36C10F26R0083_2.docx

DOCX document 302 KB Posted

Attached to
Z2DZ--Project Number 653-104, Seismic Retrofit of Building 13, Roseburg VAMC, Oregon
Solicitation number
36C10F26R0083
Issued by

About this file

This is a Request for Proposal (RFP) solicitation document for Design-Bid-Build construction services at the Department of Veterans Affairs. The Department of Veterans Affairs Office of Construction and Facilities Management is seeking a Firm-Fixed-Price contract for the Seismic Retrofit and Renovate B13 Warehouse project located on the Roseburg VA Medical Center campus in Roseburg, Oregon. The estimated project magnitude is between $2M-$5M, with a NAICS code 236220 (Commercial and Institutional Building Construction). This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside acquisition; any legally organized firm may submit a proposal. The contractor must complete a submittal phase within 90 days of receiving the Limited Notice to Proceed and complete construction within 475 days of receiving the Notice to Proceed. The project encompasses approximately 14,250 square feet over two floors and includes demolition, seismic retrofit construction with reinforced shotcrete or cast-in-place concrete walls, roof replacement with synthetic roofing tiles, and installation of all building systems (mechanical, HVAC, electrical, telecommunications/data, plumbing, fire protection).

Proposals must be submitted electronically in Adobe PDF format via email to 003C4C.acquisitions@va.gov by 4:00 p.m. Pacific on September 10, 2026. A Request for Information (RFI) is due by 5:00 p.m. Pacific on August 14, 2026, and a mandatory site visit is scheduled for 10:00 a.m. local time on August 12, 2026. Proposals must include two volumes: Volume I (Contract Requirements) containing Standard Form 1442, pricing schedule, representations and certifications, proposal data sheet, and bid bond; and Volume II (Technical Requirements) containing organizational/technical approach and schedule (30-page limit), past performance (30-page limit), and key personnel qualifications. All technical factors are approximately equal in importance to price. The bid guarantee must equal 20% of the bid price or $3M, whichever is less. Liquidated damages are assessed at $408.07 per calendar day for delays. The contractor must perform at least 20% of the total work with its own organization per FAR 52.236-1. Award will be made to the responsible offeror whose proposal offers the best value to the Government considering technical merit and price.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F26R0083

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C10F26R0083

X 08-04-2026

653-104 003C4 Department of Veterans Affairs Office of Construction and Facilities Management (00CFM3B) 425 I Street NW Washington DC 20001 See Block 7

Michelle Belkot 503-430-4881 Design-Bid-Build Construction for Project Number 653-104, Seismic Retrofit and Renovate B13 Warehouse located on the campus of the Roseburg VA Medical Center (VAMC) in Roseburg, OR.

This solicitation is being issued as a Design-Bid-Build procurement (Reference Revolutionary FAR Overhaul Subparts 36.1 and 36.2). One Firm-Fixed-Price (FFP) contract will be awarded.

This is a 100% Service-Disabled Veteran-Owned (SDVOSB) set-aside acquisition utilizing NAICS code 236220 with a size standard of $45M. In accordance with VAAR 864.204, the estimated magnitude of construction for this project is between $2M-$5M.

SEE PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF AWARD, AND EVALUATION CRITERIA

Request for Information Due Date: 5pm Pacific on August 14, 2026.

Proposal Due Date: 4:00 p.m. Pacific on September 10, 2026.

A Site Visit will be held at 10am local time on August 12, 2026 for both Building 11 (Separate RFP) and Building 13.

X X

52.211-10

13:00

PDT

09-04-2026

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

101F Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001

Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin TX 78714-9971

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
B.GENERAL INSTRUCTIONS17
f)Exceptions. Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer.19
g)Restrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal. Confidential Project is defined as projects containing confidential information of which reasonably could be expected to cause damage to the national security with the unauthorized disclosure. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data.” Files shall not contain classified data.19
C.PROPOSAL FORMAT19
1.General Proposal Format:19
a)ALL Volumes shall contain:19
D.SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA22
1.Volume II, Tab G – Factor 1 – Organizational/Technical Approach & Schedule:22
2.Volume II, Tab H – Factor 2 – Past Performance:24
3.Volume II, Tab I – Factor 3 – Key Personnel:28
E.Definitions31
All technical factors, when combined, are approximately equal in importance to Price.33
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS34
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS35
2.1 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)35
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)35
2.3 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014)35
2.4 52.228-1 BID GUARANTEE (SEP 1996)36
2.5 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021)37
2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)37
2.7 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)38
2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)42
2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)42
2.10 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)42
REPRESENTATIONS AND CERTIFICATIONS44
3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)44
3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021)45
GENERAL CONDITIONS48
4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)48
4.2 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)48
4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2025) (DEVIATION)48
4.4 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (NOV 2025) (DEVIATION)50
4.5 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026)52
4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV 2025)53
4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS57
4.8 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (AUG 2025) (DEVIATION) ALTERNATE II (APR 1984)58
4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION)59
4.10 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)69
4.11 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)71
4.12 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)74
4.13 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)76
4.14 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)77
4.15 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019)77
4.16 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020)78
4.17 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019)80

