About this file

This file is an RFI (Request for Information) tracking log for a Department of Veterans Affairs (VA) multiple-award indefinite-delivery, indefinite-quantity (IDIQ) contract solicitation numbered 36C10F27R0003 for Design-Build and Construction (DBnC) Multiple Award Task Order Contract (MATOC) services. The log documents 137 industry questions received and Government responses as of November 10, 2026, with 53 questions remaining open and 84 resolved at the time of this log version.

The solicitation seeks to establish four separate contractor pools: three Service-Disabled Veteran-Owned Small Business (SDVOSB) pools designated as Eastern (Pool 1), Central (Pool 2), and Western (Pool 3), with a minimum of ten awardees each, plus one National Unrestricted Pool with a minimum of ten awardees. The contract will provide design-build and design-bid-build construction services for VA healthcare facilities nationwide. Key evaluation factors include relevant experience (up to 22 work samples permitted), past performance, small business participation (Unrestricted Pool only), and pricing based on fully burdened labor rates submitted via Appendix L-08. Minimum qualification requirements for SDVOSB competitors include single surety bonding capacity of $30 million and aggregate capacity of $75 million. Proposals are due January 15, 2027 (extended from the original December 4, 2026 date per Amendment 0001). The RFI log reflects numerous clarifications regarding work sample eligibility criteria, joint venture participation rules, labor category definitions, attachment completeness issues, and proposal organization requirements, indicating the Government anticipates issuing additional amendments to address identified discrepancies in the solicitation documents.

View the file

Other files

File Type Posted
Appendix_L_03 Work_Sample_Cover_Sheet 20261123_tracked changes.docx DOCX document
Attachment_5 On_Off_Ramping_Procedures 20261123_tracked changes.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261123.xlsx XLSX spreadsheet
Attachment_1 DBnC Scope_20261123_tracked changes.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261123_tracked changes.docx DOCX document
36C10F27R0003 0002.pdf PDF
Attachment_3 Section_L Instructions_to_Offerors_20261123_tracked changes.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261123_tracked changes.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261123.xlsx XLSX spreadsheet
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261123.docx DOCX document
Appendix_L_06 Team Structure Format_20261123_tracked changes.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261113_A01.docx DOCX document
36C10F27R0003 0001.pdf PDF
Attachment_1 DBnC Scope_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261104.docx DOCX document
Appendix_L_06 Team Structure Format_20261104.docx DOCX document
Appendix_L_02 Choice_of_Competition 20261104.docx DOCX document
Attachment_1 Draft DBnC Scope_20261104.docx DOCX document
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Appendix_L_09 Small Business Participation Commitment Document SBPCD_20261104.pdf PDF
Attachment_5 On_Off_Ramping_Procedures 20261104.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261104.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261104.xlsx XLSX spreadsheet
Appendix_L_04 Cross Reference Matrix_20261104.docx DOCX document
Appendix_L_01 Offeror_Company_Information 20261104.docx DOCX document
Appendix_L_07 Pool Breakdown 20261104.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261104.xlsx XLSX spreadsheet
Appendix_L_03 Work_Sample_Cover_Sheet 20261104.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20261104.docx DOCX document
36C10F27R0003.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Log

Solicitation 36C10F27R0003 – IDIQ Design-Build MATOC
Request for Information (RFI) / Offeror Question Tracking Log
Total RFIs182Open53Resolved129
RFI No.RFI / QuestionDate ReceivedResolved? (Yes/No)Government ResponseRequires RFP Amendment? (Yes/No)
1Please confirm an offeror competing in more than one SDVOSB Pool shall submit one complete, separate proposal (Volumes I, II and IV) for each pool, named per para 1.9.2.3. If a single proposal covering multiple pools is acceptable, please describe how pool-specific information (Appendix L-05 state scores and PPQ pool designations) should be presented.11/04/2026YesYes. Offerors competing in more than one SDVOSB Pool shall submit a complete proposal for each Pool competition in which they choose to compete. Proposal files shall be organized and named in accordance with Section L paragraph 1.9.2.3. Pool-specific information, including Appendix L-05 scoring and any associated past performance submissions, shall correspond to the specific Pool for which the proposal is submitted. A single combined proposal covering multiple Pool competitions is not contemplated by the solicitation.Yes
2Please confirm work samples for construction at VA or non-VA healthcare facilities delivered by either design-build or design-bid-build are eligible for magnitude points under para 2.5.2.5. If only design-build work samples are eligible, please confirm.11/04/2026YesFor purposes of Sections 2.5.2.5 and 2.5.2.6, both Design-Build and Design-Bid-Build construction projects are eligible for magnitude scoring provided the work sample otherwise satisfies the requirements of Section L.Yes
3Para 2.5.1.2(2) requires work samples to be completed within the last seven years, or "projects underway with construction documented to be at least 70% complete, as of the solicitation release date." Healthcare construction projects commonly run multiple years, so a 70% threshold excludes many current, highly relevant healthcare projects from consideration. Would the VA accept projects that are more than 50% complete?11/04/2026YesNo. The solicitation requirement remains unchanged. In accordance with Section L, paragraph 2.5.1.2(2), ongoing projects must be documented as at least seventy percent (70%) complete as of the solicitation release date to qualify as work samples. The Government has no current plans to revise this requirement.No
4Percent complete is measured "as of the solicitation release date" (11/04/2026). Proposals are due 12/04/2026, and the release date may shift if the solicitation is amended. Would the VA accept projects “percent complete measured by the “proposal due date?11/04/2026YesNo. In accordance with Section L paragraph 2.5.1.2(2), the percentage completion of an ongoing project shall be measured as of the solicitation release date. The proposal due date will not be used as the measurement date for determining work sample eligibility.No
5Section L requires the percent complete of ongoing work samples to be documented but does not identify the documentation the Government will accept. Please provide instruction or required documentation that would be acceptable for “projects underway” that are used that are not fully complete.11/04/2026YesFor ongoing projects submitted as work samples, the Offeror shall provide documentation sufficient to demonstrate that construction was at least seventy percent (70%) complete as of the solicitation release date. Acceptable supporting documentation may include, but is not limited to, owner-approved pay applications, schedule of values, project schedules, progress reports, interim CPARS reports, owner correspondence, or other contemporaneous project records demonstrating the level of completion. The Government reserves the right to evaluate the sufficiency of the submitted documentation.No
6Section L does not define "VA healthcare facilities or non-VA healthcare facilities." Please provide further guidance on what is acceptable as far as work samples that can be used under this definition.11/04/2026YesFor purposes of evaluation under Section L, references to VA healthcare facilities or non-VA healthcare facilities are limited to facilities whose primary purpose is the delivery of healthcare services or healthcare support functions. Examples include VA medical centers, hospitals, clinics, ambulatory care facilities, medical research facilities, and similar healthcare-related facilities.Yes
7Please advise whether the Work Samples MUST be at a healthcare facility to be considered relevant, or whether the Government will accept any work (at any facility) that incorporates 1 or more of the 14 construction program areas listed in Section L 2.5.2.1.
