S06 Attachment HazMat Report Newington.pdf
PDF 12 MB Posted
- Attached to
- J044--Steam Trap Replacements, West Haven and Newington Federal contract opportunity
- Solicitation number
- 36C24122B0010
About this file
This solicitation from the Department of Veterans Affairs seeks proposals to replace steam traps at facilities in West Haven and Newington, Connecticut. Offerors are invited to submit bids for J044--Steam Trap Replacements, West Haven and Newington by February 15, 2023 to replace failing steam traps and associated components. The solicitation number is 36C24122B0010, and the IFB and attachment S06 provide further details on the scope of work. Proposals should address pricing and schedules to complete replacement of an estimated 150 failing steam traps across the two locations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24122B0010 0003.docx | DOCX document | |
| 36C24122B0010 0002_1.docx | DOCX document | |
| S02 Attachment Instructions to Offerors for Steam Trap Replacements West Haven and Newington.docx | DOCX document | |
| S06 Attachment Site Visit Sign In Sheet.pdf | ||
| 36C24122B0010 0001.docx | DOCX document | |
| S06 Attachment HazMat Report West Haven.pdf | ||
| S02 Wage Determination Newington CT20220021 06032022.pdf | ||
| S02 PRE-AWARD CONTRACTOR EVALUATION FORM.pdf | ||
| S02 Specifications Steam Trap Replacements.pdf | ||
| S02 Wage Determination West Haven CT20220001 060322.pdf | ||
| S02 VA Newington - 2020 COMPLETE SURVEY REPORT - Copy.pdf | ||
| S02 Final SOW Steam Trap Replacements 5-27-2022.pdf | ||
| S02 VA West Haven - 2020 COMPLETE SURVEY REPORT - Copy.pdf | ||
| S02 VHA Supplemental Contract Requirements for Combatting COVID-19.pdf | ||
| 36C24122B0010_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME II
ASBESTOS CONTAINING MATERIAL &
LEAD CONTAINING PAINT
SURVEY REPORT
BUILDING 1
VISN 1
Newington VA Medical Center
555 Willard Avenue Newington, Connecticut
Project No. 2009023.005
May 31, 2011
5 Alfred Circle Bedford, MA 01730-2318
Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info@mabbett.com www.mabbett.com
© 2011, Mabbett & Associates, Inc.
mailto:info@mabbett.com http://www.mabbett.com/
Newington VAMC - Building 1 May 2011 ©2011, Mabbett & Associates, Inc. Page i Survey Report Newington Building 1_5-11_Final.doc
ACKNOWLEDGMENT
This Asbestos Containing Materials (ACM) and Lead Containing Paint (LCP) Building Survey Report was prepared for the Veterans Affairs (VA) New England Healthcare System (VISN 1) in accordance with an established scope of work as defined in Contract Number VA241-P-1653. The information presented herein is based on the facts and information conveyed to or received by the Mabbett & Associates, Inc. (M&A) Team during the preparation of this report. If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.
This individual building report from Volume II which contains building specific lead and asbestos findings is part of the Comprehensive VAMC Lead and Asbestos Survey Report consisting of:
Volume I - General
Chapter 1 - Introduction and Executive Summary Chapter 2 - Asbestos Operations & Maintenance (O&M) Manual Chapter 3 - Asbestos Containing Materials (ACM) Survey Tables Chapter 4 - Lead Containing Paint Survey Tables
Volume II – Individual Building Reports
Individual Building Reports Chapters including:
• Cover page with building number
• Building narrative summary
• Floor plans
• Relevant asbestos findings for the building
• Relevant lead containing paint findings for the building
• Relevant photos
Volume III – Appendices and Supporting Data
Appendix A - Asbestos Laboratory Analysis Reports and Laboratory Certifications Appendix B - Inspector Field Data Sheets/Chains-of-Custody Appendix C - Personnel Certifications & Licenses Appendix D - XRF Performance Characteristics/Calibration Records Appendix E - Lead Laboratory Analysis Reports and Laboratory Certifications (If Applicable)
Volume IV – HUD Residential LBP Reports (If Applicable)
©2011, Mabbett & Associates, Inc. Page ii Survey Report Newington Building 1_5-11_Final.doc
This report was prepared by the following Mabbett & Associates, Inc. team personnel:
ENVIROMED SERVICES, INC.
John Luby Project Manager EnviroMed Services, Inc.
Connecticut Asbestos Inspector 000281 Connecticut Management Planner 000281
This report has been reviewed and approved by:
MABBETT & ASSOCIATES, INC.
Robert K. McKinley, MPH, CIH, LIH Director of Industrial Hygiene Services
©2011, Mabbett & Associates, Inc. Page iii Survey Report Newington Building 1_5-11_Final.doc
TABLE OF CONTENTS
Description Page
1.0 INTRODUCTION & EXECUTIVE SUMMARY
2.0 BUILDING DESCRIPTION
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
3.2 Analytical Methodology
3.3 Summary of Asbestos Containing Materials (ACM) Findings
4.0 LEAD SCREENING SURVEY
4.1 Screening Survey Methodology
4.2 Summary of Lead Screening Survey Findings
5.0 LIMITATIONS
6.0 CLOSING REMARKS
6.1 Asbestos
6.2 Lead Containing Paint
Tables Table 1 – Specific Inaccessible Areas Table 2 – Summary of Positive ACM Samples Table 3 – Summary of Positive XRF Measurements Table 4 – Summary of ACM Building Results, including negative results.................. Appendix A Table 5 – Summary of XRF Measurements............................................................... Appendix B
Figures Figure 1 – Asbestos Survey Summary Plan – Building 1 - First Floor Figure 2 – Asbestos Survey Summary Plan – Building 1 - Second Floor Figure 3 – Asbestos Survey Summary Plan – Building 1 - Third Floor Figure 4 – Asbestos Survey Summary Plan – Building 1 - Fourth Floor Figure 5 – Asbestos Survey Summary Plan – Building 1 - Fifth Floor Figure 6 – Asbestos Survey Summary Plan – Building 1 - Attic/Cupola Figure 7 – Lead Screening Survey Summary Plan – Building 1 - First Floor Figure 8 – Lead Screening Survey Summary Plan – Building 1 - Second Floor Figure 9 – Lead Screening Survey Summary Plan – Building 1 - Third Floor Figure 10 – Lead Screening Survey Summary Plan – Building 1 - Fourth Floor Figure 11 – Lead Screening Survey Summary Plan – Building 1 - Fifth Floor Figure 12 – Lead Screening Survey Summary Plan – Building 1 - Attic/Cupola
Appendices Appendix A – Table 4, Summary of ACM Building Result Appendix B – Table 5, Summary of XRF Measurements Appendix C – Representative Photographs of ACM Appendix D – Representative Photographs of Non-Intact Lead Containing Paint
©2011, Mabbett & Associates, Inc. Page 1 of 18 Survey Report Newington Building 1_5-11_Final.doc
1.0 INTRODUCTION & EXECUTIVE SUMMARY
Mabbett and Associates, Inc. (M&A), with EnviroMed Services, Inc. (EnviroMed) as sub-contractors, performed surveys for suspect asbestos containing building materials (ACM) and screenings of suspect lead containing paint (LCP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 555 Willard Avenue, Newington, CT, under Contract VA241-P-1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed during May, 2010, by appropriately credentialed personnel as required. Collected suspect ACM samples were submitted to a certified analytical laboratory for asbestos analysis by polarized light microscopy (PLM) using positive stop methodology and transmission electron microscopy (TEM) where indicated. When necessary, paint chip samples were collected and submitted to a certified analytical laboratory for lead content analysis using atomic absorption spectroscopy. The survey effort involved the collection of the following samples, resulting in the following conclusions:
• 563 bulk samples for suspect ACM were collected in this building.
