Columbia PreBid Transcript.pdf
PDF 642 KB Posted
- Attached to
- X1DB--Department of Veterans Affairs RLP 36C10F24R0022 Request for Lease Proposal (RLP) for Columbia, TN OPC
- Solicitation number
- 36C10F24R0022
About this file
This document is a pre-bid conference transcript for a Department of Veterans Affairs (VA) Request for Lease Proposals (RLP) for a new VA Community-Based Outpatient Clinic (CBOC) in Columbia, Tennessee. The RLP is seeking between 46,779 to 55,034 ANSI/BOMA and ABOA square feet of space in a moderate-quality building with 350 parking spaces reserved for government use. The proposed rental term is 20 years firm, with lease commencement anticipated within 24 months of award. Proposals are due by 4:00 PM ET on August 13, 2024, and this pre-bid conference provided an overview of the solicitation requirements, including technical evaluation factors focused on building design, past performance, financial resources, and operations/maintenance plans. The procurement will be set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) evaluated on a best value basis with technical and price factors equally weighted. The government will not accept any conditional offers and all costs must comply with Davis-Bacon wage requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C10F24R0022_1.docx | DOCX document | |
| Offeror Proposal Compliance Matrix.docx | DOCX document | |
| 2B Appendix A1 Columbia Room Contents List Revised.xlsx | XLSX spreadsheet | |
| VA CBOC Columbia TN RLP No 36C10F24R0022 Amendment 1.pdf | ||
| Columbia TN RLP Question Responses7252024 Final.pdf | ||
| 2A Appendix A Program for Design Final PFD Revised.xlsx | XLSX spreadsheet | |
| Columbia TN RLP 3610F24R0022.pdf | ||
| 36C10F24R0022.docx | DOCX document | |
| Columbia TN RLP 36C10F24R0022 Appendixes zip.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
·1
·2
·3· · · · ·VA OUTPATIENT CLINIC PRE-BID CONFERENCE
·4· · · · · · ·COLUMBIA, TENNESSEE VAC PROJECT
·5· · · · · ·LINDSAY MCELHINNEY, COURT REPORTER
·6· · · · · · · · · · · WASHINGTON, DC
·7· · · · · · · · · Tuesday, July 9, 2024
·8· · · · · · ·Time:· 11:06 a.m. to 11:48 a.m.
·9· · · · · · · · · · · · ·VIA ZOOM
14· · · · · · · · · · · · · HOST:
15· ·BRADFORD SEIFERT, SENIOR DIRECTOR, PUBLIC PROPERTIES
16· · · · · · · · · · · PARTICIPANTS:
17· · ·GARLAND GILL, JONATHAN TAYLOR, LINDSAY KILLIAN,
18· · · · BLAKE SPRINGER, CARA GARCIA, JENNIFER LYE,
19· · · · ·BRADFORD SEIFERT, ED BRENNAN, SAM DYSON,
20· · · · · · ·RICH PICARELLI, DAVID STENHOUSE
·1· · · · · · · · · · · · · CONFERENCE
·2· · · · MODERATOR:· I want to welcome everybody to the
·3· ·pre-bid conference for the Columbia, Tennessee VAC
·4· ·project.· The meeting should take 45 minutes to an
·5· ·hour and I am sure from looking at most of the names
·6· ·on the list, you guys are pretty familiar with a lot
·7· ·of the information we’ll provide today.· Brad, you’re
·8· ·muted.
·9· · · · MR. SEIFERT:· All right.· I didn’t do it myself.
10· ·Going into kind of the purpose of the meeting, so like
11· ·I said, we will talk about the project team and then
12· ·rules and reminders as well as kind of what the idea
13· ·of the pre-bid is what we are trying to accomplish
14· ·today.· If you are not presenting or talking, if you
15· ·could just mute your mic, that would be appreciated.
16· · · · For the VA side, we have Garland Gill who is the
17· ·Senior Realty Specialist and Project Manager on the
18· ·project; Jonathan Taylor who is the contracting
19· ·officer who is going to say a few things here in a
20· ·bit; Lindsay Killian who is the Branch Chief and
21· ·Contracting Officer; Blake Springer who is the Team
·1· ·Lead --
·2· · · · MODERATOR:· You’re muted again.· Brad, someone
·3· ·muted you again.
·4· · · · MR. SEIFERT:· Yeah.· Yeah.· I just saw that.
·5· ·I don’t know who’s doing that.· I will keep an eye on
·6· ·it.· Going to the next slide, from the medical center
·7· ·we have Cara Garcia who is the Activation Manager, and
·8· ·then Jennifer Lye who is also an Activation Manager
·9· ·with the medical center.
10· · · · I’m Brad Seifert with Public Properties.
11· · · · We are part of Team Reed.· He is the broker
12· ·representing the Department of Veterans Affairs on
13· ·this project.· On our team, we have Ed Brennan, 14· ·Sam Dyson, Rich Picarelli, and David Stenhouse.
15· · · · As I said in the beginning, we do have a court
16· ·reporter who is recording this call.
17· · · · Any questions, we are going to ask that you
18· ·submit in writing.· If you have something that you
19· ·absolutely need to say, if you could say your name
20· ·before you talk so the court reporter can get that as
21· ·part of the record.
·1· · · · To keep procurement integrity, we are going to
·2· ·ask that all questions be submitted in writing and
·3· ·then, that way, we can get you a proper answer and get
·4· ·that out to everybody at the same time so everybody
·5· ·has the same information.
·6· · · · The purpose of the pre-bid is to provide a
·7· ·general overview of the project, communicate how we
·8· ·would like you to submit your proposal, and to promote
·9· ·competition.· And then, a copy of this transcript will
10· ·be posted to SAM.gov.
11· · · · With that, before we get into the project
12· ·overview, I just want to turn it over to Jonathan to
13· ·say a couple words about the project.
14· · · · MR. TAYLOR:· Thank you.· Welcome, everyone.
15· ·Good morning.· Thank you all for jumping on this call.
16· ·We really appreciate it.· It is very important for us
17· ·to do these pre-bid conferences so that you guys can
18· ·have more information to properly prepare your bid and
19· ·your response.
20· · · · I just wanted to kind of give a brief overview
21· ·real quick of exactly what is included in the RLP
·1· ·which I’m not going to go into a lot of detail because
·2· ·you can reference this information in the RLP itself, ·3· ·but just so everybody knows.
·4· · · · This RLP number 36CTNF24R0022 is for Columbia, ·5· ·Tennessee’s CBOC.· This is going to be an SDV list B
·6· ·set-aside.· We are seeking a minimum of 46,779 to a
·7· ·maximum of 55,034 of ANCI/BOMA and ABOA square feet.
·8· ·The proposed rentable square feet shall not exceed
·9· ·60,537 rentable square feet.
10· · · · The offered space must be located in a moderate-
11· ·quality building of substantial construction with a
12· ·focaccia, stone, marble, brick, stainless steel
13· ·liminal.· If not a new building, the space should be
14· ·in a building that has undergone will complete by
15· ·occupancy any kind of modern or adaptive reuse for the
16· ·space with modern conveniences.
17· · · · We are looking for 350 parking spaces reserved
18· ·exclusive for government.
19· · · · The offer shall include these costs in part of
20· ·the rental consideration.· Approximately 250 ABOA
21· ·square foot will be used for operation of vending
·1· ·facility.· This should also be included in the tenant
·2· ·improvement costs.
·3· · · · We are looking at a price proposal for a term of
·4· ·20 years firm, and the lease commencement date at this
·5· ·time will be upon acceptance of the space and
·6· ·anticipated no more than 24 months from award.
