36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - MRI Block Diagram-Example Only.pdf

PDF 4 MB Posted

Attached to
X1DB--Allentown PA OPC - RLP Extension - Electric Vehicle Supply Equipment -EVSE- Requirements
Solicitation number
36C10F23R0095
Issued by

About this file

The document provides site planning guidelines for a mobile magnetic resonance imaging (MRI) system to be located in Allentown, Pennsylvania. Key requirements include a level concrete support pad no more than 0.125 inches out of level over 10 feet, with non-ferrous reinforcement materials. The MRI trailer weighs approximately 63,000 pounds and requires a 60 by 18 foot service pad. Electrical service must provide 480 volt, 3 phase, 112.5 kilovolt-amp power. Telephone and data connections utilizing specific connectors are also required. Potable water, drainage, and either fresh air humidification or water for a sink must be provided per the specifications. Clearance needs, power monitoring requirements, and diagrams of the MRI trailer and required turning clearances are included to aid site preparation.

View the file

Other files

File Type Posted
36C10F23R0095 - Allentown PA OPC - RLP Amendment 05 - 01.18.2023.pdf PDF
36C10F23R0095 0005.docx DOCX document
26 RLP 36C10F23R0095 Allentown Electric Vehicle Supply Equipment -EVSE- Requirements.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 04 - GSA Form 3517B _ General Clauses_Dec 23.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 04 - 01.04.2024.pdf PDF
36C10F23R0095 0004.docx DOCX document
36C10F23R0095 - Allentown PA OPC - RLP Amendment 04 - GSA Form 3516 _ Solicitation Provisions_Dec 23.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 3 - GSA Form 3516 _ Solicitation Provisions_Dec 23.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 3 - GSA Form 3517B - General Clauses_Dec 23.pdf PDF
36C10F23R0095 0003.docx DOCX document
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 -02G - Facility Security Level Req for FSL II _REV_ Dec 23.pdf PDF
36C10F23R0095 0002.docx DOCX document
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - Pre-Bid Q_A Matrix 12.15.2023.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - Pre-Bid Meeting Transcript.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - Pre Bid Conference Presentation.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - Pre Bid Conference Attendance Roster.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - 12.15.2023.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment 2 - 02D - App A.3 - Room Data Matrix_RDM - REV_ Dec 23.pdf PDF
36C10F23R0095 - Allentown PA OPC - RLP Amendment No 1 11.27.23.pdf PDF
36C10F23R0095 0001.docx DOCX document
36C10F23R0095 - Allentown PA OPC - RLP Amendment No 1 - Past Performance Questionnaire Form - Rev Nov 23.pdf PDF
01 RLP 36C10F23R0095 Lease Allentown PA CBOC.pdf PDF
13 RLP 36C10F23R0095 GSA Form 527 Contractors Qualifications and Financial Information Allentown PA CBOC.pdf PDF
03 RLP 36C10F23R0095 Appendix A_6 Conceptual Floor Plans Allentown PA CBOC.pdf PDF
08 RLP 36C10F23R0095 Attachment No 1 to GSA Form 1364 Allentown PA CBOC.xlsx XLSX spreadsheet
02C RLP 36C10F23R0095 Appendix A_2 Lease Design Narrative LDN Allentown PA CBOC.pdf PDF
02E RLP 36C10F23R0095 Appendix A_4 VA CBOC Information Transport Systems Specs Allentown PA CBOC.pdf PDF
06 RLP 36C10F23R0095 Offeror Proposal Compliance Matrix Allentown PA CBOC.pdf PDF
25 RLP 36C10F23R0095 Contractor Confidentiality Certificate Allentown PA CBOC.pdf PDF
02D RLP 36C10F23R0095 Appendix A_3 Room Data Matrix RDM Allentown PA CBOC.pdf PDF
02B RLP 36C10F23R0095 Appendix A_1 Project Room Contents List PRC Allentown PA CBOC.pdf PDF
05 RLP 36C10F23R0095 Offering Entity Acknowledgement Form Allentown PA CBOC.pdf PDF
0 RLP 36C10F23R0095 RLP Allentown PA CBOC.pdf PDF
18 RLP 36C10F23R0095 Certification of Building Energy Performance Allentown PA CBOC.pdf PDF
16 RLP 36C10F23R0095 GSA Form 3517B General Clauses Allentown PA CBOC.pdf PDF
21 RLP 36C10F23R0095 Seismic Offer Forms Allentown PA CBOC.pdf PDF
11 RLP 36C10F23R0095 Past Performance Questionnaire Allentown PA CBOC.pdf PDF
15 RLP 36C10F23R0095 GSA Form 3516 Solicitation Provisions Allentown PA CBOC.pdf PDF
09 RLP 36C10F23R0095 GSA Form 1217 Lessor_s Annual Cost Statement Allentown PA CBOC.pdf PDF
04 RLP 36C10F23R0095 Appendix B VA Janitorial and Site Management Services Allentown PA CBOC.pdf PDF
02 RLP 36C10F23R0095 Cover Page for Agency Specific Requirements ASR Allentown PA CBOC.pdf PDF
23 RLP 36C10F23R0095 Pre Bid Conference Registration Form Allentown PA CBOC.pdf PDF
12 RLP 36C10F23R0095 SF 330 Architect Engineer Qualifications Allentown PA CBOC.pdf PDF
19 RLP 36C10F23R0095 DOL Lehigh County Wage Determination Allentown PA CBOC.pdf PDF
02G RLP 36C10F23R0095 Appendix A_5 FSL II Allentown PA CBOC.pdf PDF
07 RLP 36C10F23R0095 Proposal to Lease Space GSA Form 1364 Allentown PA CBOC.pdf PDF
20 RLP 36C10F23R0095 FAR 52_204_24 Representation Regarding Certain Telecom Allentown PA CBOC.pdf PDF
14 RLP 36C10F23R0095 VA Handbook 6500_6 Allentown PA CBOC.pdf PDF
10 RLP 36C10F23R0095 VA Form 10091 FSC Vendor File Request Form Allentown PA CBOC.pdf PDF
17 RLP 36C10F23R0095 GSA Form 12000 for Prelease Fire Protection and Life Safety Evaluation for an Office Building Allentown PA CBOC.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Planning Guide