Statement of Work

Project Title: 653-104 – Seismic Retrofit and Renovate B13 Warehouse

Statement of Work The contractor shall provide all planning, labor, materials, equipment, supervision and expertise required for the complete seismic retrofit of Building 13 – Warehouse located on the campus of the Roseburg VA Medical Center (VAMC) in Roseburg, OR. The contractor shall refer to the Project #653-104, Seismic Retrofit and Renovate B13 - Warehouse plans and specifications for details on all requirements of construction. All work will be performed in accordance with this SOW, the project documents as well as all applicable local, State, Federal and VA codes and standards.

Design Alternates None

Performance Period and Operational Constraints The contractor shall perform all work described in this Statement of Work (SOW). Unless otherwise directed by the Contracting Officer, the contractor shall complete the submittal phase within 90 days of receiving the Limited Notice to Proceed (LNTP), followed by completion of the construction phase within 475 days of receiving the Notice to Proceed (NTP). All work is to be performed during normal working hours (7:00 am to 4:30 pm, Monday-Friday) unless approved in writing by the Roseburg VA Medical Center Engineering Service. Work at the government site shall not take place on Federal holidays unless directed by the Contracting Officer. This contract requires phasing of the work in accordance with the project plans and specifications. The General Contractor’s employees shall not enter the project site without appropriate authorization from the VAMC Engineering Service (up to and including the issuing of security badging via the Roseburg VAMC Police Department). Contractor shall refer to the section below titled Deliverable(s) as well as the project plans and specifications for additional constraints and requirements.

Task(s) This project shall include the following construction items (this list is generalized and shall not be considered all-inclusive nor perfectly sequenced):

1. Prior to demolition/construction activities procure and install temporary conditioned trailer for all hazards emergency cache items and move specialty equipment which requires the assistance of the manufacturer.

2. Demolition of existing hollow clay tile walls, building finishes, plumbing fixtures, miscellaneous electrical items, telecommunications/data items, and miscellaneous mechanical items. The demolition work will require the removal of hazardous building materials.

3. Sawcut, removal of existing slab, and excavation for new concrete footings and foundations in areas shown on construction documents.

4. The construction of the seismic retrofit itself. The retrofit encompasses approximately 14,250 square feet over two floors. The seismic retrofit is comprised of reinforced shotcrete or cast in place concrete walls and lightgage steel stongback walls supported by new reinforced concrete strip footings. Out of plane anchors will be used to attach and support the roof framing system to the new walls.

5. The existing claytile and standing seam metal roof will be replaced with a new synthetic roofing tile system.

6. Replacement of architectural building finishes.

7. The installation of all of the new building’s systems (mechanical, HVAC, electrical, telecommunications/data, plumbing, fire protection).

Deliverable(s)

The Contractor shall:

1. Prior to the commencement of any construction activity, submit a construction schedule to the CO/COR. The schedule shall be approved in writing by the CO/COR before to the start of work.

2. Prior to the ordering of any equipment or materials, submit shop drawings to both the AE and the CO/COR in accordance with the specifications and submittal register. All shop drawings shall be approved by the AE and the CO/COR before any procurement begins. Anything ordered ahead of an approved submittal will be at the contractor’s own liability and not subject to guaranteed payment/reimbursement by the Government.

3. Prior to the commencement of any construction activity, submit a Contractor Accident Prevention (APP) Plan in accordance with the specifications. This shall include Activity Hazard Analyses (AHA’s) in advance of any work which may pose a particularly significant hazard to Contractor or subcontractor employees, VA staff or facilities or patient care operations.

4. Prior to the commencement of any construction activity, submit a Contractor Quality Control (CQC) Plan in accordance with the specifications.

5. After the start of construction, attend a daily meeting with the COR to discuss progress, upcoming work/needs and issues faced on the project. An email covering the items discussed at each daily shall be provided to the CO and COR after the conclusion of the meeting.

