Bowling Green VA Pre-Bid Conference RLP 36C10F24R0039 Transcript.pdf
PDF 437 KB Posted
- Solicitation number
- 36C10F24R0039
About this file
This document is a transcript of a virtual pre-bid conference for RLP #36C10F24R0039 for a Community-Based Outpatient Clinic (CBOC) in Bowling Green, Kentucky.
The key details are:
- This is an SDVOSB (Service-Disabled Veteran-Owned Small Business) set-aside procurement for a fully serviced lease of up to 49,235 ABOA square feet on one contiguous floor with 300 on-site parking spaces.
- The lease term is for either 15 or 20 years firm. Proposals must provide both options.
- The project will be awarded on a best value basis, with technical factors and price each worth 50% of the evaluation. The technical evaluation areas include architectural design, site characteristics, sustainable design, Offeror qualifications, past performance, operations and maintenance, and socioeconomic status.
- Initial proposals are due by September 20, 2024 at 4:00pm ET, submitted via email. Questions are due by August 16, 2024.
- The Department of Veterans Affairs is the procuring agency, with representatives from the Tennessee Valley Health Services area and the VA Construction & Facilities Management office participating.
View the file
Other files
Show all 39
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
·1· · · · · ·U.S. DEPARTMENT OF VETERANS AFFAIRS
·2· · · · · · · ·VIRTUAL PRE-BID CONFERENCE
·3· · · · · · · · · ·RLP # 36C10F24R0039
·4· · · · COMMUNITY BASED OUTPATIENT CLINIC (CBOC)
·5· · · · · · · · · · BOWLING GREEN, KY
·6
·7
·8· · · · · · · · · · ·AUGUST 7, 2024
·9· · · · · · · · · 11:00 A.M. (via Zoom)
21· ·REPORTED BY:· Paula J. Eliopoulos
·1· ·VA PROJECT TEAM:
·2· ·Earnest Jackson, Lease Contracting Officer
·3· ·Jeff Leikin, Senior Realty Specialist/
·4· · · · · · · · Project Manager
·5· ·Derek Gray, Senior Resident Engineer
·6· ·Matt Shepardson, VA Planning Manager
·7
·8· ·MEDICAL CENTER/VISN REPRESENTATIVES:
·9· ·Joshua S. York, Strategic Capital Planning Officer
10· · · · · · · · · ·TVHS
11· ·Cara Garcia, TVHS Activation Manager
12· ·Jennifer Lye, VAMC Activation Manager
14· ·CONTRACTOR REPRESENTATIVES:
15· ·Brad Seifert REAG/PP
16· ·Ed Brennan· REAG/PP
17· ·Sam Dyson· REAG/PP
18· ·Richard Ficarelli, REAG
19· ·David Stonehouse, REAG
·1· · · · · · · · · · · PROCEEDINGS
·2· · · · · · · ·MR. SEIFERT:· I appreciate everybody
·3· ·joining us for the Bowling Green VA Virtual
·4· ·Prebid.· So we'll just get going on the slide
·5· ·show.
·6· · · · · · · ·So our agenda today.· We're going to
·7· ·kind of go over the RLP package.· We're going to
·8· ·talk about how to submit an offer.· We'll go over
·9· ·the lease document, talk about the appendices and
10· ·then review a few of the standard forms and the
11· ·documents that you'll be submitting as part of
12· ·your proposal.
13· · · · · · · ·At the end we'll talk about the
14· ·process for submitting questions, when we'll get
15· ·the answers back to everybody and what the next
16· ·steps are.
17· · · · · · · ·Before we get into everything, I want
18· ·to introduce the project team for this specific
19· ·procurement.· Earnest Jackson, some of you know by
20· ·EJ, will be lease contracting officer.
21· · · · · · · ·Jeff Leikin is the Senior Reality
·1· ·Specialist and he's working as the Project Manager
·2· ·for this procurement.
·3· · · · · · · ·Derek Gray is the Senior Resident
·4· ·Engineer for VA and Matt Shepardson has been
·5· ·involved with the planning and he'll be the VA
·6· ·Planner on this project.
·7· · · · · · · ·From the medical center we have Joshua
·8· ·York who is the Strategic Capital Planning Officer
·9· ·forth the Tennessee Valley Health Services area;
10· ·Cara Garcia who is the Activation Manager for
11· ·Tennessee Valley Health and Jennifer Lye who is
12· ·also an Activation Manager for the medical center.
13· · · · · · · ·And then on the brokerage side I'm
14· ·Brad Seifert with Public Properties, we're part of
15· ·Team REAG under this contract.
16· · · · · · · ·Ed Brennan who most of you guys have
17· ·been working with on this is working with us on
18· ·this project.
19· · · · · · · ·Sam Dyson also from Public Properties, 20· ·Rich Ficarelli from REAG and David Stonehouse from
21· ·REAG.
·1· · · · · · · ·So that's kind of the team on the
·2· ·brokerage side.
·3· · · · · · · ·As Ed mentioned, we do have a court
·4· ·reporter who will be transcribing this meeting.
·5· ·Any questions we do want submitted in writing.· So
·6· ·she's going to transcribe this, we will post that
·7· ·with the questions and answers.· That will come
·8· ·out, you know, probably a week or two after they
·9· ·are due.
10· · · · · · · ·So, again, we won't be answering any
11· ·questions on this call today.· Just to be fair to
12· ·everybody we'll get those in writing, we'll get
13· ·the subject matter expert to help put together an
14· ·answer and we'll get those back to everybody as
15· ·soon as possible.
16· · · · · · · ·The purpose of today's meeting is to
17· ·provide a general overview of the RLP, to kind of
18· ·communicate to the potential Offerors what the
19· ·requirements are and to help promote competition.
20· · · · · · · ·So a high level, this project is going
21· ·to be a community based outpatient clinic.· This
·1· ·is an SDVOSB Set-Aside so meaning that we're only
·2· ·going to be accepting proposals from verified
·3· ·service disabled veteran owned small businesses.