• Based on laboratory analysis of suspect ACM, 62 of the collected samples contained asbestos greater than 1%.
• 778 XRF analyzer measurements of building surfaces were taken in this building.
• 199 of the XRF measurements revealed concentrations of lead that exceeded
0.1 mg/cm2.
This building report consists of a summary of findings, floor plans indicating positive sample locations, detailed analytical findings for the specific surveyed building materials, and photos of identified ACM. In addition, photos of lead containing paint greater than 1.0 mg/cm2 and in an other than intact condition, when observed, were provided. Laboratory certificates of analysis and field data sheets for this building report are available in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 1 was a six-story Ambulatory Care Building built in 1930 and occupied approximately 90,750 square feet.
3.0 ASBESTOS SURVEY
3.1 Sampling Methodology
A visual screening inspection was conducted by state licensed asbestos inspectors throughout the building to identify locations of suspect ACM. Only areas that were accessible during the field work phase were inspected. Every effort was made during the initial field survey work to access areas as necessary to complete the survey. However, if any areas remained inaccessible to the survey team, they are indicated in Table 1 below.
©2011, Mabbett & Associates, Inc. Page 2 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 1 – Specific Inaccessible Areas
Newington VA Medical Center, Building 1
Building Floor Room No.
Reason Area Was Inaccessible and Survey Impacts, If Applicable
There were no inaccessible areas identified during this survey.
Other general areas that were inaccessible or where the survey was limited to visual observation only are identified below:
• Within walls • Within fire doors
• Enclosed pipe/duct chases • Inside mechanical equipment/ductwork
• Above fixed drywall or plaster ceilings
Due to these access restrictions, ACM surveys should be performed prior to any proposed renovations or maintenance involving inaccessible areas.
Bulk samples were collected of suspect ACM in accordance with US Environmental Protection Agency (EPA) Asbestos Hazard and Emergency Response Act (AHERA) and VISN 1 approved M&A VISN 1 Survey Program Standard Operating Procedure (SOP). Roofing materials were not sampled unless otherwise indicated in order to maintain applicable warranties. Bulk suspect ACM sampling was conducted according to the following sampling plan:
(a) Surfacing material:
(1) At least three bulk samples shall be collected from each homogeneous area that is 1,000 ft2 or less.
(2) At least five bulk samples shall be collected from each homogeneous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2.
(3) At least seven bulk samples shall be collected from each homogeneous area that is greater than 5,000 ft2.
(b) Thermal system insulation:
(1) At least three bulk samples shall be collected from each homogeneous area of thermal system insulation.
(2) At least one bulk sample shall be collected from each homogeneous area of patched area of thermal system insulation.
(3) Sufficient samples shall be collected from elbows and fittings to determine if it contains
ACM.
(4) Bulk samples shall not be collected from any homogeneous area where the state licensed asbestos inspector determined that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.
©2011, Mabbett & Associates, Inc. Page 3 of 18 Survey Report Newington Building 1_5-11_Final.doc
(c) Miscellaneous material:
(1) At least one bulk sample shall be collected from each homogeneous area that is less than 100 ft2.
(2) At least three bulk samples shall be collected from each homogeneous area that is greater than 100 ft2.
3.2 Analytical Methodology
The collected bulk samples were submitted under chain of custody procedures to EnviroMed Services, Inc. (EnviroMed) of Meriden, CT for polarized light microscopy (PLM) analysis of bulk materials via EPA 600/R-93/116 Method. If applicable, sample results that revealed trace concentrations of asbestos by PLM were re-analyzed using transmission electron microscopy (TEM) analysis. EnviroMed is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200858-0). Duplicate bulk samples were submitted to ProScience. ProScience is accredited by the American Industrial Hygiene Association (AIHA) and participates in the National Voluntary Laboratory Accreditation Program (NVLAP Lab Code 200090-0). A summary table containing the duplicate bulk sample results is provided in Volume I, Table 5. Copies of the laboratory accreditations are included in Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report.
Bulk sample results are summarized in Table 4 – Summary of ACM Building Results. The EPA, Occupational Safety and Health Administration (OSHA), and the State of Connecticut Department of Public Health (DPH) define any material that contains greater than one percent (>1%) asbestos as being an ACM. As such, the analytical laboratory identified bulk samples as positive for asbestos that met the regulatory criteria of greater than one percent (>1%) asbestos.
3.3 Summary of Asbestos Containing Materials (ACM) Findings
3.3.1 Data Tables, Laboratory Results, and Field Notes
Collected bulk samples confirmed by the analytical laboratory to contain >1% asbestos are listed in Table 2 - Summary of Positive ACM Samples. Samples analyzed by PLM containing trace levels of asbestos, defined as ≤ 1%, are listed in Table 4 with the TEM analysis results. Volume III of the Comprehensive VAMC Lead and Asbestos Survey Report includes copies of the laboratory certificates of analysis (including duplicate samples) and Inspector Field Data Sheets.
©2011, Mabbett & Associates, Inc. Page 4 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 2 - Summary of Positive ACM Samples
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of Asbestos
Condition Estimated Quantity
VISN 1
RISK
Hazard Category
1-4*
18A
Exterior Exterior Gray Exterior Window Sill
Caulk
15% Chrysotile Good 800 LF 4
21B 21C
4th Fl Stairway #3 2nd Fl Stairway
#1
Stair #1, Stair #3
Glue for Red Rubber Stair
Treads
2% Chrysotile Good 500 SF 4
22B 22C
4th Fl Stairway #3 5th Fl Stairwell #3
4th Fl Stairway #3
5th Fl Stairwell #3
12” Beige w/Black
Streaks Vinyl Floor Tile
3% Chrysotile Good 200 SF 4
23A 23B 23C
4th Fl Stairway #3 4th Fl Stairway #3 5th Fl Stairway #3
4th Fl Stairway #3
5th Fl Stairwell #3
Mastic for 12” Beige w/Black Streaks Vinyl
Tile
5% Chrysotile Good 200 SF 4
41A 41B 41C
4th Floor 1-405 4th Floor 1-405 4th Floor 1-405
1-405 Fire Door Core
10% Amosite
3% Chrysotile
Good 1 Door1 4
70A 70B 70C
4th Floor 1-411D 4th Floor 1-405 4th Floor 1-405
1-405, 1-411, 1-411D
Green Vinyl Sheet Flooring
3% Chrysotile Good 413 SF 4
73A 73B 73C
4th Floor 1-405 4th Floor 1-405
Exterior
1-405, 1-411, Exterior
Brown Mastic Associated w/Styrofoam Window Panels
6% Chrysotile Good 105 SF 4
75A 75B 75C
4th Floor 1-410 4th Floor 1-410 4th Floor 1-410
1-410 Brown Wall Hole Patch
7% Chrysotile Good 35 SF 4
77A 77B 77C
4th Floor 1-400 4th Floor 1-400 4th Floor 1-400
1-400, IN-224,
IN-224A, IN-
225, IN-227,
1st Fl C1-4
TSI Pipe End
15% Chrysotile
3% Amosite
Good 6 LF 4
79A 79B 79C
4th Floor 1-402 4th Floor 1-402 4th Floor 1-402
1-402 Tan Caulking on Radiator
3% Chrysotile Good 1 SF 4
©2011, Mabbett & Associates, Inc. Page 5 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 2 - Summary of Positive ACM Samples Newington VA Medical Center, Building 1
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of Asbestos
Condition Estimated Quantity
VISN 1
RISK
Hazard Category
1-4*
80A 80B 80C
4th Floor 1-402 4th Floor 1-402 4th Floor 1-402
IN-224A, IN-
214, 1-345, 1-
405, 1-402, 1-400, 1-411D, IS-
272, IS-274,
IS-271, IS-
278, IS-273,
IS-266A, IS-
266, IS-280,
IS-264, IS-
262, IS-281,
IS-279, IS-
277, IS-275,
IS-269, IS-
267, IS-265,
IS-261B, IS-
261, IC-243,
IC-246, IC-
245, IC-244,
IN-227, 2nd Fl.
