- Replace Boiler Plant and Steam Distribution System Federal contract opportunity
- Solicitation number
- 36C10F19R0086
About this file
This is a sources sought notice from the Department of Veterans Affairs Office of Construction and Facilities Management seeking capable small businesses to potentially bid on a design-bid-build contract to replace an existing 8,000 square foot boiler plant and construct a 2,087 square foot addition at a VA medical center. The estimated value is between $10-20 million. Responses were due by October 3, 2019 and should include company information, small business certification status, bonding capacity, and similar project experience. The project scope involves renovating an existing building to house three new boilers and constructing an addition for support spaces and a 400KW generator. Site modifications are required to comply with physical security standards for mission critical facilities. This notice is for market research only and does not constitute a solicitation, though interested parties may need to respond separately to any resultant solicitation.
36C10F19R0086 0006 Amendment 6 - Drawings.pdf
View the file
Other files for this federal contract opportunity
Show all 50
Replace Boiler Plant and Steam Distribution System has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
MAIN OFFICE
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 GI001
TITLE SHEET
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
CAMPUS MAP
LOCATION MAP
COORDINATION NOTES
INDEX OF DRAWINGS
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
REPLACE BOILER PLANT & STEAM
DISTRIBUTION SYSTEM
2495 SHREVEPORT HIGHWAY
PINEVILLE, LA 71360
PROJECT
SITE
PROJECT SITE
THE CONTRACTOR SHALL PREPARE COORDINATION DRAWINGS AND INCLUDE PIPE STRESS CALCULATIONS WITH COORDINATION DRAWING SUBMISSION UNDER SPEC SECTION 23 05 10. SUCH DRAWINGS SHALL BE ARRANGED AND DESIGNED THROUGH AND FROM COORDINATION WITH ALL OTHER MAJOR AND MINOR SUBCONTRACTORS. THE CONTRACTOR AT THEIR OWN EXPENSE SHALL PREPARE A THREE-DIMENSIONAL COORDINATION MODEL IN AUTODESK REVIT AND PRODUCE TWO-DIMENSIONAL COORDINATION DRAWINGS FROM MODEL, SPECIFICALLY CREATED BY THE CONTRACTOR FOR THIS PROJECT. DRAWINGS SHALL SHOW, BUT NOT BE LIMITED TO: ALL DUCTWORK; ALL AIR DISTRIBUTION; MECHANICAL EQUIPMENT; MECHANICAL PIPING; FIRE PROTECTION PIPING; ALL PLUMBING PIPING; CABLE TRAYS (WITH ELEVATIONS NOTED); LIGHTING FIXTURES (WHEN CEILING MOUNTED); CEILING GRID AND CEILING HEIGHT; MAJOR BEAMS AND JOISTS (WITH ELEVATIONS MARKED); FIRE ALARM DEVICES AND SPEAKERS (WHERE CEILING MOUNTED); ELECTRICAL CONDUITS LARGER THAN 2-INCH DIAMETER; ELECTRICAL BUSWAY AND REQUIRED CLEARANCES; EQUIPMENT PROVIDED BY OTHERS THAT PROTRUDE INTO CEILING CAVITIES OR IMPEDE THE LOCATION OR ACCESS TO ABOVE CEILING PIPING, DUCTWORK OF OTHER EQUIPMENT. SECTIONS SHALL BE CUT THROUGH AREAS SHOWING MATERIALS AND SYSTEMS OF ALL CONTRACTS. IF THERE ARE ANY OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH THE VA COR FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH DIRECTIONS GIVEN. NOTE THAT ROUGH-IN / FABRICATION CAN NOT BEGIN (AT CONTRACTOR’S RISK) UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED. BOTH MODEL AND DRAWINGS ARE TO BE MADE A PART OF COORDINATION DRAWING SUBMISSION TO GOVERNMENT AND DESIGNER. ALL SUB-CONTRACTORS ARE RESPONSIBLE FOR COORDINATION ACROSS ENTIRE SET OF CONSTRUCTION DOCUMENTS.
HAVE MEETING CONFERENCE CALL WITH NAVISWORKS
CLASH DETECTIONS ON ALL TRADES
1 1/2" OR LARGER CONDUIT
EQUIPMENT
QH101 FIRST FLOOR EQUIPMENT PLAN - PHASE 1
QH102 FIRST FLOOR EQUIPMENT PLAN - PHASE 2
QH601 EQUIPMENT SCHEDULES
FIRE ALARM
FA001 FIRE ALARM LEGEND, RISER, NOTES AND MATRIX
FA101 FIRST FLOOR PLAN - FIRE ALARM
FA102 MEZZANINE FLOOR PLAN - FIRE ALARM
FIRE PROTECTION
FX001 LEGENDS, ABBREVIATIONS AND GENERAL NOTES
FX101 FIRST FLOOR PLAN- FIRE PROTECTION - PHASE 1&2
FX102 MEZZANINE AND HIGH BAY AREA FLOOR PLAN - FIRE
PROTECTION
FX501 FIRE PROTECTION DETAILS
PLUMBING
PP001 LEGEND, SCHEDULES AND GENERAL NOTES
PD101 FIRST FLOOR PLAN - DEMOLITION - PHASE 2
PD102 MEZZANINE FLOOR PLAN - DEMOLITION - PHASE 2
PL101 FIRST FLOOR PLAN - WASTE - PHASE 1
PP101 FIRST FLOOR PLAN - SUPPLY - PHASE 1
PL102 FIRST FLOOR PLAN - WASTE - PHASE 2
PP102 FIRST FLOOR PLAN - SUPPLY - PHASE 2
PL103 MEZZANINE FLOOR PLAN - WASTE - PHASE 2
PP103 MEZZANINE FLOOR PLAN - SUPPLY - PHASE 2
PL104 ROOF PLAN - WASTE
PP501 PLUMBING DETAILS
PP601 WASTE RISER DIAGRAM
MECHANICAL
MG001 LEGEND, ABBREVIATIONS AND GENERAL NOTES
MS101 SITE PLAN
MS102A ENLARGED SITE PLAN PHASE 1 NEW WORK
MS102B ENLARGED SITE PLAN PHASE 2 NEW WORK
MD100A ENLARGED SITE PLAN PHASE 1 DEMOLITION
MD100B ENLARGED SITE PLAN PHASE 2 DEMOLITION
MD101A FIRST FLOOR DEMOLITION PLAN - PHASE 1
MD101B FIRST FLOOR DEMOLITION PLAN - PHASE 2
MD102 MEZZANINE DEMOLITION PLAN - PHASE 2
MD151 ROOF DEMOLITION PLAN
MP101A FIRST FLOOR PLAN - PHASE 1
MP101B FIRST FLOOR STEAM DISTRIBUTION PLAN - PHASE 2
MP101C FIRST FLOOR PIPING PLAN - PHASE 2 UNDER GRATING
MP102 MEZZANINE PLAN - PHASE 2
MP151 ROOF PLAN
MP301 SECTIONS
MP401 ENLARGED PLANS
MP402 ENLARGED PLANS
MP403 ENLARGED PLANS
