This document is Amendment 0002 to a Request for Information (RFI) issued by the Department of Veterans Affairs, Office of Construction and Facilities Management. The amendment extends the RFI deadline to December 14, 2026, and revises multiple solicitation provisions for a Design-Build Construction (DBnC) Multiple Award Task Order Contract (MATOC) with a shared cumulative ceiling of $7.5 billion across all contracts and pools.

Key revisions include: (1) reduced SDVOSB bonding requirements from $30 million single/$75 million aggregate capacity to $15 million single/$30 million aggregate capacity, with clarified surety letter requirements; (2) clarified that only the Prime Offeror, Joint Venture members, and properly documented team members receive evaluation credit, eliminating affiliate experience as a standalone basis; (3) added Healthcare Facility definition and clarified that qualifying work samples must be performed at Healthcare Facilities with concurrent project experience criteria revised from Design-Build to construction services projects; (4) converted past performance evaluation to Pass/Fail methodology using CPARS evaluations and Past Performance Questionnaires with ongoing project submission requirements; (5) clarified approximate award quantities by pool and ordering period structure; (6) revised Rule-of-Two procedures for task order competitions, removed prior dollar-threshold limitations, and updated the protest threshold from $25 million to $10 million; (7) increased available work sample identifiers from six to twenty-two; and (8) updated the Post Solicitation Conference end time from 4:00 PM to 2:00 PM EST and clarified that the 200-page limitation applies only to work sample documentation.

View the file

Other files

File Type Posted
Appendix_L_03 Work_Sample_Cover_Sheet 20261123_tracked changes.docx DOCX document
Attachment_5 On_Off_Ramping_Procedures 20261123_tracked changes.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261123.xlsx XLSX spreadsheet
Attachment_1 DBnC Scope_20261123_tracked changes.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261123_tracked changes.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261123_tracked changes.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261123_tracked changes.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261123.xlsx XLSX spreadsheet
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261123.docx DOCX document
Appendix_L_06 Team Structure Format_20261123_tracked changes.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261113_A01.docx DOCX document
36C10F27R0003_RFI_Tracker_Industry Version .xlsx XLSX spreadsheet
36C10F27R0003 0001.pdf PDF
Attachment_1 DBnC Scope_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261104.docx DOCX document
Appendix_L_06 Team Structure Format_20261104.docx DOCX document
Appendix_L_02 Choice_of_Competition 20261104.docx DOCX document
Attachment_1 Draft DBnC Scope_20261104.docx DOCX document
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Appendix_L_09 Small Business Participation Commitment Document SBPCD_20261104.pdf PDF
Attachment_5 On_Off_Ramping_Procedures 20261104.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261104.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261104.xlsx XLSX spreadsheet
Appendix_L_04 Cross Reference Matrix_20261104.docx DOCX document
Appendix_L_01 Offeror_Company_Information 20261104.docx DOCX document
Appendix_L_07 Pool Breakdown 20261104.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261104.xlsx XLSX spreadsheet
Appendix_L_03 Work_Sample_Cover_Sheet 20261104.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20261104.docx DOCX document
36C10F27R0003.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 2

0002 11-24-2026

003C4

Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 1800 G St NW STE 416-B Washington DC 20006

101F

Department of Veterans Affairs Office of Construction and Facilities Management 1800 G St NW STE 416-B Washington DC 20006

To all Offerors/Bidders

36C10F27R0003

11-04-2026

X

X X

Amendment 0002 revises the solicitation to: (1) extend the Request for Information (RFI) deadline to December 14, 2026;

(2) revise SDVOSB bonding requirements; (3) clarify evaluation credit for Joint Venture members and formally documented team members; (4) clarify Healthcare Facility experience requirements and concurrent project experience criteria; (5) revise past performance evaluation to a Pass/Fail methodology and associated submission requirements; (6) revise MATOC award and ceiling language; and (7) update task order competition procedures, including Rule of Two procedures.

Andrew Page

Amendment 2 – Summary of Changes

The purpose of this amendment is to provide the below revised solicitation appendices and attachments:

- Appendix_L_03 Work_Sample_Cover_Sheet

- Appendix_L_05 Self Scoring Matrix

- Appendix_L_06 Team Structure Format

- Appendix_L_08_Price_Labor_Rates_20261123

- Appendix_L_11 Past Performance Questionnaire_DBnC MATOC

- Attachment_1 DBnC Scope

- Attachment_2 DBnC_Ordering_Procedures

- Attachment_3 Section_L Instructions_to_Offerors

- Attachment_4 Section_M Evaluation_Criteria

- Attachment_5 On_Off_Ramping_Procedures

Changes within the files include, but are not limited to, the following:

1. RFI Date Updates o Updated the RFI due date to December 14, 2026.

2. Post Solicitation Conference o Updated end time from 4:00 PM EST to 2:00 PM EST.

3. Page Limitation Clarifications o Clarified that the 200-page limitation applies only to work sample documentation.

o Clarified that required forms, templates, CPARS reports, PPQs, teaming documents, and similar supporting materials do not count toward the page limitation.

4. Joint Venture and Teaming Documentation o Clarified requirements for Joint Venture Agreements and other formal teaming arrangements.

o Clarified that only the Prime Offeror, Joint Venture members, and properly documented team members will receive evaluation credit for submitted experience.

5. Bonding Requirements o Revised Block 13(b) of the SF1442 to indicate an offer guarantee is not required.

o Revised SDVOSB bonding requirements from $30M single / $75M aggregate capacity to $15M single / $30M aggregate capacity.

o Clarified surety letter requirements.

6. Relevant Experience Requirements o Removed affiliate experience as a standalone basis for evaluation credit. Under the revised solicitation, corporate affiliation or common ownership alone does not provide evaluation credit. Experience will only be evaluated for the Prime Offeror, Joint Venture members, or team members properly identified in Appendix_L_06 and supported by the required Joint Venture Agreement, Teaming Agreement, Letter of Intent, or other solicitation-required documentation.

o Added a definition of Healthcare Facility.

o Clarified that qualifying work samples must be performed at Healthcare Facilities for applicable evaluation criteria.

o Clarified requirements for concurrent project experience.

o Revised project magnitude criteria from Design-Build projects to construction services projects.

7. Past Performance Evaluation o Revised past performance evaluation to a Pass/Fail methodology.

o Clarified use of CPARS evaluations and Past Performance Questionnaires (PPQs).

o Added requirements regarding ongoing project CPARS submissions.

8. MATOC Structure and Awards o Clarified approximate award quantities by pool.

o Clarified that the $7.5B ceiling is a shared cumulative ceiling across all contracts and pools.

o Clarified the ordering period structure.

9. Task Order Competition Procedures o Revised Rule-of-Two procedures for task order competitions.

o Removed prior dollar-threshold limitations impacting pool selection.

o Updated the task order protest threshold from $25M to $10M.

10.Proposal and Evaluation Support Documents o Increased available work sample identifiers from six (6) to twenty-two (22).

o Revised scoring and evaluation worksheets to align with the updated evaluation approach and improve self-scoring verification.