Stair 1, IN-225A, IN-
225, IN-219,
2nd Fl C2-4, IN-222, IN-215, IN-224
Air Cell Paper Backing at
Steel Radiator Panel
40% Chrysotile Good 945 SF 4
81A 81B 81C
4th Floor 1-402 4th Floor 1- 402 4th Floor 1-402
4th Floor 1-402 Rope Gasket Material
15% Chrysotile Good 5 LF 4
91A 91B 91C
Northend Attic Northend Attic Northend Attic
Northend Attic Mastic Seam Sealer
3% Chrysotile Good 250 LF 4
98A 98B 98C
Attic/Cupola Attic/Cupola Attic/Cupola
Attic/Cupola Interior Window
Cupola Putty
2% Chrysotile Good 100 LF 4
102A Attic Compressor Room
Center Attic, Attic
Compressor Rm, H20
Meter Room
Attic Ceiling Base Coat
Plaster
2% Chrysotile Good 2700 SF 4
112A 112B 112C
2nd Fl Corridor C2-1
2nd Fl Corridor C2-1
2nd Fl Corridor C2-1
C2-1 Glue Dots 3% Chrysotile Good 325 SF 4
©2011, Mabbett & Associates, Inc. Page 6 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 2 - Summary of Positive ACM Samples Newington VA Medical Center, Building 1
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of Asbestos
Condition Estimated Quantity
VISN 1
RISK
Hazard Category
1-4*
117A 1st Fl Corridor C1-5
1st Fl– All Rooms
2nd Fl– All Rooms
3rd Fl– All Rooms
4th Fl– All Rooms
5th Fl– All Rooms
Wall Plaster Skim Coat
3% Chrysotile Good 186,000
SF 4
121C 1S-168 168 Wallboard Compound
3% Chrysotile Good 288 SF 4
127A 127B 127C
IN 219
2nd Fl Corridor
C2-4 2nd Fl Corridor
C2-4
217, 219, C2- 4, C2-5
Black Mastic Under 12”x12”
Tan VFT
7% Chrysotile Good 1450 SF 4
130A 130B 130C
IN-213
IN-213
IN-213
IN-213
Black Felt Paper Under Yellow Gold vinyl sheet flooring
5% Chrysotile Good 325 SF 4
144A 144B 144C
IN-225
IN-225
IN-225
IN-225, IN-
225A
9”x9” Gray
VFT
5% Chrysotile Good 65 SF 4
145A 145B 145C
IN-225
IN-225
IN-225
IN-225, IN-
225A
9”x9” White
VFT
3% Chrysotile Good 65 SF 4
146A 146B 146C
IN-225
IN-225
IN-225
IN-225, IN-
225A
Black Border Tile
5% Chrysotile Good 45 SF 4
147A 147B 147C
IN-225
IN-225
IN-225
IN-225, IN-
225A
Black Mastic Under Tiles
10% Chrysotile Good 175 SF 4
152A 2nd Fl Corridor C2-4 C2-4 Wallboard
Compound 2%
Chrysotile Good 2000 SF 4
161A 161B 161C
IN-222
IN-222
IN-222
IN- 222
Black Mastic for 12” gray
VFT with mottle
7% Chrysotile Good 158 SF 4
170A 170B 170C
IC-243
IC-243
IC-244
IC-243, IC-244
12”x12” Cream VFT with Tan and Black Streaks
2% Chrysotile Good 543 SF 4
©2011, Mabbett & Associates, Inc. Page 7 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 2 - Summary of Positive ACM Samples Newington VA Medical Center, Building 1
Sample No.
Sample Location
ACM
Location
Description of Material
Percent and Type of Asbestos
Condition Estimated Quantity
VISN 1
RISK
Hazard Category
1-4*
171A 171B 171C
IC-243
IC-243
IC-244
IC-243, IC-244
Glue Under 12”x12”
Cream VFT with Tan and Black Streaks
8% Chrysotile Good 543 SF 4
175A 175B 175C
1N-111 1N-111 1N-111
1N-111
Gray Leveling Compound Under Red
Carpet
2% Chrysotile Good 386 SF 4
177A 177B 177C
1st Floor 106D 1st Floor 106D 1st Floor 106D
106D Blue Diamond Pattern Carpet
Glue
4% Chrysotile Good 235 SF 4
178A 178B 178C
1st Floor 1C-143 1st Floor 1C-143 1st Floor 1C-143
1C-143 White Flex Connector
25% Chrysotile Good 3 SF 4
Footnotes:
1 – Fire door core insulation is visible at the 1 door listed. All doors in the building should be assumed asbestos containing.
SF – Square Feet LF – Linear Feet CF – Cubic Feet
©2011, Mabbett & Associates, Inc. Page 8 of 18 Survey Report Newington Building 1_5-11_Final.doc
* The VISN 1 hazard assessment scale 1 – 4 is a relative indicator of the risk and need for response/remediation. (1) represents the highest priority (e.g. removal or encapsulation) where as a (4) represents the lowest priority (monitor as part of 6 month O&M program). The rating assigned by an Asbestos Management Planner, takes into account: condition, friable vs. non-friable, accessibility, occupancy (e.g. continuous, intermittent or occasional and patients/staff/visitors), potential for air erosion, potential for vibration damage, potential for disturbance / damage (e.g. exposed and in an accessible location), and potential for water damage.
3.3.2 Photographs
Representative photographs of identified ACM are provided in Appendix C of this report.
3.3.3 CADD Drawings
The location of each ACM sample and its abridged sample ID is shown on the CADD drawings in the Figures Section of this report. The sample ID on the drawings has been abridged (by excluding the individual room number from the full sample ID) for aesthetic purposes. Each positive ACM sample location is colored red and marked with an asterisk (*), while stop positives are marked with two asterisks (**). Collected bulk samples that were not positive are identified solely by the abridged sample ID. Building areas containing ACM have been indicated with hatching to identify the location of the identified ACM.
4.0 LEAD SCREENING SURVEY
4.1 Screening Survey Methodology
M&A completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 703A XRF (serial number 7712). The XRF instrument was calibrated at the frequency specified in the SOP.