·4· ·We are looking for a fully serviced lease.· We'll
·5· ·get into that a little bit more in the slide show.
·6· · · · · · · ·The maximum ABOA square footage that
·7· ·is allowed under this procurement is 49,235 feet.
·8· · · · · · · ·The building must be on one contiguous
·9· ·floor and we're looking for 300 on-site parking
10· ·spaces.
11· · · · · · · ·So looking at the RLP package, there's
12· ·kind of a few different areas.· So the first part
13· ·we'll talk about is the RLP itself.· There's five
14· ·sections of the RLP, so we'll go through each of
15· ·those.· We'll then touch on a few areas of the
16· ·lease.· We'll get into the appendices and then the
17· ·standard forms.
18· · · · · · · ·So Section 1 of the RLP is called the
19· ·Statement of Requirement.· This kind of goes into
20· ·what the Government is looking for Offerors to
21· ·submit to them in terms of what they want to
·1· ·lease, starting with the term.
·2· · · · · · · ·So the lease term for this will be up
·3· ·to 20 years.· We are asking for folks to provide
·4· ·both a 15 year firm term and a 20 year firm term.
·5· ·It's the Government's intent to award a 20 year
·6· ·firm term but ask for both in case there are
·7· ·potential scoring issues with the 20 year term, we
·8· ·can move to a 15 year term.
·9· · · · · · · ·We don't foresee that being a problem.
10· ·That hasn't been a problem on a lot of these
11· ·projects, thankfully, so if we do get to, you
12· ·know, a competitive set or something like that we
13· ·may just ask for a 20.· But for the initial
14· ·proposals we need everybody to submit both a 15
15· ·and 20 year term.
16· · · · · · · ·The next section, Section 1.03 of the
17· ·RLP talks about the delineated area.· Obviously
18· ·anybody that's submitted properties during the
19· ·market survey portion of this is familiar with
20· ·this delineated area.
21· · · · · · · ·The properties have to fall within the
·1· ·area listed here, and on the next slide we have a
·2· ·map of this area.
·3· · · · · · · ·I will note that any properties
·4· ·fronting these boundaries would be considered
·5· ·within the delineated area.· So if you have a
·6· ·property that fronts one of the boundary roads, ·7· ·that would be a fine property to submit.
·8· · · · · · · ·I would also add that, you know, if
·9· ·you submitted a property during the market survey
10· ·phase and another property has come up and you
11· ·think it's better, absolutely you can submit a
12· ·property that wasn't submitted as part of the
13· ·market survey in response to the RLP.
14· · · · · · · ·Section 1.06 of the RLP lists all of
15· ·the documents that make up the RLP package.· So as
16· ·you'll see here there's 20 some odd documents that
17· ·make up the package.· Some of these are
18· ·informational, some of these are forms that need
19· ·to be completed and submitted back.· But this is
20· ·where you would find that complete list of
21· ·documents that have posted to SAM.
·1· · · · · · · ·Section 1.10 talks about the security
·2· ·requirements for the lease.· So the -- every
·3· ·Government lease falls within a different FSL
·4· ·level as determined by FPS.· This happens to be an
·5· ·FSL II project and so the security requirements
·6· ·attachment to the RLP package is for FSL II.· That
·7· ·will outline what the security requirements are.
·8· · · · · · · ·I'll note that there are some of those
·9· ·requirements that are shell items, they need to be
10· ·included in your shell costs.· And then there are
11· ·others that are tenant improvement items and that
12· ·those would be priced after award and part of the
13· ·TI allowance.
14· · · · · · · ·Moving on to Section 2.· This is
15· ·eligibility and preferences for award.· This
16· ·includes what I like to call a go, no go items.
17· ·Things that, you know, a property has to meet or
18· ·an offer has to meet to be considered.
19· · · · · · · ·The first is that we need to have an
20· ·offered space that's in an efficient layout.· And
21· ·so as part of the submission, Offerors will be
·1· ·providing a floor plan based on the conceptual
·2· ·plan that was included in the RLP package.
·3· · · · · · · ·We'll look at that to make sure that
·4· ·the layout is efficient.· Given the likelihood of
·5· ·these all being build to suit projects, we would
·6· ·hope that the layout would be efficient for all of
·7· ·these.
·8· · · · · · · ·2.02 talks about the floodplain, the
·9· ·FEMA floodplain.· We cannot accept a property that
10· ·falls within the 100-year floodplain which they
11· ·now say is a property that has a one percent
12· ·annual chance of flooding.· It means the same
13· ·thing.
14· · · · · · · ·But we cannot have a property that
15· ·falls within that area.
16· · · · · · · ·And then it must -- the proposals must
17· ·meet fire and life safety as well as accessibility
18· ·requirements.· That's both Federal requirements
19· ·and then Local jurisdictional requirements.
20· · · · · · · ·We need to have a Phase I
21· ·environmental site assessment submitted with the
·1· ·initial proposal.· And that document has to be
·2· ·recent, within the last 180 days.· Hopefully it
·3· ·doesn't have any recognized environmental
·4· ·conditions as part of the property, but if it does
·5· ·indicate that there are RECs then there may be
·6· ·some followup needed on a property by property
·7· ·basis.
·8· · · · · · · ·We also are going to need a Cultural
·9· ·Resources Report provided as part of the proposal, 10· ·this is outlined in 2.13.· This will also need to
11· ·be recent, within 180 days.· And this will allow
12· ·us to perform the NHPA study that needs to be
13· ·completed for this project.· So the Cultural
14· ·Resources Report is kind of a first step that
15· ·gives us information to move forward and complete
16· ·the NHPA internally that the Government needs to
17· ·have done.
18· · · · · · · ·Section 3 talks about how to offer.
19· ·So this is kind of how we want you guys to submit
20· ·your proposal back to us starting with, you know, 21· ·when certain things are due.
