This document is a mechanical engineering drawing sheet for a seismic retrofit and renovation project at the VA Roseburg Healthcare System. The project, numbered 653-104, involves Buildings 11, 13, and 16 and is being completed by Blue Trident, LLC, an architecture/engineering firm based in Bainbridge Island, Washington. The drawing was issued for construction on August 31, 2026, under P2S Number J24-0628 and is classified as fully sprinklered. The sheet (M-001) provides general notes, legends, abbreviations, and a mechanical drawing index for the construction documents, establishing baseline standards and specifications for mechanical systems installation.

The document contains comprehensive mechanical legends and notes including detailed specifications for ductwork, piping systems, valves and fittings, and equipment. Key requirements addressed include seismic hazard level scheduling, coordination with structural elements, noise and vibration control, equipment accessibility, and compliance with applicable codes and standards. The general notes section emphasizes contractor responsibilities for final verification of conditions, adherence to construction sequencing, coordination with other trades, equipment weight verification, and compliance with the contract documents. A seismic hazard level schedule table is included to establish performance requirements based on building classification levels. The sheet serves as a foundational reference document for all mechanical trade work required under this federal VA construction project.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

1/ 2'

'-0

1' 4'

4' 8'

8' 8'

4' 2'

2'

1/ 8'

'-0

1/

'-0

1/ 4'

'-0

1' 2'

1' 1/

2' 2'

1/ 2'

1'

'-0

3'

'-0

1'

3/ 8'

'-0

1'

2' 4'

1/

2'

'-0

2'

1/ 2'

1' 3'

6'

'-0

1/

4" 1/

2"

3/

'-0

8'

4' 4'

C :\U se rs

\la ur i\O ne

D riv e\ d2

L- Pr oj ec ts \2

4-

- R os eb ur g Bl dg s

-1

3-

\0 4-

D

ES

IG

N

\B

IM

M O

D

EL

A N

D L

IN

KS

\R O

SE

BU

R G

1-

-1

AR

C H

4.

rv t

/4 /2

3:

:5

PM

BLUE TRIDENT, LLC

7829 NE ESPERIONE LN

BAINBRIDGE ISLAND, WA 98110

206-972-0645

EMMANUEL (MANNY) BAUTISTA, PE, F.SAME

VA Roseburg Healthcare System

653-104

B13

08/31/2026 PE CN

FULLY SPRINKLERED

Revisions: Date:

P2S No. J24-0628

Seismic Retrofit and Renovate Buildings 11, 13, 16

ISSUED FOR

CONSTRUCTION

08/31/2026

GENERAL NOTES

M-001

GENERAL NOTES, LEGEND,

ABBREVIATIONS AND SHEET INDEX

MECHANICAL LEGEND

GENERAL

PIPING SYSTEMSTITLEA1

VALVES & FITTINGS MECHANICAL DRAWING INDEX

SHEET NO. DRAWING TITLE SHEET #

MECHANICAL NOTES:

SEISMIC HAZARD LEVEL SCHEDULE

SYSTEM [2]

SEISMIC HAZARD LEVEL [1]

GROUND FLOOR FIRST FLOOR

DUCTWORK CONT.