11/04/2026YesYes. Work samples must be performed at a VA healthcare facility or non-VA healthcare facility to be considered relevant under this solicitation. The primary construction program areas identified in Section L 2.5.2.1 describe the types of construction experience that may be evaluated; however, qualifying work samples must have been performed at facilities whose primary purpose is healthcare delivery or healthcare support functions. Examples include hospitals, medical centers, clinics, ambulatory care facilities, medical research facilities, and similar healthcare-related facilities.Yes
8Can the Government clarify whether there is any recency requirement for the submitted Work Samples, or whether offerors may submit any project regardless of when it was completed?11/04/2026YesYes. The solicitation contains a recency requirement. In accordance with Section L, paragraph 2.5.1.2(2), work samples must either (1) have been completed within seven (7) years of the solicitation release date, or (2) be ongoing projects with construction documented as at least seventy percent (70%) complete as of the solicitation release date. Projects that do not meet these requirements are not eligible as work samples.No
9Can offerors submit Work Samples for ongoing projects, or must they be 100% complete?11/04/2026YesYes. Offerors may submit ongoing construction projects as work samples. In accordance with Section L paragraph 2.5.1.2(2), ongoing projects must be documented as at least seventy percent (70%) complete as of the solicitation release date. Projects are not required to be 100% complete to be eligible as work samples.No
10Are we allowed to submit/use previously completed PPQs?11/04/2026YesYes. Section L, Paragraph 2.6.3 requires Offerors to submit a Past Performance Questionnaire (PPQ) when a work sample is a non-federal/commercial project or when a CPARS report has not been generated or finalized for a federal project. The solicitation does not require that a PPQ be newly generated for this procurement. Accordingly, Offerors may submit previously completed PPQs, provided the PPQ relates to the submitted work sample and contains sufficient information for the Government to evaluate past performance in accordance with Section L, Paragraphs 2.6.1 through 2.6.3 and Section M, Factor 2, Past Performance. The Government reserves the right to verify any submitted PPQ informationNo
11Section L 2.5.2.5 is titled magnitude of design-build construction services projects, but the scoring sentence awards points for every construction services work sample. Do design-bid-build construction work samples receive magnitude points, or only design-build work samples?11/04/2026YesSections L 2.5.2.5 and 2.5.2.6 are intended to evaluate the magnitude of qualifying construction services projects. Consistent with the overall scope of this MATOC, which includes both Design-Build (DB) and Design-Bid-Build (DBB) project delivery methods, both DB and DBB healthcare construction work samples may be used for magnitude scoring under these evaluation elements, provided the work sample otherwise meets all solicitation requirements.Yes
12Section L 2.5.1.2(1)(a): for a joint venture offeror, will work samples on which a JV member (the SDVOSB managing venturer or the mentor), or an affiliated joint venture of the same members, acted as prime be evaluated as Category 1? What documentation satisfies the requirement to demonstrate involvement in the project?11/04/2026No
13Section L 2.5.5(c) states mentor-protégé relationships require a TA or LOI to be considered a team member. Is a TA or LOI required between a mentor-protégé JV offeror and its own members for the members' work samples to be credited?11/04/2026YesNo. Section L 2.5.5(c) applies to mentor-protégé relationships that are being relied upon as team members. However, Section L 2.5.5(b) states that a Joint Venture (JV) will be considered a sole business entity, and Section L 2.5.1.2(1)(a) provides that relevant experience of joint venture partners will be considered. Accordingly, a separate Teaming Agreement (TA) or Letter of Intent (LOI) between a Joint Venture offeror and its own JV members is not required solely for consideration of the JV members' experience. The Offeror remains responsible for providing sufficient documentation to substantiate its claimed experience in accordance with Sections L 2.5.1.2, 2.5.4, and 2.5.6.No
14Section L Table 1 limits work sample documentation to 200 pages. Do Appendix L-03 cover sheets, CPARS reports, PPQs, statements of facts and teaming agreements count against the 200 pages?11/04/2026YesThe 200-page limitation identified in Section L, Table 1 applies to the Work Sample Documentation submitted in support of Section L 2.5.1. Required proposal forms and supporting evaluation documentation submitted separately from the work sample documentation, including Appendix L-03 Work Sample Cover Sheets, Appendix L-04 Cross Reference Matrix, Appendix L-05 Self-Scoring Matrix, CPARS reports, PPQs, Team Structure Forms, Teaming Agreements, and Organizational Structure Change History, do not count against the 200-page limitation. Offerors remain responsible for clearly organizing proposal content in accordance with Table 1 and the instructions contained in Section L.Yes
15Section L 2.5.2.4 states the selected single point in time shall be the same three-month range for all work samples, while the example shows three different ranges. Must all nine samples fall in one window, or may each instance use its own window? Appendix L-05 column C is labeled Enter Yes or No; where is the window date entered?11/04/2026YesSection L 2.5.2.4 is intended to evaluate an Offeror's ability to perform multiple qualifying construction projects concurrently. Offerors may utilize separate three-month periods for each qualifying instance of concurrent performance. The example provided in Section L reflects the Government's intended approach. Offerors shall identify the applicable three-month period(s) used to substantiate their claim within the Self-Scoring Matrix and/or supporting proposal documentation. Amendment language will be issued to clarify Section L 2.5.2.4 and Appendix L-05.Yes