4.2 Summary of Lead Screening Survey Findings
4.2.1 Data Tables
As specified by VISN 1, a description of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2 have been included in Table 3 below:
©2011, Mabbett & Associates, Inc. Page 9 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2
Reading
No. Floor Location Substrate and Component Side Condition Color Results
(mg/cm2)
14 FOURTH 1-434
METAL DOOR
CASING South - C INTACT GRAY 0.19
73 FIFTH
WEST CENTER
STAIRWELL
METAL STAIR
NEWEL POST North - A INTACT BLUE 1.6
76 FIFTH
WEST CENTER
STAIRWELL
METAL STAIR
RISER North - A INTACT BLUE 0.5
78 FIFTH
WEST CENTER
STAIRWELL
METAL STAIR
STRINGER North - A INTACT BLUE 1.4
79 FIFTH
WEST CENTER
STAIRWELL PLASTER WALL West - D INTACT BLUE 1.4
83 FIFTH
WEST CENTER
STAIRWELL METAL RAILING North - A INTACT BLUE 2
85 FIFTH
WEST CENTER
STAIRWELL METAL RAILING North - A INTACT BLUE 1.2
89 FIFTH 1-511 PLASTER WALL West - D Not Intact-
POOR BLUE 1.2
91 FIFTH 1-511
CONCRETE
FLOOR West - D Not Intact-
POOR GRAY 1.4
93 FIFTH 1-511
METAL FIRE
SPRINKLER
PIPE West - D INTACT RED 0.4
101 FIFTH
WEST CENTER
STAIRWELL
PLASTER
CEILING North - A INTACT BLUE 0.11
103 FIFTH
WEST CENTER
STAIRWELL
METAL DOOR
CASING South - C INTACT GRAY 0.19
107 FIFTH
WEST CENTER
STAIRWELL
METAL
BASEBOARD East - B INTACT BLUE 1.5
108 FIFTH
WEST CENTER
STAIRWELL
METAL STAIR
BALUSTER North - A INTACT BLUE 0.4 109 FIFTH 1-522 PLASTER WALL East - B INTACT WHITE 0.3
114 FIFTH 1-519
METAL
WINDOW
CASING North - A INTACT WHITE 3.5
160 ATTIC ATTIC NORTH
WOOD
SUPPORT BEAM South - C Not Intact-
POOR GRAY 0.11
167 ATTIC ATTIC SOUTH METAL PIPE East - B Not Intact-
POOR SILVER 0.17
170 ATTIC ATTIC SOUTH
WOOD WINDOW
CASING East - B Not Intact-
POOR GREEN 3.4
177 ATTIC ATTIC SOUTH
WOOD WINDOW
CASING West - D Not Intact-
POOR GRAY 5.2
183 ATTIC ATTIC SOUTH
WOOD WINDOW
CASING East - B Not Intact-
POOR WHITE 2.2
184 ATTIC ATTIC SOUTH
WOOD WINDOW
CASING East - B Not Intact-
POOR WHITE 1.5
188 ATTIC ATTIC CENTER PLASTER WALL West - D INTACT GREEN 0.14 191 ATTIC ATTIC CENTER PLASTER WALL East - B INTACT GREEN 0.11
192 ATTIC ATTIC CENTER
METAL
ELECTRIC BOX
MOUNT West - D Not Intact-
POOR GRAY 0.21
©2011, Mabbett & Associates, Inc. Page 10 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
194 ATTIC ATTIC CENTER
METAL STAIR
RISER West - D Not Intact-
POOR RED 0.13
195 ATTIC ATTIC CENTER
METAL STAIR
STRINGER West - D Not Intact-
POOR RED 0.15
201 ATTIC ATTIC CENTER PLASTER WALL North - A INTACT GREEN 0.6
202 ATTIC ATTIC CENTER
METAL STAIR
TREAD West - D Not Intact-
POOR RED 0.11
203 ATTIC ATTIC CENTER METAL LADDER West - D Not Intact-
POOR RED 3.1
205 ATTIC ATTIC CENTER
CONCRETE
LEDGE West - D Not Intact-
POOR RED 0.11
207 ATTIC ATTIC CENTER METAL HATCH West - D INTACT GREEN 4.3
209 ATTIC SIDE ROOM 1 PLASTER WALL East - B Not Intact-
POOR BEIGE 0.17
210 ATTIC SIDE ROOM 1
METAL
ELECTRIC BOX
MOUNT South - C INTACT GRAY 0.14
212 ATTIC SIDE ROOM 1 METAL TANK South - C Not Intact-
POOR SILVER 0.16
213 ATTIC SIDE ROOM 1 METAL MOTOR North - A Not Intact-
POOR GREEN 1.3
214 ATTIC SIDE ROOM 1 METAL DUCT North - A Not Intact-
POOR WHITE 0.14
215 ATTIC SIDE ROOM 1 METAL DUCT North - A Not Intact-
POOR WHITE 0.2
216 ATTIC SIDE ROOM 1 METAL MOTOR North - A INTACT RED 0.15
221 ATTIC SIDE ROOM 1
CONCRETE
COLUMN North - A INTACT WHITE 0.15
222 ATTIC SIDE ROOM 1
CONCRETE
COLUMN South - C INTACT WHITE 0.16 228 ATTIC SIDE ROOM 2 PLASTER WALL North - A INTACT BEIGE 0.19
229 ATTIC SIDE ROOM 2 PLASTER WALL South - C Not Intact-
POOR BEIGE 0.19
238 ATTIC
ELEVATOR MECH
RM
CONCRETE
FLOOR North - A INTACT GRAY 0.23
243 ATTIC
ELEVATOR MECH
RM
WOOD WINDOW
CASING West - D Not Intact-
POOR BEIGE 11
251 THIRD
SOUTHWEST
STAIRWELL METAL WALL North - A INTACT BLUE 1.1
252 THIRD
SOUTHWEST
STAIRWELLSOUTH
WEST STAIRWELL
METAL STAIR
HANDRAIL South - C INTACT BLUE 1.7
253 THIRD
SOUTHWEST
STAIRWELL
METAL STAIR
STRINGER North - A INTACT BLUE 0.4
254 THIRD
SOUTHWEST
STAIRWELL
METAL STAIR
RISER East - B INTACT RED 0.7
255 THIRD
SOUTHWEST
STAIRWELL
METAL
BASEBOARD West - D INTACT BLUE 0.8
256 THIRD
SOUTHWEST
STAIRWELL
METAL STAIR
BALUSTER North - A INTACT BLUE 0.24
©2011, Mabbett & Associates, Inc. Page 11 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
257 THIRD
SOUTHWEST
STAIRWELL PLASTER WALL North - A INTACT BLUE 0.2
263 THIRD
SOUTHWEST
STAIRWELL
PLASTER
CEILING South - C INTACT WHITE 0.16
264 THIRD
SOUTHWEST
STAIRWELL
METAL
WINDOW
CASING West - D INTACT BLUE 5.3
265 THIRD
SOUTHWEST
STAIRWELL
METAL
WINDOW
SECURITY
GATE West - D INTACT WHITE 0.13
267 THIRD
WEST CENTER
STAIRWELL
METAL STAIR
RISER North - A INTACT BLUE 0.6
268 THIRD
WEST CENTER
STAIRWELL
METAL STAIR
NEWEL POST North - A INTACT BLUE 1.8
269 THIRD
WEST CENTER
STAIRWELL
METAL STAIR
BALUSTER North - A INTACT BLUE 0.29
270 THIRD
WEST CENTER
STAIRWELL
METAL
BASEBOARD North - A INTACT BLUE 1
271 THIRD
WEST CENTER
STAIRWELL
METAL STAIR
STRINGER North - A INTACT BLUE 0.3
272 THIRD
WEST CENTER
STAIRWELL PLASTER WALL South - C INTACT BLUE 1.4