MP404 ENLARGED PLANS
MP405 ENLARGED PLANS
MP501 DETAILS
MP502 DETAILS
MP503 DETAILS
MP504 DETAILS
MP601 SCHEDULES
MP602 SCHEDULES
MP701 STEAM BOILER PLANT PIPING DIAGRAM
MP702 FLOW DIAGRAMS
MP703 FLOW DIAGRAMS
MP704 SCADA SYSTEM ARCHITECTURE
MP705 BOILER SYSTEM CONTROLS
MP706 HVAC CONTROLS
ELECTRICAL
EI001 SYMBOL LEGEND, LIGHT FIXTURE SCHEDULE AND GENERAL
NOTES
ES101 SITE PLAN - ELECTRICAL DEMOLITION
ES102 SITE PLAN - ELECTRICAL
ES103 SITE PLAN - SYSTEMS
ES104 FIBER LOOP
ED101 FIRST FLOOR PLAN - DEMOLITION
ED102 MEZZANINE FLOOR PLAN - DEMOLITION
EL101 FIRST FLOOR PLAN - LIGHTING
EL102 MEZZANINE FLOOR PLAN - LIGHTING
EP101 FIRST FLOOR PLAN - POWER
EP102 MEZZANINE FLOOR PLAN - POWER
EP103 ROOF PLAN - LIGHTNING PROTECTION
EY101 FIRST FLOOR PLAN - SYSTEMS
EY102 MEZZANINE FLOOR PLAN - SYSTEMS
EP501 ELECTRICAL DETAILS
EP502 ELECTRICAL DETAILS
EP503 ELECTRICAL DETAILS
EP601 EXISTING ONE-LINE DIAGRAM
EP602 ONE-LINE DIAGRAM AND SWITCHGEAR ELEVATIONS
EP701 PANEL SCHEDULES
EP702 SCHEDULES
GENERAL
GI001 TITLE SHEET
GI002 EQUIPMENT MOUNTING LEGEND
GI003 ACCESSIBILITY LEGEND
GI101 FIRST FLOOR LIFE SAFETY PLAN
GI102 MEZZANINE LIFE SAFETY PLAN
GI501 PROJECT-WIDE PARTITION TYPES AND STANDARD DETAILS
GI701 PHASING PLAN - PHASE 1
GI702 PHASING PLANS - PHASE 2
GI901 PROJECT 3D VIEWS
HAZARDOUS
HA101 FIRST FLOOR HAZARDOUS MATERIAL ABATEMENT PLAN
HA102 MEZZANINE HAZARDOUS MATERIAL ABATEMENT PLAN
CIVIL
CU101 TOPOGRAPHICAL SURVEY
CU102 SUE SURVEY
CU103 SUE SURVEY
CU104 SUE SURVEY
CU105 COMBINED TOPOGRAPHICAL SURVEY / SUE SURVEY
CU106 DEMOLITION PLAN
CU107 SITE PLAN
CU108 GRADING AND DRAINAGE PLAN
CU109 UTILITY PLAN
CU110 SITE DETAILS
CU111 DRAINAGE DETAILS
CU112 UTILITY DETAILS
CU113 UTILITY DETAILS
CU114 EROSION CONTROL DETAILS
STRUCTURAL
SS001 STRUCTURAL GENERAL NOTES
SS002 STRUCTURAL GENERAL NOTES
SS003 TYPICAL SECTION & DETAILS
SS004 TYPICAL SECTIONS & DETAILS
SB101 FOUNDATION PLAN
SB501 FOUNDATION SECTION & DETAILS
SB502 FOUNDATION SECTIONS & DETAILS
SF101 MEZZANINE FRAMING PLAN
SF102 ROOF FRAMING PLAN
SF501 FRAMING SECTIONS & DETAILS
SF502 FRAMING SECTIONS & DETAILS
ARCHITECTURAL
AI001 ARCHITECTURAL ABBREVIATIONS
AI002 NOTES AND LEGENDS
AS100 ARCHITECTURAL SITE PLAN
AD101 FIRST FLOOR DEMOLITION PLAN - PHASE 1
AD102 FIRST FLOOR DEMOLITION - PHASE 2
AD103 MEZZANINE DEMOLITION PLAN - PHASE 2
AD104 ROOF DEMOLITION PLAN - PHASE 2
AE101 FIRST FLOOR PLAN - PHASE 1
AE101A FIRST FLOOR DIMENSION PLAN - PHASE 1
AE102 FIRST FLOOR PLAN - PHASE 2
AE102A FIRST FLOOR DIMENSION PLAN - PHASE 2
AE103 FIRST FLOOR PLAN - PHASE 2 (DRAIN PLAN)
AE104 MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE
FLOOR PLAN - PHASE 1
AE111 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 1
AE112 FIRST FLOOR REFLECTED CEILING PLAN - PHASE 2
AE151 ROOF PLAN - PHASE 1
AE152 ROOF PLAN - PHASE 2
AE201 EXTERIOR ELEVATIONS
AE301 BUILDING SECTIONS
AE401 ENLARGED PLAN AND ELEVATIONS
AE402 CASEWORK ELEVATIONS
AE501 WALL SECTIONS
AE502 WALL SECTIONS
AE503 ENLARGED DETAILS
AE504 STAIR ENLARGED PLANS AND SECTIONS
AE505 CASEWORK DETAILS
AE511 INTERIOR DETAILS
AE601 DOOR SCHEDULES & WINDOW LOUVER DETAILS
AE602 DOOR AND WINDOW DETAILS
AE603 WINDOW ELEVATIONS
AE701 MISCELLANEOUS DETAILS
INTERIORS
AF101 FIRST FLOOR FINISH PLAN - PHASE 1
AF102 FIRST FLOOR FINISH PLAN - PHASE 2
AF501 SIGNAGE TYPES
AF601 INTERIOR / EXTERIOR FINISH SCHEDULE
SCHEDULE OF BID ITEMS
BID ITEM 1: CONTRACTOR SHALL COMPLETELY PREPARE SITE FOR BUILDING OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING STRUCTURES, AND FURNISH LABOR AND MATERIALS AND PERFORM WORK TO PROVIDE A NEW AND RENOVATED FACILITY TO HOUSE THREE NEW BOILERS WITH RELATED EQUIPMENT AND SUPPORT SPACES IN ORDER TO IMPROVE THE EFFICIENCY OF THE MEDICAL CENTER’S BOILER PLANT FACILITY. THE NEW / RENOVATED BOILER PLANT INCLUDES A BOILER ROOM WITH ACCESS TO AN EQUIPMENT MEZZANINE AND PIT, CHEMICAL FEED ROOM WITH WATER TESTING AREA, CONTROL ROOM, GENERAL STORAGE, AND ELECTRICAL EQUIPMENT AREAS. THE CONTROL ROOM ACCOMMODATES THE ENERGY CONTROL CENTER AND BOILER CONTROL FUNCTIONS. SUPPORT AREAS INCLUDE A TRAINING / CONFERENCE ROOM, OFFICE, GENERATOR ROOM, ELECTRICAL ROOM, TOILETS/SHOWER, HOUSEKEEPING CLOSET, AND INFORMATION TECHNOLOGY (IT) CLOSET. SITEWORK INCLUDES EARTHWORK, PAVING, ROADS, LANDSCAPING, CURB AND GUTTER, AND ADDITIONAL WORK SHOWN IN SUPPORT OF THE NEW / RENOVATED BOILER PLANT FUNCTIONS PLUS A NEW HIGH SECURITY FENCE TO PROTECT BUILDING OPERATIONS. THE EXISTING BOILER BUILDING WILL RECEIVE REFURBISHMENTS INCLUDING BUT NOT LIMITED TO A NEW
METAL ROOF.
BID ITEM 2: DEDUCT ALTERNATE 1: PERFORM ALL WORK AS IN BID ITEM 1 EXCEPT DEDUCT DESIGNATED NEW UNDERGROUND CONDENSATE RETURN PIPING. SEE PLANS
(SHEETS MP405 & MS101) FOR LOCATIONS.
BID ITEM 3: DEDUCT ALTERNATE 2: PERFORM ALL WORK AS IN BID ITEM 2 EXCEPT DEDUCT NEW HIGH SECURITY FENCE AT AREAS INDICATED ON PLAN (SHEET AS100).
No. Description Date
1 Amendment 6 4/09/2020
DN
DN
DN
UP
UP
B C D G
E
E
H J
A I
K
NEW BOILER
14-B1
NEW
FEEDWATER
PUMPS (4)
NEW SURGE
TANK
NEW
BLOWDOWN
ECONOMIZER
NEW
BLOWDOWN
SEPARATOR
BO
IL
ER
C
O N
TR
O
L
PA
N
EL
BO
IL
ER
C
O N
TR
O
L
PA
N
EL
BO
IL
ER
C
O N
TR
O
L
PA
N
EL
STEAM HEADER
1A
0.