16Sections L 2.5.2.3 and 2.5.2.4 state that work at VA healthcare facilities or non-VA healthcare facilities may be counted. Do federal construction projects at non-healthcare facilities (for example a DoD, NAVFAC, NASA) qualify as work samples for those elements, and for 2.5.2.5?11/04/2026YesNo. Federal construction projects performed at non-healthcare facilities do not qualify as work samples under Sections L 2.5.2.3, 2.5.2.4, or 2.5.2.5 merely because they were performed for a federal agency. Consistent with Sections L 2.5.1.2 and 2.5.2.3 through 2.5.2.5, qualifying work samples must have been performed at a VA healthcare facility or non-VA healthcare facility whose primary purpose is healthcare delivery or healthcare support. A project performed for DoD, NAVFAC, NASA, or another federal agency may qualify if the facility meets that healthcare-facility definition and the project otherwise satisfies the applicable work-sample requirements. Both Design-Build and Design-Bid-Build projects may receive magnitude points under Section L 2.5.2.5, provided all other requirements are met.Yes
17Appendix L-08 has no Labor Category Definitions tab (referenced in L 2.8.2), column A General Category is blank, and the Summary tab references RFP 19AQMM25R0207 with #REF! formulas. Will a corrected workbook be issued? Should the escalation rate in row 8 be entered as a percentage (for example 3.00%) or as 103% per the row 9 note? How does the whole-dollar requirement in L 2.8.4 apply to formula-calculated option-year rates?11/04/2026YesThe Government has reviewed the issues identified in Appendix L-08. The Government intends to issue a revised Appendix L-08 workbook through solicitation amendment.Yes
18Appendix L-04 references an instructions tab, but the issued file is a Word document. Will an Excel version with the instructions tab be posted, and may rows be added for each criterion and state claimed?11/04/2026YesThe Government acknowledges that Section L 2.5.4 references an instructions tab that is not present in the issued Appendix L-04. Offerors may add rows to Appendix L-04 as necessary to identify all references used to substantiate claimed evaluation criteria, states/territories, construction program areas, and other scoring elements.Yes
19Section L 2.3.2 and Section M 1.3 count teaming partners toward the competition limits. If a teaming partner (including an A/E firm) is named by more than three SDVOSB offerors, does the limit affect the prime offeror's proposal, and how will the Government resolve it?11/04/2026YesYes. In accordance with Section L 2.3.2 and Section M 1.3, the competition limitations apply to individual contractors, including teaming partners. If an individual contractor, including a teaming partner, is identified as participating in more competitions than permitted by the solicitation, the Government may contact the affected contractor to clarify which proposal(s) the Government should consider. Any such clarification will be handled in accordance with Sections L 2.3.2 and M 1.3. Offerors are responsible for ensuring that proposed teaming arrangements comply with the participation limitations established in the solicitation.No
20For a work sample that substantiates states in more than one pool, may the same work sample and PPQ be submitted in each pool proposal with the pool indicated at the top of each PPQ copy?11/04/2026YesYes. The same work sample may be submitted in multiple SDVOSB Pool proposals, provided the work sample otherwise satisfies the solicitation requirements and supports the states or territories claimed within the applicable Pool. In accordance with Section L 2.6.3, PPQs will only be considered for the Pool identified by the Offeror. Therefore, when the same work sample is submitted in multiple Pool proposals, the associated PPQ should clearly identify the applicable Pool for each submission. The Government will evaluate each proposal within the Pool competition for which it is submitted.No
21Section L 2.5.1.2(2): what documentation is acceptable to demonstrate construction at least 70 percent complete as of the solicitation release date (for example a current pay application or schedule of values)?11/04/2026YesSection L 2.5.1.2(2) requires ongoing projects to be documented as at least seventy percent (70%) complete as of the solicitation release date. The solicitation does not require a specific document type. Acceptable supporting documentation may include, but is not limited to, owner-approved pay applications, schedules of values, project schedules, progress reports, interim CPARS reports, owner correspondence, architect/engineer certifications, or other contemporaneous project records demonstrating the percentage of completion. The Government will evaluate the sufficiency of the documentation submitted by the Offeror.No
22Does VAAR 852.239-75 require a Section 508 checklist for a construction offeror, or is an exception statement sufficient?11/04/2026YesVAAR 852.239-75 requires Offerors to address Section 508 accessibility requirements and identify any applicable exceptions. For this solicitation, if an Offeror is not proposing information and communication technology (ICT) products, services, or deliverables subject to Section 508 requirements at the basic contract level, the Offeror may provide a statement identifying the exception and explaining why a Section 508 checklist is not applicable to its proposal. Offerors remain responsible for complying with any Section 508 requirements identified in future task-order solicitations, if applicable. Consistent with VAAR 852.239-75, Offerors shall clearly identify any claimed exceptions in their proposal.No
23Will the Government consider a work sample where the prime contract was a task order under an IDIQ held by a different entity than the offeror's JV member, when the JV member was the task order prime?11/04/2026YesYes. Consistent with Section L 2.5.1, task orders may be submitted as work samples and the terms "contract" and "task order" are interchangeable for purposes of relevant experience evaluation. While IDIQ contract vehicles themselves are not acceptable work samples, the Government will consider a task order work sample where the Offeror demonstrates that the JV member acted as the prime contractor responsible for performance of the task order. The Offeror remains responsible for providing sufficient documentation to substantiate the JV member's role and involvement in the task order in accordance with Sections L 2.5.1.2, 2.5.4, and 2.5.6.No