273 THIRD
WEST CENTER
STAIRWELL PLASTER WALL West - D INTACT BLUE 1.3 298 THIRD 1-304A PLASTER WALL North - A INTACT WHITE 0.17
300 THIRD 1-304A
METAL FIRE
SPRINKLER
PIPE North - A INTACT RED 0.11 311 THIRD C3-4 PLASTER WALL North - A INTACT WHITE 1.4
314 THIRD 1-305
CONCRETE
LEDGE North - A INTACT WHITE 0.7
343 THIRD 1-345
METAL
RADIATOR West - D Not Intact-
POOR WHITE 6.7
353 THIRD C3-9 METAL PIPE East - B INTACT GRAY 0.22 357 THIRD C3-7 METAL HATCH West - D INTACT WHITE 0.26 379 SECOND STAIR #1 PLASTER WALL West - D INTACT BLUE 0.3
382 SECOND STAIR #1 PLASTER
CEILING
East - B INTACT WHITE 0.16
384 SECOND STAIR #1
METAL STAIR
NEWEL POST West - D INTACT BLUE 2
385 SECOND STAIR #1
METAL STAIR
RISER West - D INTACT BLUE 1.2
386 SECOND STAIR #1
METAL STAIR
BALUSTER West - D INTACT WHITE 0.3
387 SECOND STAIR #1
METAL STAIR
STRINGER West - D INTACT WHITE 0.4
389 SECOND STAIR #1
METAL DOOR
CASING South - C INTACT RED 0.24
©2011, Mabbett & Associates, Inc. Page 12 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
391 SECOND STAIR #1
METAL
BASEBOARD East - B INTACT BLUE 1.1 392 SECOND STAIR #3 PLASTER WALL South - C INTACT BLUE 0.19
393 SECOND STAIR #3
PLASTER
CEILING West - D INTACT WHITE 0.6
394 SECOND STAIR #3
METAL
WINDOW
CASING West - D INTACT BLUE 2.7
396 SECOND STAIR #3
METAL
BASEBOARD West - D INTACT BLUE 0.9
397 SECOND STAIR #3
METAL STAIR
HANDRAIL West - D INTACT BLUE 0.9
398 SECOND STAIR #3
METAL STAIR
NEWEL POST West - D INTACT BLUE 1.2
399 SECOND STAIR #3
METAL STAIR
STRINGER West - D INTACT BLUE 0.16 401 SECOND STAIR #3 METAL PIPE East - B INTACT BLACK 0.4
402 SECOND STAIR #3
METAL STAIR
RISER East - B INTACT RED 0.9
403 SECOND STAIR #3
METAL STAIR
BALUSTER East - B INTACT BLUE 0.5 409 SECOND C2-1 PLASTER WALL South - C INTACT WHITE 1
411 SECOND C2-1
METAL
FIREHOSE
CLOSET South - C INTACT WHITE 0.3
415 SECOND 1C-245 PLASTER WALL North - A INTACT WHITE 0.4
434 SECOND 1C-241
METAL
RADIATOR North - A INTACT WHITE 0.4
435 SECOND 1C-241
WOOD WINDOW
CASING East - B INTACT WHITE 0.25
436 SECOND 1C-241
WOOD DOOR
CASING East - B INTACT WHITE 0.26
437 SECOND 1C-241
METAL
ELECTRIC BOX
MOUNT South - C INTACT GRAY 0.4
445 SECOND C2-4
CONCRETE
COLUMN West - D INTACT WHITE 2.3
446 SECOND C2-4
METAL
ELECTRIC BOX
MOUNT East - B INTACT WHITE 0.26 449 SECOND C2-4 PLASTER WALL West - D INTACT WHITE 0.2
458 SECOND 1S-278
PLASTER
WINDOW SILL East - B Not Intact-
POOR WHITE 0.3
470 SECOND 1S-273
PLASTER
WINDOW WELL North - A Not Intact-
POOR BLUE 1.5
473 SECOND 1S-269
PLASTER
WINDOW SILL West - D Not Intact-
POOR
YELLO
W 0.15
477 SECOND 1S-281
PLASTER
WINDOW SILL South - C Not Intact-
POOR WHITE 0.24
©2011, Mabbett & Associates, Inc. Page 13 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
486 SECOND 1N-217
PLASTER
WINDOW SILL East - B INTACT BLUE 4 500 SECOND 1N-207 METAL CABINET East - B INTACT TAN 0.8
531 FIRST 1S-180
METAL
CONDUIT East - B INTACT
YELLO
W 0.5
547 FIRST 1s-174
PLASTER
COLUMN North - A
Not Intact-
POOR WHITE 0.28
551 FIRST C1-3 METAL PIPE South - C Not Intact-
POOR WHITE 3.8
553 FIRST C1-3 PLASTER WALL North - A Not Intact-
POOR WHITE 1
556 FIRST 1S-167A METAL PIPE North - A INTACT
ORANG
E 0.9
557 FIRST 1S-167A
PLASTER
WINDOW SILL North - A INTACT WHITE 0.4
560 FIRST 1S-167A
PLASTER
WINDOW SILL North - A INTACT WHITE 0.4
565 FIRST 1S-167
PLASTER
COLUMN South - C INTACT WHITE 1.2
566 FIRST 1S-167
PLASTER
COLUMN South - C
Not Intact-
POOR
YELLO
W 0.29
568 FIRST
NUCLEAR
MEDICINE
METAL
FIREHOSE
CLOSET West - D INTACT WHITE 0.5
572 FIRST
NUCLEAR
MEDICINE
PLASTER
CEILING West - D INTACT BEIGE 0.11
588 FIRST Stair 3
METAL DOOR
CASING East - B INTACT BLUE 0.22 593 FIRST Stair 3 METAL STAIR
RISER
East - B INTACT BLUE 1
595 FIRST Stair 3 METAL STAIR
NEWEL POST
East - B INTACT BLUE 0.8
596 FIRST Stair 3 METAL STAIR
BALUSTER
North - A INTACT BLUE 0.3
597 FIRST Stair 3 METAL STAIR
STRINGER
North - A INTACT BLUE 1
598 FIRST Stair 3 METAL
BASEBOARD
South - C INTACT BLUE 0.8
599 FIRST Stair 3 METAL STAIR
HANDRAIL
North - A INTACT BLUE 0.6
600 FIRST Stair 3 METAL FIRE
SPRINKLER
PIPE
North - A INTACT BLACK 0.3
601 FIRST Stair 3 PLASTER
CEILING
North - A INTACT WHITE 0.7
602 FIRST Stair 3 PLASTER
CEILING
North - A INTACT WHITE 60.7
604 SECOND IN-217
VINYL FLOOR
(X-RAY) North - A INTACT WHITE 21.2 608 SECOND 1n-207 VINYL FLOOR South - C INTACT BLUE 36
©2011, Mabbett & Associates, Inc. Page 14 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
613 SECOND 1n-201
VINYL FLOOR
(X-RAY) West - D INTACT BROWN 42.2
614 SECOND 1n-201
METAL SHIELD
(X-RAY) East - B INTACT WHITE 1.8
616 SECOND 1n-201
PLASTER WALL
(X-RAY) West - D INTACT WHITE 4.6
617 SECOND 1n-201
PLASTER WALL
(X-RAY) East - B INTACT WHITE 7.4 622 SECOND 1n-206 METAL PIPE North - A INTACT RED 0.5
626 SECOND 1n-213
PLASTER WALL
(X-RAY) South - C INTACT WHITE 3.1
627 SECOND 1n-218
VINYL FLOOR
(X-RAY) South - C INTACT BEIGE 18
628 SECOND 1n-218
METAL SHIELD
(X-RAY) North - A INTACT BEIGE 56.3
629 SECOND 1n-218
DRYWALL WALL