·1· · · · · · · ·So as Ed mentioned at the beginning of
·2· ·the call, the questions are due by August 16th.
·3· ·We encourage you to submit the questions as soon
·4· ·as you can, so don't wait until August 16th.· We
·5· ·are going to be working in realtime getting
·6· ·answers to those with a goal of turning the
·7· ·answers around as quickly as possible so you have
·8· ·information to be able to work on your proposal.
·9· ·You know, we want to give you three or four weeks
10· ·to be able to do that.
11· · · · · · · ·So, again, if you can get us the
12· ·questions sooner we'll be answering those.· And
13· ·that will allow us to get the complete set of
14· ·questions with answers out to everybody as soon
15· ·after August 16th as possible.
16· · · · · · · ·The initial proposals are due
17· ·September 20th, by 4:00 p.m. Eastern time, and
18· ·those must be submitted via e-mail.· Due to the
19· ·size of the submissions they can't be attached as
20· ·an attachment so submitted through a Share Point
21· ·or any -- Drop Box or any other kind of file
·1· ·sharing method that you guys can send an e-mail
·2· ·and attach a link to.
·3· · · · · · · ·Also in Section 3 is the Offeror
·4· ·Proposal Compliance Matrix.· This goes into detail
·5· ·on exactly what is supposed to be submitted.· This
·6· ·is kind of a great kind of cheat sheet table of
·7· ·contents type of area of the RLP that you can look
·8· ·at and see exactly what needs to be submitted to
·9· ·address each section of the RLP or lease or
10· ·appendices.
11· · · · · · · ·There's a lot of things that we're
12· ·looking to have submitted so I definitely
13· ·encourage folks to use this as kind of a guide to
14· ·make sure that you've submitted everything that's
15· ·required.
16· · · · · · · ·And then the last part of it talks
17· ·about the pricing, so the pricing and the
18· ·technical being separate.· We'll get into that in
19· ·just a second.
20· · · · · · · ·Under 3.06, Additional Submittals.
21· ·There is a laundry list of items that are required
·1· ·under this section.· We've just picked a few to
·2· ·touch on.· One being the ownership or control of
·3· ·the property.
·4· · · · · · · ·So we need to see that the Offeror has
·5· ·control of the property.· This can be through an
·6· ·option to purchase contract, a sales contract, a
·7· ·deed for the property, a long term lease for the
·8· ·property that has a duration longer than the time
·9· ·frame of the development and then the 20 year
10· ·lease that the Government is looking for.· Or an
11· ·option to lease that outlines those terms.
12· · · · · · · ·Important to note that the entity
13· ·that's on that contract must match the entity
14· ·that's offering.· So the SDVOSB entity that is
15· ·offering on this submission has to also be the
16· ·entity that has control of the property.
17· · · · · · · ·And this just kind of gives you a
18· ·little bit more information on exactly what we
19· ·would be allowing as evidence of control of the
20· ·property.
21· · · · · · · ·Another item to point out here under
·1· ·additional submittals is the Green Globes.· So
·2· ·this project for buildings that are being proposed
·3· ·for new construction we'd be looking for two Green
·4· ·Globes for new construction as a minimum that
·5· ·folks would need to meet.
·6· · · · · · · ·The next, 3.07 talks about the tenant
·7· ·improvement allowance and it also goes into the
·8· ·detail on what the tenant improvements are.· In
·9· ·the lease, Section 5 talks about what the tenant
10· ·improvement items are.· The lease design narrative
11· ·also goes into detail on what some of the TIs are.
12· · · · · · · ·We've included in this section an
13· ·estimate of what we believe based on a Government
14· ·IGE the total TI cost would be.· That's really
15· ·informational to provide you and your financing
16· ·folks a ballpark of what on the TI side this
17· ·project is going to cost.
18· · · · · · · ·And I think that's important as we get
19· ·into the technical evaluation factors and start
20· ·talking about financing.· You know, we'll be
21· ·looking to see that the costs of the TI is
·1· ·included in the financing plan.
·2· · · · · · · ·That's not going to end up being the
·3· ·exact number.· Again, it's just an estimate and
·4· ·it's there for informational purposes.· The final
·5· ·TI number will be based on the notice to proceed
·6· ·after the construction drawings are finished.
·7· · · · · · · ·Next is Operating Costs, Section 3.11.
·8· ·Again this is a fully serviced lease over the full
·9· ·20 year term.· So we'll be looking for developers
10· ·and eventual owners of the building to be
11· ·providing as part of their lease cost all
12· ·utilities, janitorial services, maintenance of the
13· ·property, upkeep of the property over that 20 year
14· ·period.
15· · · · · · · ·Next up is Section 4 which is Method
16· ·of Award.· So this goes into detail of how the
17· ·Government is going to evaluate proposals.
18· · · · · · · ·And in this case this procurement is
19· ·being run as a best value procurement meaning that
20· ·price is essentially worth half of the evaluation, 21· ·technical is worth the other half of the
·1· ·evaluation.
·2· · · · · · · ·And going back to Section 3, when you
·3· ·submit your proposals you'll be submitting a
·4· ·technical volume and a price volume.· And the
·5· ·reason for that, doing that is that the folks
·6· ·looking at the technical volume will not have any
·7· ·understanding of what's going on with the price.
·8· ·They're strictly looking at the technical
·9· ·proposals and looking at the factors that we've
10· ·put into the RLP.· And these factors match the
11· ·source selection plan that's been developed for
12· ·this specific procurement.
13· · · · · · · ·We have four different evaluation
14· ·factors that we're looking at and within each
15· ·factor we have areas of consideration.
16· · · · · · · ·So for Factor 1 which is technical
17· ·quality, we'll be looking at -- and I will also
18· ·mention that these are in descending order of
19· ·importance.· So Factor 1 is more important than
20· ·Factor 2, which is more important than Factor 3
21· ·and so on.