·7· · · · Right now, we are looking at the date of
·8· ·responses being received no later than 4:00 p.m. on
·9· ·August 13th.· That could change.· We are not sure yet.
10· · · · That is basically just a brief overview of what
11· ·we are looking for.· I think most of these things are
12· ·outlined in the RLP.· Will you continue, Brad?
13· · · · MR. SEIFERT:· Excellent.· Jonathan, if you want
14· ·to go in and start talking about the delineated area
15· ·and some of the things in Section 1.
16· · · · MR. TAYLOR:· Sure.· Yes.· The delineated area on
17· ·this, you have the eastern boundary of south on Hitch
18· ·Parkway, south on Tennessee 50.· I don’t know if you
19· ·guys are familiar with this area, but there is a lot
20· ·of suitable sites we believe in this area.
21· · · · This location is fairly large.
·1· · · · Southern boundary west on Boss Road, west on
·2· ·Murphy lane, west on Neeley Hollow Road, and west on
·3· ·Albert Matthew Road.· As you can see, it is clearly
·4· ·defined in the land area map which is on the next
·5· ·page.
·6· · · · The southern boundary -- the western boundary
·7· ·north on Campbellsville Pike, north on Sunnyside Lane, ·8· ·west on Trotwood Avenue, north on Rutherford Lane, ·9· ·west on Oakland Parkway.
10· · · · We tried to include as much of this area as we
11· ·could that was going to be near a business -- in the
12· ·actual business district which is not a very large
13· ·business district, but we believe it’s pretty well
14· ·defined in that area.
15· · · · MR. SEIFERT:· Yes, and one thing just to add to
16· ·that.· Properties that are fronting the boundaries of
17· ·the delineated area would be considered within the
18· ·delineated area as well.· Folks that submitted sites
19· ·during the market survey phase of the project did get
20· ·the impact on their properties.· I will add that you
21· ·don’t necessary have to have submitted a site during
·1· ·the market survey phase to use that property as your
·2· ·submission in response to the RLP.· You just wouldn’t
·3· ·have the benefit of having the site been toured by the
·4· ·group at that time.
·5· · · · Moving into the list of documents.· This is just
·6· ·a snapshot of the documents that constitute the RLP
·7· ·package.· So you have the RLP itself that we are going
·8· ·to spend most of the time on today.· Also, the lease
·9· ·which will be ultimately the contractual document with
10· ·a successful offer.· And then we have a bunch of
11· ·appendices; we will go over a handful of those.
12· ·And then just the standard forms that you have with
13· ·any government lease transaction.
14· · · · One of those standard forms is the security form.
15· ·As many of you know, the federal government has four
16· ·different levels of security.· Those are kind of based
17· ·on client agency mix, size and space, number of
18· ·employees, access into the building, et cetera.
19· · · · This is a Level 2 FSL project, so you will see
20· ·that FSL Level 2 appendices as part of the package.
21· · · · Looking at Section 2 of the RLP.
·1· · · · This is the area that talks about eligibility and
·2· ·preference for award.· These are kind of like what I
·3· ·would call a go/no-go type of items here.· Things that
·4· ·you must meet in order to have a proposal and be
·5· ·considered.
·6· · · · First of all, you need to offer space that is
·7· ·efficient as determined by the LCO.· Most of these, if
·8· ·not all of these, submissions I would think are going
·9· ·to be new construction, and so, the building shouldn’t
10· ·have any problem being efficient and meeting the
11· ·layout that the government has provided as part of the
12· ·conceptual plan.
13· · · · Next, the building cannot be within the FEMA 100-
14· ·year flood zone.
15· · · · Third, it must meet all fire and life safety
16· ·requirements.· Again, considering most of these will
17· ·be new construction, that shouldn’t be an issue
18· ·either.
19· · · · As part of the proposal, the VA environmental
20· ·folks require a Phase I Environmental Site Assessment
21· ·to be submitted.· This document has to be recent and
·1· ·completed within 180 days of the due date for the
·2· ·proposal.· We will look at that and, based on the
·3· ·information provided in here, if there are any
·4· ·recognized environmental conditions, we will provide
·5· ·feedback on a site-by-site basis.
·6· · · · Additionally, the federal government has to
·7· ·comply with MEPA and in order to do that, we need to
·8· ·have a Cultural Resources Study provided as part of
·9· ·the initial proposal.· Again, this document needs to
10· ·be within the last 180 days so it is a recent
11· ·document.· We will review that and then we will give
12· ·feedback as need be and, ultimately, go down the MEPA
13· ·process and, hopefully, get a categorical exclusion or
14· ·some other documentation that shows that the property
15· ·is developable and meets all MEPA requirements.
16· · · · Section 3 is how to offer.· This is kind of what
17· ·we are looking for you guys to submit to us.
18· · · · As Jonathan noted, August 13th by 4:00 p.m. is
19· ·the due date for the proposal.· We have a question
20· ·kind of stop date of July 16, 2024, also at 4:00 p.m.
21· ·Our goal will be to turn these questions around as
·1· ·quickly as possible.· Obviously, that is only about
·2· ·four weeks from when the questions are due to when
·3· ·offers will be due.· So our goal will be to turn those
·4· ·questions around and give you all a couple of weeks to
·5· ·have that information when you are putting final
·6· ·touches on your proposal.
·7· · · · Your offer that you will be submitting to us and
·8· ·we will get into a little bit more detail of what that
·9· ·is going to include, but in terms of how it will be
10· ·submitted, it will be submitted via email with a link
11· ·to a Share Point or a Dropbox or something like that
12· ·that we can go in, download the files, and be on our
13· ·way.
14· · · · We won’t accept any CDs, thumb drives, nothing
15· ·like that, so it has to be via email and the email has
16· ·to be marked and received with a timestamp by
17· ·August 13th at 4:00 p.m.
18· · · · The next couple slides are just snapshots of the
19· ·proposal compliance matrix.· Again, looking at the
20· ·names on the list here, most of you guys are pretty
21· ·familiar with the VA submission process and what needs
·1· ·to be included, but this is always a great checklist
·2· ·to make sure that you are including everything that we
·3· ·are looking for because there is lots of different
·4· ·information spread out through the documents that you
·5· ·are required to respond to and address.· This matrix
·6· ·kind of is a great cheat sheet to make sure that you
·7· ·are touching on everything that is required.
·8· · · · It has kind of what we are looking for here in
·9· ·this column and then where in the RLP or other
10· ·documents that it is noted.· You will see this.
11· ·I’m not going to spend a ton of time here, but again, 12· ·this is just a good resource as you are putting your
13· ·proposal together to look at.
14· · · · Submission will be in two volumes.· Volume one
15· ·will be all of the technical information.· And then
16· ·volume two will just be the pricing information as
17· ·outlined here.
18· · · · Further on in Section 3, we have the additional
19· ·submittals section.· We are just going to note a
20· ·couple of these that are important.· One is, 21· ·obviously, control of ownership.
·1· · · · That would either be in the form of a deed, an
·2· ·option to purchase contract, a PSA, a long-term ground
·3· ·lease that would extend beyond the term of the 20-year
·4· ·lease and give you the ability to develop the
·5· ·property.
·6· · · · Important to note that the entity that is on the
·7· ·document, whether it is a purchase contract or option
·8· ·to purchase contact, that entity must match the entity
·9· ·that is proposing and that needs to be the same entity
10· ·that is in SAM.
11· · · · Again, this just goes into different documents
12· ·that are acceptable to show control of the property.