1. RESPONSE TO PREBID QUESTIONS 08/31/2026

AutoCAD SHX Text

1. ALL WORK SHALL COMPLY WITH THE 2024 INTERNATIONAL BUILDING CODE, 2024 ALL WORK SHALL COMPLY WITH THE 2024 INTERNATIONAL BUILDING CODE, 2024 INTERNATIONAL MECHANICAL CODE, 2024 UNIFORM PLUMBING CODE, 2024 OREGON STATE ENERGY CODE, AND OTHER APPLICABLE FEDERAL, STATE, OR LOCAL CODES AS ADOPTED AND ENFORCED BY THE LOCAL JURISDICTION. IN CASE THE PLANS SHOW MORE STRINGENT REQUIREMENTS, THE PLANS SHALL GOVERN THE DESIGN, YET NOTHING ON THE DESIGN DOCUMENTS SHALL BE INTERPRETED AS AUTHORITY TO VIOLATE CODE(S) OR REGULATION(S). 2. SUBMISSION OF BID IN CONNECTION WITH THIS WORK SHALL IMPLY THAT THE SUBMISSION OF BID IN CONNECTION WITH THIS WORK SHALL IMPLY THAT THE BIDDER HAS EXAMINED THE JOB SITE UNDER WHICH THE CONTRACTOR WILL BE OBLIGATED TO OPERATE UNDER THIS CONTRACT. NO EXTRA CHARGE WILL BE ALLOWED FOR FAILURE OF ANY BIDDER TO EXAMINE THE SITE PRIOR TO BID. 3. WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL". WHERE USED, THE TERM "PROVIDE" SHALL MEAN "FURNISH AND INSTALL". 4. IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON IN THE EVENT OF A CONFLICT OR INCONSISTENCY BETWEEN ITEMS INDICATED ON DRAWINGS AND SPECIFICATIONS WITH CODE REQUIREMENTS, THE MORE STRINGENT STANDARD SHALL PREVAIL. 5. CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE WORK AREAS TO KEEP DUST AND DIRT WITHIN THE CONSTRUCTION AREA. 6. NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN NO PIPING, EQUIPMENT, ETC. SHALL BE REMOVED, DISCONNECTED OR SHUT DOWN WITHOUT PRIOR REVIEW WITH THE COR TO CONFIRM THAT AREAS TO REMAIN IN OPERATION WILL NOT BE AFFECTED. IF ANY AREAS NOT WITHIN THE SCOPE OF WORK ARE AFFECTED BY ANY SHUTDOWN, REMOVAL OR DISCONNECTION, SUFFICIENT ADVANCE NOTICE MUST BE GIVEN TO THE COR INDICATING WHICH AREAS WILL BE AFFECTED, WHEN THE PROPOSED SHUTDOWN WILL OCCUR, AND FOR HOW LONG A PERIOD OF TIME. 7. THE ARRANGEMENT OF EQUIPMENT AND PIPING SHOWN ON THE DRAWINGS IS BASED THE ARRANGEMENT OF EQUIPMENT AND PIPING SHOWN ON THE DRAWINGS IS BASED UPON INFORMATION AVAILABLE TO THE ENGINEER AT THE TIME OF DESIGN AND IS NOT INTENDED TO SHOW EXACT DIMENSIONS. THIS CONTRACTOR SHALL VERIFY ALL DIMENSIONS AT THE SITE MAKING FIELD MEASUREMENTS AND SHOP DRAWINGS NECESSARY FOR FABRICATION OR ERECTION OF HVAC SYSTEMS. MAKE ALLOWANCE FOR BEAMS, PIPES AND OTHER OBSTRUCTIONS IN BUILDING CONSTRUCTION. CHECK DRAWINGS SHOWING WORK OF OTHER TRADES AND CONSULT WITH THE COR'S REPRESENTATIVE IN THE EVENT OF POTENTIAL INTERFERENCE. SHOP DRAWINGS SHALL BE MINIMUM 1/4"=1'-0" SCALE, INDICATING FITTINGS, SIZES, WELDS AND CONFIGURATIONS AND SUBMITTED TO ENGINEER FOR REVIEW. 8. THIS CONTRACTOR SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES PRIOR THIS CONTRACTOR SHALL COORDINATE THEIR WORK WITH ALL OTHER TRADES PRIOR TO FABRICATION, PURCHASE AND/OR INSTALLATION OF ALL WORK. 9. EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXISTING MATERIALS THAT ARE REMOVED SHALL NOT BE REUSED IN NEW SYSTEMS, EXCEPT WHERE INDICATED AS BEING RELOCATED. 10. ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THE ALL EQUIPMENT SHALL BE INSTALLED IN STRICT COMPLIANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. 11. THIS CONTRACTOR SHALL NOT BORE, NOTCH, CUT, OR PENETRATE INTO A THIS CONTRACTOR SHALL NOT BORE, NOTCH, CUT, OR PENETRATE INTO A STRUCTURAL MEMBER WITHOUT WRITTEN APPROVAL FROM A DESIGNATED STRUCTURAL ENGINEER AND THE COR. 12. ALL PIPE ELBOWS SHALL BE LONG RADIUS UNLESS OTHERWISE SPECIFICALLY NOTED ALL PIPE ELBOWS SHALL BE LONG RADIUS UNLESS OTHERWISE SPECIFICALLY NOTED ON THE DRAWINGS. 13. COORDINATE ACCESS TO EQUIPMENT WITH WORK OF OTHER TRADES. PROVIDE DUCT COORDINATE ACCESS TO EQUIPMENT WITH WORK OF OTHER TRADES. PROVIDE DUCT ACCESS DOORS AND CEILING ACCESS DOORS TO ALLOW ACCESS FOR FILTER CHANGEOUT, CONTROLS ACCESS AND ACCESS TO SERVICE/REMOVE COMPONENTS INCLUDING, BUT NOT LIMITED TO, FANS, PULLEYS, SHEAVES, BELTS, ETC.