(X-RAY) South - C INTACT BLUE 5.5
631 SECOND C2-5
DRYWALL WALL
(X-RAY) North - A INTACT WHITE 0.4
635 FIRST 1S-174 METAL PIPE South - C INTACT
ORANG
E 2.3
638 FIRST 1S-171A METAL PIPE West - D Not Intact-
POOR
ORANG
E 3.2
639 FIRST 1S-171 METAL PIPE West - D Not Intact-
POOR
ORANG
E 1.3
644 FIRST STAIR #4
METAL STAIR
STRINGER South - C INTACT BLUE 0.3
645 FIRST STAIR #4
METAL STAIR
BALUSTER South - C INTACT BLUE 0.4
646 FIRST STAIR #4
METAL STAIR
RISER East - B INTACT BLUE 1.2
647 FIRST STAIR #4
METAL
BASEBOARD North - A INTACT BLUE 0.9
648 FIRST STAIR #4
METAL STAIR
HANDRAIL North - A INTACT BLUE 0.9
649 FIRST STAIR #4
METAL STAIR
NEWEL POST East - B INTACT BLUE 1.4
652 FIRST STAIR #4
PLASTER
CEILING North - A INTACT TAN 0.11
657 FIRST 1N-110 PLASTER WALL North - A INTACT WHITE 0.27 661 FIRST 1N-113 PLASTER WALL East - B INTACT WHITE 1
664 FIRST 1N-113
METAL DOOR
CASING West - D INTACT GRAY 0.3
688 FIRST 1N-109A
PLASTER
WINDOW
CASING West - D
Not Intact-
POOR BEIGE 0.3
689 FIRST 1N-109A
METAL
RADIATOR West - D Not Intact-
POOR BEIGE 0.6
705 FIRST 1N-104
METAL
PRIVACY
PARTITION East - B INTACT TAN 0.16
©2011, Mabbett & Associates, Inc. Page 15 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
708 FIRST AUDIO WAITING
METAL AIR
VENT East - B INTACT TAN 0.17
711 FIRST AUDIO WAITING
PLASTER
WINDOW SILL West - D INTACT WHITE 0.13
726 FIRST WEST HALL
METAL
FIREHOSE
CLOSET South - C INTACT WHITE 0.5
727 FIRST C1-4
METAL
FIREHOSE
CLOSET West - D INTACT WHITE 0.18
EXTERI
OR EXTERIOR
METAL LINTEL
(EXTERIOR) West - D INTACT WHITE 29.9
EXTERI
OR EXTERIOR
METAL
WINDOW
LINTEL
(EXTERIOR) South - C Not Intact-
POOR WHITE 26.3
EXTERI
OR EXTERIOR
METAL FIRE
ALARM South - C INTACT RED 0.5
EXTERI
OR EXTERIOR
METAL STAIR
HANDRAIL
(EXTERIOR) East - B Not Intact-
POOR BLACK 1.6
EXTERI
OR EXTERIOR
METAL LINTEL
(EXTERIOR) East - B Not Intact-
POOR WHITE 35
EXTERI
OR EXTERIOR
METAL DOWN
SPOUT
(EXTERIOR) East - B INTACT BROWN 11.1
EXTERI
OR EXTERIOR
METAL LINTEL
(EXTERIOR) East - B Not Intact-
POOR WHITE 31.6
EXTERI
OR EXTERIOR
METAL LINTEL
(EXTERIOR) North - A Not Intact-
POOR WHITE 28.9
854 FIRST 1S-175 WOOD DOOR West - D INTACT WHITE 46.1 856 FIRST 1S-175A DRYWALL WALL South - C INTACT WHITE 8.1 857 FIRST 1S-175A DRYWALL WALL North - A INTACT WHITE 7.9
871 FIRST 1S-170
PLASTER
WINDOW SILL North - A INTACT WHITE 0.18
2271 FOURTH 1-446
CONCRETE
WALL South - C INTACT WHITE 1.4
2272 FOURTH 1-446
CONCRETE
LEDGE South - C INTACT WHITE 1.4
2298 FOURTH 1-427
METAL
WINDOW
FRAME West - D INTACT WHITE 0.5
2523 FOURTH STAIRWELL
METAL STAIR
NEWEL POST South - C
Not Intact-
POOR BLUE 0.6
2524 FOURTH STAIRWELL
METAL STAIR
HANDRAIL South - C Not Intact-
POOR BLUE 1.1
2525 FOURTH STAIRWELL
METAL STAIR
BALUSTER South - C INTACT BLUE 0.3
2526 FOURTH STAIRWELL
METAL STAIR
RISER South - C INTACT RED 1.5
©2011, Mabbett & Associates, Inc. Page 16 of 18 Survey Report Newington Building 1_5-11_Final.doc
Table 3 - Summary of Positive XRF Measurements above VISN1-Specified Threshold of >0.1 mg/cm2 Newington VA Medical Center, Building 1
Reading No. Floor Location Substrate and
Component Side Condition Color Results (mg/cm2)
2527 FOURTH STAIRWELL
METAL STAIR
STRINGER South - C INTACT BLUE 1.1
2528 FOURTH STAIRWELL
METAL
BASEBOARD South - C Not Intact-
POOR BLUE 5
2530 FOURTH STAIRWELL PLASTER WALL South - C INTACT WHITE 0.15
2531 FOURTH STAIRWELL
METAL DOOR
CASING South - C INTACT GRAY 0.2
2535 FOURTH STAIRWELL
METAL
WINDOW
FRAME West - D INTACT BLUE 6.9
2537 FOURTH STAIRWELL
METAL STAIR
RISER East - B INTACT BLUE 0.9
2538 FOURTH STAIRWELL
METAL STAIR
BALUSTER East - B INTACT BLUE 1.9
2539 FOURTH STAIRWELL
METAL STAIR
NEWEL POST East - B INTACT WHITE 0.5
2540 FOURTH STAIRWELL
METAL STAIR
HANDRAIL East - B INTACT BLUE 0.8
2541 FOURTH STAIRWELL
METAL STAIR
STRINGER East - B INTACT BLUE 1.7 2544 FOURTH STAIRWELL PLASTER WALL South - C INTACT WHITE 1.4
2548 FOURTH STAIRWELL
METAL DOOR
CASING South - C INTACT GRAY 0.24
2550 FOURTH STAIRWELL
METAL
BASEBOARD East - B INTACT BLUE 1.1 2556 FOURTH C4-7 PLASTER WALL West - D INTACT WHITE 1.4 2559 FOURTH C4-7 METAL PANEL East - B INTACT WHITE 1.2 2562 FOURTH 1-400 CERAMIC WALL East - B INTACT WHITE 0.3 2564 FOURTH 1-400 CERAMIC WALL South - C INTACT WHITE 0.3
2565 FOURTH 1-400
CONCRETE
FLOOR South - C Not Intact-
POOR GRAY 1.9
2566 FOURTH 1-400
METAL DOOR
CASING South - C INTACT WHITE 0.4 2567 FOURTH 1-400 CERAMIC WALL West - D INTACT WHITE 1.2 2568 FOURTH 1-400 METAL PIPE West - D INTACT WHITE 0.4 2571 FOURTH 1-400 METAL I-BEAM South - C INTACT WHITE 0.6
2577 FOURTH 1-400
CONCRETE
LEDGE North - A INTACT WHITE 0.12
2578 FOURTH C 4-1
METAL DOOR
CASING West - D INTACT GRAY 0.23
2592 FOURTH C 4-07
METAL FIRE
SPRINKLER
PIPE North - A INTACT RED 0.4
In addition, XRF measurements collected during the screening survey of interior and exterior building components are included in Table 5 – Summary of XRF Measurements. Table 5 includes a description of each screened surface and resulting XRF-measured lead concentration.