6. After the start of construction, provide a daily report of construction-related details to the COR. The report shall be in the form of VA 6131 / OMB No. 2900-0208 or an equivalent approved by the COR.

7. After the start of construction, submit written requests for shutdowns, interruptions and outages to the COR at least (21) days in advance of need. These requests shall apply to any required shutdown, interruption or outage of any campus utility, surface feature, building/space or campus amenity to facilitate the project work. No shutdown shall ever proceed without prior written approval from the COR. Contractor shall refer to the project specifications for more information.

8. After the start of construction, submit permit requests (as needed) to the COR for all required “hot work”. Examples of “hot work” are; welding, soldering, brazing, grinding, torch-cutting or any other work which is capable of producing sparks or flame. The hot work permit request template will be provided to the Contractor by the COR prior to the start of work. Hot work without an approved permit is prohibited.

9. After the start of construction, submit “lift plans” (as needed) to the COR for all required crane or hoisting work at least (21) days in advance of need. The “lift plan” template will be provided to the Contractor by the COR prior to the start of work. Working with elevated loads without an approved lift plan is prohibited.

10. After the start of construction, submit confined space entry permit requests (as needed) to the COR for all required confined space entry work at least (21) days in advance of need. The entry permit template will be provided to the Contractor by the COR prior to the start of work. Working in confined spaces without an approved permit is prohibited.

11. Submit a written request to conduct a final project walkthrough at least (14) days before the proposed inspection date.

12. Submit final “redlines” and plan markups for all field-administered changes to the AE for the purpose of as-built/record drawing generation in accordance with the specifications.

13. Submit all maintenance and operations information (model numbers, serial numbers, owner’s manuals, wiring diagrams, etc.) for all equipment installed prior to project closeout in accordance with the specifications. Information shall include all warranty details.

14. Submit all deliverables which are required by the contract, plans or specifications, but not specifically identified within this list.

Requirements of the Project:

Seismic Retrofit and Renovation of B13 – Warehouse In Accordance With

Drawings: GI000 - B13 COVER

GI012 - CODE PLANS

HM-001 HAZARDOUS MATERIALS REMEDIATION - MAIN LEVEL

HM-002 HAZARDOUS MATERIALS REMEDIATION - LOWER LEVEL

S-001 - GENERAL STRUCTURAL NOTES

S-100 - FOUNDATION AND FIRST FLOOR PLANS

S-101 - MEZZANINE AND ROOF FRAMING PLAN

S-200 - SHEAR WALL ELEVATIONS

S-201 - SHEAR WALL ELEVATIONS

S-211 - DOWEL PLACEMENT ELEVATIONS

S-501 - CONCRETE DETAILS

S-511 - MASONRY DETAILS

S-512 - MASONRY DETAILS

S-521 - STEEL DETAILS

AD102 - GROUND FLOOR DEMOLITION PLAN

AD112 - FIRST FLOOR DEMOLITION PLAN

AD132 - ROOF DEMOLITION PLAN

A-102 - B13 GROUND FLOOR PLAN

A-112 - B13 FIRST FLOOR PLAN

A-132 - ROOF PLAN

A-201 - EXTERIOR ELEVATIONS

A-202 - EXTERIOR ELEVATIONS

A-301 - BUILDING SECTIONS

A-402 - ENLARGED GROUND FLOOR PLANS

A-412 - ENLARGED FIRST FLOOR PLANS

A-602 - DOOR AND WINDOW SCHEDULE AND DETAILS

A-810 - INTERIOR ELEVATIONS

A-811 - INTERIOR ELEVATIONS

AC102 - BASEMENT RCP

AC112 - FIRST FLOOR RCP

FX002 - B13 FIRE PROTECTION GENERAL NOTES AND LEGEND

FD102 - B13 FIRE PROTECTION DEMOLITION - GROUND FLOOR PLAN

FD112 - B13 FIRE PROTECTION DEMOLITION - FIRST FLOOR PLAN

FX102 - B13 FIRE SPRINKLER - GROUND FLOOR PLAN

FX112 - B13 FIRE SPRINKLER - FIRST FLOOR PLAN

FX122 - B13 FIRE SPRINKLER - MEZZANINE FLOOR PLAN

FX612 - FIRE PROTECTION DIAGRAMS

M-001 - GENERAL NOTES, LEGEND, ABBREVIATIONS

MD-111 - MECHANICAL DEMO PLANS

M-111 - MECHANICAL PLANS

M-112 - MEZZANINE MECHANICAL PLANS

M-400 - ENLARGED PLUMBING PLANS

M-401 - ENLARGED MECHANICAL PLANS

M-501 - MECHANICAL DETAILS

M-601 - MECHANICAL SCHEDULES

EG002 - B13 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX

ED102 - B13 ELECTRICAL DEMOLITION - GROUND FLOOR PLAN

ED112 - B13 ELECTRICAL DEMOLITION - FIRST FLOOR PLAN

EL102 - B13 ELECTRICAL LIGHTING - GROUND FLOOR PLAN

EL112 - B13 ELECTRICAL LIGHTING - FIRST FLOOR PLAN

EP102 - B13 ELECTRICAL POWER - GROUND FLOOR PLAN

EP112 - B13 ELECTRICAL POWER - FIRST FLOOR PLAN

EL602 - B13 ELECTRICAL LIGHTING SCHEDULE

EP622 - B13 ELECTRICAL ONE-LINE DIAGRAM

(57) Sheets in total

Specifications:00 01 10 Table of Contents
01 32 16.15 – Project Schedules
01 00 00 General Requirements

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01 33 23 Shop Drawings, Product Data, and Samples 01 35 26 Safety Requirements for Major Projects 01 42 19 Reference Standards 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 01 45 35 Special Inspections 01 57 19 Temporary Environmental Controls 01 74 19 Construction Waste Management 01 81 13 Sustainable Construction Requirements 01 91 00 General Commissioning Requirements 02 41 00 Demolition 02 82 11 Traditional Asbestos Abatement 02 83 33.13 Lead-Based Paint Removal and Disposal 03 30 53 (Short-Form) Cast-in-Place Concrete 03 37 13 Shotcrete 05 12 00 Structural Steel Framing 05 40 00 Cold-Formed Metal Framing 05 50 00 Metal Fabrications 06 10 00 Rough Carpentry 07 01 50.19 Preparation for Re-Roofing 07 21 13 Thermal Insulation 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Retarding 07 32 13.13 Synthetic Roof Tiles 07 60 00 Flashing and Sheet Metal 07 71 00 Roof Specialties 07 84 00 Firestopping 07 92 00 Joint Sealants 08 11 13 Hollow Metal Doors and Frames 08 31 13 Access Doors and Frames 08 71 00 Door Hardware 08 80 00 Glazing 09 05 16 Subsurface Preparation for Floor Finishes 09 22 16 Non-Structural Metal Framing 09 29 00 Gypsum Board 09 30 13 Ceramic/Porcelain Tiling 09 51 00 Acoustical Ceilings 09 65 13 Resilient Base and Accessories 09 65 19 Resilient Tile Flooring 09 91 00 Painting 10 14 00 Signage 10 21 13 Toilet Compartments 10 28 00 Toilet, Bath, and Laundry Accessories 10 44 13 Fire Extinguisher Cabinets 12 32 00 Manufactured Wood Casework 12 36 00 Countertops 13 05 41 Seismic Restraint Requirements for Non-Structural Components 21 08 00 Commissioning of Fire Suppression System 21 13 13 Wet-Pipe Sprinkler Systems 22 05 11 Common Work Results for Plumbing 22 05 23 General-Duty Valves for Plumbing Piping 22 07 11 Plumbing Insulation 22 08 00 Commissioning of Plumbing Systems 22 11 00 Facility Water Distribution 22 13 00 Facility Sanitary and Vent Piping 22 40 00 Plumbing Fixtures 23 05 11 Common Work Results for HVAC 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 23 07 11 HVAC Insulation 23 08 00 Commissioning of HVAC Systems 23 31 00 HVAC Ducts and Casings 23 34 00 HVAC Fans 23 37 00 Air Outlets and Inlets 23 72 00 Air-to-Air Energy Recovery Equipment 26 05 11 Requirements for Electrical Installations 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 73 Overcurrent Protective Device Coordination Study 26 08 00 Commissioning of Electrical Systems 26 09 23 Lighting Controls 26 24 16 Panelboards 26 27 26 Wiring Devices 26 29 11 Motor Controllers 26 29 21 Enclosed Switches and Circuit Breakers 26 51 00 Interior Lighting 26 56 00 Exterior Lighting 27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 27 05 33 Raceways and Boxes for Communications Systems 27 08 00 Commissioning of Communication Systems 27 10 00 Control, Communication and Signal Wiring 27 11 00 Telecommunication Room Fittings 27 15 00 Communications Structured Cabling 27 51 16 Public Address and Mass Notification Systems 28 05 00 Common Work Results for Electronic Safety and Security 28 05 13 Conductors and cables for Electronic Safety and Security 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 28 08 00 Commissioning of Electronic Safety and Security Systems 28 13 00 Physical Access Control System 28 23 00 Video Surveillance 28 31 00 Fire Detection and Alarm 31 20 11 Earthwork (Short Form)

Schedule for Deliverable If, for any reason, any deliverable cannot be provided within the scheduled time frame the contractor is required to notify the contracting Officer and the COR in writing immediately. This should include a firm commitment of when the work shall be completed. This notice to the Contracting Officer shall cite the reasons for the delay, and the impact on the overall project. The Contracting Officer will then review the facts and issue a response in accordance with applicable regulations.