MRI SYSTEMS

13’-6” H x 8’-6” W x 48’-0” L USA UNIT

EXAMPLE

Table of Contents

Introduction

Support Pad Requirements

Trailer Weight Recommended Service Pad and Support Pad Requirements Support Pad Depth Support Pad Levelness Vehicle Access Steel Reinforced Concrete Pad Recommended Attachment to Facility Exclusion Zone Vehicle Movement Vibration / Foundation Design Swing Clearance Note

Customer Power Requirements

Lockout/Tagout Electrical Service Configuration Frequency Phase Balance Maximum voltage variation Connector Type Customer Facility Voltage Surges Power Source Monitoring (Facility Only) Ground Conductor Magnetic Shielding R.F. Shielding

Mobile Grounding Requirements

Special Grounding Note:

Telephone and Data Service Requirements

Telephone Service Data Service

Water and Chiller Requirements

Humidifier Fresh Water Direct Connection Water Supply Requirements (Sink Option) Waste Water Connections (Sink Option) ........................................................................................ 9 EXAMPLE

Table of Figures Figure 1: Plan View and Pad Layout………………………………………………………… Figure 2: Right Side Elevation …………………………………………………………………………….13 Figure 3: Left Side Elevation ……………………………………………………………………………….14 Figure 4: Front and Rear Elevation ……………………………………………………………………….15 Figure 5: Russellstoll Service Outlet………………………………………………………………………16 Figure 6: Russellstoll Chart…………………………………………………………………………………17 Figure 7: Turning Requirements…………………………………………………………………………...18

Introduction The purpose of this document is to provide the basic information needed for site planning. For specific information not contained in this document, please contact Advanced Mobility Specialty Vehicles.

The mobile unit requires sufficient room to be maneuvered and positioned for setup and takedown.

The mobile unit has many storage compartments and service doors that require access during these procedures as well as during operation. The patient lift, entry stairs, and optional platform require additional space on the passenger side of the mobile unit. Refer to the drawings provided for actual locations of doors, platform lift, and stair sizes and locations.

This type of notice indicates a potentially hazardous situation, which if not avoided, could result in injury or death to the operator of the mobile unit.

This type of notice indicates a potentially hazardous situation, which if not avoided, could result in irreparable damage to the mobile unit.

This type of notice is meant to inform the operator of useful information.

Support Pad Requirements If other modalities utilize the same support pad, it is recommended that non-ferrous reinforcement materials be used for pad reinforcement.

The Original Equipment Manufacturer (OEM) of the scanning equipment must approve plans for pad construction.

The following is a list of recommendations and requirements for a concrete support pad. However, due to varying site conditions, the actual pad design should be prepared by an appropriately licensed structural or architectural engineer.

Trailer Weight The weight of the trailer should be considered in the design of the support and service pads. The overall weight of the trailer is approximately 63,000 lbs. The weight on the rear axles is approximately 40,000 lbs. The weight on the King Pin is approximately 23,000 lbs.

