Attachment E Quality Assurance Surveillance Plan.pdf
PDF 260 KB Posted
- Solicitation number
- 36C10G23R0004
About this file
This combined synopsis/solicitation seeks proposals for Electronic Data Interchange and Paper to Electronic transaction services. The Department of Veterans Affairs Veterans Health Administration requires a Healthcare Clearinghouse to support incoming and outgoing electronic transactions with over one million medical providers. Services include processing Health Insurance Portability and Accountability Act standard transactions and hosting real-time transactions. Paper claims and documentation will also be converted to electronic format. The North American Industry Classification System code is 518210 and the size standard is $40 million. Proposals are due by February 17, 2023. Questions are due by January 25, 2023 to the identified contracting staff. The agency is the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| UPDATED Solicitation 36C10G23R0004 Amendment 0002.pdf | ||
| 36C10G23R0004 0002_2.docx | DOCX document | |
| Amendment 0001 Solicitation 36C10G23R0004 VA HCCH EDIP2E Services .pdf | ||
| Amendment 0001 UPDATED Attachment B Pricing.xlsx | XLSX spreadsheet | |
| 36C10G23R0001 0001 Combined Synopsis Amendment 0001.pdf | ||
| Attachment D Question and Answers.xlsx | XLSX spreadsheet | |
| Amendment 0001 Updated Attachment A Performance Work Statement EDIP2E.pdf | ||
| 36C10G23R0004 0001_1.docx | DOCX document | |
| Solicitation 36C10G23R0004 VA HCCH EDIP2E Services.pdf | ||
| Attachment A Performance Work Statement EDIP2E .pdf | ||
| Attachment B Pricing.xlsx | XLSX spreadsheet | |
| Attachment C Past Performance Questionnaire.docx | DOCX document | |
| Attachment D Questions.xlsx | XLSX spreadsheet | |
| 36C10G23R0004_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT E QUALITY ASSURANCE PLAN
Quality Assurance Surveillance Plan For: Electronic Data Interchange (EDI) and Paper-Based Health Claims and Associated
Medical Documentation (P2E) Services
Contract/Order Number: TBD
The Contractor shall provide all resources necessary to accomplish the requirements described in the Performance Work Statement (PWS). The Contractor shall also follow all applicable privacy laws, including but not limited to the Health Insurance Portability and Accountability Act of 1996 (HIPAA; Pub.L. 104–191, 110 Stat. 1936, enacted August 21, 1996), in the performance of this requirement.
Contractor’s Name: TBD
1. PURPOSE
This Quality Assurance Surveillance Plan (QASP) provides a systematic method to monitor Contractor performance. This QASP describes:
What will be monitored?
How monitoring will take place?
Who will conduct the monitoring?
How monitoring efforts and results will be documented?
Copies of the original QASP and revisions shall be provided to the Contractor and Government officials responsible for surveillance activities. The Government can change the method of surveillance at any time.
1.1 PERFORMANCE MANAGEMENT APPROACH
The PWS sets forth “what” service is required as well as the performance standards associated with that task, as opposed to “how” the Contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Office of Office of Integrated Veteran Care or Office of Finance? to monitor the Contractor’s performance to ensure the expected outcomes or performance standards communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates to what extent the expected outcomes for the project are being achieved by the Contractor.
Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the Contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. Required processes are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus by the Government provides the Contractor flexibility to continuously improve and innovate over the course of the contract/order as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.2 PERFORMANCE MANAGEMENT STRATEGY
The Contractor is responsible for the quality of all work performed. The Contractor measures that quality through the Contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract/order regardless of whether the work is performed by Contractor employees or by Subcontractors. The Contractor’s QC Program (QCP) will set forth the procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The Contractor will implement a performance management system with processes to assess and report its performance to the designated government representative.
The government representative(s) will monitor performance by the Contractor to determine how the Contractor is performing against performance standards. The Contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively. The Contractor will be monitored and assessed throughout the period of performance of the contract/order as to either meeting or not meeting the performance thresholds stated in the Performance Metrics Section of the PWS. The Contracting Officer’s Representative (COR) will perform monthly assessments. The Performance Based Service Assessment Survey, or other method, may be used to document this assessment. A sample Performance Based Service Assessment Survey is provided at the end of this document. When a Contractor performance issue occurs, the COR will notify the Program Manager and Contracting Officer (CO). The COR/CO will engage the Contractor PM to resolve the discrepancy.
