SOUTH - C
Not Intact-
POOR
GREEN 4
258 BASEMENT B-18
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
GREEN 2.2
259 BASEMENT B-18 METAL PIPE SOUTH - C
Not Intact-
POOR
WHITE 0.3
265 BASEMENT B-18
METAL
RAILING
SOUTH - C
Not Intact-
POOR
BLACK 0.9
271 BASEMENT B-18
WOOD
WINDOW SASH
NORTH - A
Not Intact-
POOR
GREEN 8.6
273 BASEMENT B-18
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
GREEN 1.3
275 BASEMENT B-15
WOOD
FIREHOSE
CLOSET
NORTH - A
Not Intact-
POOR
RED 0.21
281 BASEMENT B-15
METAL
ELECTRICAL
BOX MOUNT
NORTH - A
Not Intact-
POOR
GRAY 0.17
283 BASEMENT B-15
METAL
CONDUIT
SOUTH - C
Not Intact-
POOR
WHITE 0.5
284 BASEMENT B-15 METAL DOOR NORTH - A INTACT GRAY 0.17
287 BASEMENT B-31 METAL POLE SOUTH - C INTACT RED 0.5
288 BASEMENT B-31 METAL POLE SOUTH - C INTACT RED 0.6
289 BASEMENT B-31 METAL POLE SOUTH - C INTACT RED 0.6
292 BASEMENT B-31 METAL BEAM SOUTH - C INTACT RED 0.6
293 BASEMENT B-31 METAL BEAM SOUTH - C INTACT RED 0.8
294 BASEMENT B-31 METAL BEAM SOUTH - C INTACT RED 0.6
296 BASEMENT B-31
METAL DOOR
CASING
WEST - D
Not Intact-
POOR
GRAY 4.6
297 BASEMENT B-31
WOOD
WINDOW SASH
NORTH - A
Not Intact-
POOR
GRAY 5.9
298 BASEMENT B-31
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
GRAY 6.8
306 BASEMENT B-31
PLASTER
WALL
NORTH - A
Not Intact-
POOR
GRAY 0.14
310 BASEMENT B-14
WOOD
WINDOW SASH
NORTH - A
Not Intact-
POOR
WHITE 5.9
311 BASEMENT B-14
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
WHITE 7.5
313 BASEMENT B-14
PLASTER
CEILING
NORTH - A
Not Intact-
POOR
WHITE 0.7
315 BASEMENT B-14
METAL
CONDUIT
NORTH - A
Not Intact-
POOR
WHITE 0.7
323 BASEMENT B-14 METAL PIPE SOUTH - C
Not Intact-
WHITE 0.9
©2011, Mabbett & Associates, Inc. Page 20 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
325 BASEMENT B-14 METAL POLE SOUTH - C
Not Intact-
POOR
WHITE 0.21
326 BASEMENT B-14 METAL POLE SOUTH - C
Not Intact-
POOR
WHITE 0.25
329 BASEMENT
MEN’S
TOILET 1
WOOD DOOR SOUTH - C
Not Intact-
POOR
GRAY 0.23
330 BASEMENT
MEN’S
TOILET 1
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
GRAY 0.6
331 BASEMENT B-13
METAL FIRE
EXTINGUISHER
CASING
WEST - D INTACT RED 0.4
332 BASEMENT B-13 METAL I-BEAM SOUTH - C
Not Intact-
POOR
WHITE 0.12
333 BASEMENT B-13 METAL DOOR WEST - D
Not Intact-
POOR
BLACK 2.1
334 BASEMENT B-13
METAL DOOR
CASING
WEST - D
Not Intact-
POOR
BLACK 1.4
335 BASEMENT B-13
METAL DOOR
CASING
WEST - D INTACT BEIGE 12.8
336 BASEMENT B-13 METAL DOOR WEST - D
Not Intact-
POOR
BLACK 2.1
338 BASEMENT B-31
METAL DOOR
CASING
WEST - D
Not Intact-
POOR
TAN 3.2
342 BASEMENT B-31
WOOD
WINDOW SASH
EAST - B
Not Intact-
POOR
TAN 0.21
343 BASEMENT B-31
WOOD
WINDOW
CASING
EAST - B
Not Intact-
POOR
TAN 4.7
344 BASEMENT B-31
PLASTER
WALL
WEST - D
Not Intact-
POOR
TAN 0.22
358 BASEMENT B-10
METAL FIRE
SPRINKLER
PIPE
NORTH - A INTACT RED 0.3
362 BASEMENT
FEMALE
TOILET B-22
METAL BUS
BOX
EAST - B INTACT GRAY 1.7
363 BASEMENT B-23
CONCRETE
COLUMN
NORTH - A INTACT WHITE 0.16
364 BASEMENT B-23 WOOD DOOR EAST - B INTACT WHITE 0.5
366 BASEMENT B-23
WOOD
WINDOW
CASING
EAST - B INTACT WHITE 8.1
367 BASEMENT B-23
METAL STAIR
NEWEL POST
EAST - B INTACT GRAY 4.1
368 BASEMENT B-23
METAL STAIR
RISER
WEST - D INTACT GRAY 3.5
