About this file

This file is a Document Verification and Self-Scoring Worksheet (Appendix L-05) for the VA's Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) for construction services, Solicitation 36C10F27R0003. The worksheet serves as a compliance checklist and scoring template for offerors to self-assess their proposal submissions across four evaluation factors.

The worksheet is organized by volume and factor, requiring offerors to confirm submission of required documentation and self-score their proposals. Volume 1 addresses contract documentation including company information, choice of competition, bonding capability, organizational conflict of interest statements, signed model contracts, and representations and certifications—all marked N/A for scoring. Volume 2 evaluates Factor 1 (Relevant Experience) with maximum points allocated for work samples (22 points), primary construction program areas (14 points), states/territories in respective pools (ranging from 13-22 points depending on pool), subcontractors managed (10 points each for five selected projects), concurrent project performance (15 points across three instances), and magnitude of construction services projects (88 points for SDVOSB or Full & Open categories with specified ranges). The worksheet also addresses Factor 2 (Past Performance) on a Pass/Fail basis using CPARS or PPQs, Factor 3 (Small Business Participation for Full & Open competition only) requiring Volume III submission and supporting documentation, and Factor 4 (Price) with fully burdened labor rates submitted in Appendix L-08 Excel format. Offerors must indicate Yes/No responses and cross-reference supporting work sample file names throughout the submission.

View the file

Other files

File Type Posted
Appendix_L_03 Work_Sample_Cover_Sheet 20261123_tracked changes.docx DOCX document
Attachment_5 On_Off_Ramping_Procedures 20261123_tracked changes.docx DOCX document
Attachment_1 DBnC Scope_20261123_tracked changes.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261123_tracked changes.docx DOCX document
36C10F27R0003 0002.pdf PDF
Attachment_3 Section_L Instructions_to_Offerors_20261123_tracked changes.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261123_tracked changes.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261123.xlsx XLSX spreadsheet
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261123.docx DOCX document
Appendix_L_06 Team Structure Format_20261123_tracked changes.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261113_A01.docx DOCX document
36C10F27R0003_RFI_Tracker_Industry Version .xlsx XLSX spreadsheet
36C10F27R0003 0001.pdf PDF
Attachment_1 DBnC Scope_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Attachment_4 Section_M Evaluation_Criteria_20261104.docx DOCX document
Appendix_L_06 Team Structure Format_20261104.docx DOCX document
Appendix_L_02 Choice_of_Competition 20261104.docx DOCX document
Attachment_1 Draft DBnC Scope_20261104.docx DOCX document
Appendix_L_11 Past Performance Questionnaire_DBnC MATOC_20261104.docx DOCX document
Attachment_3 Section_L Instructions_to_Offerors_20261104.docx DOCX document
Appendix_L_09 Small Business Participation Commitment Document SBPCD_20261104.pdf PDF
Attachment_5 On_Off_Ramping_Procedures 20261104.docx DOCX document
Attachment_2 DBnC_Ordering_Procedures 20261104.docx DOCX document
Appendix_L_05 Self Scoring Matrix_20261104.xlsx XLSX spreadsheet
Appendix_L_04 Cross Reference Matrix_20261104.docx DOCX document
Appendix_L_01 Offeror_Company_Information 20261104.docx DOCX document
Appendix_L_07 Pool Breakdown 20261104.docx DOCX document
Appendix_L_08_Price_Labor_Rates_20261104.xlsx XLSX spreadsheet
Appendix_L_03 Work_Sample_Cover_Sheet 20261104.docx DOCX document
Appendix_L_10 Subcontracting Plan Template 20261104.docx DOCX document
36C10F27R0003.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix L-05

CFM Healthcare DBnC MATOC
Solicitation 36C10F27R0003
APPENDIX L-05
DOCUMENT VERIFICATION AND SELF SCORING WORKSHEET

OFFEROR NAME:

SectionElementEnter Yes or No for each question as applicableMaximum Self-Score PointsOfferor Proposed Self-Score PointsFile Name(s), e.g. ABC.VOL1.TOC.pdf
VOLUME 1 - Contract Documentation
2.3.1Offeror Company Information
(Appendix L-01)Yes/NoN/A
2.3.2Choice of Competition
(Appendix L-02)Yes/NoN/A
2.3.3.2Proof of Bonding CapabilityYes/NoN/A
2.3.4Organizational Conflict of Interest StatementYes/NoN/A
2.3.5Signed Model Contract / Award DocumentYes/NoN/A
2.3.6Representations and CertificationsYes/NoN/A
VOLUME 2 - Factor 1 Relevant Experience
2.5.1Work Samples Submitted (Max 22)Yes/NoN/A
2.5.1.1Work Sample Cover Sheets (Appendix L-03)Yes/NoN/A
2.5.1.2Work Sample QualificationsYes/NoN/A
2.5.2.1Total Number of Primary Construction Program AreasYes/No14
2.5.2.2Total Number of States/Territories in Pool (fill in only for respective pool(s))
Eastern PoolYes/No22
Central PoolYes/No17
Western PoolYes/No13
2.5.2.3Total Number of Subcontractors Managed (Prime Only)
Selected Project AWS____Yes/No10
Selected Project BWS____Yes/No10
Selected Project CWS____Yes/No10
Selected Project DWS____Yes/No10
Selected Project EWS____Yes/No10
SectionElementApplicable Three-Month PeriodSupporting Work SamplesMaximum PointsOfferor Proposed PointsSupporting File Name(s)
2.5.2.4Concurrent Project Performance15
2.5.2.4, Instance 1Three qualifying projects performed concurrentlyMM/DD/YYYY–MM/DD/YYYYWS__, WS__, WS__5
2.5.2.4, Instance 2Three qualifying projects performed concurrentlyMM/DD/YYYY–MM/DD/YYYYWS__, WS__, WS__5
2.5.2.4, Instance 3Three qualifying projects performed concurrentlyMM/DD/YYYY–MM/DD/YYYYWS__, WS__, WS__5
2.5.2.5(SDVOSB Only) Magnitude of Construction Services Projects (see Section L for ranges)Yes/No88
Range 1# of WS' ____N/A
Range 2# of WS' ____N/A
Range 3# of WS' ____N/A
Range 4# of WS' ____N/A
2.5.2.6(Full & Open Only) Magnitude of Construction Services Projects (see Section L for ranges)Yes/No88
Range 1# of WS' ____N/A
Range 2# of WS' ____N/A
Range 3# of WS' ____N/A
Range 4# of WS' ____N/A
2.5.4Cross Reference Matrix (Appendix L-04)Yes/NoN/A
2.5.5Team Structure (Appendix L-06) & Teaming Agreements (Signed)Yes/NoN/A
2.5.7Organizational Structure Change HistoryYes/NoN/A
Factor 2: Past Performance
2.6Past Performance Submission IncludedYes/NoN/A
2.6CPARS Provided for Each Work SampleYes/NoN/A
2.6PPQs Provided Where CPARS Not AvailableYes/NoN/A
2.6Past Performance Scoring (CPARS/PPQ)Yes/NoPASS/FAIL
Factor 3: Small Business Participation (Full & Open Only)
2.7Volume III SubmissionYes/NoN/A
2.7.2Small Business Participation Commitment Document (SBPCD, Appendix L-09)Yes/NoN/A
2.7.3Small Business Subcontracting Plan (Appendix L-10)Yes/NoN/A
Factor 4: Price
2.8Price Volume SubmittedYes/NoN/A
2.8.3NTE Fully Burdened Labor Rates (Appendix L-08 Excel File)Yes/NoN/A

&9 Appendix L-05 | Page &P of &N

File details come from the government source that posted it. Updated .