1A100.1
B138
02.07
NEW BOILER
14-B2
NEW BOILER
14-B3
07.36
03.06
TYP.
23.28
03.04 03.04
0' - 0"
D5
AE50207.10
D3
AE502
NO WORK IN THIS AREA
THIS PHASE
PHASE 1
PHASE 2
PHASE 1
PHASE 2
1A
1.
5' - 0"
CHEMICAL
STORAGE
1A101
BOILER ROOM
1A100
2 1 S
CR
2 1
YY
CR
2 1 S
10.22
FEC
0' - 0"
22.03
05.35
05.3505.35
05.35
03.04
05.32
05.02
05.32
05.06 05.05
33.08
NEW CONCRETE
ENCASEMENT
OVER EXISTING
STEEL COLUMN,
SEE STRUCTURAL
26.22
R
0'
6"
STATIONARY DOCK LIFT, SEE
MECHANICAL FOR INFO.
B15
MANHOLE COVERS TO
TANK BELOW GROUND
R @ 0' - 6"6
5' - 0"
R
0'
6"
LINE OF MEZZANINE ABOVE
O
PE
N A
BO
VE
D2
AE301
05.02
0' - 0"
CONCRETE
ENCASEMENT,
SEE
STRUCTURAL
R @ 0' - 6 3/4"2
NEW CONCRETE SIDEWALK, SEE CIVIL
05.06
F
F
/8
EJ2"
5'
0" T
YP
V.I.F.
± 85' - 3 5/8"
05.32
05.32
05.40
MASTER BOILER
CONTROL PANEL
E3 E2 E1
E4
E6
E5
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
PARTITION GRAPHICS
NORTH LEGEND
PLAN NORTH
BOILER ROOM FFE: 138' 7-1/2"
NEW CONTROL FFE: 142' 7-1/2"
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
PARTITION PHASING
INTERIOR PARTITION RATING
MAIN OFFICE
NEW PARTITION
MEZZANINE FFE: 153' 3-1/2"
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE102
FIRST FLOOR PLAN - PHASE 2
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
1/4" = 1'-0"
D1 FIRST FLOOR PLAN - PHASE 2
2'0 4' 8'
- SHEET KEYNOTES
REFER TO SHEET AI002 FOR GENERAL FLOORPLAN NOTES AND SYMBOLS.
02.07 INFILL EXISTING WALL OPENING WITH MASONRY - SEE
STRUCTURAL (TYP) AND ADD EIFS TO FLUSH WITH EXISTING
WALL.
03.04 CONCRETE HOUSEKEEPING PAD REF: SHEET GI501
03.06 4" DEPRESSED SLAB.
05.02 STEEL RAILINGS (05 50 00)
05.05 STEEL SHIP'S LADDER - 75 DEGREE SLOPE, COMPLY WITH
ANSI/ASSE A12641.1 REQUIREMEMTS. (05 50 00)
05.06 42"H STEEL GUARDRAIL (05 50 00)
05.32 NEW DIAMOND PLATED STEEL STAIR & SUPPORT POSTS.
05.35 STEEL GRATING BASIS OF DESIGN MCNICHOLS GW-150 19-W-4
(SECURE EACH REMOVABLE [3 x 4 FT PANELS @ 10.8 SF =
129.6# PER PANEL] STEEL GRATE) STRUCTURAL STEEL &
SUPPORTS BY DELEGATED DESIGN [UNIFORM LOAD 947# &
CONCENTRATED LOAD 1421#]
05.40 PROVIDE SAFETY CHAIN AT OPENINGS
07.10 PREFINISHED SHEET METAL DOWNSPOUT AND STRAPS. REF:
CIVIL FOR CONTINUATION AND ROUTING OF LEADERS TO
OUTFALL (07 60 00)
07.36 2" EXPANSION JOINT. BASIS OF DESIGN: FOR ROOF TO ROOF
AND ROOF TO WALL APPLICATIONS NYSTROM EWCF-200W.
FOR WALL TO WALL EXTERIOR APPLICATIONS USE
EWN-200MB COLOR TO MATCH EIFS. (800-547-2635,
WWW.NYSTROM.COM)
10.22 FIRE EXTINGUISHER BRACKET.
22.03 EMERG EYE/FACE WASH AND SHR SAFETY STATION WITH
DRAIN PAN AND CLG MTD EXPOSED SST SHR HEAD – REF
PLBG DWG.
23.28 MECHANICAL EQUIPMENT. SEE MECHANICAL DRAWINGS.
26.22 15" x 18" x 29" POWERPACK FOR SCISSOR LIFT - SEE
ELECTRICAL DWGS
33.08 NEW PAD MOUNTED TRANSFORMER WITH NEW PAD, REFER
TO ELECTRICAL SITE PLAN FOR COMPLETE SCOPE OF WORK.
OCTOBER 18, 2019
No. Description Date
1 Amendment 2 2/03/2020 2 Amendment 6 4/09/2020
B C D
E H J
A I
K
05.02
23.89
22.19
22.18
23.86
22.20
23.8823.88 23.88
26.04
26.04
23.9123.91
23.92 02.4602.46
02.4602.4602.4602.4602.46
02.4602.46
02.07
02.07
MEZZANINE
1A112
NO WORK IN THIS AREA
THIS PHASE
BIOMED
1A116
1A
6.
8' - 8 3/8"
PHASE 1
PHASE 2
PHASE 1
PHASE 2
4'
0"
1' - 3 3/8"
GUARDRAIL OPENING
8' - 11 3/4" 5' - 4"
GUARDRAIL OPENING
8' - 10 1/2" 5' - 4"
GUARDRAIL OPENING
8' - 10 1/2" 7' - 6 3/4"
3'
3"
1' - 3 3/8"
05.02
4" / 1'-0"
METAL ROOF
14' - 8 1/4"
NEW CONCRETE TOPPING,
SEE STRUCTURAL
O
PE
N T
O
BE
LO
W
14' - 8 1/4"
CONC. SLAB INFILL
R
0'
7"
14' - 8 1/4"
NEW FLOOR BEAM ,
SEE STRUCTURAL
NEW FLOOR BEAM ,
SEE STRUCTURAL
23.28
D N
R
DN 1R
D N
8R
7' - 2"
05.33
05.33
05.06
02.35
F
13' - 6"
05.27
05.40
05.40
E7
E8
E9
E10
E11
B C D G
E H
A I
K
02.07 02.07 02.07
F
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
PARTITION GRAPHICS
NORTH LEGEND
PLAN NORTH
BOILER ROOM FFE: 138' 7-1/2"
NEW CONTROL FFE: 142' 7-1/2"
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
PARTITION PHASING
INTERIOR PARTITION RATING
MAIN OFFICE
NEW PARTITION
MEZZANINE FFE: 153' 3-1/2"
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE104
MEZZANINE FLOOR PLAN -
PHASE 2 AND PARTIAL
MEZZANINE FLOOR PLAN -
PHASE 1
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
1/4" = 1'-0"
D1 MEZZANINE FLOOR PLAN - PHASE 2
4'0 8' 16'
- SHEET KEYNOTES
REFER TO SHEET AI002 FOR GENERAL FLOORPLAN NOTES AND SYMBOLS.
02.07 INFILL EXISTING WALL OPENING WITH MASONRY - SEE
STRUCTURAL (TYP) AND ADD EIFS TO FLUSH WITH EXISTING
WALL.
02.35 REMOVE LOUVER AND INFILL EXISTING WALL OPENING WITH
MASONRY - SEE STRUCTURAL (TYP) AND ADD EIFS TO FLUSH
WITH EXISTING WALL.