AutoCAD SHX Text %%uSYMBOL

AutoCAD SHX Text %%uABBREVIATION

AutoCAD SHX Text C

AutoCAD SHX Text L

AutoCAD SHX Text

CL

AutoCAD SHX Text %%uDESCRIPTION

AutoCAD SHX Text

CENTERLINE

AutoCAD SHX Text

ITEM TO BE REMOVED

AutoCAD SHX Text

SHEET KEYNOTE

AutoCAD SHX Text

MECHANICAL EQUIPMENT TAG

AutoCAD SHX Text

POINT OF CONNECTION

AutoCAD SHX Text

POC

AutoCAD SHX Text %%C

AutoCAD SHX Text

DIAMETER OR ROUND

AutoCAD SHX Text

DIA

AutoCAD SHX Text

EXISTING WORK

AutoCAD SHX Text

NEW WORK OR EXISTING TO BE BRACED

AutoCAD SHX Text %%uDESCRIPTION

AutoCAD SHX Text %%uABBREVIATION

AutoCAD SHX Text %%uSYMBOL

AutoCAD SHX Text

CDR

AutoCAD SHX Text

CDR

AutoCAD SHX Text

CONDENSATE RETURN

AutoCAD SHX Text A1

AutoCAD SHX Text M-000

AutoCAD SHX Text

DRAWING BLOCK TITLE

AutoCAD SHX Text

DRAWING BLOCK COORDINATES

AutoCAD SHX Text

DETAIL TAG

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

SHEET WHERE DETAIL IS LOCATED

AutoCAD SHX Text

REFERENCE SHEET NUMBER

AutoCAD SHX Text

SCALE: 1/4"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 2'

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text 10'

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text 2'

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 32'

AutoCAD SHX Text 16'

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 4'

AutoCAD SHX Text 1'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 8'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text 20'

AutoCAD SHX Text 40'

AutoCAD SHX Text

AutoCAD SHX Text 30'

AutoCAD SHX Text 60'

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text

AutoCAD SHX Text 4'

AutoCAD SHX Text 16'

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 32'

AutoCAD SHX Text 16'

AutoCAD SHX Text 2'

AutoCAD SHX Text

AutoCAD SHX Text 1'

AutoCAD SHX Text 4'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text 2'

AutoCAD SHX Text 8'

AutoCAD SHX Text 40'

AutoCAD SHX Text 80'

AutoCAD SHX Text

AutoCAD SHX Text

REFERENCE

AutoCAD SHX Text

TRUE NORTH INDICATOR

AutoCAD SHX Text

PROJECT NORTH INDICATOR

AutoCAD SHX Text

NORTH ARROW SYMBOL

AutoCAD SHX Text

AutoCAD SHX Text

PIPE UP AND DOWN (SINGLE LINE)

AutoCAD SHX Text

PIPE DOWN (SINGLE LINE)

AutoCAD SHX Text %%uDESCRIPTION

AutoCAD SHX Text %%uABBREVIATION

AutoCAD SHX Text %%uSYMBOL

AutoCAD SHX Text

FLOW DIRECTION

AutoCAD SHX Text

FLEXIBLE CONNECTOR

AutoCAD SHX Text

CAP

AutoCAD SHX Text

FLOW DIRECTION (HIGH POINT TO LOW POINT)