1.2.1 PERFORMANCE FEEDBACK:
At the end of each assessment period, the assessment will be reviewed by the Program Manager and CO. The COR/CO will notify the Contractor of the results no later than 15 working days after the end of the assessment period.
2. Government Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
a. Contracting Officer (CO) - The CO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract/order terms, and shall safeguard the interests of the United States in the contractual relationship. The CO shall also assure that the Contractor receives impartial, fair, and equitable treatment under this contract/order. The CO is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Assigned CO: Terri Duenas, Contracting Officer Organization: Department of Veterans Affairs, Office of Procurement, Acquisition and Logistics, Strategic Acquisition Center (SAC-V)
Assigned CS: Justin Sink, Contract Specialist Organization: Department of Veterans Affairs, Office of Procurement, Acquisition and Logistics, Strategic Acquisition Center (SAC-V)
b. Contracting Officer’s Representative (COR) - The COR is responsible for technical administration of the contract/order and shall assure proper Government surveillance of the Contractor’s performance. The COR shall keep a quality assurance file. This file shall contain all quality assessment reports. The COR is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf.
Assigned COR: TBD
c. Other Key Government Personnel – None
3. Contractor Representatives
Program Manager –TBD
b. Other Contractor Personnel – TBD
4. Performance Standards
The Performance Metrics for Deliverables and Performance Standards are outlined in the Performance Work Statement (PWS). The schedule of deliverables is outlined in Section 5 of the PWS. The table is listed below.
Performance Standards define required performance for specific tasks. The Government performs surveillance to determine if the Contractor exceeds, meets or does not meet these standards (see table of Objectives).
The Government may utilize the Performance Based Service Assessment Survey, provided at the end of this document, or other method to compare Contractor performance to the Acceptable Levels of Performance (ALPs).
5. Methods of QA Surveillance
The Government will evaluate contractor performance and deliverables against the following criteria to determine interim and final acceptance of the services provided:
Task ID Indicator Standard Accepta ble
Quality
Level
Method of
Surveillance
Incentive
5.1.1 Kick-Off Meeting Bilaterally
acceptable date (but not later than
(NLT) 10
business days of award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.1.2 Kick-Off Meeting
Agenda
NLT two (2) business days prior to the
Kick-Off
Meeting
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.1.3 Kick-Off Meeting
Minutes
NLT three
(3) business days after conclusion of the Kick-Off
Meeting
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.1 Specifications for
Hosted
Transactions
(270/271, , 276/277, 278)
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
5.2.2
Specifications for
Direct
Transactions
(270/271, 277CA,
278, 837, 837COB, 275,
835)
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.3 Business Rules for
Payer Specific
Edits (278, 837, 837COB)
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
5.2.4 Specification for
Paper to EDI
(P2E)
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.1 The Contractor
shall receive paper claims
(CMS-1500, UB-
04, and American
Dental
Association
(ADA) Dental
Forms), and documentation supporting claims from VA community providers and all
VFMP claims at a single mailing address
NLT 180
days after contract award
100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.2 The contractor
shall store original paper documentation for six calendar weeks after receipt. After six calendar weeks the contractor shall submit a shred request approval to the
COR.
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
5.2.4.3 The contractor
shall receive paper claims and supporting documentation scan paper claims and supporting documentation and convert all scanned documentation into the industry standard EDI transactions format and shall charge the VA a per page rate.
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.4 The contractor
shall convert ninety-eight percent (98%) of all clean paper-based claims and supporting documentation to
HIPAA compliant
EDI transactions within two (2) business day of receipt and one hundred percent
(100%) of all paper-based forms within five
(5) business days.
contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.5 The Contractor
shall return one hundred percent
(100%) of deficient claims and/or supporting documentation to the provider with a clear explanation of deficiencies within ten (10) business days of original receipt. Copies of
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and rejected claims and letters shall be accessible to
VA personnel.
