11. Past Performance Questionnaire-9-6-24.pdf

PDF 246 KB Posted

Attached to
X1DB--Bowling Green Community-Base Outpatient Clinic (CBOC) 49, 235 ANSI/BOMA
Solicitation number
36C10F24R0039
Issued by

About this file

This document is a Past Performance Questionnaire related to a federal contract opportunity for the Bowling Green, KY Community-Based Outpatient Clinic (CBOC) project.

The key details are:

  • The solicitation number is 36C10F24R0039, issued by the Department of Veterans Affairs Office of Construction and Facilities Management.
  • The questionnaire requests information on the contractor's past performance, including quality of work, schedule/timeliness, customer satisfaction, management, cost/financial management, safety/security, and overall performance.
  • The questionnaire provides instructions for references to complete and submit the form directly to the VA's Broker by October 4, 2024.
  • The government reserves the right to verify all information provided on the form.
  • The questionnaire uses a rating scale ranging from Exceptional to Unsatisfactory to evaluate the contractor's performance.

View the file

Other files

File Type Posted
Bowling Green VA Pre-Bid Conference RLP 36C10F24R0039 Transcript.pdf PDF
5. Offering Entity Acknowledgement Form-8-27-24.pdf PDF
4. Appendix B. Bowling Green, KY Janitorial Services and Site Management-9-6-24.pdf PDF
Bowling Green KY RLP Questions Responses-9-6-24-FINAL.pdf PDF
VA CBOC Bowling Green - RLP No. 36C10F24R0039 - Amendment Number 1.pdf PDF
2. Agency Specific Requirements ASR Package - Cover Page.pdf PDF
3. Appendix A.6 Bowling Green Concept Plan-8-26-24.pdf PDF
36C10F24R0039_1.docx DOCX document
2C. Appendix A.2 Bowling Green LDN-8-27-24.pdf PDF
2F. Appendix A.5 VA LEASE SECURITY REQUIREMENTS FOR FSL II.pdf PDF
16. GSA 3517B General Clauses.pdf PDF
2A. Appendix A. Program for Design PFD.pdf PDF
7. Proposal to Lease Space GSA Form 1364.pdf PDF
8. Attachment to GSA Form 1364.xlsx XLSX spreadsheet
13. GSA Form 527 - Contractor's Qualifications and Financial Information.pdf PDF
12. SF-330 Architect-Engineer Qualifications.pdf PDF
5. Offering Entity Acknowledgement Form.pdf PDF
10. VA Form 10091 VA FSC Vendor File Request Form.pdf PDF
15. GSA 3516 Solicitation Provisions.pdf PDF
22. Pre-Bid Registration Form.pdf PDF
2C. Appendix A.2 Bowling Green LDN.pdf PDF
17. GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building.pdf PDF
36C10F24R0039.docx DOCX document
2D. Appendix A.3 Bowling Green, KY RDM.xlsx XLSX spreadsheet
14. VA Handbook 65006.pdf PDF
0. Bowling Green RLP.pdf PDF
2B. Appendix A.1 Bowling Green.pdf PDF
20. FAR 52.204-24 Representation Regarding Certain Telecom.pdf PDF
21. Seismic Offer Forms.pdf PDF
18. Certification of Building Energy Performance.pdf PDF
2E. Appendix A.4 Information Transport Systems Specifications.pdf PDF
4. Appendix B. Bowling Green KY Janitorial Services and Site Management.pdf PDF
11. Past Performance Questionnaire.docx DOCX document
23. Commission Agreement Bowling Green CBOC.pdf PDF
6. Offeror Proposal Compliance Matrix.docx DOCX document
3. Appendix A.6 Bowling Green POC Concept Plan.pdf PDF
19. DOL Wage Determination-Warren County.pdf PDF
1. Bowling Green Lease.pdf PDF
9. GSA Form 1217 Lessor's Annual Cost Statement.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RLP No.: 36C10F24R0039 Bowling Green, KY CBOC