13· ·It does not necessarily mean ownership of the property
14· ·today.· It is control of the property.
15· · · · Another part in the additional submittals is the
16· ·green globes requirement for new construction, so this
17· ·will be required to have two green globe
18· ·certifications.
19· · · · Section 3.07 talks about tenant improvements.
20· · · · This is going to be a project where the tenant
21· ·improvements are going to be developed through DID and
·1· ·CD process following award.· We do have an allowance, ·2· ·an estimated number, that is included in the RLP.
·3· ·Of course, that number is kind of a snapshot in time
·4· ·and an estimate.· Based on construction of the
·5· ·project, it is doubtful that it will exactly being
·6· ·that number, but it should give you a sense in terms
·7· ·of financing what kind of magnitude of pricing is
·8· ·going to be.· Once we get through the design process, ·9· ·then there will be pricing of the TIs through the TIX
10· ·table and, ultimately, a notice to proceed on the
11· ·construction of the tenant improvements.
12· · · · The government reserves the right in here to pay
13· ·lump sum for any of the improvements or, like, if they
14· ·would like to amortize a portion of the improvements, 15· ·they can do that as well.
16· · · · This lease is a full-service lease, so we are
17· ·looking for the successful party to provide everything
18· ·from utilities to janitorial service, interior and
19· ·exterior cleaning, maintenance of the facility for the
20· ·full 20 years of the lease.
21· · · · Moving onto Section 4.
·1· · · · This goes into detail about the method for
·2· ·awarding this lease.· This is going to be a best value
·3· ·lease.
·4· · · · As Jonathan noted at the beginning, it is a
·5· ·set-aside for SDVOSBs.· And then assuming you submit
·6· ·as an SDV, the next piece will be a best value
·7· ·tradeoff meeting that we are going to be looking at
·8· ·price and technical factors to make the determination
·9· ·of who the successful awardee will be.· In this case, 10· ·technical and price are approximately equal in
11· ·importance, so about a 50/50 breakdown between
12· ·technical and price.
13· · · · Within technical, there are basically three areas
14· ·that we are going to be looking at, and within these
15· ·areas, there are kind of subareas that we will be
16· ·looking at.
17· · · · Factor one is technical quality, and within
18· ·technical quality, we are looking at kind of three
19· ·areas of consideration.· The first being architectural
20· ·concept and building design.· This is really kind of
21· ·your design of both the interior and exterior of the
·1· ·building.· So what materiality you are using for the
·2· ·building, getting natural lighting to the building, ·3· ·using materials that are going to last the lifetime of
·4· ·this long lease, making sure that the building kind of
·5· ·fits within the marketplace in which it is being
·6· ·developed.· And then also the floor plan, making sure
·7· ·that the flow of the building works for the VA.
·8· · · · Next is quality site characteristics and
·9· ·development.· This is looking at both the site design
10· ·itself on site, so how does the parking look, how does
11· ·the site flow, what kind of on-site amenities are
12· ·being offered.· And then it also looks at the
13· ·surrounding area.· What are the amenities?· What’s the
14· ·public transportation look like?· What do the
15· ·adjoining roads look like?· What is the ease of access
16· ·to and from the property?· Those are things that are
17· ·being looked at under area consideration.
18· · · · Lastly is sustainable design and energy
19· ·efficiency.· This is looking at your green globe
20· ·submission.· It is looking at your energy star.
21· ·Again, it is look at materiality to make sure that the
·1· ·building is going to be sustainable and to the extent
·2· ·it can be energy efficient.
·3· · · · The second factor that we are looking at has four
·4· ·areas of consideration.· This factor is the off road
·5· ·fault occasions in past performance.
·6· · · · The first area of consideration is the off force
·7· ·past performance area.· This is an evaluation based on
·8· ·the past performance forms that you all will have
·9· ·submitted on your behalf directly to the contracting
10· ·officer and ourselves and we will look at those forms
11· ·and see kind of what past performance evaluations were
12· ·for projects that you have submitted or folks that
13· ·have submitted on your behalf.
14· · · · The second is design team and general contractor
15· ·qualifications.· This is just looking at your design
16· ·team and your general contractor.· Their experience in
17· ·completing projects of similar size, similar scope, 18· ·developing in this marketplace potentially.· This is
19· ·looking at the company itself but then, also, the
20· ·individuals that have been picked to work on this
21· ·specific project.
·1· · · · The third area of consideration is the financial
·2· ·resources plan.· This is how you are going to finance
·3· ·and fund the project.· We are looking at equity.
·4· ·What are the equity sources?· How reliable are they?
·5· ·We are looking at debt.· We are looking at multiple
·6· ·backup plans so there are contingencies in place if
·7· ·something goes a little bit sideways or if there are
·8· ·cost overruns.· In this marketplace, things are
·9· ·changing daily whether it is rates, constructions
10· ·costs.· This is your plan to make sure we are
11· ·comfortable that if awarded the project, you can
12· ·perform financially.
13· · · · Last is the project management plan.· And so, 14· ·this is your kind of plan in terms of design and
15· ·construction of the building.· Looking at quality
16· ·control, again, contingency plans, dealing with
17· ·permitting, phasing of the projects, your overall
18· ·schedule.· These are all considerations within the
19· ·project management plan.
20· · · · The third area or third factor I should say that
21· ·we are looking at is operational and maintenance plan.
·1· · · · Within operation and maintenance plan, there are
·2· ·three areas of consideration:
·3· · · · Interior and exterior maintenance of the building
·4· ·and grounds.· Pretty straightforward.· What is your
·5· ·plan to maintain this building over the lifetime of
·6· ·the lease?
·7· · · · The second area is routine and emergency calls, ·8· ·procedures, and response time.· If there is a routine
·9· ·problem at the building, what is the process for a VA
10· ·employee to notify building management so that a
11· ·routine issue is dealt with accordingly?· And then, 12· ·similarly, if there is an emergency, what is the plan
13· ·for that?· Obviously, to get whatever that emergency
14· ·issue is remedied or at least controlled in as short a
15· ·time as possible.
16· · · · The last area of consideration is the staffing
17· ·plan, administrative procedures, and quality control
18· ·plan.· This is kind of three difference areas, but
19· ·really, kind of how you are staffing the building and
20· ·what your plan is at an administrative level for the
21· ·property?
·1· · · · The last factor, which in this case, isn’t really
·2· ·a factor at all, it is something that you must meet
·3· ·and that is being a service-disabled veteran in small
·4· ·business.
·5· · · · That is how we will look at it technically.
·6· · · · And then the other 50 percent or half essentially
·7· ·is looking at the pricing.· The pricing is done on a
·8· ·present value basis looking at the cost per square
·9· ·foot on a present value basis.· The RLP itself goes
10· ·into detail in Section 4.05 about how that is going to
11· ·be calculated.· The free rent is being evaluated if
12· ·offered in the year of which it is being offered.
13· · · · So if you offer three months of free rent in year
14· ·one, three months in year, so on and so forth, that is
15· ·how we would run the calculations.
16· · · · And then your A&E fees and your PM fees are
17· ·looked at as markups to the TI and 4.05 goes into
18· ·detail about how that has gotten essentially kind of
19· ·like double counting the markup piece of it for count
20· ·four whatever fees on the A&E and the PM are going to
21· ·be.
·1· · · · This gets us down to a cost per square foot on a
·2· ·net present value basis and we are then able to
·3· ·compare apples to apples with all offers that are
·4· ·presumably going to be submitting different financial
·5· ·structures in their proposal.