369 BASEMENT B-23
METAL STAIR
STRINGER
SOUTH - C INTACT GRAY 4.1
370 BASEMENT B-23 METAL I-BEAM SOUTH - C INTACT WHITE 8.3
372 BASEMENT B-23
CONCRETE
WALL
NORTH - A
Not Intact-
WHITE 0.3
©2011, Mabbett & Associates, Inc. Page 21 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
373 BASEMENT B-9
METAL
RADIATOR
WEST - D INTACT BROWN 0.4
374 BASEMENT B-9
METAL DOOR
CASING
EAST - B
Not Intact-
POOR
GRAY 7.8
376 BASEMENT
CORRDIDOR
B-4
METAL FIRE
EXTINGUISHER
CASING
WEST - D INTACT RED 0.3
378 BASEMENT
CORRDIDOR
B-4
WOOD
FIREHOSE
CLOSET
WEST - D INTACT RED 0.25
382 BASEMENT
CORRDIDOR
B-4
BRICK WALL SOUTH - C
Not Intact-
POOR
WHITE 0.2
384 BASEMENT B-6 WOOD DOOR SOUTH - C
Not Intact-
POOR
GRAY 0.5
385 BASEMENT B-6
METAL DOOR
CASING
SOUTH - C
Not Intact-
POOR
GRAY 1.9
386 BASEMENT
CORRDIDOR
B-4
WOOD
FIREHOSE
CLOSET
WEST - D INTACT RED 0.11
387 BASEMENT
CORRDIDOR
B-4
METAL FIRE
EXTINGUISHER
CASING
EAST - B INTACT RED 0.3
390 BASEMENT B-6
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 0.3
391 BASEMENT B-6
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 0.25
392 BASEMENT B-7
WOOD
WINDOW SASH
NORTH - A
Not Intact-
POOR
BLUE 10
393 BASEMENT B-7
WOOD
WINDOW SASH
NORTH - A
Not Intact-
POOR
BLUE 14
395 BASEMENT B-7
METAL
COLUMN
WEST - D
Not Intact-
POOR
GREEN 0.4
396 BASEMENT B-6
CONCRETE
WALL
EAST - B
Not Intact-
POOR
WHITE 2.7
397 BASEMENT STAIR B-1
METAL STAIR
NEWEL POST
SOUTH - C
Not Intact-
POOR
WHITE 2.9
398 BASEMENT STAIR B-1
METAL
RAILING
SOUTH - C
Not Intact-
POOR
WHITE 10.8
399 BASEMENT STAIR B-1
METAL STAIR
RISER
SOUTH - C
Not Intact-
POOR
BLACK 0.3
400 BASEMENT STAIR B-1
METAL STAIR
STRINGER
SOUTH - C INTACT WHITE 11.8
401 BASEMENT STAIR B-1
CONCRETE
WALL
NORTH - A
Not Intact-
POOR
WHITE 6.1
403 BASEMENT STAIR B-1
METAL
RADIATOR
WEST - D INTACT WHITE 0.17
405 FIRST EXTERIOR
WOOD DOOR
CASING
SOUTH - C INTACT GRAY 17.3
406 FIRST EXTERIOR
WOOD
AWNING
SOUTH - C
Not Intact-
WHITE 8.2
©2011, Mabbett & Associates, Inc. Page 22 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
413 FIRST EXTERIOR
METAL DOWN
SPOUT
SOUTH - C
Not Intact-
POOR
GRAY 0.12
414 FIRST EXTERIOR
METAL
RAILING
SOUTH - C INTACT BLACK 11.2
418 FIRST EXTERIOR
WOOD DOOR
CASING
SOUTH - C
Not Intact-
POOR
WHITE 8.5
419 FIRST EXTERIOR
METAL
RAILING
SOUTH - C
Not Intact-
POOR
BLACK 6.1
421 FIRST EXTERIOR
WOOD
WINDOW
CASING
SOUTH - C
Not Intact-
POOR
WHITE 0.5
424 FIRST EXTERIOR
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 8.7
430 FIRST EXTERIOR
WOOD DOOR
CASING
EAST - B INTACT WHITE 15.9
434 FIRST EXTERIOR
CONCRETE
WALK STRIPE
EAST - B
Not Intact-
POOR
YELLOW 0.5
435 FIRST EXTERIOR
METAL LAMP
POST
EAST - B INTACT BLACK 14.4
436 FIRST EXTERIOR
METAL LAMP
POST
EAST - B INTACT BLACK 16.7
452 FIRST EXTERIOR
WOOD
WINDOW
CASING
SOUTH - C
Not Intact-
POOR
WHITE 12.4
453 FIRST EXTERIOR
METAL AC
UNIT
EAST - B
Not Intact-
POOR
TAN 0.11
458 FIRST EXTERIOR
METAL DOWN
SPOUT
EAST - B
Not Intact-
POOR
GRAY 0.22
460 FIRST EXTERIOR
METAL
WINDOW
CASING
NORTH - A INTACT WHITE 0.22
461 FIRST EXTERIOR
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
WHITE 18.6
463 FIRST EXTERIOR
METAL DOWN
SPOUT
NORTH - A
Not Intact-
POOR
BLACK 8
464 FIRST EXTERIOR
METAL DOWN
SPOUT
WEST - D