02.46 EXISTING KICKER TO REMAIN
05.02 STEEL RAILINGS (05 50 00)
05.06 42"H STEEL GUARDRAIL (05 50 00)
05.27 NEW STEEL CATWALK WITH GUARDRAILS TO ALIGN FLUSH
WITH BOILER PLATFORM & WITH MEZZANINE STAIR
INTERMEDIATE LANDING.
05.33 INSTALL DEMOUNTABLE GUARD RAILS AFTER EQUIPMENT IS
INSTALLED. (05 50 00)
05.40 PROVIDE SAFETY CHAIN AT OPENINGS
22.19 AIR COMPRESSOR - SEE PLUMBING DRAWINGS.
23.28 MECHANICAL EQUIPMENT. SEE MECHANICAL DRAWINGS.
23.86 DUCT PENETRATIONS - SEE MECH DWGS.
23.87 EXHAUST FAN - SEE MECH DWGS.
23.89 DEAERATOR - SEE MECH DWGS.
23.91 PRV STATION - SEE MECHANICAL DWGS
23.92 MODULATING DAMPER - SEE MECHANICAL DWGS
26.04 LIGHTING FIXTURE
1/4" = 1'-0"
A2 MEZZANINE FLOOR PLAN - PHASE 1
2'0 4' 8'
No. Description Date
1 Amendment 6 4/09/2020
1 1
EAVE
161' - 7 1/2"
MEZZANINE LEVEL
153' - 3 1/2"
NEW CONTROL
143' - 7 1/2"
CONTROL ROOF
157' - 7 1/2"
BCDG EHJ AI
07.30
07.10
07.38
05.17
K
04.12
04.18
04.12 04.12
NEW ADDITION
07.37
07.38
04.18 04.18
T.O. PARAPET
160' - 1 1/2"07.30
07.10
26.04
26.13
07.30
07.10
26.04
26.08
08.23
08.09
26.1026.10
26.13
23.87
26.13
05.36 23.9523.95
07.45
07.4507.45 23.95
23.8623.86
26.08 23.8622.17
22.17
26.04
08.0908.09
26.04
26.21
23.86
23.28 23.28 23.28
2'
6"
1'
6"
/8
C
L
EI
FS
H
O R
IZ
9'
8"
2' - 1 1/2"
14' - 3 1/2"3' - 2"8' - 6 1/2"16' - 0 5/8"6' - 11"14' - 5 5/8"6' - 2"13' - 0 1/8"17' - 0 3/4"
VERTICAL EIFS JOINT CENTER LINES
MCJMCJMCJMCJ
04.12 04.12
04.12
MEZZANINE (NEW 1/4"
TOPPING)
153' - 3 3/4"
26.04
07.30
07.10 04.12
EQ EQ
08.03
F
BOILER RM LEVEL
138' - 7 1/2"
EAVE
161' - 7 1/2"
MEZZANINE LEVEL
153' - 3 1/2"
NEW CONTROL
143' - 7 1/2"
CONTROL ROOF
157' - 7 1/2"
D2
AE301
32 4 51
05.17
04.12
07.37
EXISTING CONSTRUCTION
07.38
04.18 04.18
PIT
134' - 7 1/2"
T.O. PARAPET
160' - 1 1/2"
08.26
26.04
3' - 5"
17' - 7 3/8"
2' - 2 1/2"
MCJMCJ
26.21
23.86
22.17
26.08
26.08
26.08
22.17
07.10
23.2823.28
23.86 26.04
26.13
26.04
26.04
26.13
26.04
07.09
26.10 23.95
32.14
VERTICAL EIFS JOINT CENTER LINES
MEZZANINE (NEW 1/4"
TOPPING)
153' - 3 3/4"
(0'-0")
08.2208.2208.2208.22
02.35
2'
8"
2' - 3"
C L
EI
FS
H O
R
IZ
9'
8"
E4E5
E8 E9 E10 E11
BOILER RM LEVEL
138' - 7 1/2"
EAVE
161' - 7 1/2"
MEZZANINE LEVEL
153' - 3 1/2"
NEW CONTROL
143' - 7 1/2"
CONTROL ROOF
157' - 7 1/2"
D2
AE301
3 245 1
LINE OF EXISTING
CANOPY
07.10
07.09
07.38
05.17
04.1204.1204.12
NEW ADDITION
07.36 07.37
PIT
134' - 7 1/2"
T.O. PARAPET
160' - 1 1/2"
23.8223.83
26.04
26.1323.28
26.14
26.04
02.35
T.O. GRATING
141' - 7 1/2"
MEZZANINE (NEW 1/4"
TOPPING)
153' - 3 3/4"
(0'-0")
2' - 2 1/2"
15' - 3 3/8"
2' - 2 1/2" EJ
2"
26.04
26.04
23.86 22.17
07.45
07.09
26.14
02.35
08.22
E6
BOILER RM LEVEL
138' - 7 1/2"
EAVE
161' - 7 1/2"
B2
AE301
MEZZANINE LEVEL
153' - 3 1/2"
NEW CONTROL
143' - 7 1/2"
CONTROL ROOF
157' - 7 1/2"
B
C
D GE H JA I
07.38
07.10
07.09
07.10
K
04.12
NEW ADDITION
07.37
07.36
08.09
PIT
134' - 7 1/2"
T.O. PARAPET
160' - 1 1/2"
26.04
T.O. GRATING
141' - 7 1/2"
MEZZANINE (NEW 1/4"
TOPPING)
153' - 3 3/4"
(0'-0")
23.28
AE201
D2
26.13
23.9526.10
26.13 26.21
26.1326.13
26.04
23.87
23.95
2' - 2 1/2"
6' - 6 1/4"6' - 4"
1' - 4"
EJ
2"
23.86
22.17
26.14 26.14 26.14
26.14
D5
AE602
PIPE TO ROTOCLAY,
BUILDING 138
26.0426.04 26.04 26.04
F
E2 E1E3
E7
08.22
08.22 08.22
T.O. GRATING
141' - 7 1/2"
EIFS INFILL, COLOR TO
MATCH ADJACENT WALL.
BLEND W/ EXISTING
SURFACE. EIFS TO MATCH
EXISTING SURFACE IN
TEXTURE AND COLOR.
DOOR AS SCHEDULED.
PAINTED INSULATED
HOLLOW METAL FRAME.
D1
AE602
HEAD
D1
AE602
JAMBD1
AE602
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
MAIN OFFICE
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE201
EXTERIOR ELEVATIONS
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
- SHEET KEYNOTES
02.35 REMOVE LOUVER AND INFILL EXISTING WALL OPENING WITH
MASONRY - SEE STRUCTURAL (TYP) AND ADD EIFS TO FLUSH
WITH EXISTING WALL.
04.12 EIFS V GROOVE JOINT IN SYSTEM
04.18 EIFS V GROOVE OVER MASONRY CONTROL JOINT (MCJ); SEE
STRUCTURAL DRAWINGS
05.17 ROOF ACCESS LADDER WITH CAGE, CROSS-OVER PLATFORM
AND GUARDRAIL.
05.36 STEEL GUARDRAIL TO EXTEND 24"H ABOVE PARAPET COPING
(05 50 00)
07.09 NEW PREFINISHED SHEET METAL GUTTER, SEE SHEET B1 /
AE501 (07 60 00)
07.10 PREFINISHED SHEET METAL DOWNSPOUT AND STRAPS. REF:
CIVIL FOR CONTINUATION AND ROUTING OF LEADERS TO
OUTFALL (07 60 00)
07.30 PRE-FINISHED METAL SCUPPER
07.36 2" EXPANSION JOINT. BASIS OF DESIGN: FOR ROOF TO ROOF
AND ROOF TO WALL APPLICATIONS NYSTROM EWCF-200W.
FOR WALL TO WALL EXTERIOR APPLICATIONS USE
EWN-200MB COLOR TO MATCH EIFS. (800-547-2635,
WWW.NYSTROM.COM)
07.37 2" EIFS ON 7 5/8" CONCRETE MASONRY UNIT
07.38 PREFINISHED ALUMINUM COPING
07.45 PREFINISHED SHEET METAL DOWNSPOUT AND STRAPS -
DRAIN TO ROOF.