·6· · · · The last section of the RLP is Section 5 which is
·7· ·additional terms and conditions.· I just want to point
·8· ·out a few things that are kind of unique to VA ROPs.
·9· · · · One is that any off-site improvements are the
10· ·responsibility of the lessor, so the jurisdiction is
11· ·going to require you to build a road or build a
12· ·sidewalk or a bus stop.· Anything that like that all
13· ·needs to be considered and built into your proposal.
14· ·It is not something that, after aware, the VA would
15· ·entertain paying for separately.
16· · · · Along the same lines, anything on site, anything
17· ·unforeseen, there are rocks you didn’t realize were
18· ·going to be there, something like that.· Again, that
19· ·is the lessor’s risk and their responsibility.
20· · · · 5.06 talks about the teaming arrangements.
21· · · · For the general contractor and the design team, ·1· ·you will need to submit letters on company letterhead
·2· ·for both the GC and the AE team just stating that you
·3· ·are team members and that they are going to be working
·4· ·on this project.
·5· · · · That is just kind of a summary of what we have
·6· ·gone over.
·7· · · · Moving to the lease, the lease has seven
·8· ·different sections, each one addressing a unique area.
·9· · · · Section 1 is the part of the lease that basically
10· ·takes your proposal and the terms that are submitted
11· ·and kind of puts that into the lease itself.
12· · · · Section 2 is general terms and conditions.
13· · · · Section 3 goes into shell components, so the
14· ·building costs are basically broken up to shell and
15· ·then TI.· So 3 is talking about the shell.
16· · · · Section 4 talks about design construction process
17· ·for post awards and that goes into detail about the DD
18· ·phase of the project, the CD phase of the project, and
19· ·deliverables that you would be submitting through
20· ·those phases.
21· · · · Section 5 talks about TI, so the opposite of the
·1· ·shell part of it.· Just going into what items are
·2· ·considered TI.
·3· · · · Section 6 talks about utility services and other
·4· ·obligations during the lease.
·5· · · · Section 7 is just kind of any additional terms.
·6· · · · We are not going to spend a ton of time going
·7· ·into the details of the lease.· That is a standard
·8· ·document for folks that have bid on VA projects in the
·9· ·past or have VA leases.· I’m sure you are familiar
10· ·with it.
11· · · · One area that we do want to point out is the HVAC
12· ·section because that has been modified.· The HVAC will
13· ·be completely shell.· In the standard GSA lease, you
14· ·had a piece of HVAC that is TI and that language has
15· ·been moved out of the TI section and into the shell
16· ·section of the lease.· The entirety of the HVAC system
17· ·will be shell.
18· · · · Just looking at the design overview, this is what
19· ·we are looking for you to be able to provide us and is
20· ·specific to factor one so we can properly evaluate the
21· ·building.
·1· · · · And so, in that proposal, we are looking for a
·2· ·detailed explanation and analysis of the design of
·3· ·the building as well as kind of the nature of the
·4· ·building.· This can be done through renderings, ·5· ·elevation drawings, section drawings, narrative, and
·6· ·probably a combination of all of those so we can
·7· ·understand exactly what the design concept is and what
·8· ·the materiality will be.
·9· · · · This just kind of points out different areas
10· ·within the package and the appendices that outline
11· ·regulations that must be adhered to in terms of the
12· ·building guidelines.· You have things within the RLP
13· ·itself.· You have the lease design narrative, the
14· ·program for design.· You have federal regulations.
15· ·You are going to have FGI regulations.· You are going
16· ·to have local regulations.· Whatever the jurisdiction
17· ·having authority is will have codes and ordinances
18· ·that need to be met.· We talked about the green globes
19· ·and then we have accessibility standards that must be
20· ·met.· ABA standards as well as BA barrier free design
21· ·standards.
·1· · · · This is a Davis-Bacon wage project, and so, all
·2· ·costs for this project must be paid Davis-Bacon wages.
·3· · · · Here is a list of the appendices and we will go
·4· ·through most of these here now.· I will just give a
·5· ·brief overview on what each is.
·6· · · · Appendix A is the program for design.
·7· · · · This really is like a breakdown of every net
·8· ·area within the space and then the number of rooms of
·9· ·that specific area.· For example, if you look at, 10· ·like, let’s say eye clinic here, there are four rooms
11· ·for optometry patient care, each room would be 130
12· ·square feet of net area for a total net area of 520.
13· ·This document goes room-by-room outlining everything
14· ·that would be in this facility.· This will correspond
15· ·with the conceptual site plan that we will get to in a
16· ·second.
17· · · · The project room and contents list takes the
18· ·Appendix A and just takes it a step further, so now, 19· ·in addition to listing the rooms, this also goes into
20· ·detail about what is going to be located within each
21· ·room.
·1· · · · This kind of just gives you a sense of what
·2· ·will be in the rooms in terms of your planning of the
·3· ·facility as you submit to us a floor plan.· Most of
·4· ·these are kind of furniture fixtures.· You will see
·5· ·here that, to use an example, for audiology, here is
·6· ·the room, there are two of these room, they are 260
·7· ·square feet each.· We pulled that information from the
·8· ·previous document.· Now, here is what is going to be
·9· ·in each of these rooms.· It has a cart, a chair, 10· ·another chair, computer.· And then the code is telling
11· ·you who is going to be buying and installing, so this
12· ·is like VA purchased and installed.· CC would be
13· ·contractor purchased and installed.
14· · · · The lease design narrative or LDN is a document
15· ·that is kind of an agency-specific requirements
16· ·document that goes into more detail in technical
17· ·narrative about interior design, architecture, site
18· ·and civil, and so, this document is pretty
19· ·standardized.· If you have worked on any VA projects
20· ·lately, it will look familiar.· Here is kind of an
21· ·overview of kind of the idea of the LDN is and it is
·1· ·to consolidate governing code standards, references, ·2· ·and guidelines that provide performance based
·3· ·standards for VA.
·4· · · · The next matrix is the room data matrix.· Again, ·5· ·these documents are kind of building on each other.
·6· ·This now goes into detail about what the finish is in
·7· ·the interior construction of the room will be.· So we
·8· ·will have this information for every single room as
·9· ·well.· You will see here the floor, what the floor
10· ·finishes, what the base finish would be.· Wall, you
11· ·have chips and board painted.· SCCR rating, what the
12· ·ceiling tile will be.· And then what the height would
13· ·be of the room.· This just kind of is a helpful
14· ·document.
15· · · · More than anything, once we get into the TI
16· ·portion, so successful award, sits down and we start
17· ·laying out the room after award.· This document is
18· ·really, really helpful in terms of knowing exactly
19· ·what the price for my rent.
20· · · · The next appendix is the CBOC transport system
21· ·specs.· This is an IT kind of tech document that
·1· ·outlines what that system looks like.
·2· · · · Here is the shell level II security requirements
·3· ·document.· Some items in here will be shell and then
·4· ·other items would be paid for with the tenant
·5· ·improvement allowance.· This is definitely something
·6· ·you want to make sure that you are covering the shell
·7· ·costs of in your rental rate.
·8· · · · Here is the conceptual floor plan.· I will say
·9· ·that VA has worked hard with the local group at the VA
10· ·medical center there in Nashville and the local group
11· ·in Columbia, Tennessee, to come up with this design.
12· ·I say that in kind of stressing that I would not
13· ·deviate too much from this.
14· · · · Obviously, the building’s dimensions are going
15· ·to be based on what your site looks like and how it
16· ·lays out, but in terms of the adjacencies and the flow
17· ·of the clinic, VA has come up with this spent a lot of
18· ·time doing so.· This is kind of how their prototype in
19· ·their minds works the best.