·1· · · · · · · ·So within Factor 1 we're looking at
·2· ·three parts.· We're looking at architectural
·3· ·concept and building design.· This is the
·4· ·aesthetics of the building, what kind of materials
·5· ·are being used, what's their durability.· Does
·6· ·this project the image that VA wants, which is of
·7· ·a Class A medical facility.
·8· · · · · · · ·Does it include natural light?· Does
·9· ·it fit into the Bowling Green marketplace?· These
10· ·are all things that we're looking at under Factor
11· ·A.
12· · · · · · · ·Additionally we're looking at the
13· ·floor plan.· So how did the Offeror and their
14· ·architect team take our conceptual plan and put
15· ·this into their building.· Are the adjacencies
16· ·similar?· Are the room sizes right?· Are all of
17· ·the rooms there?· Is there a front of house, back
18· ·of house separation that's required by the PACT
19· ·model?
20· · · · · · · ·So these are things that will be
21· ·considered under Factor A -- or area of
·1· ·consideration A.
·2· · · · · · · ·Area of consideration B is quality of
·3· ·site characteristics and development.· So that's
·4· ·looking at both on-site development and then what
·5· ·are the characteristics of the property.
·6· · · · · · · ·So on-site we're looking at parking, ·7· ·we're looking at site circulation, loading docks, ·8· ·how are those accessed.· Any gardens, any kind of
·9· ·sitting areas, things like that.
10· · · · · · · ·Off-site we're looking at amenities, 11· ·public transportation, those type of items.
12· · · · · · · ·We're also looking at kind of ease of
13· ·access to and from the property, so kind of
14· ·connectivity of roads, highways, let's see what
15· ·else on the off-site -- but those are the main
16· ·things, public transportation, amenities, site
17· ·access, things like that.
18· · · · · · · ·And then under sustainable design and
19· ·energy efficiency, that is pretty straightforward
20· ·in terms of what the RLP consideration is.· This
21· ·is how you're meeting the Green Globes energy
·1· ·star, natural light into the building.· These are
·2· ·all things that are being considered under
·3· ·sustainable design and energy efficiency.
·4· · · · · · · ·There are minimal requirements
·5· ·throughout the lease as it pertains to sustainable
·6· ·design energy efficiency.· So that's kind of the
·7· ·baseline and then we're looking at how folks go
·8· ·above and beyond that.
·9· · · · · · · ·Next up is Factor 2, Offeror's
10· ·Qualifications and Past Performance.· So there's
11· ·four areas of consideration under Factor 2.· The
12· ·first is the Offeror's past performance.· So this
13· ·specifically is looking at the past performance
14· ·questionnaires that were included as part of the
15· ·RLP package.· Those are going to be completed by
16· ·whoever you decide to send them to and sent
17· ·directly to our team as well as the contracting
18· ·officer and project manager from VA.
19· · · · · · · ·And we'll be looking at how did the
20· ·person who filled out questionnaire evaluate the
21· ·Offeror.
·1· · · · · · · ·And that is just the offering entity.
·2· ·We're not looking under that one at the GC or the
·3· ·AE or anything like that.· That is the developer, ·4· ·Offeror.
·5· · · · · · · ·Factor B -- or I'm sorry, area of
·6· ·consideration B, we're looking at the design team
·7· ·and then we're looking at the general contractor
·8· ·qualifications.· So here we're looking at the team
·9· ·itself, the experience level of the team members, 10· ·the experience of the company.· But kind of more
11· ·importantly who specifically is going to be
12· ·working on this project.
13· · · · · · · ·Have they worked on projects of
14· ·similar size?· Have they worked on projects of
15· ·similar scope?· Have they worked on other VA
16· ·projects?· That's kind of what we're looking at
17· ·under Factor B.
18· · · · · · · ·Area of consideration C, we're looking
19· ·at the financial resources.· So as I mentioned
20· ·before, you know, this is an important part.
21· ·We're looking at how this building is going to be
·1· ·financed both the shell and the TI.
·2· · · · · · · ·You know, in this marketplace this is
·3· ·more and more important to make sure that these
·4· ·projects once they're awarded can get finished.
·5· ·Specifically under the financial resources plan
·6· ·we're looking at two debt sources as well as two
·7· ·equity sources; so a primary solution for the debt
·8· ·and equity and then a secondary solution for the
·9· ·debt and equity.
10· · · · · · · ·We're looking for backup information
11· ·to support those.· So whether it's balance sheets, 12· ·bank letters, everything that's kind of in that
13· ·plan needs to be supported by backup information.
14· · · · · · · ·The next area of consideration under
15· ·Factor 2 is the Project Management Plan.· So the
16· ·Project Management Plan is really looking at from
17· ·lease award to commencement what is the plan to
18· ·get through design, construction and activation, 19· ·you know, looking at quality control, looking at
20· ·communication plans, looking at a plan to kind
21· ·of -- permitting in this area takes a long time.
·1· ·Here's how we're going to mitigate risks.
·2· · · · · · · ·You know, mitigating risks in terms of
·3· ·construction with long lead items, all of that
·4· ·kind of falls under the Project Management Plan.
·5· · · · · · · ·Factor 3 is looking at the Operations
·6· ·and Maintenance of the Building.· So this is after
·7· ·the building has been delivered and the developer
·8· ·is now operating the building, that part of the
·9· ·entire contract falls under Factor 3.
10· · · · · · · ·So this would be the interior and
11· ·exterior maintenance plan for both the building
12· ·and the grounds.· You know, what maintenance is
13· ·being done, how often is it being done, who's
14· ·doing it?· Those are things that we'll look at
15· ·under that area of consideration.
16· · · · · · · ·Area of consideration B, routine and
17· ·emergency calls and procedures.· So this is if
18· ·there's a problem with the building, what's
19· ·protocol?· Does a doctor or a nurse or other kind
20· ·of practitioner call the building manager and then
21· ·what happens.· And these would be different plans
·1· ·for if it was an emergency and something needed to
·2· ·be addressed immediately versus if it was
·3· ·something that was more routine.· So this looks at
·4· ·chain of communication and, you know, response
·5· ·times and just kind of the feasibility of the
·6· ·overall plan.