242.5.2.1 references “total number of primary construction program areas supported at VA healthcare facilities or non-VA healthcare facilities.” There are fourteen (14) primary construction program areas listed, with two (2) areas related to healthcare facilities and eight (8) other areas of work. Please confirm non-healthcare facilities may be provided for the other eight (8) primary construction program areas? For example, to satisfy the Historic Facility Renovation construction program (area #8), could offerors include a project that involved renovating an historic US Embassy building, historic courthouse, or other historic non-healthcare building?11/04/2026YesNo. Section L 2.5.2.1 evaluates primary construction program areas supported at VA healthcare facilities or non-VA healthcare facilities. For purposes of this solicitation, qualifying work samples must have been performed at facilities whose primary purpose is healthcare delivery or healthcare support functions. While a project may demonstrate one or more of the listed primary construction program areas, projects performed at non-healthcare facilities, such as courthouses, embassies, office buildings, or similar facilities, are not considered qualifying work samples for this evaluation element.Yes
252.5.2.2 references “Total number of States/Territories supported in selected competition SDVOSB Pool”. Please confirm that work samples that involved non-healthcare facilities may be provided to demonstrate construction services experience in states/territories included in the respective Pool.11/04/2026YesNo. For purposes of Section L 2.5.2.2, qualifying state/territory experience must be derived from work performed at a VA healthcare facility or non-VA healthcare facility. Consistent with the solicitation's relevant experience requirements, projects performed at non-healthcare facilities may not be used to claim credit under this evaluation element. The location of the project alone does not establish eligibility; the project must otherwise satisfy the applicable work-sample requirements of the solicitation.Yes
262.5.2.3 references “Total number of subcontractors managed by prime contractor under a single construction project”. Please confirm that work samples that involved non-healthcare facilities may be provided to demonstrate management of multiple subcontractors by the prime, supported under a single work sample.11/04/2026YesNo. Section L 2.5.2.3 evaluates the Offeror's experience managing subcontractors under qualifying construction work samples. Consistent with the solicitation's relevant experience requirements, qualifying work samples must have been performed at a VA healthcare facility or non-VA healthcare facility. Projects performed at non-healthcare facilities may not be used to claim credit under this evaluation element, regardless of the number of subcontractors managed. Offerors must satisfy both the facility-type requirement and the subcontractor-management requirement to receive credit.Yes
272.5.2.4 references “Total number of construction services contracts performed as Prime at a single point in time”. Please confirm that work samples that involved non-healthcare facilities may be provided to demonstrate the three (3) instances of performance of three (3) projects at a single point in time.11/04/2026YesNo. Section L 2.5.2.4 evaluates an Offeror's experience performing multiple qualifying construction projects concurrently. Consistent with the solicitation's relevant experience requirements, work samples used to support this evaluation element must have been performed at a VA healthcare facility or non-VA healthcare facility. Projects performed at non-healthcare facilities may not be used to claim credit under Section L 2.5.2.4, regardless of whether they demonstrate concurrent performance. Offerors must satisfy both the healthcare-facility requirement and the concurrent-performance requirement to receive credit.Yes
282.5.2.6 references “Full & Open Only: Magnitude of design-build construction services projects supporting VA healthcare facilities or non-VA healthcare facilities.” Please confirm that work samples that involved non-healthcare facilities may be provided to demonstrate magnitude of the work samples where the Offeror performed design-build construction services.11/04/2026YesNo. For purposes of Section L 2.5.2.6, qualifying work samples must have been performed at a VA healthcare facility or non-VA healthcare facility. Projects performed at non-healthcare facilities may not be used to claim magnitude credit under this evaluation element. The magnitude criterion evaluates the size of qualifying healthcare construction projects that otherwise satisfy the solicitation's work-sample requirements. Both Design-Build and Design-Bid-Build healthcare construction projects may be submitted for magnitude scoring, provided all other solicitation requirements are met.Yes
29Please confirm that the VA will not accept design only projects and that all projects submitted shall be for construction services.11/04/2026YesYes. In accordance with Section L 2.5.1 and Section L 2.5.1.2(3), work samples must be construction projects whose primary scope was construction services. Additionally, Attachment 1 (DBnC Scope) states that standalone design services without accompanying construction services are excluded from this contract. Accordingly, design-only projects are not acceptable work samples for purposes of this solicitation. Construction projects delivered through either Design-Build (DB) or Design-Bid-Build (DBB) methods may be submitted, provided they otherwise satisfy the solicitation requirements.No
30Section 2.5.1.2 of Section L, para. B, Category 2, states that Subcontractor work samples who have formal teaming arrangements may be used. Please clarify if a subcontractor is allowed to be on multiple teams. For example, Subcontractor XYZ has a teaming agreement with two offerors competing in the Unrestricted pool.11/04/2026YesYes. The solicitation does not prohibit a subcontractor or teaming partner from appearing on multiple teams. However, in accordance with Section L 2.3.2 and Section M 1.3, participation limitations apply to individual contractors, including teaming partners. The Government will review Appendix L-02 and proposal submissions to verify compliance with those limitations. If an individual contractor, including a teaming partner, exceeds the allowable participation limits established by the solicitation, the Government may seek clarification in accordance with Sections L 2.3.2 and M 1.3 regarding which proposal(s) should be considered.No