20· · · · Take that for what it is worth.· The clinic, as
21· ·you can see, has a few packed modules that is in the
·1· ·main part of the clinic here.· You have your mental
·2· ·health clinic along an outside wall over here and then
·3· ·this is kind of shipping/receiving/logistics type area
·4· ·over here.· And then these are your other clinical
·5· ·spaces -- Audiology, Eye, EM&R -- things like that are
·6· ·mostly located in this wing of the building.
·7· · · · With the packed model, the whole idea of kind of
·8· ·front of house, back of house is important to
·9· ·maintain.· That is demonstrated by these different
10· ·walls, so you want to have the VA staff -- doctors, 11· ·medical staff -- be able to have this back of the
12· ·house area where they are not interacting necessarily
13· ·with the patients.· And then you have the front of
14· ·house where the patients are able to access the
15· ·spaces.
16· · · · The next appendix is the VA janitorial services
17· ·and site management requirements.· Again, this is a
18· ·full-service lease.· We will be looking for the lessor
19· ·to provide all janitorial services.· This includes all
20· ·materials.· This document goes into detail about what
21· ·those cleaning requirements are, when we want the work
·1· ·to be performed, both interior and exterior of the
·2· ·building.
·3· · · · This next one is over a couple of the standard
·4· ·forms that should look normal to most folks.
·5· · · · The GSA Form 1364.· This is the government’s
·6· ·standard pricing form.· We are only looking for the
·7· ·20-year proposal here, so you just need to submit one
·8· ·of these.· In addition to this, we also have the
·9· ·Attachment 1 which would be the Excel document where
10· ·you can breakout your pricing year-by-year if that is
11· ·something that you would be interested to do where you
12· ·can have kind of the rent step.· Either way, both of
13· ·the documents, this 1364 Form as well as the
14· ·Attachment 1, need to be provided.
15· · · · Looking at this, there is where you would have
16· ·your rent, TI, BSEC, parking information.· Here is
17· ·your markup on here.· And then, Section 2, I’m sorry, 18· ·Section 3 goes into pre-rent, emissions, a total tax
19· ·parcel percentage of occupancy.· Like, would it be 100
20· ·percent.· HVAC for overtime, so outside of the normal
21· ·building hours.
·1· · · · And then you have an adjustment for Bacon
·2· ·premises.· For those that are not really familiar with
·3· ·that idea, that is a part of the lease that talks
·4· ·about if the government was to vacate the building at
·5· ·any time, you would still have a firm term lease with
·6· ·the government, but we would look to offset some of
·7· ·the savings that you have by not having the building
·8· ·functioning.· That is what this number is here.
·9· · · · Here is a Form 1217.· This is where you are going
10· ·to capture all of your operating expenses.· We have
11· ·kind of above Line 27 and below Line 27.· So the true
12· ·kind of operating costs or the above Line 27 numbers
13· ·that are summarized here and this is going to be your
14· ·total annual costs.· And then your below Line 27
15· ·number -- which is taxes, insurance, reserves, 16· ·commission, and management -- these will all be built
17· ·into your shell rate and captured there.
18· · · · We have the general clause to this document that
19· ·will become part of the lease and governs a lot of the
20· ·leasing ideas that are not captured within the lease
21· ·itself.
·1· · · · This is kind of just a wrap-up summary of what
·2· ·the contract requirements are and things that you
·3· ·would need to meet or the building needs to meet.
·4· ·Fire protection, life safety, physical security, ·5· ·zoning, (inaudible), local codes, national codes, ·6· ·the biggest thing that might be talked about, and
·7· ·accessibility requirements.
·8· · · · This is kind of a wrap-up reminder of things to
·9· ·kind of be careful of and read all parts of the RLP
10· ·and respond accordingly.· Just because you have looked
11· ·at one RLP does not mean they are all the same, so
12· ·respond to this project specifically.
13· · · · Audit and ensure compliance for Section 3.02.
14· · · · Make sure to initial all pages of the offer.
15· · · · Ensure completeness and consistency throughout
16· ·the proposal, that all forms are completed and are
17· ·accurate.
18· · · · Make certain that the offering entity matches
19· ·throughout the document and has been signed by
20· ·somebody that has authority to do so.· Again, that
21· ·ties back to your SAM registration which is the next
·1· ·thing on the list.· Matching the control of property.
·2· ·Matching the up/or.· Matching the letters on your
·3· ·financing plan.· All of that needs to be tied
·4· ·together.
·5· · · · And this is talked about again -- 1364 and
·6· ·Attachment No. 1 -- that we touched on earlier.
·7· · · · A few other reminders:
·8· · · · To ensure that the Phase I and culture resources
·9· ·study are submitted with the initial offer.· I know
10· ·there is a long lead time on these items, so make sure
11· ·you are getting those started straight away.
12· · · · Any letters in terms of zoning, utilities, et
13· ·cetera, should come from the AHA following the RLP as
14· ·well as the compliance matrix that we went through.
15· ·These documents are big.· There are multiple offers.
16· · · · If you are sitting in an evaluation board, it is
17· ·very helpful if the structure of the proposal and the
18· ·narratives and the drawings and everything are
19· ·submitted in a way that makes it easy for the folks
20· ·doing the evaluation.
21· · · · I think that only can help you in having a clean
·1· ·offer that has a good format and structure to it.
·2· · · · The last thing here to point out which is super
·3· ·important is that the VA will not accept any
·4· ·conditional offers.· We are not going to accept
·5· ·changes to standard lease language or conditions upon
·6· ·which the proposal is being submitted.· You need to
·7· ·stated that you are going to meet all requirements of
·8· ·the lease and you can do that by initialing the lease
·9· ·and submitting that in.
10· · · · Other reminders:· Evidence of ownership, putting
11· ·together a comprehensive schedule.· This is going to
12· ·be part of the project management plan that has an
13· ·occupancy date in there.· And then we talked about the
14· ·financial resources as well.
15· · · · Kind of as a wrap-up here.
16· · · · Like we said, we are not going to be taking
17· ·questions during the call.· That said, we absolutely
18· ·want to make sure that all questions are submitted and
19· ·answered and we are going to do so as quickly as we
20· ·can.
21· · · · When you get into the RLP and the lease and the
·1· ·attachments and you have questions, please submit
·2· ·those in writing by July 16th at 4 o’clock and you
·3· ·will see on the next slide, we have a format here.
·4· ·Question number, the section, and then the question.
·5· ·It is very important that you state the section as
·6· ·well as the document because we have so many forms and
·7· ·so many of them are very large documents.· We need to
·8· ·have that information so we can quickly figure out
·9· ·exactly what the question is and best address it so
10· ·you have some clarity for it.
11· · · · That is pretty much everything we wanted to touch
12· ·on today.· Jonathan, I want to turn it back over to
13· ·you to see if there is anything else you wanted to
14· ·make sure that we were able to discuss before we close
15· ·out the meeting.
16· · · · MR. TAYLOR:· Not really, Brad.· You did a great
17· ·job.· If anybody has any questions, please submit them
18· ·and we will try to get everything responded in a
19· ·timely manner.· We look forward to you guys submitting
20· ·some good quality proposals.
21· · · · MR. SEIFERT:· Awesome.· Thanks, Jonathan.
·1· · · · Thanks, everybody for making time today to go
·2· ·over this.· Like Jonathan said, we look forward to
·3· ·everybody working on this project and getting your
·4· ·submissions in.· Please submit your questions as soon
·5· ·as you can and we will get answers back to you guys
·6· ·ASAP.
