Appendix_L_08_Price_Labor_Rates_20261123.xlsx
XLSX spreadsheet 13 KB Posted
- Solicitation number
- 36C10F27R0003
About this file
This file is a pricing template for labor rates applicable to the VA's IDIQ MATOC National Construction Program contract.
The spreadsheet establishes standardized labor rate structures for construction services across the enterprise-wide procurement. It serves as Appendix L to Section L of the RFP and provides the pricing framework that offerors must utilize when submitting proposals for the multiple award task order contract. The labor rates template supports the VA's objective to award multiple IDIQ MATOCs with a minimum of ten awardees each across three SDVOSB-designated pools and one National Unrestricted pool. This pricing document is essential for ensuring consistent, comparable proposals across all offerors competing for construction, renovation, maintenance, and repair services nationwide across the 50 United States and territories. The template was updated as of November 23, 2026, in conjunction with Amendment 0002 to the solicitation.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Labor Rates
| APPENDIX L-08 | LABOR RATES TABLE | ||||||
| Solicitation 36C10F27R0003 | Design-Build & Construction (DBnC) for Veterans Affairs Healthcare Enterprise | ||||||
| Offeror Name | ||||||
| Ordering Period | Base | Option 1 | Option 2 | Option 3 | Option 4 | |
| Period Dates | 2027-2028 | 2028-2029 | 2029-2030 | 2030-2031 | 2031-2032 | |
| Escalation Rate | N/A | 3.0% | 3.0% | 3.0% | 3.0% | |
| Enter escalation as a percentage (for example, 3.0%). Option-year rates equal the prior year rate multiplied by (1 + escalation rate). | ||||||
| General Category | Labor Category | Base Rate | Option 1 Rate | Option 2 Rate | Option 3 Rate | Option 4 Rate |
| Program Leadership | PRINCIPAL | |||||
| Project Management | PROJECT MANAGER, SR | |||||
| Project Management | PROJECT MANAGER, MID | |||||
| Project Management | PROJECT MANAGER, JR | |||||
| Construction Management | CONSTRUCTION MANAGER, SR | |||||
| Construction Management | CONSTRUCTION MANAGER, MID | |||||
| Construction Management | CONSTRUCTION MANAGER, JR | |||||
| Field Supervision | SUPERINTENDENT, SR | |||||
| Field Supervision | SUPERINTENDENT, MID | |||||
| Field Supervision | SUPERINTENDENT, JR | |||||
| Safety | SITE SAFETY REPRESENTATIVE, SR | |||||
| Safety | SITE SAFETY REPRESENTATIVE, MID | |||||
| Safety | SITE SAFETY REPRESENTATIVE, JR | |||||
| Quality | QUALITY CONTROL - CONSTRUCTION, SR | |||||
| Quality | QUALITY CONTROL - CONSTRUCTION, MID | |||||
| Quality | QUALITY CONTROL - CONSTRUCTION, JR | |||||
| Cost Management | COST ESTIMATOR, SR | |||||
| Cost Management | COST ESTIMATOR, MID | |||||
| Cost Management | COST ESTIMATOR, JR | |||||
| Scheduling | SCHEDULER, SR | |||||
| Scheduling | SCHEDULER, MID | |||||
| Scheduling | SCHEDULER, JR | |||||
| Procurement | PROCUREMENT, SR | |||||
| Procurement | PROCUREMENT, MID | |||||
| Procurement | PROCUREMENT, JR | |||||
| Industrial Hygiene | INDUSTRIAL HYGIENIST, SR | |||||
| Industrial Hygiene | INDUSTRIAL HYGIENIST, MID | |||||
| Industrial Hygiene | INDUSTRIAL HYGIENIST, JR | |||||
| Architecture | SR. ARCHITECT | |||||
| Architecture | ARCHITECT | |||||
| Architecture | JR. ARCHITECT | |||||
| Engineering | SR. MECHANICAL ENGINEER | |||||
| Engineering | MECHANICAL ENGINEER | |||||
| Engineering | JR. MECHANICAL ENGINEER | |||||
| Engineering | SR. ELECTRICAL ENGINEER | |||||
| Engineering | ELECTRICAL ENGINEER | |||||
| Engineering | JR. ELECTRICAL ENGINEER | |||||
| Engineering | SR. CIVIL/STRUCTURAL ENGINEER | |||||
| Engineering | CIVIL/STRUCTURAL ENGINEER | |||||
| Engineering | JR. CIVIL/STRUCTURAL ENGINEER | |||||
| Engineering | SR. FIRE PROTECTION ENGINEER | |||||
| Engineering | FIRE PROTECTION ENGINEER | |||||
| Engineering | JR. FIRE PROTECTION ENGINEER | |||||
| Quality | QUALITY CONTROL - DESIGN, SR | |||||
| Quality | QUALITY CONTROL - DESIGN, MID | |||||
| Quality | QUALITY CONTROL - DESIGN, JR | |||||
| Design Support | DRAFTSPERSON | |||||
| Design Support | SPECIFICATION WRITER |
&BAppendix L-08
Page &P of &N
File details come from the government source that posted it. Updated .