References All contractor work, methods, materials, installation and testing shall conform to the latest approved editions of these documents and standards as well as any other applicable VA regulations not specifically listed here. In cases where the standards may differ from one another, the more stringent shall apply.

· Design documentation for Project 653-104, Seismic Retrofit and Renovation B13 - Warehouse, including both plans and specifications

· The Infection Control Risk Assessment (ICRA) completed for this project

· The Pre-Construction Risk Assessment (PCRA) completed for this project

· VA’s Design and Construction Procedures (PG-18-3)

· 29 CFR 1926 – Occupational Safety and Health Administration (OSHA) Code

· NFPA 70 – National Electric Code (NEC)

· NFPA 101 – Life Safety Code

· VA Barrier Free Architectural Accessibility Standard (PG-18-13)

· VA Environmental Compliance Manual (PG-18-17)

· VA H-18-8 Seismic Design Handbook

· VA PG-18-10 Design Manuals (including but not necessarily limited to)

· Architectural

· Electrical

· Fire Protection

· HVAC

· Physical Security and Resiliency

· Plumbing

· Site

· Structural

· Sustainable Design

· Telecom and Special Telecom Systems

· VA PG-18-12 Office of Information and Technology Design Guide

· VA Infrastructure Standard for Telecommunications Spaces (ISTS)

· VHA Boiler and Associated Plant Safety Device Testing Manual, 8th Edition

· The International Building Code (IBC)

· The International Mechanical Code (IMC)

· The International Plumbing Code (IPC) PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS, BASIS OF AWARD, AND EVALUATION CRITERIA

A. DESCRIPTION OF WORK

This Request for Proposal (RFP) solicits for a single Firm-Fixed-Price (FFP) Contract to construct the Seismic Retrofit and Renovate B13 Warehouse project at the Roseburg VAMC campus in Oregon.

The contractor shall provide all planning, labor, materials, equipment, supervision and expertise required for the complete seismic retrofit of Building 13 – Warehouse located on the campus of the Roseburg VA Medical Center (VAMC) in Roseburg, OR. The contractor shall refer to the Project #653-104, Seismic Retrofit and Renovate B13 - Warehouse plans and specifications for details on all requirements of construction. All work will be performed in accordance with this SOW, the project documents as well as all applicable local, State, Federal and VA codes and standards.

B. GENERAL INSTRUCTIONS

1. This requirement will be advertised for 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) competition; any legally organized firm may submit a proposal. Offerors submitting as a joint venture must provide the agreement forming the joint venture.

All proposals shall be submitted electronically, except for the Bid Bond.

All submissions shall be in Adobe PDF format. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.

Title the file(s) in the following format:

36C10F26R0083_COMPANY NAME_ VOLUME I

36C10F26R0083_COMPANY NAME_ VOLUME II

Submit proposals electronically via email to the following:

003C4C.acquisitions@va.gov

2. SUBMITTAL OF OFFERS:

a) Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's experience and capability, past performance, and use of small business necessary for successful completion of the project. Requirements stated in this RFP are minimums.

b) The Offeror’s conformance with the specified format, submission requirements, and the Offeror’s attention to detail will be considered during the technical evaluation and trade-off. Material omission(s) may result in a deficiency, which may cause the technical proposal to be rejected as unacceptable.

c) Technical proposals that do not provide the specified information in the specified location in accordance with the submission instructions may be found to have weaknesses or significant weaknesses. The Government is under no obligation to search for information that is not in the specified location.

d) Responses that are essentially blanket offers of compliance are not adequate substitutes for the detailed and complete technical information necessary to establish that an Offeror can meet Government needs. The proposal submission instructions are written to give prospective contractors, where feasible, an indication of the level of detail desired by the Government. The Offeror’s failure to include information that the Government has indicated should be included may result in the proposal being assigned a (significant) weakness and/or being found deficient if inadequate detail is provided.

e) Any prescribed page and formatting limitations will be strictly adhered to and enforced by the Government. The Government will not evaluate any excess information resulting from the Offeror’s failure to comply with the submission instructions.