AutoCAD SHX Text M-001

AutoCAD SHX Text M-111

AutoCAD SHX Text M-112

AutoCAD SHX Text

GENERAL NOTES, LEGEND, ABBREVIATIONS AND SHEET INDEX

AutoCAD SHX Text

MECHANICAL PLANS

AutoCAD SHX Text

MEZZANINE MECHANICAL PLAN

AutoCAD SHX Text

XXX

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

TEMPERATURE SENSOR

AutoCAD SHX Text T

AutoCAD SHX Text

LPS

AutoCAD SHX Text

LPS

AutoCAD SHX Text

LOW PRESSURE STEAM

AutoCAD SHX Text

MD-111

AutoCAD SHX Text

MECHANICAL DEMO PLANS

AutoCAD SHX Text

AutoCAD SHX Text SEISMIC BRACING SPECIAL INSPECTION REQUIREMENTS DESIGNATED SEISMIC SYSTEMS: THE BUILDING AND NON-STRUCTURAL ITEMS ARE DESIGNED FOR SEISMIC DESIGN CATEGORY D. THE FOLLOWING SYSTEMS ARE “DESIGNATED SEISMIC SYSTEMS” THAT SHALL CONTINUE TO OPERATE DURING A SEISMIC EVENT: DESIGNATED SEISMIC SYSTEMS” THAT SHALL CONTINUE TO OPERATE DURING A SEISMIC EVENT: THAT SHALL CONTINUE TO OPERATE DURING A SEISMIC EVENT: SPRINKLER SYSTEMS SPECIAL INSPECTIONS: A SPECIAL INSPECTION AGENCY HIRED BY THE CONTRACTOR, SHALL PROVIDE PERIODIC SPECIAL INSPECTIONS OF SEISMIC RESTRAINTS FOR THE ABOVE SYSTEMS. INSPECTIONS SHALL BE PERFORMED BASED ON IBC 2024 SECTION 1704 AND SHALL VERIFY THAT SYSTEMS ARE BRACED AND SUPPORTED PER IBC 2024, ASCE 7-22 CHAPTER 13 REQUIREMENTS, AND THE MECHANICAL SPECIFICATIONS. THE SPECIAL INSPECTOR SHALL SUBMIT A REPORT TO THE VA CONTRACTING OFFICERS REPRESENTATIVE (COR) FOR EACH SITE VISIT. A FINAL REPORT SHALL ALSO BE SUBMITTED TO THE MECHANICAL INSPECTOR AND COR. CONTRACTOR'S STATEMENT OF RESPONSIBILITY: SUBMIT A STATEMENT TO THE VA COR STATING THE FOLLOWING: THEY ARE RESPONSIBLE FOR THE DESIGNATED SEISMIC SYSTEMS AND THE SEISMIC RESTRAINT SYSTEMS. THEY ARE AWARE OF THE REQUIREMENT FOR SPECIAL INSPECTIONS. AN OUTLINE OF QUALITY CONTROL PROCEDURES TO OBTAIN CONFORMANCE WITH THE CONTRACT DOCUMENT REQUIREMENTS. IDENTIFICATION OF STAFF RESPONSIBLE FOR QC PROCEDURES. DESIGN CRITERIA: SEISMIC REQUIREMENTS FOR MECHANICAL COMPONENTS (PER 2024 IBC AND ASCE 7-22) GOVERNING/REFERENCE CODES: 2022 ASCE 7-22 2024 INTERNATIONAL BUILDING CODE 2022 AISC 16TH EDITION VA H-18-8 (JULY 2023, REV NOV 2024) ASCE 41-23 FACILITY CRITICALITY DESIGNATION: ESSENTIAL SITE-SPECIFIC SEISMIC RESPONSE SPECTRUM PER THE GEOTECHNICAL GROUND-MOTION STUDY RISK CATEGORY = III

AutoCAD SHX Text SITE CLASS: C Ss=1.02; S1 = 0.46 [ASCE 7] BSE-2N: Sxs = 1.16 ; Sx1 = 0.65 [ASCE 41] BSE-1N: Sxs = 0.78 ; Sx1 = 0.43 [ASCE 41] [ASCE 41] ANALYSIS PROCEDURE USED = LINEAR STATIC PROCEDURE ASCE STRUCTURAL PERFORMANCE OBJECTIVES: IMMEDIATE OCCUPANCY AT THE BSE-1N; LIFE SAFETY AT THE BSE-2N ASCE 41 NON-STRUCTURAL PERFORMANCE OBJECTIVE = OPERATIONAL @ BSE-1N; HAZARDS REDUCED @ BSE-2N SEISMIC BRACING CRITERIA: PROVIDE SEISMIC BRACING ON DUCTWORK PER CRITERIA BELOW. DUCTWORK SUSPENDED FROM HANGERS 12 INCHES OR LESS FROM THE TOP OF THE DUCT TO THE SUPPORTING STRUCTURE WILL NOT BE BRACED. - RECTANGULAR DUCTWORK 6 SQUARE FEET AND GREATER. - ROUND DUCTWORK 28 INCHES DIAMETER AND GREATER. PROVIDE SEISMIC BRACING ON PIPING PER CRITERIA BELOW. PIPING SUSPENDED FROM HANGERS 12 INCHES OR LESS FROM THE TOP OF THE PIPE TO THE SUPPORTING STRUCTURE WILL NOT BE BRACED. - HVAC PIPING AND PLUMBING OUTSIDE OF MECHANICAL ROOMS 2-1/2 INCHES AND GREATER. - HVAC PIPING AND PLUMBING INSIDE OF MECHANICAL ROOMS 1 INCH AND GREATER. - COMPRESSED AIR, FUEL GAS, HIGH/LOW PRESSURE STEAM, STEAM CONDENSATE, VACUUM, ACID WASTE AND CHEMICAL FEED PIPING 1 INCH AND GREATER. PROVIDE SEISMIC BRACING AND/OR ANCHORAGE FOR MECHANICAL EQUIPMENT PER CRITERIA BELOW. SEE PLANS FOR SPECIFIC METHODS OF BRACING AND/OR ANCHORAGE. - FALL-PRONE EQUIPMENT WITH AN OPERATING WEIGHT OVER 20 LBS WHOSE CENTER OF MASS IS MORE THAN 4 FEET ABOVE THE ADJACENT FLOOR LEVEL. - IN-LINE EQUIPMENT WITH AN OPERATING WEIGHT OVER 75 LBS. - TALL AND NARROW EQUIPMENT OVER 6 FEET HIGH WITH A HEIGHT-TO-DEPTH OR HEIGHT-TO-WIDTH RATIO GREATER THAN 3:1. - VIBRATION ISOLATED EQUIPMENT. - HEAVY EQUIPMENT WITH AN OPERATING WEIGHT OVER 400 LBS. SPACING OF TRANSVERSE AND LONGITUDINAL BRACING PER ASCE 41-23 AND ASCE 7-22.