ORP Past Performance Questionnaire November 2018 Page 1 of 6

VA PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Past Performance Reference No. (1-5):

Offeror Name:

Address:

Phone Number: DUNs Number:

Contact Name:

Email Address: Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as: Offering Entity Predecessor Companies Key Personnel Percent (%) of project work performed by Offering Entity, Predecessor Companies or Key Personnel:

List of Major Subcontractor(s) and Role(s):

3. CONTRACT INFORMATION

Contract Number:

Contractor Name Reference Contract Awarded To: Contractor DUNS Awarded:

Agency/Customer:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please explain) Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Construction Completion Date (mm/dd/yy):

Awardee Ongoing Services:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

REFERENCE INFORMATION

Past Performance Questionnaire Reference

Name & Title:

Phone No.:

Email:

Address:

Contracting Officer (CO) or Individual Responsible for Signing Contract

Name & Title:

Phone No.:

Resident Engineer/CO’s Technical Representative or Construction Supervisor

Name & Title:

Phone No.:

ORP Past Performance Questionnaire November 2018 Page 2 of 6

ORP PAST PERFORMANCE QUESTIONNAIRE (CONTINUED)

4. PROJECT DESCRIPTION

Type of Work (check all that apply): VA Federal Medical Office Other:

Reference Project Key Personnel Assigned as Key to Solicitation Project: Yes No If yes, please provide key personnel names and roles:

DETAILED DESCRIPTION OF THE WORK PERFORMED

EXPLANATION OF RELEVANCY TO SOLICITATION REQUIREMENTS

ORP Past Performance Questionnaire November 2018 Page 3 of 6

INSTRUCTIONS FOR REFERENCES COMPLETING THIS QUESTIONNAIRE: VA requests that the reference completes this questionnaire and submits it directly back to VA’s Broker, Ed Brennan, ebrennan@ppwashdc.com, no later than 4:00 pm ET on October 4, 2024, with a subject line that reads “RLP 36C10F24R0039 – Bowling Green, KY CBOC, [Name of Offeror], Completed Past Performance Questionnaire”. The government reserves the right to verify all information on this form. To select: click box and fill shape in black.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per VA policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

ORP Past Performance Questionnaire November 2018 Page 4 of 6

TO BE COMPLETED BY PPQ REFERENCE

PPQ REFERENCE

PPQ Reference Point of Contact Information Name:

Title:

Agency/Company:

Phone Number:

Email Address:

Contract No.:

Contract Type:

Contract Title: Contract Location:

Describe your role in the project:

Does the narrative in No. 4, above, accurately describe the scope, complexity, and relevance:

Date Questionnaire was completed (mm/dd/yy):

PPQ Reference’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of building design, construction, workmanship, quality of materials used, interior spaces, and overall appearance.

(b) Ability to meet quality standards specified for technical performance.

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract.

(c) Rate your satisfaction with the contractor’s ability to respond to questions and/or comments in a timely manner.

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project?

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

(d) Overall customer satisfaction.

ORP Past Performance Questionnaire November 2018 Page 5 of 6

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of management, including management of subcontractors and/or labor force?

(b) Ability to hire, apply, and retain a qualified workforce to this effort.

(c) Government Information Property Control.

(d) Knowledge/expertise demonstrated by contractor key personnel.

(e) Government contract requiring a subcontracting plan (Complete if the contractor was required to submit and adhere to a small business subcontracting plan. Were small business goals met?

(f) Ability to simultaneously manage multiple projects with multiple disciplines.

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the project).

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)?

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the

PM.

(c) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.)

Yes No

(d) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

Yes

No

(e) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.)

Yes No

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all general and IT security requirements for the project and personnel security requirements.

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below

(c) In summary, provide an overall rating for the work performed by this contractor.

ORP Past Performance Questionnaire November 2018 Page 6 of 6

8. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.) Yes No

COMMENTS SECTION

Please provide responses to the above questions (if applicable) and/or additional remarks. Also, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

File details come from the government source that posted it. Updated .