31Section 2.3.2 of Section L states that an individual contractor may participate in no more than four (4) competitions. Please clarify whether a contractor is allowed to serve as a subcontractor/teaming partner with an offeror to perform work in a specific geographic region and also pursue the three Regional Pools and the Full & Open (Unrestricted) competition. For example, if Company ABC is a subcontractor/teaming partner to an offeror competing in the Full & Open (Unrestricted) competition, may Company ABC also submit proposals as a prime contractor for the three Regional Pools and the Full & Open (Unrestricted) competition, or would such participation exceed the four-competition limitation?11/04/2026YesParticipation limitations apply to individual contractors, including teaming partners, in accordance with Sections L 2.3.2 and M 1.3. Participation as a teaming partner counts toward the contractor's overall participation under the solicitation. Accordingly, an individual contractor may not avoid the participation limitations by competing as a prime contractor in some competitions while simultaneously participating as a teaming partner in additional competitions. Where an individual contractor exceeds the participation limitations established by the solicitation, the Government may seek clarification in accordance with Sections L 2.3.2 and M 1.3 regarding which proposal(s) should be considered.No
32Volume II – Factor 2 – Past Performance. Many of our Government clients have stated that they are unwilling to complete additional Past Performance Questionnaires (PPQs) if they have previously submitted one, as doing so creates an additional burden on their already demanding schedules. Therefore, we respectfully request that the Government accept previously completed PPQs.11/04/2026YesSection L 2.6.3 requires Offerors to submit PPQs for qualifying work samples when CPARS information is not available; however, the solicitation does not require that a PPQ be newly completed specifically for this procurement. Accordingly, Offerors may submit previously completed PPQs, provided the PPQ relates to the submitted work sample and contains sufficient information for the Government to evaluate past performance in accordance with Section L 2.6 and Section M Factor 2. The Government reserves the right to verify any submitted PPQ information and determine its suitability for evaluation purposes.No
3310.Volume II – Factor 2 – Past Performance. The requirements states that offerors must provide an interim CPARS report reflecting at least 70% project complete. However, in some cases, a project may be 90% complete while the most recent CPARS report was issued 11 months prior and only reflects a completion of 50%. As a result, the CPARS is not a true reflection of the project's current status or level of completion. Furthermore, many of our Government clients have stated they will not complete a PPQ when there is an existing CPARS report available. Therefore, we respectfully request that the Government consider allowing the submission of interim CPARS reports regardless of the percentage of completion reflected in the report, provided the project otherwise meets the intent of the past performance requirements.11/04/2026YesSection L 2.5.1.2(2) establishes the requirement that an ongoing project be at least seventy percent (70%) complete as of the solicitation release date to qualify as a work sample. Section L 2.6.3 requires submission of a CPARS evaluation for Federal projects when available. The Government will accept the most recent available interim CPARS for an otherwise qualifying ongoing project, even if the interim CPARS reflects a completion percentage below seventy percent (70%), provided the Offeror otherwise demonstrates that the project satisfies the work-sample qualification requirements of Section L 2.5.1.2(2). The Government may consider other proposal documentation submitted in support of the work sample to verify project status as of the solicitation release date.Yes
34Volume III – Factor 3 – Small Business Participation. Please provide Appendix L-9 Small Business Participation Commitment Document as a Word file template.11/04/2026YesThe Government provided Appendix L-09 as part of the solicitation package and Offerors shall submit the Small Business Participation Commitment Document (SBPCD) in accordance with Section L 2.7.2. At this time, Offerors may reproduce the format provided in Appendix L-09 in a Word or similar editable format, provided all required information and representations contained in Appendix L-09 are included. The Government is evaluating whether an editable version of Appendix L-09 will be provided through amendment.No
35Please confirm that projects performed at any location, including those outside of the listed geographic regions, can be used to satisfy categories 2.5.2.1, 2.5.2.3, 2.5.2.4, 2.5.2.5, and 2.5.2.6. For example, would a project that was performed in South America still count towards those categories?11/04/2026YesYes. For Sections L 2.5.2.1, 2.5.2.3, 2.5.2.4, 2.5.2.5, and 2.5.2.6, the solicitation does not limit qualifying work samples to projects performed within a particular geographic region. Work samples performed outside the United States may be submitted for these evaluation elements, provided the work sample otherwise satisfies all solicitation requirements, including the requirement that the project be performed at a qualifying VA healthcare facility or non-VA healthcare facility. Geographic location is only specifically evaluated under Section L 2.5.2.2, which awards points based upon states and territories contained within the applicable SDVOSB Pool.No
36The 200-page limit for the Work Sample Documentation is insufficient. For example, para. 2.5.2.3 total number of subcontractors managed by a prime contractor under a single construction project is for a maximum of 50 points where evidence for up to 10 subcontractors needs to be provided. If evidence is kept to 1 page (but most likely it would need to be more to show evidence of signature and scope of work, so most likely 2 pages each) that is 50 pages for just that one section. Please expand the page limit to 300 pages.11/04/2026YesThe Government has considered the request and, at this time, does not intend to increase the 200-page limitation for Work Sample Documentation established in Section L, Table 1. Offerors are responsible for selecting and presenting the information they believe best substantiates their claimed experience and self-score. The page limitation remains as stated in the solicitation.No
37Section L states proposals must be submitted via email to 003C4C.acquisitions@va.gov with 20MB attachment limit and max 10 attachments per email. Given the 200-page work sample limit plus additional documentation, what is the preferred file organization strategy? Should we:
•Submit one email per volume?