5.2.4.6 The Contractor
shall confirm the actual date of receipt is entered into the Internal
Control Number
(ICN) and all required claims aging, and inventory controls are applied for all claims. The
Contractor shall count the actual date of receipt as day one.
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.7 The Contractor
shall provide within Claims
Attachments transactions identifiers and means to match to the existing claim.
contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.8 The contractor
shall provide all services necessary to return to sender the
“inappropriate paper” and paper forms that are illegible that may be received, i.e., claims that are not contained on designated claims forms or valid medical documentation.
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
5.2.4.9 The EDI 275
transaction file shall include a unique Trace
Number (TRN) segment that contains the
Provider
Attachment
Control Number.
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.10 The EDI 837
transaction file shall include a
Paperwork
(PWK) segment that contains the
Attachment
Control Number to include the matching unique
TRN.
contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.11 When additional
accompanying
EDI Standard
Transactions are adopted and mandated by
CMS for use at a future date, the
Contractor shall comply with those
EDI Standard
Transactions by the compliance dates as specified by the
Department of
Health and
Human Services
(HHS).
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.12 The Contractor
shall meet a data quality performance metric of >99.5% for overall data quality inclusive of Optical
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Exercise of
Character
Recognition
(OCR) and keyed data (including handwritten forms).
Analysis of contractor's progress reports.
option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.13 If the VA
discovers a scanning error after submission from the contractor, the contractor will assist the VA with resolution of the error so the claim may be processed.
contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.14 If the VA
discovers a scanning error after submission from the contractor, the contractor will assist the VA with resolution of the error so the claim may be processed.
contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.4.15 The contractor
shall provide for electronic document retention of received paper claims or paper medical documentation for a minimum of six years from the date received. The stored electronic documents retained in the contractor system shall be accessible and viewable to
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
VA employees per
Section 508 of the
Rehabilitation Act
(29 U.S.C. § 794d) as outlined in
PWS Section 16. .
The VA shall be able to establish the folder taxonomy within the contractor’s system.
5.2.5 Implementation
Work Breakdown
Structure and
Schedule with
Durations, Predecessors, and
Responsible
Parties
NLT 30 days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.6 Implementation
Development and
Reports
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.7 Implementation
Testing and
Report
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.8 Implementation
Deployment and
Report
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation
Analysis of contractor's progress reports.
option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.9 Weekly
Implementation
Meetings and
Status Reports
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.10 Create and
Manage Payer
Identifiers
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.11.1 Communication
Plan
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.11.2 Provider
Communication
System
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
5.2.11.3 Secure Email
System
NLT 180
days after contract award
Per PWS 100%
100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.2.11.4 Emergency Call-
Back Service
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.3.1 EDI Enrollment
Process
NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.3.2 Transactions NLT 180
days after contract award
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.1 Daily Claim (837)
Transaction
Counts Report by
Payer ID, Claim
Type and
Provider
Daily Per PWS 100% 100%
Inspection or
Direct
Observation or
Exercise of option period and past performance and/or other incentives proposed and progress reports.
5.4.2 Monthly
Summary Claim
(837) Transaction
Counts by Payer
ID, Claim Type and Provider
Report
NLT the 4th business day of each month
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.3 Daily 835 Health
Care
Payment/Advice
Transactions
Picked up by
Provider Report
Daily Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.4 Monthly
Summary 835
Health Care
Payment/Advice
Transactions
Picked Up by
Provider Report
NLT the 4th business day of each month
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.5 Daily Real-Time
Transaction
Volume (270/271, 276/277/277CA,
278) Report
Daily Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.6 Monthly
Summary of Real-
Time Transaction
Volume (270/271, 276/277/277CA,
278) Report
NLT the 4th business day of each month
Per PWS 100% 100%
Inspection or
Direct
Observation progress reports.
option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.7 Daily
Attachments (275)
Transaction
Counts Report
Daily Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.8 Monthly
Summary
Attachments (275)
Transaction
Counts Report
NLT the 4th business day of each month
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.9 Daily P2E
Reports
Daily Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.10 Monthly
Summary P2E
Reports
NLT the 4th business day of each month
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
5.4.11 Ad Hoc Reports NLT five (5)
business days after request
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.12 Monthly Status
Meeting
NLT than the seventh (7th) day of each month
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.12.1 Monthly Status
Meeting Agenda
& Other
Supporting
Documentation
NLT two (2) business days prior to the meeting
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.4.12.2 Monthly Status
Meeting Minutes
NLT three
(3) business days after the meeting
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and accepted by
VHA
5.5 Transition
Support A.