·7· · · · · · · ·And in area of consideration C we're
·8· ·looking at staffing plan, administrative
·9· ·procedures and quality control.
10· · · · · · · ·Staffing plan is pretty
11· ·straightforward.· You know, are you going to have
12· ·somebody on-site during operating hours?· Is it
13· ·more kind of a roving thing?· What's the staffing
14· ·for the janitorial services?· What's the staffing
15· ·for the general maintenance of the building?
16· · · · · · · ·And then quality control, looking at
17· ·kind of what methods and plans are in place to
18· ·make sure that there is quality control and backup
19· ·for operation and maintenance of the building.
20· · · · · · · ·And then Factor 4 is the
21· ·socio-economic status.· So this one essentially
·1· ·will being a neutral rating.· Because this is a
·2· ·SDVOSB set aside, every Offeror has to be an
·3· ·SDVOSB.· So there will be no benefit for this
·4· ·factor where one group can do better than another
·5· ·group.
·6· · · · · · · ·Everybody for this factor will be on
·7· ·an even playing field.
·8· · · · · · · ·Section 4.05 talks about how we
·9· ·evaluate price.· So like I said at the beginning, 10· ·technical is worthy essentially half; price is
11· ·worth the other half.· And for the price component
12· ·what we do is we take the rental stream which will
13· ·differ Offeror to Offeror how that is set up and
14· ·we'll bring that down to a present value number on
15· ·a per ABOA square foot basis.
16· · · · · · · ·And 4.05 talks about the methodology
17· ·behind that calculation and how we get there.
18· · · · · · · ·Section 5 is additional terms and
19· ·conditions.· So these are things that are kind of
20· ·unique to VA's RLP so we wanted to point out a few
21· ·of these.· One is, 5.02 talks about off-site
·1· ·improvements.· So anything that the jurisdiction
·2· ·is requiring, whether it be putting in a traffic
·3· ·light or building a sidewalk or extending a road, ·4· ·all of those costs are the developer's costs and
·5· ·they need to be considered and built into the
·6· ·shell rental rate.
·7· · · · · · · ·VA will not be paying for any of those
·8· ·off-site improvements down the road if the
·9· ·developer comes and says, hey, you know, when we
10· ·got this award we had no idea that we were going
11· ·to have to put this traffic signal in, you know, 12· ·100 yards down the road but the jurisdiction is
13· ·making us.· That risk is on the developer and that
14· ·needs to be considered and built in as part of the
15· ·proposal.
16· · · · · · · ·Similarly on-site, below the site if
17· ·you run into rock while you're starting to
18· ·excavate or there's something that's kind of
19· ·unforeseen in site development, again that's the
20· ·responsibility of the Offeror.· That's not
21· ·something that the VA is going to be paying for
·1· ·outside of the rent.
·2· · · · · · · ·So it is incumbent on the developers
·3· ·to really understand their site and then
·4· ·understand the jurisdiction and what the
·5· ·requirements are going to be for their site to be
·6· ·developed.
·7· · · · · · · ·5.06 talks about teaming agreements.
·8· ·Because the architect and the general contractor
·9· ·are such important parts of the total team that's
10· ·being proposed for the project and because we're
11· ·evaluating both of those entities, we want to make
12· ·sure that there's a formalized teaming agreement
13· ·between the Offeror and then the GC and the
14· ·Offeror and the design team.
15· · · · · · · ·And we request letters kind of stating
16· ·such, that there is an agreement in place to move
17· ·forward on this project.
18· · · · · · · ·So, again, in summary we kind of
19· ·talked through all five sections of the RLP.
20· · · · · · · ·And we'll move on to the lease which
21· ·has a total of seven sections.· Section 1, which
·1· ·is the premises and the rent.· This section is the
·2· ·one that gets kind of manipulated the most while
·3· ·we're creating the lease document.
·4· · · · · · · ·We're taking information from the
·5· ·presumed successful Offeror and we're going to put
·6· ·that into Section 1 and that will cover the term
·7· ·of the lease and the rent, the operating expenses, ·8· ·percentage of occupancy, a bunch of different
·9· ·things in Section 1 that needs to be filled in.
10· ·And that will be offer specific.
11· · · · · · · ·The rest of the sections, Sections 2
12· ·through 7 are pretty much standard language and
13· ·there's not a ton that gets changed in those, you
14· ·know, from the document that's a part of the RLP
15· ·package.
16· · · · · · · ·A few things to point out that's
17· ·different from the general GSA lease that folks
18· ·might be familiar with.· And the most important
19· ·one being in Section 3, 3.40.· The standard kind
20· ·of GSA language takes the HVAC system and it
21· ·breaks part of it into shell and part of it into
·1· ·the TI.· In this case, this lease requires all
·2· ·HVAC costs to be shell.· So there will be no HVAC
·3· ·costs at all that will be part of the tenant
·4· ·improvement allowance.
·5· · · · · · · ·So that's one, for folks that haven't
·6· ·bid on these VA projects prior, we wanted to point
·7· ·out because it is different and, you know, it's a
·8· ·substantial kind of cost shift from TI to shell.
·9· · · · · · · ·This just talks about the design
10· ·overview and the design concept.· So what you
11· ·submit with proposal, that's what we're going to
12· ·hold you to.· So the building itself, the building
13· ·design, the building materiality, this will all be
14· ·incorporated into the lease, you know, through
15· ·plans and references to the proposal.
16· · · · · · · ·So I just want to point out that, you
17· ·know, whatever you propose make sure that you've
18· ·covered the costs because that's what we're going
19· ·to hold the developer to.