f) Exceptions. Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal volumes. Inclusion of any standard company terms and conditions that conflict with the terms and conditions of the solicitation may result in a determination that the offer is unacceptable and thus ineligible for award. Resolve questions about the terms and conditions or technical requirements of the solicitation prior to submission of the offer.

g) Restrictions on Offeror-Provided Information. “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can nonetheless be provided to the Government as part of the Offeror’s technical proposal. Confidential Project is defined as projects containing confidential information of which reasonably could be expected to cause damage to the national security with the unauthorized disclosure. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must clearly mark the information in accordance with FAR 52.215-1, “Instructions to Offeror – Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data.” Files shall not contain classified data.

C. PROPOSAL FORMAT

1. General Proposal Format:

a) ALL Volumes shall contain:

1) Title Page. Include the title of the solicitation, solicitation number, Offeror name, and date of the submittal.

2) Table of Contents. Each volume of the proposal shall contain a detailed table of contents. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.

3) Tabs. Proposals shall be organized and tabbed in accordance with the tabbing per Phase and Volume.

b) All Volumes shall be formatted as follows:

1) Electronic Matter Submissions. Written material shall be on single sided 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Pages in excess of any specified limitation shall not be evaluated.

2) Number of Copies. Offerors SHALL submit an electronic version (PDF Format) of the original Volume I and Volume II. Offerors SHALL submit only two files in PDF format (i.e. Volume I and Volume II). These two files should be named in a specific format: Solicitation Number, Offerors Company and the volume (i.e. 36C10F26R0083_Company_VolumeI.pdf). Given the limited time and resources of the evaluation board, failure to provide proposal in the correct format may hinder the board's ability to evaluate the Offeror's proposal.

2. Proposal Formatting:

a) VOLUME I (Contract Requirements):

1) TAB A – Standard Form 1442, completed and signed by authorized individual(s) of the Offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.

2) TAB B – Proposal Pricing Schedule.

3) TAB C – Representations and Certifications.

4) TAB D – Proposal Data Sheet – See Attachment 3 provided in the solicitation. Offerors should ensure telephone number, fax number, e-mail address and Unique Entity ID are all included. The Unique Entity ID provided will be used to access Contractor Performance Assessment Reporting System (CPARS) data. If a separate ID has been created for a joint venture it must also be submitted. The Offeror shall also submit its Tax ID number on the proposal data sheet.

5) TAB E - Bid Bond –The Offeror is required to submit a bid bond for this project. This is to be submitted in original form and sent to the Contracting Office with an electronic copy included here in Tab D. Submit originals; photocopied or scanned copies are not acceptable. FAR clause 52.228-1, “Bid Guarantee” will be included in the contract.

6) TAB F – Joint Venture Agreement, if applicable.

b) VOLUME II (Technical- Requirements):

1) TAB G – FACTOR 1 Organization/Technical Approach & Schedule

2) TAB H – FACTOR 2 Past Performance of the Offeror’s Team

3) TAB I – FACTOR 3 Key Personnel

D. SUBMISSION REQUIREMENTS AND EVALUATION CRITERIA

1. Volume II, Tab G – Factor 1 – Organizational/Technical Approach & Schedule:

1.1 Provide information that describes the Offeror's organization and intended technical approach to executing the contract per the detailed requirements of the solicitation. Offerors are limited to 30 pages total for this factor. Any pages submitted beyond this limit will be removed and will not be read or given any consideration. Offerors should clearly but concisely describe the organizational and technical approach to project management and execution.

1.2 Organizational Approach: Describe what firms (Offeror/Prime and subcontractors), their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that will be established. Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including construction activities for each major feature. The Offeror should identify any specific firms chosen as subcontractors for electrical, structural, mechanical, etc; or indicate self-performance. If the Offeror intends to subcontract out any separate work types, identify the subcontractor. In order for a firm other than the Offeror to contribute to the Offeror’s organizational approach, document unequivocal teaming arrangements with subcontractors. Describe the proposed management structure for the team, how the construction process will be managed and the authorities and the delegations of authority within the team. Include a chart illustrating the organization including the proposed quality control group(s). Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, and their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart and with the matrix of responsibilities assigned to the team firms.

1.3 Technical Approach for Construction: Describe the approach for the full scope of work in the contract. Describe the role and interaction of the construction team during construction, addressing elements such as schedule management, material/equipment delivery and management, labor management, cost management, site security and personnel assurance system management, progress meetings, documentation and quality control.

1.3.1 Describe quality control procedures during construction. Include description of quality control inspection and submittal register control.