•Combine multiple work samples into single PDFs?
•What file naming convention is preferred beyond the example provided?11/04/2026YesSection L 1.9.2.3 establishes the submission requirements, including the 20 MB attachment limitation, the maximum of ten attachments per email, and the ability to submit multiple emails when necessary. The solicitation does not prescribe a required file-packaging methodology, such as one email per volume or one PDF per work sample. Offerors may organize proposal files in the manner they deem most appropriate, provided the submission complies with the solicitation requirements, files are clearly identified, and any multi-email submission is sequentially labeled (e.g., Email 1 of X, Email 2 of X, etc.). Offerors should utilize the file naming convention contained in Section L 1.9.2.3 or a similarly clear convention that identifies the Offeror, file number, proposal volume, and competition being submitted.No
38Please confirm that the Volume II 200-page limit does NOT include work sample cover sheets (Appendix L-03).11/04/2026YesThe 200-page limitation identified in Section L, Table 1 applies to the Work Sample Documentation submitted pursuant to Section L 2.5.1. The Appendix L-03 Work Sample Cover Sheets are a separate required submission item and do not count against the 200-page limitation for Work Sample Documentation.No
39Please confirm that the Volume II 200-page limit does NOT include the Cross Reference Matrix Word document (Appendix L-04).11/04/2026YesNo. The 200-page limitation identified in Section L, Table 1 applies to the Work Sample Documentation submitted pursuant to Section L 2.5.1. The Appendix_L_04 Cross Reference Matrix_20261104.docx, required by Section L 2.5.4, is a separate submission requirement and does not count against the 200-page limitation for Work Sample Documentation.No
40Section L 2.5.1.2(2) requires work samples to be "completed within the last seven (7) years, or projects underway with construction documented to be at least 70% complete."
Is the 7-year lookback from the solicitation release date (November 4, 2026)?11/04/2026YesYes. For purposes of Section L 2.5.1.2(2), the seven-year recency requirement is measured from the solicitation release date. Accordingly, completed work samples must have been completed within seven (7) years of the solicitation release date, and ongoing projects must be documented as at least seventy percent (70%) complete as of the solicitation release date.No
41Section L 2.6.3 states "For projects actively underway, a copy of an interim CPARS report reflecting at least 70 percent completion may be submitted."
•If an interim CPARS exists but shows less than 70% completion, is this acceptable?
•If no interim CPARS has been generated yet for an ongoing project >70% complete, should we submit a PPQ instead?11/04/2026YesSection L 2.5.1.2(2) establishes the requirement that an ongoing project be at least seventy percent (70%) complete as of the solicitation release date to qualify as a work sample. For Federal government work samples, Section L 2.6.3 requires submission of a CPARS evaluation when one exists. Accordingly, if an interim CPARS exists, the Offeror shall submit the most recent available CPARS evaluation. The Government may consider other proposal documentation to verify that the underlying project satisfies the seventy percent (70%) completion requirement of Section L 2.5.1.2(2). If no CPARS evaluation has been generated or finalized for a Federal project, the Offeror may submit a PPQ in accordance with Section L 2.6.3.Yes
42Section M 1.2.1 states the Government intends to award to "one (1) SDVOSB firm with the Woman Owned Small Business (WOSB) designation, and to one (1) SDVOSB firm with the Historical Underutilized Small Business Zone (HUBZone) designation."
Are these awards IN ADDITION to the 10 awards per pool, or WITHIN the 10 awards?11/04/2026YesSection M 1.2.1 contemplates ten (10) awards per SDVOSB Pool to the highest technically rated offerors. If an otherwise awardable SDVOSB WOSB concern and/or SDVOSB HUBZone concern is already included within those ten (10) awardees, no additional award is required. However, as stated in Section M 1.2.1, if the SDVOSB WOSB concern and/or SDVOSB HUBZone concern falls outside the top ten (10) highly technically rated proposals, the Government reserves the right to make an additional award to satisfy the socioeconomic reserves identified in the solicitation. Accordingly, depending on proposal rankings, the WOSB and HUBZone awards may be either within the ten (10) contemplated awards or additional to those awards.No
43Attachment 5 states "Awardees must, on an annual basis, demonstrate their participation in the program."
•What constitutes "participation"?