20· · · · · · · ·And then the other things to think
21· ·about, and this factors into the lease is, you
·1· ·know, what building standards and design standards
·2· ·you guys need to meet.· And there's a bunch of
·3· ·different ones.· The RLP package, that kind of
·4· ·goes away but some of the attachments, the LDN and
·5· ·the PFD, those will be part of it.· There's
·6· ·Federal regulations, there's FGI, there's local
·7· ·building codes and standards.· You have to meet
·8· ·the Green Globes, accessibility.· And then making
·9· ·sure that your costs include Davis-Bacon wages.
10· · · · · · · ·So part of the RLP package are a
11· ·handful of appendices, and I'm going to touch on
12· ·just a couple of these appendices today.
13· · · · · · · ·Appendix A is the Program for Design.
14· ·So this is a breakdown of each space within the
15· ·facility.
16· · · · · · · ·So as you can see here it takes each
17· ·room and it will outline exactly what the room is.
18· ·So let's just say it's a storage room and it's
19· ·within the audiology area of the building and
20· ·there's two of them.· And so you list that square
21· ·footage for each, maybe 100 square feet, total 200
·1· ·square feet.
·2· · · · · · · ·And so this document lists every
·3· ·single room within the building giving you a
·4· ·quantity and a size and that's ultimately how we
·5· ·come up with the square footage required for this
·6· ·project.
·7· · · · · · · ·The next is the Project Room Content
·8· ·List.· So these appendices kind of build on each
·9· ·other.· The Project Room Content List lists the
10· ·room again, but then it goes into more detail and
11· ·it tells you exactly what is going to be in the
12· ·room.
13· · · · · · · ·And then if it's going to be something
14· ·that the vendor -- or I'm sorry, the contractor is
15· ·going to be providing and installing or the VA is
16· ·going to be providing and installing.
17· · · · · · · ·So you can see here within this
18· ·audiology booth there's going to be chairs, 19· ·there's going to be computers, there's going to be
20· ·dispensers, there's going to be a hook, stools.
21· ·So it kind of gives you a list of everything.
·1· · · · · · · ·And then it will tell you how many and
·2· ·who's going to be providing what.
·3· · · · · · · ·These come really into play in
·4· ·planning but then also post award as we get into
·5· ·more of a detailed design of the space.
·6· · · · · · · ·Appendix 2 talks about -- it's the
·7· ·Lease Design Narrative.· This has become a fairly
·8· ·standard document and it goes into detail, kind of
·9· ·consolidating codes, standards and references, 10· ·building off kind of the RLP -- I'm sorry, the
11· ·lease with the shell section and the TI section
12· ·and just giving more detail on what's going to be
13· ·happening in this specific building.· Kind of
14· ·agency specific requirements.
15· · · · · · · ·And then Appendix 3 kind of goes back
16· ·to the PFD and the room contents list and
17· ·continuing to kind of build on that.· The
18· ·difference being here on the room data matrix is
19· ·that it's taking each room and then breaking down
20· ·what the room is going to be constructed of.
21· · · · · · · ·So you'd see like interior
·1· ·construction, it will give you an STC rating for
·2· ·the room, it will give you a ceiling height for
·3· ·the room.· It will give you what the finishes are, ·4· ·so what the doors would be, the paint would be.
·5· ·If there's Wainscoting, what that would be.· So
·6· ·that has a breakdown room by room so when you are
·7· ·in the post award phase and you're pricing this
·8· ·information you would be able to have one spot you
·9· ·can go to with your contractor and gather all of
10· ·it together.
11· · · · · · · ·Section 4 -- or I'm sorry, Appendix 4
12· ·is VA Transport System Specs.· So this is more of
13· ·an IT type of document to make sure that the IT
14· ·meets all of the requirements of VA's Office of
15· ·Information and Technology.
16· · · · · · · ·This is the FSL II document that I
17· ·talked about briefly previously.· So these will be
18· ·the security requirements.· Again some of these
19· ·items are shell requirements and then others would
20· ·fall under the tenant improvement allowance.· So
21· ·this is an important document to look at, one, ·1· ·when you're designing the building to make sure
·2· ·that the design meets the security requirements
·3· ·outlined in here.
·4· · · · · · · ·And then once we get into the pricing
·5· ·phase after award this becomes an important factor
·6· ·as well.
·7· · · · · · · ·The next is the conceptual layout
·8· ·which is kind of a standard single story packed
·9· ·layout.· And I think that Derek was going to talk
10· ·about this a little bit.· Derek, do you want to
11· ·touch on it?
12· · · · · · · ·MR. GRAY:· Derek Gray here.· Let me
13· ·start off with an apology.· I've got mowers right
14· ·outside my office windows right now so if there's
15· ·some background noise, please forgive.· I'll try
16· ·to speak up, though.
17· · · · · · · ·Derek Gray,· I work at the Office of
18· ·Construction Facilities Management in the Lease
19· ·Delivery Division and will be assigned
20· ·particularly to this project as indicated in the
21· ·introductory slides.
·1· · · · · · · ·So Appendix A.6, the Conceptual Floor
·2· ·plan.· One thing to note here, this was developed
·3· ·by CFM and LDD, lease delivery.· This is not a
·4· ·design and intended to be a design but it is a
·5· ·block diagram for the purposes which was stated
·6· ·earlier outlining what VA has identified as the
·7· ·desired departmental adjacencies, the flow of
·8· ·operations across the building.
·9· · · · · · · ·As mentioned earlier, the separation
10· ·between front of house, back of house and how all
11· ·the different areas of consideration need to be
12· ·both captured within the ultimate layout of the
13· ·facility but also how those adjacencies are so
14· ·important to the functional operations of day to
15· ·day operations of the clinic.
16· · · · · · · ·And so play close attention to this, 17· ·particularly those adjacencies, the separations
18· ·between areas, the front of house, back of house
19· ·operations.· But if there are ways to find
20· ·efficiencies in your design, in your anticipated
21· ·design model throughout the course of your
·1· ·proposal package, please include that, annotate
·2· ·how that does so.
·3· · · · · · · ·Pay specific attention to the PACT
·4· ·models that are represented here.· But again not a
·5· ·design, just a block diagram.