08.03 PREFINISHED ALUMINUM LOUVER (08 90 00)
08.09 EXTERIOR INSULATED DOOR AND FRAME
08.22 STEEL WINDOW TO BE REFURBISHED TO MATCH EXISTING.
08.23 ALUMINUM STOREFRONT WINDOW.
08.26 NEW LOUVER IN EXISTING OPENING.
22.17 PIPE STACK (TYPICAL). SEE PLUMBING/MECHANICAL
DRAWINGS.
23.28 MECHANICAL EQUIPMENT. SEE MECHANICAL DRAWINGS.
23.82 MAKEUP AIR UNIT - SEE MECH DWGS.
23.83 ROOFTOP VENTILATOR - SEE MECH DWGS.
23.86 DUCT PENETRATIONS - SEE MECH DWGS.
23.87 EXHAUST FAN - SEE MECH DWGS.
23.95 DISCONNECT SWITCH, SEE MECHANICAL & ELECTRICAL
DWG'S
26.04 LIGHTING FIXTURE
26.08 LIGHTNING PROTECTION COMPONENT: SEE ELECTRICAL
DRAWINGS FOR COMPLETE SCOPE.
26.10 CARD READER - SEE ELECTRICAL DWGS
26.13 SECURITY CAMERA - SEE ELECTRICAL DWGS
26.14 LIGHTING ROD - SEE ELECTRICAL DWGS
26.21 PANELBOARD - SEE ELECTRICAL DWGS
32.14 6" CONCRETE FILLED STEEL PIPE BOLLARD
1/8" = 1'-0"
B4 WEST ELEVATION
1/8" = 1'-0"
C4 NORTH ELEVATION
1/8" = 1'-0"
C2 SOUTH ELEVATION
1/8" = 1'-0"
D4 EAST ELEVATION
4'0 8' 16'
4'0 8' 16' 4'0 8' 16'
4'0 8' 16'
1/2" = 1'-0"
D2 ELEV-NEW DOOR @ EAST ELEV
1'0 2' 4'
No. Description Date
1 Amendment 2 2/03/2020 2 Amendment 6 4/09/2020
2 2
GENERAL SHEET NOTES2
1. PAINT EXISTING BUILDING TO MATCH NEW BUILDING
NEW CONTROL
142' - 7 1/2"
TOP OF MASONRY
158' - 7 1/2"
JOINT BEARING
156' - 7 1/2"
NEW CEILING
151' - 7 1/2"
03.01
03.03
09.05
05.09
07.39
07.40
07.38
04.15
07.37
1' - 2 5/8"
07.41
05.19
03.07
CORR
1A102
09.19
07.10
07.48
07.46
03.12
03.13
07.49
07.50
07.51
07.50
NEW CONTROL
142' - 7 1/2"
NEW CEILING
151' - 7 1/2"
07.40
07.39
05.19
05.09
05.20
09.19
26.06
09.20
09.05
09.05
03.03
1' - 4 5/8"
6"
03.13
CORR
1A102
CONTROL
1A106
07.46
03.12
NEW CONTROL
142' - 7 1/2"
BOILER ROOM
138' - 7 1/2"
W14X22
5 4
NEW CEILING
151' - 7 1/2"
AE503
A5
07.3603.03
03.0703.01
09.19
05.20
09.05
02.39
05.09
05.1907.40 07.39
02.39
02.39
04.14
08.18
02.39
02.39
CONTROL
1A106
BOILER
ROOM
1A100
07.43
AE501
B1
MIRR
BOILER RM LEVEL
138' - 7 1/2"
EAVE
161' - 7 1/2"
B.O. TRENCH
137' - 7 1/2"
T.O. GRATING
141' - 7 1/2"
T.O STEEL @ GRATE
141' - 5 3/4"
B.O. STEEL
140' - 3 9/16"
GRADE @ COIL DOORS 1
140' - 0 31/32"
3'
0"
BOILER ROOM
1A100
02.39
07.43
02.39
32.14
5' - 0"
BEYOND
09.18
07.09
06.04
A1
AE501
AE501
B1
CONTINUOUS VAPOR BARRIER
03.0203.11
08.29
AE503
D5
AE503
C5
DOUBLE LOCK SEAM PROFILE
PANEL WIDTH (TYP.)
1' - 0"
PANEL CLIPS (MIN. 2
FASTENERS PER CLIP) AS
REQUIRED (NOT SHOWN FOR
CLARITY)
ORGANICE COATED 400
SERIES STAINLESS STEEL
SELF PIERCING SCREWS
PAINTED GALVALUME STEEL
COLOR: TERRA COTA
UNDERLAYMENT &
SUBSTRATE BELOW (NOT
SHOWN)
7/ 8"
3/ 8"
EXISTING WOOD DECKING TO REMAIN
EXISTING SLOPING WOOD PURLINS TO REMAIN
(4 LAYERS) 3/4" FRT CDX EXTERIOR GRADE PLYWOOD
UNDERLAYMENT
SLIP SHEET
STANDING SEAM METAL PANEL, SEE DETAIL A2 / AE501 FOR INFO.
A2
AE501
STANDING SEAM METAL ROOF,
SEE DETAIL A1 / AE501 FOR
INFO.
T-TYPE DOWNSLOPE
PERIMETER EDGE-METAL
FLASHING
GUTTER BRACKET SUPPORT
8" W x 6" D SHEET METAL GUTTER
STIFFENING BAR
FOLD PANEL PANS TO ENGAGE EDGE METAL
AND ACCOMMODATE THEMAL MOVEMENT
(1/2")
EXISTING WOOD PURLINS &
WOOD PLANKS TO REMAIN
FRT 2x12 WOOD FASCIA (PTD TO MATCH)
NOTE: DEMOLISH EXISTING ROOF DOWN TO WOOD PLANKS
EXISTING EXTERIOR WALL
TO REMAIN
REPLACE WITH PT WOOD PLANKS AT EXPOSED RAFTER
ENDS
GUTTER LEAF GUARD
4" x 4" DOWNSPOUT (VERTICAL LEADER)
STANDING SEAM METAL ROOF,
SEE DETAIL A1 / AE501 FOR
INFO.
EXISTING WOOD PURLINS
& WOOD PLANKS TO
REMAIN
NOTE: DEMOLISH EXISTING
ROOF DOWN TO WOOD PLANKS
SEALANT TAPE
PREFORMED METAL CLOSURE
SET IN SEALANT TAPE AND
FASTENED - DO NOT SEAL
VERTICAL LEGS.
SEALANT TAPE
CONTINUOUS OFFSET CLEAT
SHEET-METAL HIP CAP
FASTENERS
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
NORTH LEGEND
PLAN NORTH
BOILER ROOM FFE: 138' 7-1/2"
NEW CONTROL FFE: 142' 7-1/2"
MAIN OFFICE
MEZZANINE FFE: 153' 3-1/2"
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE501
WALL SECTIONS
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
- SHEET KEYNOTES
02.38 EXISTING STRUCTURAL STEEL TO REMAIN
02.39 EXISTING CONSTRUCTION TO REMAIN
03.01 CONCRETE FOUNDATIONS REF: STRUCTURAL
03.02 NEW CONCRETE SLAB ON COMPACTED BASE, SEE
STRUCTURAL
03.03 CONCRETE SLAB REF: STRUCTURAL
03.07 GRADE
03.11 SEALANT OVER PREFORMED EXPANSION JOINT FILLER
03.12 6" CLEAN GRAVEL
03.13 COMPACTED SOIL
04.14 8" CMU, SEE STRUCTURAL B4 / SB501
04.15 12" CMU, SEE STRUCTURAL
05.09 STEEL TRUSS REF: STRUCTURAL
05.19 METAL ROOF DECK
05.20 3-5/8" METAL STUDS
06.04 NEW 1x12 TREATED FASCIA
07.09 NEW PREFINISHED SHEET METAL GUTTER, SEE SHEET B1 /
AE501 (07 60 00)
07.10 PREFINISHED SHEET METAL DOWNSPOUT AND STRAPS. REF:
CIVIL FOR CONTINUATION AND ROUTING OF LEADERS TO
OUTFALL (07 60 00)
07.36 2" EXPANSION JOINT. BASIS OF DESIGN: FOR ROOF TO ROOF
AND ROOF TO WALL APPLICATIONS NYSTROM EWCF-200W.