AutoCAD SHX Text

STEEL PIPING - THREADED OR GROOVED

AutoCAD SHX Text

STEEL PIPING - WELDED

AutoCAD SHX Text

COPPER TUBING - THREADED, SOLDERED, OR GROOVED

AutoCAD SHX Text

CAST IRON PIPING

AutoCAD SHX Text

DUCTWORK

AutoCAD SHX Text

NOTES:

AutoCAD SHX Text [1] SEE SMACNA SEISMIC RESTRAINT MANUAL FOR BRACING REQUIREMENTS FOR SEISMIC HAZARD LEVEL INDICATED

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

[2] SEE SPECIFICATION SECTION 13 05 41 FOR REQUIRMENTS AND EXEMPTIONS

AutoCAD SHX Text

PLUMBING FIXTURE TAG

AutoCAD SHX Text P-X

AutoCAD SHX Text M-400

AutoCAD SHX Text

ENLARGED PLUMBING PLANS

AutoCAD SHX Text

AutoCAD SHX Text M-501

AutoCAD SHX Text

MECHANICAL DETAILS

AutoCAD SHX Text

AutoCAD SHX Text M-601

AutoCAD SHX Text

MECHANICAL SCHEDULES

AutoCAD SHX Text

AutoCAD SHX Text M-402

AutoCAD SHX Text

ENLARGED MECHANICAL PLANS - AHEC MOD

AutoCAD SHX Text

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

RECT.

AutoCAD SHX Text

ROUND

AutoCAD SHX Text

TRANSITION (RECTANGULAR TO ROUND)

AutoCAD SHX Text

TAKEOFF BOOT

AutoCAD SHX Text

CONICAL TEE

AutoCAD SHX Text

BRANCH TAKEOFF

AutoCAD SHX Text

CONICAL SPIN-IN TAKEOFF

AutoCAD SHX Text %%uSINGLE LINE

AutoCAD SHX Text

%%UDOUBLE LINE

AutoCAD SHX Text %%uDESCRIPTION

AutoCAD SHX Text

H-HIGH, L-LOW, W-WALL

AutoCAD SHX Text

G-GRILLE, R-REGISTER

AutoCAD SHX Text

RECT.

AutoCAD SHX Text

RECT.

AutoCAD SHX Text

TRANSITION (ROUND TO ROUND/RECTANGULAR

AutoCAD SHX Text

TO RECTANGULAR)

AutoCAD SHX Text

POINT OF DEMOLITION

AutoCAD SHX Text V

AutoCAD SHX Text V

AutoCAD SHX Text

VENT

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text

WASTE

AutoCAD SHX Text

HW

AutoCAD SHX Text

HW

AutoCAD SHX Text

DOMESTIC HOT WATER

AutoCAD SHX Text

CW

AutoCAD SHX Text

CW

AutoCAD SHX Text

DOMESTIC COLD WATER

AutoCAD SHX Text M-401

AutoCAD SHX Text

ENLARGED MECHANICAL PLANS

AutoCAD SHX Text

AutoCAD SHX Text

File details come from the government source that posted it. Updated .