·6· · · · · · · ·It doesn't address -- one thing of
·7· ·note, it does not address any of the site
·8· ·constraints that may be particular to the layout
·9· ·and functionally of the facility since the current
10· ·site is unknown as part of your alls proposal
11· ·package.
12· · · · · · · ·And so bear in mind and take into
13· ·consideration as you do your preliminary design
14· ·layouts that it does need to reflect the
15· ·constraints, uniqueness of the sites that may
16· ·proposed.
17· · · · · · · ·MR. SEIFERT:· Thanks, Derek.
18· ·Appreciate it.
19· · · · · · · ·MR. GRAY:· Yes, sir.
20· · · · · · · ·MR. SEIFERT:· And just to kind of
21· ·piggyback on what Derek was saying.· VA at the
·1· ·local level, so that medical center and the
·2· ·Tennessee Valley Health System has spent a fair
·3· ·amount of time, you know, working on this and
·4· ·coming up with the adjacencies and what they think
·5· ·the flow should be like.
·6· · · · · · · ·So I say that in that, you know, ·7· ·you're free to offer whatever you'd like in terms
·8· ·of the layout, but just keep in mind that this is
·9· ·kind of what -- in terms of adjacencies and flow, 10· ·this is what VA has come up with and, you know, 11· ·sticking with it as much as you can probably isn't
12· ·a bad idea.
13· · · · · · · ·And then the last appendix that we'll
14· ·talk about is Appendix B.· So this is VA
15· ·Janitorial Services and Site Management.· So this
16· ·is the janitorial scope that will become part of
17· ·the contract and what you will need to be pricing
18· ·in your operating expenses as part of the
19· ·proposal.
20· · · · · · · ·Lastly, we'll talk about a few of the
21· ·standard forms.· The first is GSA Form 1364.· So
·1· ·this is the pricing form.· You'll be submitting
·2· ·one of these for both your 15 year and your 20
·3· ·year proposal.
·4· · · · · · · ·On here you'll submit the information, ·5· ·building name, location, offered square footage.
·6· ·You'll capture what the rent is that you're
·7· ·proposing here.· You'll talk -- you'll capture
·8· ·your mark-ups for the architect and your PM markup
·9· ·as well.
10· · · · · · · ·The second part of this is the
11· ·additional financial aspect.· So this talks about
12· ·free rent.· If you're going to offer free rent at
13· ·the beginning or at any time during the lease, 14· ·that gets factored into the Present Value
15· ·Analysis.
16· · · · · · · ·Talking about adjustment for vacant
17· ·premises, adjustment for reduced space.· This
18· ·information is taken for the successful Offeror
19· ·and put into the lease itself.
20· · · · · · · ·And, again, the key thing is that you
21· ·will be submitting this for both your 15 and your
·1· ·20 year term and then there's also an attachment
·2· ·to GSA Form 1364 that's an Excel spreadsheet that
·3· ·allows you if you want to bump your rate annually
·4· ·or every couple of years, whatever the case is on
·5· ·the shell rate, that form will give you the
·6· ·ability to show how you'd like that to be
·7· ·structured.· So both -- you know, that form needs
·8· ·to be completed and that form has a spot for both
·9· ·the 20 year and the 15 year term on it.
10· · · · · · · ·Next is your GSA Form 1217.· So GSA
11· ·Form 1217 is your operating cost and it's broken
12· ·into two areas.· So Section 1 which we all call it
13· ·kind of above line 27, those are your operating
14· ·expenses.· So that's per Government leasing, that
15· ·will be your operating expense number that gets
16· ·escalated annually by CPI to hopefully keep up
17· ·with inflation and your operating costs.
18· · · · · · · ·The numbers that are below line 27, so
19· ·Section 2 that gets summed up in line 33 which is
20· ·your real estate taxes, your insurance, 21· ·maintenance and management, those costs are built
·1· ·in to your shell rate.
·2· · · · · · · ·And so although they show up on the
·3· ·form for operating expenses, those specific costs
·4· ·are built into the shell.
·5· · · · · · · ·The next form is GSA Form 3517 B.
·6· ·This is General Clauses.· These are standard
·7· ·across all Government lease contracts.· And this, ·8· ·you know, basically governs the lease after award
·9· ·and, you know, what can happen.· You know, there's
10· ·performance, payment, standards of conduct, all
11· ·sorts of different things that aren't in the lease
12· ·itself but are covered within the general clauses
13· ·which becomes part of the lease document.
14· · · · · · · ·Kind of just to wrap up here with, you
15· ·know, some reminders and general contract
16· ·requirements.
17· · · · · · · ·Again you need to make sure that the
18· ·building meets fire and life safety regulations, 19· ·physical security and accessibility.· The property
20· ·has to be zoned, obviously, for this specific
21· ·medical use.
·1· · · · · · · ·It needs to meet all Codes, Local and
·2· ·Federal.· And you need to make sure that your cost
·3· ·of construction you're paying Davis-Bacon wages, ·4· ·that's both for the shell and the TI, and that the
·5· ·Uniform Accessibility Standards are met.
·6· · · · · · · ·A few other reminders.· And it kind of
·7· ·goes without saying, but make sure you read
·8· ·everything in the RLP.· I know a lot of the folks
·9· ·on this call bid on tens if not hundreds of these
10· ·projects.· Each one is a little bit different in
11· ·terms of what's in the RLP, so just make sure that
12· ·you understand specific to this project what's in
13· ·there.
14· · · · · · · ·Looking at Section 3.02 to make sure
15· ·you have a fully compliant offer and looking at
16· ·that proposal matrix.
17· · · · · · · ·Initial every page when you submitted
18· ·the proposal.