1.3.2 As per FAR 52.236-1, the contractor shall perform on the site, and with its own organization, work equivalent to at least 20% of the total amount of work to be performed under the contract.

1.3.3 Proposed Contract Duration and Summary Schedule: The Offeror shall submit a summary level schedule for construction with details for all major activities. The number of calendar days should be included for each activity. The Offeror shall also include their proposed contract duration in this summary level schedule, which shall not exceed the maximum contract duration specified in the solicitation. It is the Offeror’s responsibility to schedule the work considering all constraints of the project. This summary schedule will, after contract award, be replaced with a project schedule as required by the specifications. The schedules should be task oriented, indicating the number of calendar days, after notice to proceed, by which milestones are to be achieved. The proposed project schedule shall reflect the proposed contract duration and phasing requirements as indicated within the Scope of Work (SOW).

1.4 Source Selection Evaluation Criteria for Factor 1 – Organizational/Technical Approach & Schedule:

1.4.1 The Government will evaluate the firm’s understanding and capability to execute the project, as well as compliance w/ the percentage of work to be performed by the contractor as per FAR 52.236-1. Some additional specific evaluation considerations are listed below.

1.4.2 Organizational Approach: The Government will evaluate the clarity and strength of the overall organization and how well it is organized, structured and staffed to execute the entire scope of work. Joint venture participant’s contribution to the organization should be commensurate with their skills and background.

1.4.3 Technical Approach for Construction: The Government will evaluate the clarity and strength for technical approach. The Government places a higher value on an Offeror that provides proposed methods to streamline construction, manage labor and other resource constraints in an effort to reduce costs and support an aggressive schedule. The Government will also consider whether the approach reduces on-site fabrication and susceptibility to inclement weather delays. The Government will also evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for construction.

1.4.4 Schedule:

1.4.4.1 Summary Schedule: The Government will evaluate the summary schedule for construction. The length of the schedule must match the contract duration. The Government will evaluate the schedule to assess the strength of understanding of the project scope, restrictions which must be considered in the schedule e.g. permitting, long lead items, etc. The Government will evaluate the Offeror's capability to schedule the complete project within the contract duration and the realism of the schedule. A schedule that offers advantage(s) to the Government over one that merely indicates an adequate understanding of the scope, restrictions, major milestones and general understanding of the various events that can affect start and completion of construction will receive additional consideration.

2. Volume II, Tab H – Factor 2 – Past Performance:

2.1 The Past Performance Questionnaire (PPQ) included in the Government’s RFP as Attachment 2 is provided for the Offeror or its team members to submit to the client for each project the Offeror includes in its RFP response for “Past Performance.” Ensure correct phone numbers and email addresses are provided for the client point of contact. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before the response closing dates, the Offeror should complete and submit with the response the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires.

2.2 Offerors may also include performance recognition documents, not necessarily related to those projects submitted for Factor 2, received within the last seven (7) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

2.3 In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through Contractor Performance Assessment Reporting System (CPARS), using all UEI/CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, etc.) identified in the Offeror’s response, inquiries of owner representative(s).

2.4. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

2.5 Rating Guidelines for Factor 2 - Past Performance:

2.5.1 The Offeror shall present examples of previous projects demonstrating construction performance and specialized experience using the format provided in Attachment 2 (Past Performance Questionnaire). As noted in Attachment 2, Offerors may use continuation sheets to provide information to the level of detail required to answer the RFP, as necessary. Relevant experience is obtained by performing projects similar in scope, complexity, and magnitude to this project. In order to be relevant, the experience must also be recent. However, this does not prevent the Government from considering projects completed more than seven (7) years ago; with less recent projects being considered less relevant. Submit relevant specialized experience information for the elements/types of work listed within the Scope of Work, with each project having a contract value of at least $1M.

Offerors shall submit at least two (2) relevant projects, but no more than five (5). Additional consideration will be given to submissions of more than two (2) relevant projects. The dollar value of the proposed subcontractor’s experience on a submitted relevant project shall be explicitly stated (regardless of whether that contractor was a prime or subcontractor on the submitted project). Also, in order for the Offeror to meet the criteria above, an Offeror’s relevant experience must have been met cumulatively by no more than the Offeror and/or one (1) key subcontractor.

2.5.2 Offerors are limited to 30 pages total for this factor (PPQs do not count towards this total). Any pages submitted beyond this limit will be removed and will not be read or given any consideration.