FOR WALL TO WALL EXTERIOR APPLICATIONS USE
EWN-200MB COLOR TO MATCH EIFS. (800-547-2635,
WWW.NYSTROM.COM)
07.37 2" EIFS ON 7 5/8" CONCRETE MASONRY UNIT
07.38 PREFINISHED ALUMINUM COPING
07.39 RIGID ROOF INSULATION
07.40 SINGLE-PLY ROOF SYSTEM
07.41 RAIN LEADER
07.43 INSTALL NEW METAL STANDING SEAM ROOF OVER 30#
ROOFING FELT ON (4 LAYERS) 3/4" FRT CDX PLYWOOD
(EXTERIOR GRADE) OVER EXISTING WOOD PLANKS.
07.46 CONTINUOUS VAPOR BARRIER
07.48 BATT INSULATION
07.49 BITUMINOUS DAMPROOFING, TYPICAL
07.50 BITUMINOUS MODIFIED WATERPROOFING, TYPICAL
07.51 BITUMINOUS MASTIC SLOPE TO DRAIN, TYPICAL
08.18 NON-OPERABLE WINDOW
08.29 EXISTING WINDOW TO BE REFURBISHED.
09.05 SCH CEILING
09.18 NEW STEEL CATWALK WITH GUARDRAILS OFF OF MEZZANINE
STAIR INTERMEDIATE LANDING.
09.19 5/8" GWB
09.20 RATED PARTITION - SEE PLAN
26.06 ELECTRICAL EQUIPMENT.
32.14 6" CONCRETE FILLED STEEL PIPE BOLLARD
3/4" = 1'-0"
C1 NEW EXTERIOR WALL SECTION
3/4" = 1'-0"
C2 CORRIDOR WALL SECTION
3/4" = 1'-0"
D3 NEW WALL SECTION AT EXISTING BUILDING
1' 2' 3'01' 2' 3'01' 2' 3'01' 2' 3'0 3/4" = 1'-0"
D5 WALL SECTION AT BOILER ROOM
6" = 1'-0"
A2 METAL PANEL PROFILE
1" 2" 4"0 3"
1 1/2" = 1'-0"
A1 METAL PANEL ROOF DETAIL
0 1 1/2'1'1/2'
1 1/2" = 1'-0"
B1 METAL PANEL GUTTER DETAIL
0 1 1/2'1'1/2' 1 1/2" = 1'-0"
B2 METAL PANEL - HIP CAP FLASHING
0 1 1/2'1'1/2'
No. Description Date
1 Amendment 2 2/03/2020 2 Amendment 6 4/09/2020
138' - 7 1/2"
BOILER ROOM
02.39
02.39
02.39
02.39
02.39
BOILER
ROOM
02.3902.39
02.39
AE503
D3
138' - 7 1/2"
BOILER ROOM
134' - 7 1/2"
PIT
02.39
02.39
02.39
I
03.07
07.37
04.15
PIT
1A114
3'
4"
1'
9" 05.02
12" CMU (RE:
STRUCTURAL
DETAIL
B4/SB501)
+ 3'-0"
TOP OF GRATING
GROUT CMU SOLID
REMOVEABLE
3 RAIL
PANELS
STEEL
POST &
CAP
8'
0" N
O M
IN
AL
2"
1.5" ANTI-SCALE
AIRSPACE
(TYP.)
STEEL
POST &
CAP
M
IN
3'
0"
CONCRETE (TYP.)
GRADE
8' - 0" O.C.
RAIL
BEAM POST CAP
20' - 0" GATE OPENING 10' - 2"
DETAIL A
DETAIL B
DETAIL C
8'
0"
FENCE POSTFENCE LINE
8"
10.5"
MOUNTING POSTS
POST
POST
FENCE LINE
FENCE POST
MOUNTING POST
FENCE POST
MOUNTING POSTS
4'
0"
CONCRETE (TYP.)
GRADE
DETAIL A
ISO VIEW ISO VIEW FRONT VIEW SIDE VIEW TOP VIEW
DETAIL B DETAIL C
3 RAIL
STEEL
POST &
CAP
8'
0" N
O M
IN
AL
2"
1.5" ANTI-SCALE
AIRSPACE
(TYP.)
STEEL
POST &
CAP
CONCRETE (TYP.)
GRADE
3' - 6"
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
PARTITION GRAPHICS
NORTH LEGEND
PLAN NORTH
BOILER ROOM FFE: 138' 7-1/2"
NEW CONTROL FFE: 142' 7-1/2"
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
PARTITION PHASING
INTERIOR PARTITION RATING
MAIN OFFICE
NEW PARTITION
MEZZANINE FFE: 153' 3-1/2"
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE502
WALL SECTIONS
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
GENERAL SHEET NOTES
3/4" = 1'-0"
D5 EXISTING WALL SECTION AT LOUVER INFILL
02.39 EXISTING CONSTRUCTION TO REMAIN
03.07 GRADE
04.15 12" CMU, SEE STRUCTURAL
05.02 STEEL RAILINGS (05 50 00)
07.37 2" EIFS ON 7 5/8" CONCRETE MASONRY UNIT
3/4" = 1'-0"
D3 EXISTING EXTERIOR WALL SECTION AT PIT
1' 2' 3'0 1' 2' 3'0
3/8" = 1'-0"
A1 SECURITY FENCE ELEVATION & SECTION
NOT TO SCALE
A3 SECURITY FENCE ISOMETRIC & RAIL SECTION
3/8" = 1'-0"
C1 SECURITY FENCE SLIDING GATE ELEVATION
0 6'4'2'
0 6'4'2'
NOT TO SCALE
D1 SECURITY FENCE SLIDING GATE DETAILS
3/8" = 1'-0" A2
SECURITY FENCE ELEVATION
SINGLE SWING GATE
0 6'4'2'
No. Description Date
1 Amendment 6 4/09/2020
W14X22
8"
05.2005.08
05.08
05.19
07.39
07.40
02.39
06.03
07.36
07.38
BEYOND
02.39
04.14
07.36
07.46
COMPACTED EARTH
NORMAL WEIGHT 3,000 PSI
MIN STRENGTH CONCRETE
4 x 4 PT WOOD POST
EQ EQ
1' - 4"
1'
0" 2'
6"
3'
6" 6"
CL
4 x 4 PT WOOD POST
2 x 8 PT WOOD DECK
SUPPORTS, 16" OC MAX, TYP
2 x 8 PT WOOD DECK
PLANKS
2 x 6 PT WOOD GUARDRAIL BASE
1-1/2" x 1-1/2" PT WOOD PICKETS, 5-3/8" OC MAX, SPACE BETWEEN EACH NO GREATER THAN 3-7/8"
4 x 4 PT WOOD POST
2 x 6 PT WOOD GUARDRAIL CAP
6 1/4"
3'
6"
1/
2"
SEE SPEC SECTION 061000
FOR DECK REQUIREMENTS
(2) 2x8 INTERMEDIATE
BEAMS @ 12'-0" MAX
SPACING
CL
11"
TREAD
11"
TREAD
11"
TREAD
11"
TREAD
1'-1 3/4"
2X12 PT
WOOD
STRINGER
1-1/2" DIA, GALV. STEEL PIPE
HANDRAIL ON CAST METAL
BRACKETS, 6'-0" OC MAX
FINISH GRADE
1-1/2" X 1-1/2" PT WOOD
PICKETS, 5-3/8" OC MAX,
SPACE BETWEEN EACH NO
GREATER THAN 3-7/8"
CAST METAL HANDRAIL BRACKET
CENTERED ON POST, ROTATED
TO ALIGN PERPENDICULAR TO
HANDRAIL
(2) 2X6 PT WOOD
TREADS, PAINTED
W/SKID-RESISTANT
COATING
4X4 PT
WOOD POST
CONC SIDEWALK
2X6 PT WOOD RAIL
CAP BEHIND HANDRAIL
2X16 PT CAP PLATE
1 1/2"
1" TYP.