19· · · · · · · ·Making sure it's complete and
20· ·consistent.· One thing that we have been seeing is
21· ·a lot of these projects are out at similar times, ·1· ·there are references to other projects or other
·2· ·locations, you know, just kind of making sure that
·3· ·this offer is specific to the Bowling Green
·4· ·requirement so when we're looking at it, and most
·5· ·importantly the Technical Evaluation Board is
·6· ·looking at it, they're sure that the reference is
·7· ·specific to this project and that the design is to
·8· ·this project.
·9· · · · · · · ·And making sure that you're registered
10· ·in SAM.· So, again, the SAM registration has to be
11· ·in the name of the offering entity and that needs
12· ·to be active and that also needs to match the
13· ·entity that controls the property, so through that
14· ·option to purchase contract or something else.
15· · · · · · · ·A couple other reminders.· The Phase I
16· ·and the Cultural Resources Study need to be
17· ·provided with the initial offer.· Those are long
18· ·lead time items so I'd recommend that folks get on
19· ·that early for their specific sites.
20· · · · · · · ·For the narratives that will be
21· ·backing up your plans, make sure that they're
·1· ·deliberate and concise.· Your Technical Evaluation
·2· ·Board for this project is going to be looking at
·3· ·multiple proposals and if they get proposals that
·4· ·are super wordy and they're not concise and
·5· ·they're not to the point in trying to get that
·6· ·message across, things can get lost in the long
·7· ·narrative.
·8· · · · · · · ·So I recommend, you know, making sure
·9· ·that those narratives are to the point and address
10· ·what's being looked for in Section 4 of the RLP.
11· · · · · · · ·We talked about kind of eliminating
12· ·discrepancies, references to other projects, 13· ·references to different square footages in the
14· ·proposal or different parking numbers or things
15· ·like that.
16· · · · · · · ·Probably the last bullet is the most
17· ·important is that we're not going to be accepting
18· ·any conditional offers.· So the terms are what
19· ·they are.· We're not going to be changing the
20· ·lease for one group versus another group.· And so
21· ·no proposals can be conditioned on changes to the
·1· ·standard lease language.
·2· · · · · · · ·We talked about the evidence of
·3· ·ownership.· Occupancy date.· So as part of the
·4· ·PMP, Project Management Plan, you guys will be
·5· ·submitting a schedule that includes kind of design
·6· ·as well as construction into occupancy and just
·7· ·making sure that you're comfortable with that.
·8· ·Those numbers will be transposed into the lease
·9· ·itself in Section 4.01.· And it will be something
10· ·that, you know, the successful developer is held
11· ·to.
12· · · · · · · ·So making sure that you can hit the
13· ·occupancy date but that the durations and the
14· ·schedule is realistic.
15· · · · · · · ·And we talked about the financial
16· ·resources and just how important, specifically in
17· ·this market, that that is.· It's harder and harder
18· ·to get loans, especially for commercial real
19· ·estate and we want to make sure that as soon as
20· ·the award is made this project is off and running
21· ·and it's not delayed at all because of financing
·1· ·issues.
·2· · · · · · · ·Kind of lastly on the questions and
·3· ·answers.· The questions are due by the 16th of
·4· ·August, like we talked about, 4:00 p.m.· Those can
·5· ·be sent directly to Ed as outlined in the RLP.
·6· ·And really important is that they need to be
·7· ·submitted on an Excel sheet.· So don't take an
·8· ·Excel sheet and make it a PDF for us.
·9· · · · · · · ·The easiest way to get these questions
10· ·is in an Excel document, putting the number
11· ·question in row A, referencing where the question
12· ·is from, so--
13· · · · · · · ·So let's just say in row B, you know, 14· ·RLP Section 3.06, and then what the question is
15· ·about that specific section of the RLP.
16· · · · · · · ·And the same if it was Appendix A and
17· ·then what the question is.· That will allow us to
18· ·quickly understand what you're asking and it will
19· ·help us get you a better answer going forward.
20· · · · · · · ·So that's everything we wanted to
21· ·touch on today.· I appreciate everybody's time and
·1· ·look forward to receiving folks' questions by the
·2· ·mid part of this month and then getting the
·3· ·initial offers in late September.
·4· · · · · · · ·If you have any questions at all, ·5· ·please submit those in writing and we will get
·6· ·back to you as soon as possible.
·7· · · · · · · ·Have a great afternoon.
·8· · · · ·(Proceedings concluded at 11:50 p.m.)
·9
·1· ·State of Maryland
·2· ·Baltimore County, to wit:
·3· · · · · · ·I, PAULA J. ELIOPOULOS a Notary Public of the
·4· ·State of Maryland, County of Baltimore, do hereby
·5· ·certify that the within proceedings occurred remotely
·6· ·before me via Zoom at the time herein set out.
·7· · · · · · ·I further certify that the proceedings were
·8· ·recorded stenographically by me and this transcript is
·9· ·a true record of the proceedings.
10· · · · · · ·I further certify that I am not of counsel to
11· ·any of the parties, nor in any way interested in the
12· ·outcome of this action.
13· · · · · · ·As witness my hand and notarial seal this
14· ·19th day of August, 2024.
16· · · · · · · · · · · · · · ·_______________________
17· · · · · · · · · · · · · · · ·PAULA J. ELIOPOULOS
18· · · · · · · · · · · · · · · · Notary Public
19· ·My Commission Expires:
20· ·June 15, 2028
| Transcript |
| Caption |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
| Page 14 |
| Page 15 |
| Page 16 |
| Page 17 |
| Page 18 |
| Page 19 |
| Page 20 |
| Page 21 |
| Page 22 |
| Page 23 |
| Page 24 |
| Page 25 |
| Page 26 |
| Page 27 |
| Page 28 |
| Page 29 |
| Page 30 |
| Page 31 |
| Page 32 |
| Page 33 |
| Page 34 |
| Page 35 |
| Page 36 |
| Page 37 |
| Page 38 |
| Page 39 |
| Page 40 |
| Page 41 |
| Page 42 |
| Page 43 |
| Page 44 |
| Page 45 |
| Page 46 |
| Page 47 |
File details come from the government source that posted it. Updated .