Not Intact-
POOR
BLACK 5.3
467 FIRST EXTERIOR
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 22.8
468 FIRST EXTERIOR
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 23.2
469 FIRST EXTERIOR
WOOD
WINDOW WELL
WEST - D
Not Intact-
POOR
WHITE 1.5
470 FIRST EXTERIOR
WOOD
WINDOW JAMB
WEST - D
Not Intact-
WHITE 17.6
©2011, Mabbett & Associates, Inc. Page 23 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
471 FIRST EXTERIOR
METAL
WINDOW
SECURITY
GATE
WEST - D
Not Intact-
POOR
WHITE 3
472 FIRST EXTERIOR
METAL
WINDOW
SECURITY
GATE
WEST - D
Not Intact-
POOR
WHITE 2.9
473 FIRST EXTERIOR
METAL
WINDOW
SECURITY
GATE
WEST - D
Not Intact-
POOR
WHITE 9.6
474 FIRST EXTERIOR
METAL
WINDOW
SECURITY
GATE
WEST - D
Not Intact-
POOR
WHITE 3.1
475 FIRST EXTERIOR
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 22.9
476 FIRST EXTERIOR
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 19.8
477 FIRST EXTERIOR
WOOD
WINDOW SASH
WEST - D
Not Intact-
POOR
WHITE 20.2
478 FIRST EXTERIOR
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 25.4
479 FIRST EXTERIOR
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 25.7
480 FIRST EXTERIOR
WOOD
WINDOW
CASING
WEST - D
Not Intact-
POOR
WHITE 23.7
481 FIRST EXTERIOR
WOOD
WINDOW WELL
WEST - D
Not Intact-
POOR
WHITE 0.8
482 FIRST EXTERIOR
WOOD
WINDOW WELL
WEST - D
Not Intact-
POOR
WHITE 17.3
483 FIRST EXTERIOR
WOOD
WINDOW WELL
WEST - D
Not Intact-
POOR
WHITE 3.3
484 FIRST EXTERIOR
WOOD
WINDOW WELL
WEST - D
Not Intact-
POOR
WHITE 0.8
485 FIRST EXTERIOR
WOOD
WINDOW JAMB
WEST - D
Not Intact-
POOR
WHITE 18
486 FIRST EXTERIOR
WOOD
WINDOW JAMB
WEST - D
Not Intact-
POOR
WHITE 17
487 FIRST EXTERIOR
WOOD
WINDOW JAMB
WEST - D
Not Intact-
POOR
WHITE 17.5
490 FIRST EXTERIOR
METAL FIRE
HYDRANT
WEST - D
Not Intact-
POOR
RED 18.8
493 FIRST EXTERIOR
CONCRETE
CURB
NORTH - A
Not Intact-
YELLOW 1.6
©2011, Mabbett & Associates, Inc. Page 24 of 26 West Haven Building 5 Rpt Final 9-16-11.doc
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm2)
498 FIRST EXTERIOR
WOOD
WINDOW
CASING
NORTH - A
Not Intact-
POOR
WHITE 18.8
499 FIRST EXTERIOR
WOOD
WINDOW SASH
NORTH - A
Not Intact-
POOR
WHITE 24.2
503 BASEMENT EXTERIOR
METAL DOOR
CASING
NORTH - A INTACT GRAY 6.4
504 BASEMENT EXTERIOR
METAL DOOR
LINTEL
NORTH - A
Not Intact-
POOR
WHITE 7.2
509 BASEMENT EXTERIOR METAL DOOR EAST - B
Not Intact-
POOR
GREEN 3.5
510 BASEMENT EXTERIOR
METAL DOOR
CASING
EAST - B
Not Intact-
POOR
GREEN 0.25
511 FIRST EXTERIOR
WOOD
WINDOW SASH
EAST - B
Not Intact-
POOR
WHITE 24.6
512 FIRST EXTERIOR
WOOD
WINDOW SASH
EAST - B
Not Intact-
POOR
WHITE 1.7
513 FIRST EXTERIOR METAL GRATE EAST - B
Not Intact-
POOR
BLACK 4.2
514 FIRST EXTERIOR
METAL DOWN
SPOUT
EAST - B
Not Intact-
POOR
BLACK 1.7
517 FIRST EXTERIOR
WOOD DOOR
CASING
EAST - B
Not Intact-
POOR
GRAY 2
521 BASEMENT EXTERIOR
METAL
WINDOW
SECURITY
GATE
EAST - B
Not Intact-
POOR
WHITE 0.26
526 FIRST EXTERIOR
METAL FIRE
HYDRANT
EAST - B
Not Intact-
POOR
RED 15.8
528 FIRST EXTERIOR
METAL LAMP
POST
EAST - B
Not Intact-
GRAY 0.3
In addition, all other XRF measurements collected during the screening survey of interior and exterior building components are included in Table 5 – Summary of XRF Measurements.