•What is the threshold for "not actively competing" that could trigger off-ramping?11/04/2026YesAttachment 5 does not establish a specific numerical threshold for participation, proposal submissions, task order awards, or other measurable metric required to remain in the program. As stated in Attachment 5, participation will be evaluated based upon the totality of an awardee's involvement in the DBnC MATOC program, which may include, but is not limited to, responses to task order opportunities, expressions of interest submitted in response to RFIs, submission of task order proposals, and performance under awarded task orders. Off-ramping determinations, if necessary, will be made in accordance with Attachment 5 and based upon the specific facts and circumstances applicable to the awardee.No
44Attachment 5 states "Any awardee who expresses interest during an RFI and does not submit a proposal will receive a warning. Three warnings may result in off-ramping."
•Is this cumulative over the 5-year contract period, or reset annually?
•Will the Government provide written notice of warnings?
•Is there an appeals process if an awardee believes a warning was issued in error (e.g., due to legitimate business conflict)?
•If an awardee expresses interest in the RFI but determines they cannot submit a competitive proposal, will this count as a "warning" toward off-ramping?11/04/2026YesAttachment 5 currently provides that an awardee who expresses interest during an RFI and subsequently does not submit a proposal will receive a warning and that three warnings may result in off-ramping. Attachment 5 does not establish additional procedures regarding expiration, annual reset, appeals, written notice requirements, or other administrative processes associated with warnings. The Government will administer the On/Off-Ramping Procedures in accordance with Attachment 5 and will consider the facts and circumstances associated with contractor participation and performance when evaluating potential off-ramping actions.No
45Attachment 1 (SOW) describes both Design-Build and Design-Bid-Build delivery methods.
What percentage of task orders are anticipated to be DB vs. DBB?11/04/2026YesAttachment 1 identifies both Design-Build (DB) and Design-Bid-Build (DBB) as authorized delivery methods under the DBnC MATOC. The solicitation does not establish an anticipated percentage, volume, or distribution of future task orders between the two delivery methods. Task-order requirements will be determined based on individual project needs and acquisition strategies at the time of issuance. Offerors should be prepared to perform work under either delivery method in accordance with the requirements of Attachment 1.No
46Please confirm that 11 x 17 pages count as one page.11/04/2026YesYes. For purposes of proposal page limitations, one 11 x 17 page permitted under Section L 1.9.2.2 counts as one page. As stated in Section L 1.9.2.2, 11 x 17 pages may only be used for large tables and charts and may not be used for pages of text.No
47Please confirm where a JV agreement should be placed within the proposal as it is not identified in Table 1 Proposal Organization.11/04/2026YesThe Government acknowledges that Table 1 does not specifically identify where a Joint Venture (JV) Agreement should be submitted. The solicitation will be revised by amendment to add a separate line item for Joint Venture Agreements within Volume I – Contract Documentation.Yes
48Table 1 - Please confirm where the signed SF 1442 and acknowledgment of amendments is to be placed within the proposal11/04/2026YesThe Government acknowledges that Table 1 does not specifically identify where the signed SF 1442 and acknowledgment of amendments should be submitted. The solicitation will be revised by amendment to add a separate line item within Volume I – Contract Documentation identifying the required location for the signed SF 1442 and amendment acknowledgments.Yes
49Table 1 – Please confirm the intent is for Offerors to submit ONE Self-Scoring Matrix (Appendix L-05).11/04/2026YesYes. The Government intends for Offerors to submit one completed Appendix L-05 Self-Scoring Matrix per proposal submission. Consistent with Table 1 and Appendix L-05, the Self-Scoring Matrix serves as the Offeror's consolidated scoring worksheet for the applicable competition. Offerors competing in multiple Pools shall submit a separate Self-Scoring Matrix within each separate proposal submitted for that Pool.No
50Table 1 – Please confirm the intent is for Offerors to submit ONE Cross Reference Matrix (Appendix L-04).11/04/2026YesYes. The Government intends for Offerors to submit one completed Appendix L-04 Cross Reference Matrix per proposal submission. Consistent with Section L 2.5.4 and Table 1, the Cross Reference Matrix serves as the Offeror's consolidated reference document identifying where substantiating information may be found within the proposal. Offerors competing in multiple Pools shall submit a separate Cross Reference Matrix within each separate proposal submitted for that Pool.No
51Table 1 – Please confirm the Self-Scoring Matrix (Appendix L-04) and Cross Reference Matrix (Appendix L-05) are NOT intended to be contained within Volume II and should be submitted as separate, individual files.11/04/2026YesNo. Consistent with Table 1, Appendix L-05 (Self-Scoring Matrix) and Appendix L-04 (Cross Reference Matrix) are components of Volume II – Relevant Experience. Offerors shall complete and submit these documents as part of Volume II. The solicitation does not require Offerors to submit the Self-Scoring Matrix or Cross Reference Matrix as separate proposal volumes. Offerors may organize proposal files in a manner consistent with the submission instructions contained in Section L 1.9.2.3, provided all required Volume II materials are clearly identified and submitted.No
52Section L, 2.5.1.2 and 2.5.2 reference Unrestricted categories in Paragraphs 2.5.2.8 – 2.5.2.9 of this Section L. These sections do not exist in the solicitation. Please clarify.11/04/2026YesThe Government acknowledges the references in Section L to Paragraphs 2.5.2.8 and 2.5.2.9. The referenced paragraphs do not exist in the issued solicitation. The Government will revise the solicitation by amendment to correct the erroneous references and clarify the applicable scoring instructions for the Unrestricted competition.Yes
53Section L, 2.5.1 and 2.5.2 reference Paragraph 2.5.2.7 of this Section L. This section does not exist in the solicitation. Please clarify.11/04/2026YesThe Government acknowledges the references in Section L to Paragraph 2.5.2.7. The referenced paragraph does not exist in the issued solicitation. The Government will revise the solicitation by amendment to correct the erroneous references and clarify the applicable scoring instructions.Yes
54Many contracting officers, contracting officers’ representatives, and relevant customer points of contact have suddenly retired from the industry leaving very few points of contact left to field past performance questions.