©2011, Mabbett & Associates, Inc. Page 17 of 18 Survey Report Newington Building 1_5-11_Final.doc
4.2.2 Photographs
Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and where in other in intact condition (e.g. fair, peeling, cracking) are provided in Appendix D of this report.
4.2.3 CADD Drawings
Based on the results of the lead screening survey a table of LCP components identified with > 0.1 mg/cm2 was developed. This table is available on the CADD drawings for use by the VAMC for exposure assessments and preliminary renovation planning. Based on the results of the survey these components identified in the CADD table and on the plan should be assumed to be LCP unless otherwise determined.
5.0 LIMITATIONS
This survey report is the result of a diligent search of the building for ACM and LCP. Only accessible areas were included in this survey. Although a comprehensive inspection was performed, M&A does not claim to have identified all of the ACM and LCP that could be present in the facility (for example, materials potentially located within aforementioned inaccessible areas discussed in Section 3.1). M&A’s survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.
6.0 CLOSING REMARKS
Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the asbestos and lead survey results to determine whether any of the materials identified as ACM or LCP will be disturbed by proposed work activities.
6.1 Asbestos
The purpose of the ACM survey was to identify ACM in the building within the limitations of the survey for worker protection purposes and future renovation or demolition planning purposes. In regards to asbestos, any suspect material encountered during renovation/demolition that is not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, that was not inspected should be assumed to contain asbestos if discovered during any renovation process or until otherwise verified. If ACM must be disturbed, the ACM must be removed by a licensed asbestos abatement contractor and be performed in accordance with applicable regulations. If proposed work activities will not disturb ACM, continuous monitoring of ACM should be conducted throughout work activities to ensure the ACM remains in an intact condition. Additionally, prior to commencing work activities, contractors involved with the work activities should be made aware of the location of ACM, within the building in which they will be working. Additional information regarding asbestos management and the Operations & Maintenance (O&M) program is outlined in the VAMC campus wide Asbestos
©2011, Mabbett & Associates, Inc. Page 18 of 18 Survey Report Newington Building 1_5-11_Final.doc
Management Plan available in Volume I of the Comprehensive VAMC Lead and Asbestos Survey Report.
6.2 Lead Containing Paint
The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were tested. The regulations addressing LCP in non-residential building are focused on protecting workers who are involved with paint disturbing activities and related waste disposal activities.
Worker protection is regulated by OSHA regulations as well as applicable state regulations. These regulations involve air monitoring of workers to determine exposure levels when disturbing paint containing measurable lead. A lead based paint determination can not determine a safe level of lead, but is intended to provide guidance as to the locations of what are considered industry standards for lead in paint. VA employees and contractors may use this information to better determine exposures of workers to airborne lead by understanding the different concentrations of lead paint on representative components and surfaces. Worker exposure controls can then be implemented and air monitoring can then be performed during activities that disturb paint on representative surfaces.
A concentration of lead greater than or equal to 1.0 mg/cm2 exceeds HUD residential standards and is an indicator of risk. OSHA does not specify a safe concentration of LCP. However, for the purposes of this LCP screening survey the lead concentrations greater than 0.1 mg/cm2 have been utilized as a threshold established by VISN 1 for areas where possible worker exposures may occur.
Figures
Appendix A
Table 4 Summary of ACM Building Results
Newington VAMC – Building 1 May 2011 ©2011, Mabbett & Associates, Inc. Table 4 – Page 1 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 1A 1-409 2'x2' Dot/Slash
Pattern Ceiling Tile
NAD - - - -
1B 5th Fl Corridor C5-11
2'x2' Dot/Slash Pattern Ceiling
Tile
NAD - - - -
1C 5th Fl Corridor C5-11
2'x2' Dot/Slash Pattern Ceiling
Tile
NAD - - - -
2A Kitchenette 1-C5-10
2'x2' Swirl texture Pattern
Ceiling Tile
NAD - - - -
2B 1-539 2'x2' Swirl texture Pattern
Ceiling Tile
NAD - - - -
2C 5th Fl Corridor C5-11
2'x2' Swirl texture Pattern
Ceiling Tile
NAD - - - -
3A 4th Fl Corridor C4-
Wall Board Ceiling
NAD - - - -
3B 4th Fl Corridor C4-
Wall Board Ceiling
NAD - - - -
3C 1-532 Wall Board Ceiling
NAD - - - -
4A 4th Fl Lobby C4-7
Wall Board Joint compound on ceiling
NAD - - - -
4B 1-445 Wall Board Joint compound on ceiling
NAD - - - -
4C 1-532 Wall Board Joint compound on ceiling
NAD - - - -
05A 1-445 2'x4' DAT Slash Ceiling Tile
NAD - - - -
5B 4th Fl Corridor C4-12
2'x4' DAT Slash Ceiling Tile
NAD - - - -
5C 1-516 2'x4' DAT Slash Ceiling Tile
NAD - - - -
6A 1-522 Glue For Blue Carpet
NAD - - - -
6B 1-501 Glue For Blue Carpet
NAD - - - -
6C 1-502 Glue For Blue Carpet
NAD - - - -
©2011, Mabbett & Associates, Inc. Table 4 – Page 2 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 7A 1-509 Glue For
Multicolor Purple/Blue
Carpet
NAD - - - -
7B 5th Fl Waiting Room 1-C-52
Glue For Multicolor
Purple/Blue Carpet
NAD - - - -
7C 5th Fl Corridor C5-11
Glue For Multicolor
Purple/Blue Carpet
NAD - - - -
8A 5th Fl Corridor C5-11
Glue For 4" Gray Vinyl Base
(NEW)
NAD - - - -
8B 1-517 Glue For 4" Gray Vinyl Base
(New)
NAD - - - -
8C 5th Fl Corridor C5-11
Glue For 4" Gray Vinyl Base
(New)
NAD - - - -
9A 1-501 Glue For 4" Dark Blue Vinyl Base
NAD - - - -
9B 1-517 Glue For 4" Dark Blue Vinyl Base
NAD - - - -
9C 1-512 Glue For 4" Dark Blue Vinyl Base
NAD - - - -
10A 1-417 Glue For 4" Dark Blue Vinyl Base
NAD - - - -
10B 1-409 Wall Board Walls NAD - - - - 10C 1-429 Wall Board Walls NAD - - - - 11A 1-417 Wall Board Joint compound on Walls Only
NAD - - - -
11B 1-426 Wall Board Joint compound on
Walls Only