Transition Plan B.
Certification of
Transition
Completion
(Optional)
Bilateral agreement
TBD
Per PWS 100% 100%
Inspection or
Direct
Observation or
Analysis of contractor's progress reports.
Exercise of option period and past performance and/or other incentives proposed and
6. METHODS OF QA SURVEILLANCE
Various methods exist to monitor performance. The COR shall use the surveillance methods listed below in the administration of this QASP.
a. DIRECT OBSERVATION. (Can be performed periodically or through 100% surveillance.)
b. PERIODIC INSPECTION. (Evaluates outcomes on a periodic basis. Inspections may be scheduled [Daily, Weekly, Monthly, Quarterly, or annually] or unscheduled, as required.)
c. USER SURVEY. (Combines elements of validated user complaints and random sampling.
Random survey is conducted to solicit user satisfaction. May also generate inspections and sampling.)
d. VALIDATED USER/CUSTOMER COMPLAINTS. (Relies on the patient to identify deficiencies. Complaints are then investigated and validated.)
e. 100% INSPECTION. (Evaluates all outcomes.)
f. PERIODIC SAMPLING. (Variation of random sampling. However, sample is only taken when a problem/deficiency is suspected. Sample results are applicable only for the specific work inspected. Since sample is not entirely random, it cannot be applied to total activity performance.)
g. RANDOM SAMPLING. (Designed to evaluate performance by randomly selecting and inspecting a sample of cases.
h. Progress or status meetings.
i. Analysis of contractor's progress reports. (Evaluate cost, schedule, etc.)
Each month, the COR shall review the Contractor’s performance/generated documentation corresponding to a validated customer complaint or validated inability to perform in accordance with the ALP in a specific area and document your results accordingly. This assessment shall be placed in the COR’s QA file.
7. ACCEPTABLE LEVELS OF PERFORMANCE (ALP)
Metrics and methods are designed to determine if performance exceeds, meets, or does not meet a given standard and ALP.
The ALPs are included in the Performance Metrics Section of the PWS for Contractor performance and are structured to allow the Contractor to manage how the work is performed, while providing negative incentives for performance shortfalls.
8. Incentives
The Government shall consider the Contractor’s performance when deciding to exercise any options.
9. Documenting Performance
a. Acceptable Performance
The Government shall document acceptable performance accordingly. Any report may become a part of the supporting documentation for any contractual action.
b. Unacceptable performance
When unacceptable performance occurs, the COR shall inform the CO. This will always be in writing although when circumstances necessitate immediate verbal communication, that communication will be followed in writing. The COR shall document the discussion and place it in the COR file.
When the CO determines formal written communication is required, the COR shall prepare a Contract Discrepancy Report (CDR) and present it to the Contractor's program manager.
The Contractor shall acknowledge receipt of the CDR in writing to the CO. The CDR will state how long after receipt the Contractor has to take corrective action. The CDR will also specify if the Contractor is required to prepare a corrective action plan to document how the Contractor shall correct the unacceptable performance and avoid a recurrence. The CO shall review the Contractor's corrective action plan to determine acceptability.
Any CDRs may become a part of the supporting documentation for any contractual action deemed necessary by the CO.
10. Frequency of Measurement
a. Frequency of Measurement.
During contract/order performance, the COR will periodically analyze whether the negotiated frequency of surveillance is appropriate for the work being performed, and at a minimum shall be twice a year.
b. Frequency of Performance Assessment Meetings.
The COR shall meet with the Contractor monthly to assess performance and shall provide a written assessment to the CO.
Quality of submission should also be considered. See examples below. Error rates or resubmits for content flaws would be the measures associated with these standards.
Accuracy - Work Products shall be accurate in presentation, technical content, and adhere to accepted elements of style.