·7· · · · With that, we will close the meeting.
·8· · · · Again, thanks for everybody’s time.
·9· · · · · · ·(Whereupon, the conference concluded at
10· ·11:48 a.m.)
·1· · · · · · · · · · CERTIFICATE OF NOTARY
·2· · · · · · ·I, LINDSAY MCELHINNEY, before whom the
·3· ·foregoing conference was taken, do hereby certify that
·4· ·the proceedings were taken by me by digital recording
·5· ·means and thereafter reduced to typewriting by me or
·6· ·under my direction; that said transcript is a true
·7· ·record of the proceedings; that I am neither counsel
·8· ·for, related to, or employed by any of the parties to
·9· ·the action in which this proceeding is taken; and
10· ·further, that I am not a relative or employee of any
11· ·attorney or counsel employed by the parties hereto, 12· ·nor financially or otherwise interested in the outcome
13· ·of the action.
15· · · · · · · · · · · · ____________________________
16· · · · · · · · · · · · LINDSAY MCELHINNEY
17· · · · · · · · · · · · Notary Public in and for the
18· · · · · · · · · · · · State of Maryland
19· ·My Commission Expires:· June 2027 aries.spearman Placed Image
| Transcript |
| Cover |
| Caption |
| Page 2 |
| Page 3 |
| Page 4 |
| Page 5 |
| Page 6 |
| Page 7 |
| Page 8 |
| Page 9 |
| Page 10 |
| Page 11 |
| Page 12 |
| Page 13 |
| Page 14 |
| Page 15 |
| Page 16 |
| Page 17 |
| Page 18 |
| Page 19 |
| Page 20 |
| Page 21 |
| Page 22 |
| Page 23 |
| Page 24 |
| Page 25 |
| Page 26 |
| Page 27 |
| Page 28 |
| Page 29 |
| Page 30 |
| Page 31 |
| Page 32 |
| Page 33 |
| Page 34 |
| Page 35 |
| Page 36 |
| Page 37 |
| Word Index |
| Index: 1..analysis |
| 1 (5) |
| 100 (1) |
| 100- (1) |
| 1217 (1) |
| 130 (1) |
| 1364 (3) |
| 13th (3) |
| 16 (1) |
| 16th (1) |
| 180 (2) |
| 2 (5) |
| 20 (2) |
| 20-year (2) |
| 2024 (1) |
| 24 (1) |
| 250 (1) |
| 260 (1) |
| 27 (4) |
| 3 (5) |
| 3.02 (1) |
| 3.07 (1) |
| 350 (1) |
| 36CTNF24R0022 (1) |
| 4 (3) |
| 4.05 (2) |
| 45 (1) |
| 46,779 (1) |
| 4:00 (4) |
| 5 (2) |
| 5.06 (1) |
| 50 (2) |
| 50/50 (1) |
| 520 (1) |
| 55,034 (1) |
| 6 (1) |
| 60,537 (1) |
| 7 (1) |
| A&e (2) |
| ABA (1) |
| ability (1) |
| ABOA (2) |
| absolutely (2) |
| accept (3) |
| acceptable (1) |
| acceptance (1) |
| access (3) |
| accessibility (2) |
| accomplish (1) |
| accurate (1) |
| Activation (2) |
| actual (1) |
| adaptive (1) |
| add (2) |
| addition (2) |
| additional (4) |
| Additionally (1) |
| address (2) |
| addressing (1) |
| adhered (1) |
| adjacencies (1) |
| adjoining (1) |
| adjustment (1) |
| administrative (2) |
| AE (1) |
| Affairs (1) |
| agency (1) |
| agency-specific (1) |
| AHA (1) |
| Albert (1) |
| allowance (2) |
| amenities (2) |
| amortize (1) |
| analysis (1) |
| Index: ANCI/BOMA..buying |
| ANCI/BOMA (1) |
| annual (1) |
| answers (1) |
| anticipated (1) |
| appendices (4) |
| appendix (4) |
| apples (2) |
| appreciated (1) |
| approximately (2) |
| architectural (1) |
| architecture (1) |
| area (26) |
| areas (7) |
| arrangements (1) |
| ASAP (1) |
| Assessment (1) |
| assuming (1) |
| Attachment (3) |
| attachments (1) |
| audiology (2) |
| Audit (1) |
| August (3) |
| authority (2) |
| Avenue (1) |
| award (5) |
| awarded (1) |
| awardee (1) |
| awarding (1) |
| awards (1) |
| aware (1) |
| Awesome (1) |
| BA (1) |
| back (5) |
| backup (1) |
| Bacon (1) |
| barrier (1) |
| base (1) |
| based (6) |
| basically (4) |
| basis (4) |
| beginning (2) |
| behalf (2) |
| benefit (1) |
| bid (2) |
| big (1) |
| biggest (1) |
| bit (3) |
| Blake (1) |
| board (2) |
| Boss (1) |
| boundaries (1) |
| boundary (4) |
| Brad (5) |
| Branch (1) |
| breakdown (2) |
| breakout (1) |
| Brennan (1) |
| brick (1) |
| broken (1) |
| broker (1) |
| BSEC (1) |
| build (2) |
| building (31) |
| building™s (1) |
| built (2) |
| bunch (1) |
| bus (1) |
| business (4) |
| buying (1) |
| Index: calculated..contingencies |
| calculated (1) |
| calculations (1) |
| call (4) |
| calls (1) |
| Campbellsville (1) |
| capture (1) |
| captured (2) |
| Cara (1) |
| care (1) |
| careful (1) |
| cart (1) |
| case (2) |
| categorical (1) |
| CBOC (2) |
| CD (2) |
| CDS (1) |
| ceiling (1) |
| center (3) |
| certifications (1) |
| cetera (2) |
| chair (2) |
| change (1) |
| changing (1) |
| characteristics (1) |
| cheat (1) |
| checklist (1) |
| Chief (1) |
| chips (1) |
| civil (1) |
| clarity (1) |
| clause (1) |
| clean (1) |
| cleaning (2) |
| client (1) |
| clinic (5) |
| clinical (1) |
| close (2) |
| code (2) |
| codes (3) |
| Columbia (3) |
| column (1) |
| combination (1) |
| comfortable (1) |
| commencement (1) |
| commission (1) |
| communicate (1) |
| company (2) |
| compare (1) |
| competition (1) |
| complete (1) |
| completed (2) |
| completely (1) |
| completeness (1) |
| completing (1) |
| compliance (3) |
| comply (1) |
| components (1) |
| comprehensive (1) |
| computer (1) |
| concept (2) |
| conceptual (3) |
| conditional (1) |
| conditions (4) |
| conference (1) |
| conferences (1) |
| consideration (8) |
| considerations (1) |
| considered (4) |
| consistency (1) |
| consolidate (1) |
| constitute (1) |
| construction (9) |
| constructions (1) |
| contact (1) |
| contents (1) |
| contingencies (1) |
| Index: contingency..Dyson |
| contingency (1) |
| continue (1) |
| contract (3) |
| contracting (3) |
| contractor (4) |
| contractual (1) |
| control (6) |
| controlled (1) |
| conveniences (1) |
| copy (1) |
| correspond (1) |
| cost (3) |
| costs (8) |
| count (1) |
| counting (1) |
| couple (5) |
| court (2) |
| covering (1) |
| Cultural (1) |
| culture (1) |
| daily (1) |
| data (1) |
| date (6) |
| David (1) |
| Davis-bacon (2) |
| days (2) |
| DD (1) |
| dealing (1) |
| dealt (1) |
| debt (1) |