1/8"
TYP.
R
IS
ER
S M
AX
" H
IG
H
E
AC
H
4' -0
" M
AX
3'
0"
NEW 1/4" SOLID SURFACE
SILL ADHERED TO EXISTING
SILL. USE FRT WOOD SHIMS
2"
SOLID SURFACE SKIRT
SOFTEN EDGES
STEEL WINDOW PANEL TO
BE REFURBISHED
EMBED ANGLE TO BE
STRIPPED, SANDED,
AND PAINTED
EMBED ANGLE TO BE
STRIPPED, SANDED,
AND PAINTEDSOLID SURFACE SKIRT
SOFTEN EDGES
NEW 1/4" SOLID SURFACE
SILL ADHERED TO EXISTING
SILL. USE FRT WOOD SHIMS
NEW LOUVER
STRIP, SAND, AND REPAINT
EMBED ANGLES IN PLACE
SOLID SURFACE SKIRT
SOFTEN EDGES
INSTALL 1/4" THICK SOLID
SURFACE SILL ON ALL WINDOW
SILLS. USE FRT WOOD SHIMS.
STEEL WINDOW PANEL TO
BE REFURBISHED
PROTECT HISTORIC FEATURES
DURING CONSTRUCTION
REPAINT WALLS
REMOVE CONCRETE SILL AT
LARGE WINDOWS BY CAREFULLY
CHIPPING AND SANDING TO
EXTRACT WINDOW PANELS
AT LARGE BAY WINDOWS,
REMOVE CENTER TEE FOR
BOILER INSTALLATION. REWELD
AFTER EQUIPMENT INSTALL.
STEEL WINDOW PANEL TO
BE REFURBISHED
REPAINT / REPLASTER
HEAD, JAMB, AND SILLS.
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
NO RATING
SMOKE RESISTIVE PARTITION - NON RATED
1 HOUR FIRE BARRIER
1 HOUR FIRE/SMOKE BARRIER
2 HOUR FIRE BARRIER
2 HOUR FIRE/SMOKE BARRIER
PARTITION GRAPHICS
NORTH LEGEND
PLAN NORTH
BOILER ROOM FFE: 138' 7-1/2"
NEW CONTROL FFE: 142' 7-1/2"
EXISTING PARTITION TO REMAIN
EXISTING PARTITION TO BE DEMOLISHED
PARTITION PHASING
INTERIOR PARTITION RATING
MAIN OFFICE
NEW PARTITION
MEZZANINE FFE: 153' 3-1/2"
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE503
ENLARGED DETAILS
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
GENERAL SHEET NOTES
1 1/2" = 1'-0"
A5 ROOF EXPANSION JOINT DETAIL
0 1 1/2'1'1/2'
0 1 1/2'1'1/2'
0 1 1/2'1'1/2'
02.39 EXISTING CONSTRUCTION TO REMAIN
04.14 8" CMU, SEE STRUCTURAL B4 / SB501
05.08 STEEL FRAME REF: STRUCTURAL
05.19 METAL ROOF DECK
05.20 3-5/8" METAL STUDS
06.03 TREATED 2X WOOD BLOCKING
07.36 2" EXPANSION JOINT. BASIS OF DESIGN: FOR ROOF TO ROOF
AND ROOF TO WALL APPLICATIONS NYSTROM EWCF-200W.
FOR WALL TO WALL EXTERIOR APPLICATIONS USE
EWN-200MB COLOR TO MATCH EIFS. (800-547-2635,
WWW.NYSTROM.COM)
07.38 PREFINISHED ALUMINUM COPING
07.39 RIGID ROOF INSULATION
07.40 SINGLE-PLY ROOF SYSTEM
07.46 CONTINUOUS VAPOR BARRIER
1" = 1'-0"
D1 POST FOUNDATION DETAIL
1" = 1'-0"
C1 GUARDRAIL @ DECKING DTL.
2'1'0 1/2'
0 1 1/2'1'1/2' 1" = 1'-0"
B1 STAIR @ DECKING DTL.
2'1'0 1/2'
No. Description Date
1 Amendment 6 4/09/2020
1 1/2" = 1'-0"
C3 TYP. SILL DETAIL
1 1/2" = 1'-0"
D3 SILL DETAIL - LARGE BAY LOUVER
1 1/2" = 1'-0"
D5 SILL DETAIL - LARGE BAY WINDOW
1 1/2" = 1'-0"
C5 TYP. HEAD DETAIL
0 1 1/2'1'1/2'
0 1 1/2'1'1/2'
DOOR SIZES
MARK WIDTH HEIGHT
A 1' - 6" 6' - 8"
B 2' - 0" 6' - 8"
C 2' - 2" 6' - 8"
D 2' - 4" 6' - 8"
E 2' - 6" 6' - 8"
F 2' - 8" 6' - 8"
G 2' - 10" 6' - 8"
H 3' - 0" 6' - 8"
I 3' - 2" 6' - 8"
J 3' - 4" 6' - 8"
K 3' - 8" 6' - 8"
L 3' - 10" 6' - 8"
M 3' - 8 1/2" 7' 11 3/4"
N 2' - 0"
O 2' - 2"
P 2' - 4"
Q 2' - 6"
R 2' - 8"
S
T
3' - 0"
U
V
3' - 4"
W
3' - 8"
X
3' - 10"
Y 3' - 0" 8' - 0"
MARK WIDTH HEIGHT
Z
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
7' - 0"
3' - 6"
4' - 0"
1' - 6" 10' - 10"
0' - 9"
1'
0"
3'
6"
0' - 9"
0' - 9"
3'
6"
0'
9"
0' - 9"
12" MAX
0' - 9"
1'
6"0'
7"
0' - 9" MIN 0' - 9" MIN
0'
9" 1'
0"
0'
9"
0' - 9" 0' - 9"
2'
0" 4'
3"
MUNTINS AS
REQ'D
T.A. OR W/F
LOUVER SIZE AS
REQ'D
100 SQ IN MAX
4"x25"
T.A. OR W/F
M
'A' LABEL
180 MINUTE
'B' LABEL
90 MINUTE
100 IN2 MAX
4"x25"
'F' GLASS
SHELF
'B' LABEL
90 MINUTE
'C' LABEL
45 MINUTE
DUTCH DOOR
15/1
7LEAD LINED
8"x10" LEAD
GLASS IF
REQ'D (DR 15)
RAY PROOF
L IF REQ'D
(DR 15)
SOUND RATED
DETENTION TYPE
LOUVERS
AS REQ'D
SECURITY VAULT
DOOR
SECURITY DOOR
SECURITY
RM DR
INEGRATED
DOOR
ASSEMBLY
40 42
INEGRATED
DOOR
ASSEMBLY
1296 SQ IN MAX
EACH LEAF 4"x25"
'F' GLASS
COMBINATION
LOCK & HANDLE
T.A. VIEWER
DOOR MODIFICATIONS (APPLICATION CODES)
A LAMINATED GLAZING
D DOUBLE GLAZED TEMPERED GLASS
H ELECTRIC HOLD
L LOUVER
LP LIGHT PROOF LOUVER
M MECHANICAL SEAL FOR LIGHT PROOF AND
SOUND RETARDING DOOR
T TEMPERED GLASS
U UNDERCUT 1"
V LEAD GLASS
W WIRE GLASS
SD SLIDING DOOR (SEE PLAN FOR CLEAR OPENING)
DOOR NOTES:
1. ALL DOORS SHALL BE FLUSH - 1 3/4" THICK
UNLESS NOTED OTHERWISE
2. TOP AND SIDE RAILS SHALL BE 9" MIN.
BOTTOM RAILS SHALL BE 12" MIN.
