About this file

This file is a pricing template for labor rates applicable to the VA's IDIQ MATOC National Construction Program contract.

The spreadsheet establishes standardized labor rate structures for construction services across the enterprise-wide procurement. It serves as Appendix L to Section L of the RFP and provides the pricing framework that offerors must utilize when submitting proposals for the multiple award task order contract. The labor rates template supports the VA's objective to award multiple IDIQ MATOCs with a minimum of ten awardees each across three SDVOSB-designated pools and one National Unrestricted pool. This pricing document is essential for ensuring consistent, comparable proposals across all offerors competing for construction, renovation, maintenance, and repair services nationwide across the 50 United States and territories. The template was updated as of November 23, 2026, in conjunction with Amendment 0002 to the solicitation.

View the file

Other files

File Type Posted
Appendix_L_03 Work_Sample_Cover_Sheet 20261123_tracked changes.docx DOCX document
Attachment_5 On_Off_Ramping_Procedures 20261123_tracked changes.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261123.xlsx XLSX spreadsheet
Attachment_1 DBnC Scope_20261123_tracked changes.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261123_tracked changes.docx DOCX document
36C10F27R0003 0002.pdf PDF
Attachment_3 Section_L Instructions_to_Offerors_20261123_tracked changes.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261123_tracked changes.docx DOCX document
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261123.docx DOCX document
Appendix_L_06 Team Structure Format_20261123_tracked changes.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261113_A01.docx DOCX document
36C10F27R0003_RFI_Tracker_Industry Version .xlsx XLSX spreadsheet
36C10F27R0003 0001.pdf PDF
Attachment_1 DBnC Scope_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261104.docx DOCX document
Appendix_L_06 Team Structure Format_20261104.docx DOCX document
Appendix_L_02 Choice_of_Competition 20261104.docx DOCX document
Attachment_1 Draft DBnC Scope_20261104.docx DOCX document
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Appendix_L_09 Small Business Participation Commitment Document SBPCD_20261104.pdf PDF
Attachment_5 On_Off_Ramping_Procedures 20261104.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261104.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261104.xlsx XLSX spreadsheet
Appendix_L_04 Cross Reference Matrix_20261104.docx DOCX document
Appendix_L_01 Offeror_Company_Information 20261104.docx DOCX document
Appendix_L_07 Pool Breakdown 20261104.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261104.xlsx XLSX spreadsheet
Appendix_L_03 Work_Sample_Cover_Sheet 20261104.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20261104.docx DOCX document
36C10F27R0003.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Labor Rates

APPENDIX L-08 | LABOR RATES TABLE
Solicitation 36C10F27R0003 | Design-Build & Construction (DBnC) for Veterans Affairs Healthcare Enterprise
Offeror Name
Ordering PeriodBaseOption 1Option 2Option 3Option 4
Period Dates2027-20282028-20292029-20302030-20312031-2032
Escalation RateN/A3.0%3.0%3.0%3.0%
Enter escalation as a percentage (for example, 3.0%). Option-year rates equal the prior year rate multiplied by (1 + escalation rate).
General CategoryLabor CategoryBase RateOption 1 RateOption 2 RateOption 3 RateOption 4 Rate
Program LeadershipPRINCIPAL
Project ManagementPROJECT MANAGER, SR
Project ManagementPROJECT MANAGER, MID
Project ManagementPROJECT MANAGER, JR
Construction ManagementCONSTRUCTION MANAGER, SR
Construction ManagementCONSTRUCTION MANAGER, MID
Construction ManagementCONSTRUCTION MANAGER, JR
Field SupervisionSUPERINTENDENT, SR
Field SupervisionSUPERINTENDENT, MID
Field SupervisionSUPERINTENDENT, JR
SafetySITE SAFETY REPRESENTATIVE, SR
SafetySITE SAFETY REPRESENTATIVE, MID
SafetySITE SAFETY REPRESENTATIVE, JR
QualityQUALITY CONTROL - CONSTRUCTION, SR
QualityQUALITY CONTROL - CONSTRUCTION, MID
QualityQUALITY CONTROL - CONSTRUCTION, JR
Cost ManagementCOST ESTIMATOR, SR
Cost ManagementCOST ESTIMATOR, MID
Cost ManagementCOST ESTIMATOR, JR
SchedulingSCHEDULER, SR
SchedulingSCHEDULER, MID
SchedulingSCHEDULER, JR
ProcurementPROCUREMENT, SR
ProcurementPROCUREMENT, MID
ProcurementPROCUREMENT, JR
Industrial HygieneINDUSTRIAL HYGIENIST, SR
Industrial HygieneINDUSTRIAL HYGIENIST, MID
Industrial HygieneINDUSTRIAL HYGIENIST, JR
ArchitectureSR. ARCHITECT
ArchitectureARCHITECT
ArchitectureJR. ARCHITECT
EngineeringSR. MECHANICAL ENGINEER
EngineeringMECHANICAL ENGINEER
EngineeringJR. MECHANICAL ENGINEER
EngineeringSR. ELECTRICAL ENGINEER
EngineeringELECTRICAL ENGINEER
EngineeringJR. ELECTRICAL ENGINEER
EngineeringSR. CIVIL/STRUCTURAL ENGINEER
EngineeringCIVIL/STRUCTURAL ENGINEER
EngineeringJR. CIVIL/STRUCTURAL ENGINEER
EngineeringSR. FIRE PROTECTION ENGINEER
EngineeringFIRE PROTECTION ENGINEER
EngineeringJR. FIRE PROTECTION ENGINEER
QualityQUALITY CONTROL - DESIGN, SR
QualityQUALITY CONTROL - DESIGN, MID
QualityQUALITY CONTROL - DESIGN, JR
Design SupportDRAFTSPERSON
Design SupportSPECIFICATION WRITER

&BAppendix L-08

Page &P of &N

File details come from the government source that posted it. Updated .