Please advise what information should be provided in the event the last known points of contact are no longer available. (Appendix L-03 Work Sample Cover Sheet)11/04/2026YesSection L 2.5.1.1 addresses this circumstance directly. If a Contracting Officer, Contracting Officer's Representative, customer representative, or other point of contact is retired or otherwise unavailable, the Offeror shall provide the last known contact information available and identify the point of contact as "unreachable" in accordance with Appendix L-03 instructions. The Government reserves the right to contact additional points of contact or utilize other available sources to verify submitted information, as necessary.No
55The referenced section states: “Appendix L-04 has additional instructions for completion of the Cross Reference Matrix.”
No additional instructions are found within Appendix L-04. Please provide the additional instructions to support how to complete the Cross Reference Matrix.11/04/2026YesThe Government acknowledges that Section L 2.5.4 references additional instructions for completion of Appendix L-04 that are not contained within the issued attachment. The solicitation will be revised by amendment to remove or correct the references to the non-existent instructions tab and provide additional completion guidance for Appendix L-04.Yes
56Attachment 1 states that “Task Orders (TOs) under this contract will be executed through either Design-Build (DB) or Design-Bid-Build (DBB) delivery methods.”
Please confirm that both Design-Build (DB) or Design-Bid-Build (DBB) projects are considered relevant project experience under Sections 2.5.2.5 and 2.5.2.6?11/04/2026YesYes. Attachment 1 establishes that the DBnC MATOC will support both Design-Build (DB) and Design-Bid-Build (DBB) delivery methods. Accordingly, for purposes of Sections L 2.5.2.5 and 2.5.2.6, both DB and DBB healthcare construction projects may be submitted and considered for magnitude scoring, provided the work sample otherwise satisfies all solicitation requirementsYes
57Please confirm that projects other than healthcare facilities are considered relevant project experience under Paragraphs 2.5.2.5 and 2.5.2.6 so long as the project meets one of the primary construction program areas listed in Section 2.5.2.1?11/04/2026YesNo. Sections L 2.5.2.5 and 2.5.2.6 require qualifying projects supporting VA healthcare facilities or non-VA healthcare facilities. While a work sample must demonstrate one or more of the primary construction program areas identified in Section L 2.5.2.1, satisfying a program area alone does not make a project eligible for credit. To receive credit under Sections L 2.5.2.5 and 2.5.2.6, the work sample must both demonstrate the applicable construction program area(s) and have been performed at a qualifying healthcare facility whose primary purpose is healthcare delivery or healthcare support functions.Yes
58Attachment 1 lists 14 primary construction areas.

Section L Paragraph 2.5.2.1 lists only 10 primary construction areas.

Please clarify which primary construction areas are applicable11/04/2026YesThe Government intends to evaluate the fourteen (14) primary construction program areas identified in Section L 2.5.2.1 and Attachment 1. Offerors should rely upon the current list of fourteen (14) construction program areas contained in the issued solicitation and use that list when preparing proposals and calculating self-scores under Section L 2.5.2.1. This is consistent with Appendix L-05, which provides a maximum available score of fourteen (14) points for this criterion.No
59The client’s completion and submission of a PPQ is outside of the Offeror’s control.
Please clarify that an Offeror will be evaluated no less than neutrally for any project where a PPQ cannot be obtained from the client and when a CPARS is not available in accordance with FAR 15.305(a)(2)(iv). Otherwise, an Offeror will be disadvantageously penalized for a client’s lack of response.11/04/2026YesSection L 2.6.3 requires submission of past performance information for each work sample. For Federal Government work samples, Offerors shall submit a CPARS evaluation when one exists. A PPQ shall only be submitted for a non-federal/commercial project or for a Federal project where a CPARS report has not yet been generated or finalized. Accordingly, Offerors are responsible for obtaining and submitting the required past performance documentation associated with the work samples they elect to submit. The Government intends to evaluate past performance in accordance with Sections L 2.6 and M Factor 2 using the information required by the solicitation.No
60The solicitation states that a PPQ will only be considered for the pool noted at the top of the PPQ.

There is no place at the top of the PPQ form to list the competitive pool(s).

Please provide a location on the form at the top to list the competitive pool(s).11/04/2026YesThe Government acknowledges that Section L 2.6.3 instructs Offerors to identify the applicable Pool on the PPQ; however, the issued Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx does not currently contain a field for that information. The solicitation will be revised by amendment to update the PPQ template and provide a location for Offerors to identify the applicable Pool or competition for which the PPQ is being submitted.Yes
61Please identify in Table 1 where CPARS and PPQs should be included in the proposal and confirm that no page limitations apply to these documents.11/04/2026YesSection L 2.6.3 requires submission of CPARS and/or PPQs, as applicable, for the work samples submitted under Factor 1. The Government intends for CPARS and PPQs to be submitted as part of Volume II. Because Table 1 does not currently identify CPARS and PPQs as separate Volume II items, the solicitation will be revised by amendment to clarify their location within the proposal structure. The Government also confirms that CPARS reports and PPQs do not count against the 200-page limitation applicable to Work Sample Documentation.Yes
62Per the instructions, the wording implies that only healthcare facilities (either VA or non-VA) will be considered relevant.

This is the start of the file's text. The full file is on GovTribe.