2.5.3 Project completion is defined as the date the facility or work was turned over to or occupied by the owner. Projects that are considered substantially complete meaning listed at a percentage of completion of 90% or higher will be considered complete, but the Offeror must explicitly state so for a project to be considered complete.

2.5.4 If the Offeror submits experience for a proposed subcontractor, the experience must be relevant to the firm’s role on this project. In addition, the Offeror must include documentation of an unequivocal teaming agreement or letter of commitment in this section of the proposal, signed by an authorized representative of the proposed subcontractor.

2.6 Source Selection Evaluation Criteria for Factor 2 – Past Performance:

2.6.1 The Government will first assess and rate the relevancy of recent projects accomplished by the Offeror to the scope of this contract for overall application to the performance confidence assessment ratings described hereinafter. Relevancy, as it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source solicitation requirements; and a measure of the likelihood that the past performance is an indicator of future performance. The projects will include those submitted under Factor 2 as well as from other sources described above. This rating is not a separate response rating but is only used in developing overall past performance confidence assessment rating assigned to the Past Performance Criterion.

2.6.2 The Government will next perform a performance confidence assessment, considering how well the Offeror performed on the contracts. The Government will consider the recency (completed no longer than seven (7) years preceding the date of this solicitation) and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy and recency, successful past performance on projects with more relevance and/or those that are more recent will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than successful past performance on projects of lesser relevance and/or those that are less recent. If any firm has multiple functions or divisions, The Government will only evaluate past performance of the division or unit submitting the offer or by the team member. The Government also places a higher value on projects which document successful outcomes and are supported by outside source confirmation, for example, but not limited to telephone interviews with points of contact identified in the response, CPARS or other agency performance databases, Offeror furnished references, or personal knowledge. The Government also places a higher value on projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The rating for this criterion will be expressed as a degree of confidence in the Offeror's ability to successfully accomplish the contract requirements.

2.6.3 Each entity (firm) will be rated on its own performance. An entity may not establish past performance based on the past performance of its proposed key personnel, apart from that of the entity. If the Government does not obtain past performance information for the projects identified by the Offeror and cannot establish a past performance record for the Offeror through other sources, past performance will be rated neither favorably nor unfavorably.

2.6.4 For this factor, the Government will evaluate the degree of relevance of the demonstrated experience and will assess the level of risk of unsuccessful performance based on the extent of relevant experience presented.

2.6.5 Demonstrated experience of the Offeror (Prime Contractor) will be given greater weight than that of a proposed subcontractor.

2.6.6 Projects that are more similar to this work will be given more weight. For example, single projects that include multiple aspects will be given greater weight than separate projects that include only one aspect of requested experience.

2.6.7 Projects that exceed the magnitudes stated above may be given greater weight. However, in any case, the Government will consider the nature of the project, duration, timeframe, as well as the scope and complexity in determining whether the previous project is a positive indicator of capability with respect to this work.

2.6.8 Other aspects of the project that may be considered in determining similarity include: location (jurisdiction), agency and stakeholder coordination requirements, security requirements, safety and quality control criteria, type of contract (e.g. Firm Fixed Price, Cost Reimbursable), and other project constraints affecting complexity.

2.6.9 Projects completed by affiliates, subsidiaries, parent companies, or similar will be given no weight.

3. Volume II, Tab I – Factor 3 – Key Personnel:

3.1 Provide resumes for the personnel proposed for the key positions identified below. These positions must be staffed by the Prime contractor. Indicate whether each individual has had a significant role in any of the project examples cited in Factor 2. For each person, provide a brief resume using the Key Personnel Resume form (Attachment 1).

Note: References to the alternate personnel in Factor 3 are listed in the event that any of the required personnel need to be replaced, or require a backup for personal vacations or in the event of illness, in which case contractors will be required to provide personnel w/ qualifications that are equal to or greater than the requirements in the RFP/specification or the original personnel submitted, whichever is greater. All substituted personnel will be subject to approval by the Government. To ensure sufficient coverage during construction, Offerors shall submit at least one (1) alternate personnel each, for the Contractor Quality Control System Manager and the Site Safety and Health Officer, in addition to the minimum required number of personnel for each position.

3.2. Project Superintendent: The project superintendent is the individual primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project. The superintendent is required to attend partnering meetings, and quality control meetings. The superintendent (or qualified alternative) must be on-site at all times during the performance of this contract until the work is completed and accepted, and is responsible for all construction and related activities at the site, including quality and production, except as otherwise acceptable to the Contracting Officer.

The Project Superintendent should have a minimum of ten (10) years on-site construction experience. The individual must be capable of interpreting a critical path schedule and construction drawings.