Recommended Service Pad and Support Pad Requirements A service pad is recommended to provide adequate service access. The recommended size of the pad is 60” x 18’, for details go to Figure 1: Plan View and Pad Layout.

Support Pad Depth Recommendations for the width and length of the pad are given above. Based upon existing site conditions, the depth should be determined by a local contractor. It is recommended that non-ferrous reinforcement materials be used for pad reinforcement. The OEM of the scanning equipment must approve plans for pad construction.

Support Pad Levelness The support pad must be level to ensure proper operation of the MRI system. The pad must not exceed .125” deviation in 10’-0”. If the minimum support pads are selected, rather than the recommended single pad, they must also meet this specification.

Vehicle Access A firm, level surface is required around the mobile unit to provide access to the tractor/trailer, aid with patient handling, servicing the unit, and delivering of cryogens.

Steel Reinforced Concrete Pad Nonferrous reinforcement materials are recommended. If ferrous materials are used, contact the OEM of the scan equipment for the maximum weight allowed per foot.

Recommended Attachment to Facility An inflatable air bag or soft seal is recommended at the point of connection from the unit to the facility.

Fixed or solid connections may hinder imaging quality. Contact Advanced Mobility Specialty Vehicles or the local OEM of the scanning equipment representative prior to construction if the proposed connection varies from the recommended. EXAMPLE

Exclusion Zone The helium gas must be allowed to vent, unrestricted, to a non-accessible area, allowing the helium gas to dissipate.

To avoid the risk of injury and cold burns and the possibility of asphyxiation, access to the quench tube must be restricted by 10’ to each side and below, and 20’ vertically above the exit vent. Failure to do so could result in severe personal injury or death.

Vehicle Movement The MRI is very sensitive to vibration and moving metal. Consequently, all vehicle traffic shall be kept as far away as possible from the pad. Moving ferrous materials having the listed masses should be limited to areas as described in the OEM of the scanning equipment’s site planning publication.

Contact OEM of the scan equipment to obtain the latest version.

Vibration / Foundation Design Please contact OEM of the scanning equipment for the latest system specific vibration requirements.

Swing Clearance Note Please verify the actual dimensions of the rearmost projections on the cab of your tractor to the centerline of tandem suspension or centerline of the fifth wheel plate on your tractor. Refer to Figure 7:

Turning Requirements for proper tractor sizing information.

Customer Power Requirements It is the operators’ responsibility to verify that the shore power receptacle is of the same type and voltage as the connection that is supplied by Advanced Mobility Specialty Vehicles. Failure to do this can result in injury or death to the operator of the mobile unit as well as irreparable damage to the mobile unit.

The standard connector for the unit is a Russellstoll #DS2504 MP000/DF2032.

If an existing site currently implements a different connector or connector configuration, please contact Advanced Mobility Specialty Vehicles in order to arrange for a compatible power connector before the unit leaves the facility.

Lockout/Tagout A Lockout/Tagout provision in accordance with OSHA Standard 1910.147 is required. The facility shore power disconnect device must be located within 40’- 0” of the unit and must provide for an effective lockout/tagout to facilitate safe service and maintenance of the unit.

Electrical Service One electrical power source receptacle is required for operation of the MRI system. It must be capable of providing 480 Volt A.C., 3 Phase, 112.5 KVA, fused at 150 Amps. One source provides power to the medical system and the trailer systems, such as lighting and air conditioning.

Configuration The connector is wired for three phase, four wire, Delta connection, with ground (not less than AWG #1/0).

Frequency 60 Hz ±1.0%

Phase Balance The phase balance is + 2% maximum phase-to-phase line voltage difference lowest phase.

Maximum voltage variation The maximum voltage variation is ± 10% from nominal steady state (under the worst case conditions of line voltage)

Connector Type The unit is supplied with a 50-foot cable and male connector. The connector is a Russellstoll 200 Amp plug #DS2504MP000/DF2032.

Customer Facility The facility must have the matching receptacle as specified in Figure 5: Russellstoll Service Outlet and Figure 6: Russellstoll Chart. The receptacle is a Russellstoll #DF2504FRAB0.

Voltage Surges Transient voltage variations caused by external loads must not:

• Exceed + 5%

• Exceed five cycles duration

• Occur more than ten times an hour.

Power Source Monitoring (Facility Only) NOTE: Perform a power audit first.

A power analyzer should be used to check the proposed Mobile MRI Series facility site power for average line voltage, surges, sags, reclosures, impulses, frequency and microcuts. A period that includes two weekends should be used to simulate several days of normal use. Analysis of the data and site history of any previous power problems with other X-ray systems or computer installations should be reviewed with your power and ground representative. Verify “brown-out” (low voltage) conditions, which may occur during summer months, will not exceed the allowable range.