| deed (1) |
| defined (2) |
| delineated (4) |
| deliverables (1) |
| demonstrated (1) |
| Department (1) |
| design (20) |
| detail (10) |
| detailed (1) |
| details (1) |
| determination (1) |
| determined (1) |
| develop (1) |
| developable (1) |
| developed (2) |
| developing (1) |
| development (1) |
| deviate (1) |
| didn™t (2) |
| difference (1) |
| dimensions (1) |
| directly (1) |
| discuss (1) |
| district (2) |
| doctors (1) |
| document (20) |
| documentation (1) |
| documents (9) |
| don™t (3) |
| double (1) |
| doubtful (1) |
| download (1) |
| drawings (3) |
| drives (1) |
| Dropbox (1) |
| due (4) |
| Dyson (1) |
| Index: earlier..forms |
| earlier (1) |
| ease (1) |
| eastern (1) |
| easy (1) |
| Ed (1) |
| efficiency (1) |
| efficient (3) |
| elevation (1) |
| eligibility (1) |
| EM&R (1) |
| email (3) |
| emergency (3) |
| emissions (1) |
| employee (1) |
| employees (1) |
| energy (3) |
| ensure (3) |
| entertain (1) |
| entirety (1) |
| entity (5) |
| environmental (3) |
| equal (1) |
| equity (2) |
| essentially (2) |
| estimate (1) |
| estimated (1) |
| evaluate (1) |
| evaluated (1) |
| evaluation (3) |
| evaluations (1) |
| everybody™s (1) |
| Evidence (1) |
| exceed (1) |
| Excel (1) |
| Excellent (1) |
| exclusion (1) |
| exclusive (1) |
| expenses (1) |
| experience (1) |
| explanation (1) |
| extend (1) |
| extent (1) |
| exterior (4) |
| eye (3) |
| facility (4) |
| factor (7) |
| factors (1) |
| fairly (1) |
| familiar (6) |
| fault (1) |
| federal (3) |
| feedback (2) |
| fees (3) |
| feet (5) |
| FEMA (1) |
| FGI (1) |
| figure (1) |
| files (1) |
| final (1) |
| finance (1) |
| financial (3) |
| financially (1) |
| financing (2) |
| finish (2) |
| finishes (1) |
| fire (2) |
| firm (2) |
| fits (1) |
| fixtures (1) |
| flood (1) |
| floor (5) |
| flow (3) |
| focaccia (1) |
| folks (6) |
| foot (3) |
| force (1) |
| form (6) |
| format (2) |
| forms (7) |
| Index: forward..integrity |
| forward (2) |
| free (3) |
| front (2) |
| fronting (1) |
| FSL (2) |
| full (1) |
| full-service (2) |
| functioning (1) |
| fund (1) |
| furniture (1) |
| Garcia (1) |
| Garland (1) |
| GC (1) |
| general (6) |
| Gill (1) |
| give (6) |
| globe (2) |
| globes (2) |
| go/no-go (1) |
| goal (2) |
| good (4) |
| governing (1) |
| government (8) |
| government™s (1) |
| governs (1) |
| great (3) |
| green (4) |
| ground (1) |
| grounds (1) |
| group (3) |
| GSA (2) |
| guidelines (2) |
| guys (7) |
| half (1) |
| handful (1) |
| hard (1) |
| health (1) |
| height (1) |
| helpful (3) |
| Hitch (1) |
| Hollow (1) |
| hour (1) |
| hours (1) |
| house (4) |
| HVAC (5) |
| idea (4) |
| ideas (1) |
| II (1) |
| impact (1) |
| importance (1) |
| important (6) |
| improvement (2) |
| improvements (6) |
| inaudible (1) |
| include (3) |
| included (4) |
| includes (1) |
| including (1) |
| individuals (1) |
| information (13) |
| initial (3) |
| initialing (1) |
| installed (2) |
| installing (1) |
| insurance (1) |
| integrity (1) |
| Index: interacting..magnitude |
| interacting (1) |
| interested (1) |
| interior (6) |
| isn™t (1) |
| issue (3) |
| items (5) |
| it™s (1) |
| I™m (5) |
| janitorial (3) |
| Jennifer (1) |
| job (1) |
| Jonathan (8) |
| July (2) |
| jumping (1) |
| jurisdiction (2) |
| Killian (1) |
| kind (47) |
| knowing (1) |
| land (1) |
| lane (3) |
| language (2) |
| large (3) |
| Lastly (1) |
| laying (1) |
| layout (1) |
| lays (1) |
| LCO (1) |
| LDN (2) |
| lead (2) |
| lease (31) |
| leases (1) |
| leasing (1) |
| lessor (2) |
| lessor™s (1) |
| letterhead (1) |
| letters (3) |
| let™s (1) |
| level (4) |
| levels (1) |
| life (2) |
| lifetime (2) |
| lighting (1) |
| liminal (1) |
| Lindsay (1) |
| lines (1) |
| link (1) |
| list (7) |
| listing (1) |
| local (4) |
| located (3) |
| location (1) |
| long (2) |
| long-term (1) |
| looked (3) |
| lot (5) |
| lots (1) |
| lump (1) |
| Lye (1) |
| magnitude (1) |
| Index: main..occupancy |
| main (1) |
| maintain (2) |
| maintenance (4) |
| make (11) |
| makes (1) |
| making (3) |
| management (6) |
| Manager (3) |
| manner (1) |
| map (1) |
| marble (1) |
| marked (1) |
| market (2) |
| marketplace (3) |
| markup (2) |
| markups (1) |
| match (1) |
| matches (1) |
| Matching (3) |
| materiality (3) |
| materials (2) |
| matrix (5) |
| Matthew (1) |
| maximum (1) |
| medical (4) |
| meet (4) |
| meet all (2) |
| meeting (6) |
| meets (1) |
| members (1) |
| mental (1) |
| MEPA (3) |
| met (2) |
| method (1) |
| mic (1) |
| minds (1) |
| minimum (1) |
| minutes (1) |
| mix (1) |
| model (1) |
| moderate- (1) |
| MODERATOR (2) |
| modern (2) |
| modified (1) |
| modules (1) |
| months (3) |
| morning (1) |
| moved (1) |
| Moving (3) |
| multiple (2) |
| Murphy (1) |
| mute (1) |
| muted (3) |
| names (2) |
| narrative (4) |
| narratives (1) |
| Nashville (1) |
| national (1) |
| natural (1) |
| nature (1) |
| necessarily (2) |
| Neeley (1) |
| net (4) |
| normal (2) |
| north (3) |
| note (2) |
| noted (3) |
| notice (1) |
| notify (1) |
| number (9) |
| numbers (1) |
| Oakland (1) |
| obligations (1) |
| occasions (1) |
| occupancy (3) |
| Index: off-site..prepare |
| off-site (1) |
| offer (9) |
| offered (4) |
| offering (1) |
| offers (4) |
| officer (3) |
| offset (1) |
| on-site (1) |
| operating (2) |
| operation (2) |
| operational (1) |
| opposite (1) |
| option (2) |
| optometry (1) |
| order (2) |
| ordinances (1) |
| outline (1) |
| outlined (2) |
| outlines (1) |
| outlining (1) |
| overruns (1) |
| overtime (1) |
| overview (7) |
| ownership (3) |
| o™clock (1) |
| p.m. (4) |
| package (3) |
| packed (2) |
| pages (1) |
| paid (2) |
| painted (1) |
| parcel (1) |
| parking (3) |