NAD - - - -
11C 1-409 Wall Board Joint compound on
Walls Only
NAD - - - -
11D 1-429 Wall Board Joint compound on
Walls Only
NAD - - - -
11E 1-429 Wall Board Joint compound on
Walls Only
©2011, Mabbett & Associates, Inc. Table 4 – Page 3 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 11F 4th Fl
Corridor C4-12
Wall Board Joint compound on
Walls Only
NAD - - - -
11G 1-419 Wall Board Joint compound on
Walls Only
NAD - - - -
12A 5th Fl Open Office C5-5
Gray fire proofing insulation
NAD - - - -
12B 1-521 Gray fire proofing insulation
NAD - - - -
12C 5th Fl Open Office C5-5
Gray fire proofing insulation
NAD - - - -
13A 5th Fl Corridor
C5-7
12" Gray w/Black specs vinyl floor tile
NAD - - - -
13B 5th Fl Corridor
C5-7
12" Gray w/Black specs vinyl floor tile
NAD - - - -
13C 5th Fl Elevator Lobby C5-4
12" Gray w/Black specs vinyl floor tile
NAD - - - -
14A 5th Fl Corridor
C5-7
12" Pink vinyl floor tile
NAD - - - -
14B 5th Fl Corridor
C5-7
12" Pink vinyl floor tile
NAD - - - -
14C 5th Fl Elevator Lobby C5-4
12" Pink vinyl floor tile
NAD - - - -
15A 5th Fl Corridor
C5-7
Flooring mastic under 12" Gray +12" pink floor tile
NAD - - - -
15B 5th Fl Corridor
C5-7
Flooring mastic under 12" Gray +12" pink floor tile
NAD - - - -
15C 5th Fl Elevator Lobby C5-4
Flooring mastic under 12" Gray +12" pink floor tile
NAD - - - -
16A 1-316 Sink under coating black
©2011, Mabbett & Associates, Inc. Table 4 – Page 4 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 16B 1-316 Sink under coating black
NAD - - - -
16C 1-316 Sink under coating black
NAD - - - -
17A 1-445 White interior window sill caulk
NAD - - - -
17B 1-522 White interior window sill caulk
NAD - - - -
17C 1-322 White interior window sill caulk
NAD - - - -
18A Exterior Gray Exterior Window Sill
Caulk
15% Chrysotile
800 LF Good Exterior 4
18B Exterior Gray Exterior window sill caulk
NAD - - - -
18C Exterior Gray Exterior window sill caulk
NAD - - - -
19A 1-536 Glue for
Glue/Tan swirled carpet
19B 5th Fl Waiting Room 1-C5-8
Glue for
19C 5th Fl Corridor C5-
Glue for
20A 4th Fl Stairway #1
Glue for 6" Black vinyl base on stair
NAD - - - -
20B 4th Fl Stairway #1
Glue 6" Black vinyl base on stair
NAD - - - -
20C 4th Fl Stairway #1
Glue 6" Black vinyl base on stair
NAD - - - -
21A 4th Fl Stairway #3
Glue for Red Rubber Stair
Treads
<1% Chrysotile
21B 4th Fl Stairway #3
Glue for Red Rubber Stair
Treads
Chrysotile
500 SF
Good
Stair #1, Stair #3
©2011, Mabbett & Associates, Inc. Table 4 – Page 5 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 21C 2nd Fl
Stairway #1 Glue for Red Rubber Stair
Treads
2% Chrysotile
22A 4th Fl Stairway #3
12” Beige w/Black Streaks Vinyl Floor Tile
1% Chrysotile
22B 4th Fl Stairway #3
12” Beige w/Black Streaks Vinyl Floor Tile
2% Chrysotile
22C 5th Floor Stairwell #3
12” Beige w/Black Streaks Vinyl Floor Tile
3% Chrysotile
200 SF Good 4th Fl Stairway #3, 5th Fl Stairwell #3
23A 4th Fl Stairway #3
Mastic for 12” Beige w/Black Streaks Vinyl
Tile
2% Chrysotile
23B 4th Fl Stairway #3
Mastic for 12” Beige w/Black Streaks Vinyl
Tile
2% Chrysotile
23C 5th Floor Stairway #3
Mastic for 12” Beige w/Black Streaks Vinyl
Tile
5% Chrysotile
200 SF Good 4th Fl Stairway #3, 5th Fl Stairwell #3
24A 4th Fl Stairway #1
12" white w/blacks specks vinyl floor tile
NAD - - - -
24B 4th Fl Corridor C4-12
12" white w/blacks specks vinyl floor tile
NAD - - - -
24C 1-534 12" white w/blacks specks vinyl floor tile
NAD - - - -
25A 4th Fl Stairway #1
Mastic for 12" white w/ black specks vinyl floor tile
NAD - - - -
25B 4th Fl Corridor C4-12
Mastic for 12" white w/ black specks vinyl floor tile
NAD - - - -
25C 1-534 Mastic for 12" white w/ black specks vinyl floor tile
NAD - - - -
26A 1-532A Gray steel sink undercoating
©2011, Mabbett & Associates, Inc. Table 4 – Page 6 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 26B 1-532A Gray steel sink undercoating
NAD - - - -
26C 1-532A Gray steel sink undercoating
NAD - - - -
27A 1-537 Glue for blue leaf pattern carpet
NAD - - - -
27B 1-528 Glue for blue leaf pattern carpet
NAD - - - -
27C 5th Fl Corridor C5-12
Glue for blue leaf pattern carpet
NAD - - - -
28A 1-400 Wall plaster-white skim coat
NAD - - - -
28B 1-446
Wall plaster-white skim coat
NAD - - - -
28C 1-322 Wall plaster-white skim coat
NAD - - - -
28D 3rd Fl Corridor C3-
Wall plaster-white skim coat
NAD - - - -
28E 2nd Fl Lobby C2-1
Wall plaster-white skim coat
NAD - - - -
28F 2nd Fl Corridor C2-
Wall plaster-white skim coat
NAD - - - -
28G 2nd Fl Corridor C2-
Wall plaster-white skim coat
NAD - - - -
29A 1-400 Wall plaster- Base coat
NAD - - - -
29B 1-446 Wall plaster- Base coat
NAD - - - -
29C 1-322 Wall plaster- Base coat
NAD - - - -
29D 3rd Fl Corridor C3-
Wall plaster- Base coat
NAD - - - -
29E 2nd Fl Lobby C2-1
Wall plaster- Base coat
NAD - - - -
29F 2nd Fl Corridor C2-
Wall plaster- Base coat
NAD - - - -
29G 2nd Fl Corridor C2-
Wall plaster- Base coat
©2011, Mabbett & Associates, Inc. Table 4 – Page 7 of 35 Survey Report Newington Building 1_5-11_Final.doc
Table 4 - Summary of ACM Building Results Newington VA Medical Center, Building 1
Sample No.
Sample Location
Description of Material
Percent and Type of Asbestos
Estimated Quantity
Condition ACM Location
VISN 1
RISK
Hazard Category
1-4* 30A 4th Fl Stair 1 12" white w/ black + red streaks vinyl floor tile
NAD - - - -
30B 4th Fl Stair 1 12" white w/black + red streaks vinyl floor tile
NAD - - - -
30C 4th Fl Stair 1 12" white w/ black + red streaks vinyl floor tile
NAD - - - -
31A 4th Fl Stair 1 Mastic for 12" white w/black + red streaks vinyl floor tile
NAD - - - -
31B 4th Fl Stair 1 Mastic for 12" white w/black + red streaks vinyl floor tile
NAD - - - -
31C 4th Fl Stair 1 Mastic for 12" white w/black + red streaks vinyl floor tile
NAD - - - -
32A 1-443 Ceiling plaster-skim coat
NAD - - - -
32B 1-400 Ceiling plaster-skim coat
NAD - - - -
32C 1-322 Ceiling plaster-skim coat
NAD - - - -
32D 1-322 Ceiling plaster-skim coat
NAD - - - -
32E 1-322 Ceiling plaster-skim coat
NAD - - - -
32F IN-110 Ceiling plaster-skim coat
NAD - - - -
32G 1st Fl Corridor C1-
Ceiling plaster-skim coat
NAD - - - -
33A 1-443 Ceiling plaster- Base coat
NAD - - - -
33B 1-400 Ceiling plaster- Base coat
NAD - - - -
33C 1-322 Ceiling plaster- Base coat
NAD - - - -
33D 1-322 Ceiling plaster- Base coat
NAD - - - -
33E 1-322 Ceiling…
This is the start of the file's text. The full file is on GovTribe.