Some analyzer models that are suitable for power monitoring are:

• Dranetz Model 658

• Dranetz Model 656A

• BMI 3630

• RPMEXAMPLE

Ground Conductor An insulated ground conductor sized in accordance with National, State, and local codes shall be installed between the facility vault and the MRI System ground bus location in the power distribution unit.

Magnetic Shielding The MRI unit is equipped with magnetic shielding. The exclusion zone for cardiac pacemakers, neurostimulators, and other biostimulation devices is recommended at 5 gauss (0.5mT). Signs provided by the OEM of the scanner, must be posted to alert all who approach the unit of this requirement. The appropriate warning signs are permanently attached to the scan room doors.

The 1.0T and 1.5T magnet systems exclusion zone (5) gauss is restricted to within 8” of the exterior walls of the mobile unit.

R.F. Shielding The R.F. shield is included with the MRI system and will provide minimum level of attenuation:

• 15Mhz – 128Mhz, 90db.

Mobile Grounding Requirements Special Grounding Note:

The unit must have an earth driven ground rod within five (5) feet of the facility power receptacle. A grounding cable of a minimum #3/0 AWG must be connected between the grounding rod and the grounding pin of the facility power receptacle. Another cable to be kept as short as possible may also be connected between the ground stud on the Incoming Power Distribution Panel and an earth driven ground rod. A separate grounding conductor must still be run with the phase conductors to the source of power from the grounding pin of the facility power receptacle in accordance with NEC 2002 Article 250-24.

Telephone and Data Service Requirements Telephone Service The mobile unit may or may not be supplied with telephone connections as this is dependent on the requirement of the customer.

If equipped the connector type that is used and supplied by Advanced Mobility Specialty Vehicles is an all-weather Hubbell PH-6595 (inlet) with a model PH-6624 connector body.

If equipped the customer should purchase and install at least the number of connections that were specified with all-weather Hubbell PH-6597 phone outlets for use at the site.

If equipped two all-weather Hubbell PH-6599, 50’-0” telephone connecting cables are included with the unit. If additional cables are required, the customer must purchase them.

Data Service The mobile unit is supplied with data line connections that utilize RJ-45 outlets. The number of outlets are dependent on customer requirements.

The customer is required to purchase the data connection cables for use with the data line connections. The data line connections each require a 50’-0” CAT-5E cable with RJ-45 connections.

Water and Chiller Requirements During winter conditions, provisions must be made to ensure that water lines do not freeze because of weather conditions.

Humidifier Fresh Water Direct Connection The unit contains a fresh water Direct Connection for the humidifier. The direct connection is located at the forward left side of the trailer. Fresh water mist is injected into the return air plenum through a spray nozzle that is controlled by a Humidistat through an automatic supply on demand valve. Any excess water is drained from the bottom of the plenum to the outside of the unit.

The direct connect utilizes a ¾” garden hose male threaded hose coupling.

Water Supply Requirements (Sink Option) The mobile unit will be supplied with a ¾” diameter, 20’-0” long hose terminated with a ¾” I.P.S male threaded hose connector located on the left side of the mobile unit. The facility must provide a ¾” female connecter and a water supply that meets the following specifications:

A flow rate of 5 gallons per minute.

45-60 PSI.

A maximum temperature of 70°F.

Waste Water Connections (Sink Option) A 3/4” IPS male connection is required to sink wastewater.

Any pipes and drains within 20’-0” of the magnet isocenter should be of non-ferrous materials such as PVC, copper, or brass. All plumbing must comply with all applicable codes.

The mobile unit is supplied with a 20’-0” long 3/4” diameter hose that is terminated with a 3/4” female threaded connector for sanitary wastewater drainage located on the left side of the mobile unit. The facility must provide means of sanitary wastewater drainage from the system, which complies with all local applicable codes. EXAMPLE

Figure 1: Plan View and Pad Layout

Figure 2: Right Side Elevation

Figure 3: Left Side Elevation

Figure 4: Front and Rear Elevation

Figure 5: Russellstoll Service Outlet

Figure 6: Russellstoll Chart

Figure 7: Turning Requirements

A minimum dimension of 79” is required from rearmost projection to centerline of kingpin. This provides swing clearance for generator set which is mounted on the front of the trailer. Hospital is responsible to ensure the access route is clear of obstructions when the trailer is scheduled to arrive or depart. The 50’ minimum outside turning radius shown here has been calculated using an international harvester (Navistar) tractor Model COF-9670 with a 161” wheelbase. Turning radius will vary with towing tractor. Customer must confirm the turning radius on their tractor and prepare each site with adequate space to accommodate it.