| Parkway (2) |
| part (14) |
| parts (1) |
| party (1) |
| past (5) |
| patient (1) |
| patients (2) |
| pay (1) |
| paying (1) |
| percent (2) |
| percentage (1) |
| perform (1) |
| performance (5) |
| performed (1) |
| permitting (1) |
| phase (6) |
| phases (1) |
| phasing (1) |
| physical (1) |
| Picarelli (1) |
| picked (1) |
| piece (3) |
| Pike (1) |
| place (1) |
| plan (19) |
| planning (1) |
| plans (2) |
| PM (2) |
| point (4) |
| points (1) |
| portion (2) |
| post (1) |
| posted (1) |
| potentially (1) |
| pre-bid (4) |
| pre-rent (1) |
| preference (1) |
| premises (1) |
| prepare (1) |
| Index: present..reminder |
| present (3) |
| presenting (1) |
| pretty (6) |
| previous (1) |
| price (5) |
| pricing (7) |
| problem (2) |
| procedures (2) |
| proceed (1) |
| process (6) |
| procurement (1) |
| program (2) |
| project (26) |
| projects (5) |
| promote (1) |
| proper (1) |
| properly (2) |
| properties (3) |
| property (9) |
| proposal (18) |
| proposals (1) |
| proposed (1) |
| proposing (1) |
| protection (1) |
| prototype (1) |
| provide (7) |
| provided (4) |
| PSA (1) |
| public (2) |
| pulled (1) |
| purchase (3) |
| purchased (2) |
| purpose (2) |
| puts (1) |
| putting (3) |
| qualifications (1) |
| quality (7) |
| question (4) |
| questions (10) |
| quick (1) |
| quickly (3) |
| rate (2) |
| rates (1) |
| rating (1) |
| read (1) |
| real (1) |
| realize (1) |
| Realty (1) |
| received (2) |
| recent (2) |
| recognized (1) |
| record (1) |
| recording (1) |
| Reed (1) |
| reference (1) |
| references (1) |
| registration (1) |
| regulations (4) |
| reliable (1) |
| remedied (1) |
| reminder (1) |
| Index: reminders..sideways |
| reminders (3) |
| renderings (1) |
| rent (5) |
| rentable (2) |
| rental (2) |
| reporter (2) |
| representing (1) |
| require (2) |
| required (3) |
| requirement (1) |
| requirements (9) |
| reserved (1) |
| reserves (2) |
| resource (1) |
| resources (4) |
| respond (3) |
| responded (1) |
| response (3) |
| responses (1) |
| responsibility (2) |
| reuse (1) |
| review (1) |
| Rich (1) |
| risk (1) |
| RLP (17) |
| road (5) |
| roads (1) |
| rocks (1) |
| room (10) |
| room-by-room (1) |
| rooms (5) |
| ROPS (1) |
| routine (3) |
| rules (1) |
| run (1) |
| Rutherford (1) |
| safety (2) |
| Sam (3) |
| Sam.gov. (1) |
| savings (1) |
| SCCR (1) |
| schedule (2) |
| scope (1) |
| SDV (2) |
| SDVOSBS (1) |
| section (26) |
| sections (1) |
| security (4) |
| seeking (1) |
| Seifert (6) |
| Senior (1) |
| sense (2) |
| separately (1) |
| service (1) |
| service-disabled (1) |
| services (3) |
| set-aside (2) |
| Share (1) |
| sheet (1) |
| shell (11) |
| shipping/receiving/logistics (1) |
| short (1) |
| shouldn™t (2) |
| show (1) |
| shows (1) |
| side (1) |
| sidewalk (1) |
| sideways (1) |
| Index: signed..table |
| signed (1) |
| similar (2) |
| similarly (1) |
| single (1) |
| site (12) |
| site-by-site (1) |
| sites (2) |
| sits (1) |
| sitting (1) |
| size (2) |
| slide (2) |
| slides (1) |
| small (1) |
| snapshot (2) |
| snapshots (1) |
| sources (1) |
| south (2) |
| southern (2) |
| space (7) |
| spaces (3) |
| Specialist (1) |
| specific (3) |
| specifically (1) |
| specs (1) |
| spend (3) |
| spent (1) |
| spread (1) |
| Springer (1) |
| square (8) |
| staff (2) |
| staffing (2) |
| stainless (1) |
| standard (7) |
| standardized (1) |
| standards (5) |
| star (1) |
| start (2) |
| started (1) |
| state (1) |
| stated (1) |
| stating (1) |
| steel (1) |
| Stenhouse (1) |
| step (2) |
| stone (1) |
| stop (2) |
| straight (1) |
| straightforward (1) |
| stressing (1) |
| structure (2) |
| structures (1) |
| study (2) |
| subareas (1) |
| submission (4) |
| submissions (2) |
| submit (10) |
| submittals (2) |
| submitted (14) |
| submitting (5) |
| substantial (1) |
| successful (4) |
| suitable (1) |
| sum (1) |
| summarized (1) |
| summary (2) |
| Sunnyside (1) |
| super (1) |
| surrounding (1) |
| survey (2) |
| sustainable (2) |
| system (3) |
| table (1) |
| Index: takes..Veterans |
| takes (3) |
| taking (1) |
| talk (2) |
| talked (4) |
| talking (3) |
| talks (7) |
| tax (1) |
| taxes (1) |
| Taylor (4) |
| team (9) |
| teaming (1) |
| tech (1) |
| technical (8) |
| technically (1) |
| telling (1) |
| tenant (5) |
| Tennessee (3) |
| Tennessee™s (1) |
| term (3) |
| terms (12) |
| thing (4) |
| things (11) |
| thumb (1) |
| TI (8) |
| tied (1) |
| ties (1) |
| tile (1) |
| time (14) |
| timely (1) |
| timestamp (1) |
| TIS (1) |
| TIX (1) |
| today (6) |
| ton (2) |
| total (3) |
| touch (1) |
| touched (1) |
| touches (1) |
| touching (1) |
| toured (1) |
| tradeoff (1) |
| transaction (1) |
| transcript (1) |
| transport (1) |
| transportation (1) |
| Trotwood (1) |
| true (1) |
| turn (4) |
| type (2) |
| ultimately (3) |
| undergone (1) |
| understand (1) |
| unforeseen (1) |
| unique (2) |
| up/or (1) |
| utilities (2) |
| utility (1) |
| VA (18) |
| VAC (1) |
| vacate (1) |
| vending (1) |
| veteran (1) |
| Veterans (1) |
| Index: volume..zoning |
| volume (2) |
| volumes (1) |
| wage (1) |
| wages (1) |
| wall (2) |
| walls (1) |
| wanted (3) |
| weeks (2) |
| west (6) |
| western (1) |
| we™ll (1) |
| What™s (1) |
| who™s (1) |
| wing (1) |
| won™t (1) |
| words (1) |
| work (2) |
| worked (2) |
| working (2) |
| works (2) |
| worth (1) |
| wouldn™t (1) |
| wrap-up (3) |
| writing (3) |
| year (4) |
| year-by-year (1) |
| years (2) |
| you™re (2) |
| zone (1) |
| zoning (2) |
| Transcript Formats |
| Amicus |
| ASCII/TXT |
3 VA OUTPATIENT CLINIC PRE-BID CONFERENCE
4 COLUMBIA, TENNESSEE VAC PROJECT
5 LINDSAY MCELHINNEY, COURT REPORTER
6 WASHINGTON, DC
7 Tuesday, July 9, 2024 8 Time: 11:06 a.m.