Clarity - Work Products shall be clear and concise. Any/All diagrams shall be easy to understand and be relevant to the supporting narrative.
Consistency to Requirements - All work products must satisfy the requirements of this PWS.
File Editing - All text and diagrammatic files shall be editable by the VA in Windows-based or Adobe environments/platforms.
Format - Follow specified VA Directives or Manuals and/or best business practices.
Presentations - Presentations shall be clear, concise, executive-focused, and written in plain, clear English with minimal jargon, understandable by lay persons. The quality of deliverables directly contributes to organizational communications.
Project Plan - Project Plan shall be comprehensive; recognize and address authority, perceptions, and concerns of stakeholders; incorporate scope of requisite requirements across the organization and/or agency.
Reports - There shall be no omissions in the reports, documents or functional requirements.
Publications and other documents - Deliverables shall be in formats appropriate to target audiences; user friendly, clear, thorough and comprehensive.
Meeting support - Pre-meeting preparations and logistics; smooth meeting operations;
comprehensive post-meeting summaries to include but not limited to: Minutes, Action Items, Attendees, Program Objectives and Milestones and major decision points.
Analyses and Assessments - Analyses and assessments are performed with accuracy, completeness and adherence to industry best practices.
Obtain stakeholder input - Deliverables shall consist of the timely implementation of input mechanisms and shall consist of an accurate and comprehensive synthesis of results and recommendations. Integration of relevant stakeholder input documented for deliverable.
The following rating definitions can be used as a guide when completing the Performance Based Service Assessment:
Performance Rating
Criteria
Exceptional Performance meets all contractual requirements and exceeds most to the government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with almost no minor problems for which corrective actions were taken by the contractor, and the corrective actions were highly effective.
Very Good Performance meets all contractual requirements and exceeds some to the government’s benefit. The contractual performance element or sub-element being assessed was accomplished with very few minor problems for which corrective actions taken by the contractor were highly effective.
Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Below Satisfactory
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Poor Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
PERFORMANCE BASED SERVICE ASSESSMENT
CONTRACTOR: GOVERNMENT REQUIRING ACTIVITY
CONTRACT/ORDER NUMBER/ TITLE:
PERIOD COVERED:
Place an X in the appropriate response
Performance Standards for Assessment VERY ***BELOW ***
EXCELL
ENT
GOO
D
SATISFACT
ORY
SATISFACT
ORY POOR
VALUE 5 4 3 2 1
A. MEETING TECHNICAL NEEDS:
1. What level of understanding does the contractor have of my technical needs and my mission requirements?
2. What level of efficiency and effectiveness does the contractor demonstrate in meeting my requirements?
3. Overall, how well does the contractor meet my technical needs and mission requirements?
B. PROJECT MILESTONES AND SCHEDULE:
1. How well does the contractor meet my established milestones and project dates?
2. How timely are products, reports, and invoices completed, reviewed, and delivered?
3. How would you assess the reasonableness of cost of the services being provided and the accuracy of submitted invoice?
4. How well does the contractor notify me in advance about potential milestones and scheduling problems so that I have enough time to correct them?
C. PROJECT STAFFING:
1. How current is the expertise of those contractors performing requested tasks?
2. Do contractor personnel possess the necessary knowledge, skills and ability to accomplish assigned tasks?
3. Are the staffing levels assigned by contractor appropriate for accomplishing the mission?
D. PERFORMANCE MEASURES:
1. Overall, how well does the contractor meet my established target rates for each claims processing section?
2. How accurately are claims entered into the VA- FSC computer systems?
3. How well does the contractor adhere the VA ICARE values?
4. What overall rating would you give to the contractor's performance?
** Ratings for a Performance Standard are calculated by adding the individual scores under a Performance Standard and dividing it by the number of sub-standards under that Performance Standard.
***Poor and Below Satisfactory ratings must be explained in Section II (Narrative Clarification) below. Must be supportive and objective
II NARRATIVE
CLARIFICATION
(USE ADDITIONAL SPACE
AS REQUIRED)
Typed Name And Title of Government Project Lead/ Date
File details come from the government source that posted it. Updated .