Table 5 includes a description of each screened surface and resulting XRF-measured lead concentration.
4.2.2 Photographs
Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and in non-intact condition (e.g. fair, peeling, cracking) are provided in Appendix D of this report.
4.2.3 CADD Drawings
Based on the results of the lead screening survey, a table of LCP components identified with >0.1 mg/cm2 was developed. This table is presented on the CADD drawings for use by the VAMC for exposure assessments and preliminary renovation planning. Based on the results
©2011, Mabbett & Associates, Inc. Page 25 of 26 West Haven Building 5 Rpt Final 9-16-11.doc of the survey, these components identified in the CADD table and on the plan should be assumed to be LCP unless otherwise determined.
5.0 LIMITATIONS
This inspection report is the result of a diligent search of the building for ACM and LCP. Only accessible areas were included in this survey. Although a comprehensive inspection was performed, the M&A Team does not claim to have identified all of the ACM and LCP that could be present in the facility (for example, materials potentially located within aforementioned inaccessible areas in Section 3.1). M&A’s survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.
6.0 CLOSING REMARKS
Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the asbestos and lead survey results to determine whether any of the materials identified as ACM or LCP will be disturbed by proposed work activities.
6.1 Asbestos
The purpose of the ACM survey was to identify ACM in the building within the limitations of the survey for worker protection purposes and future renovation or demolition planning purposes.
In regard to asbestos, any suspect material encountered during renovation/demolition that is not identified in this report as being non-ACM should be assumed to be ACM unless laboratory analytical data for bulk samples prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, and that accordingly was not inspected, should be assumed to contain asbestos if discovered until otherwise verified, as previously described. If ACM must be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb intact ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, personnel involved with the work activities should be made aware of the location of ACM within the building in which they will be working. Additional information regarding asbestos management and the Operations & Maintenance (O&M) program is outlined in the VAMC campus-wide Asbestos O&M Management Plan available in Volume I of the Comprehensive VAMC Lead and Asbestos Survey Report.
6.2 Lead Containing Paint
The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were
©2011, Mabbett & Associates, Inc. Page 26 of 26 West Haven Building 5 Rpt Final 9-16-11.doc tested. The regulations addressing LCP in non-residential building are focused on protecting workers involved with paint-disturbing activities and related waste-disposal activities.
Worker protection is regulated by OSHA regulations as well as applicable state regulations.
These regulations involve air monitoring of workers to determine exposure levels when disturbing paint…