3. DOOR TYPES 7,8, & 9 SHALL NOT BE USED
FOR OPPOSING DOORS.
4. EVEN NUMBERS ARE METAL; ODD NUMBER
ARE SOLID CORE WOOD.
5. NOT ALL DOOR TYPES ARE USED.
GLASS OR
LOUVER
REQUIRED BY
MODIFICATION
GLASS OR
LOUVER
REQUIRED BY
ELEVATION TYPE
5'
0"
5'
0"
GENERAL NOTES
A. CONTRACTOR IS RESPONSIBLE FOR
COORDINATING DOORS, DOOR
FRAMES, AND HARDWARE.
B. HARDWARE SUPPLIER IS RESPONSIBLE
FOR BUILDING CODE AND FIRE RATED
DOOR REQUIREMENTS.
C. ALL FIRE RATED DOORS SHALL HAVE
APPLIED U.L. LABEL ON HINGE SIDE. IF
DOOR IS RATED, THEN FRAME ALSO
REQUIRES MATCHING UL LABEL.
D. FRAME SIZES TO BE COORDINATED
WITH PARTITION WIDTHS ON THE JOB
SITE BY CONTRACTOR.
E. PROVIDE TWO (2) 16 GAUGE METAL
STUDS AT ALL DOOR JAMBS AND
PARTITION CORNERS.
F. GLASS SHALL BE PERMANENTLY
MARKED TO INDICATE THAT IT IS
TEMPERED.
G. AFTER INSTALLATION OF EACH
HOLLOW METAL DOOR FRAME, MARK
THE ROOM NUMBER ON THE INTERIOR
AND EXTERIOR OF THE FRAME WITH
INK THAT WILL NOT BE VISIBLE AFTER
THE SPECIFIED FINISHING IS
COMPLETED.
H. WOOD VENEER AND FINISH TO MATCH
FACILITY STANDARDS.
AS SCH
AS
S
C H
AD
J U
ST
C M
U T
O C
O U
R S E
2"
2" 2" AS SCH
AS
S
C H
2"
2" 2"
1 2
AS SCH2" 2"
AS
S
C H
AS SCH
AS
S
C H
AD
J U
ST
C M
U T
O C
O U
R S E
2"
2" 2"
8"
1' - 0"
T
AS SCH
AS
S
C H
CW
AL
WIDE STILE ALUMINUM
ENTRANCE
HOLLOW
METAL
HOLLOW
METAL
POCKET DOOR
HOLLOW
METAL w/ SIDE
LITE
2-SIDED
HOLLOW
METAL
ALUMINUM
CURTAIN WALL
REF: GI011 FOR
CURTAIN WALL
TYPES
NEW CONTROL
143' - 7 1/2"
2"2' - 8"2"
3' - 0"
IG #1
2" 3'
8"
2" 3'
0"
4'
0"
1 2 A
T, 90 MIN.
DOOR SYMBOL
FRAME TYPE
(JAMB DETAIL) DOOR TYPE
DOOR RATING
DOOR SIZE DOOR MODIFICATION
DOOR RATINGS
UL LABEL RATING (HRS) RATING (MIN.) MAX. GLASS AREA
A 3 HR 180 MIN. 100 SQUARE INCHES PER LEAF
B 1 1/2 HR 90 MIN. 100 SQUARE INCHES PER LEAF
C 3/4 HR 45 MIN. 1296 SQUARE INCHES PER LEAF
D 1 1/2 HR 90 MIN. REFER TO LOCAL CODES
E 3/4 HR 45 MIN. REFER TO LOCAL CODES
1/3 HR 20 MIN. 1296 SQUARE INCHES PER LEAF
S SMOKE SMOKE
UL LABLES D AND E ARE FOR EXTERIOR DOORS THAT ARE SUBJECT TO FIRE HAZARDS FROM
THE OUTSIDE OF THE DOOR.
LOUVER
GENERATOR
EQ EQ
8' - 0"
8'
0"
BOILER RM LEVEL
138' - 7 1/2"
± 7' - 4 7/8" V.I.F.
0" V
.I.
F.
3'
0"
V .I.
F.
T.O. GRATING
141' - 7 1/2"
D5
AE502
D3
AE503
BOILER RM LEVEL
138' - 7 1/2"
NEW CONTROL
143' - 7 1/2"±
3'
6" V
.I.
F.
4'
0"
V .I.
F.± 7' - 3" V.I.F.
02.68
2" 3'
2"
2"3' - 8"2"3' - 8 1/8"2"3' - 7 7/8"2"
11' - 8"
MG
#1
MG
#1
MG
#1
T.O. GRATING
141' - 7 1/2"
3'
6"
4'
2" 2'
6"
2'
0" 3'
0"
LINE OF EXISTING
DEMO'D WINDOW
SHOWN FOR CLARITY
3' - 4"
4'
0" 3'
0"
2" 3' - 0" 2"
2" 3'
8"
2"
FG #1
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
MAIN OFFICE
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE601
DOOR SCHEDULES & WINDOW
LOUVER DETAILS
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
DOOR SCHEDULE
DOOR NO SIZE
DOOR FRAME
RATING HW SIGN REMARKSTYPE MAT'L TYPE MAT'L
1A100.1 YY 2 HM 1 HM SH-9 CR
1A100.5 S 2 HM 1 HM SH-3 CR
1A100.6 S 8 HM 1 HM 90 MIN. SH-3D CR
1A100.7 S 8 HM 1 HM 90 MIN. 1R
1A101.2 S 2 HM 1 HM 5
1A103.1 S 1 WD 1 HM 5G
1A104.1 S 1 WD 1 HM 2
1A105.1 S 1 WD 1 HM 3E
1A106.1 S 7 WD 1 HM 90 MIN. 3H
1A106.2 S 7 WD 1 HM 90 MIN. 3H
1A107.1 S 1 WD 1 HM 5D CR
1A108.1 S 1 WD 1 HM 3E
1A109.1 S 4 WD 1 HM 5
1A110.1 S 19 HM 1 HM
1A111.1 S 8 HM 1 HM 90 MIN. 5
1A113.1 S 1 WD 1 HM 5
1A116.1 S 2 HM 1 HM 11
110.4 WD HM
114.2 114.5 114.8 114.12 114.15 114.18 114.21
254 WD HM
E3 SS 2 HM 1 HM SH-9 CR
E4 SS 2 HM 1 HM SH-9
E5 SS 2 HM 1 HM SH-9
E6 S 2 HM 1 HM SH-3 CR
1/4" = 1'-0"
C2 DOOR AND FRAME TYPES
W2
DOOR SYMBOL LEGEND
1/4" = 1'-0"
D5 LOUVERS
1/4" = 1'-0"
D3 HOLLOW METAL WINDOW ELEVATIONS
W1
02.68 INFILL EXISTING WALL OPENING WITH MASONRY -
SEE STRUCTURAL (TYP) AND ADD LAYERS OF GWB
TO FLUSH WITH ADJACENT FINISH.
- SHEET KEYNOTES
2'0 4' 8'2'0 4' 8'
MG #1 LAMINATED SAFETY GLASS, BLAST RESISTANT. BASIS OF DESIGN: KRIEGER WIN - KBR -3.0 (WITH CUSTOM FRAME)
FG #1 FIRELITE GLASS - RATED 2 HOURS
IG #1 SEE SPEC SECTION 08 52 13
GLAZING TYPE CLARIFICATION
W3
OCTOBER 18, 2019
No. Description Date
1 Amendment 2 2/03/2020 2 Amendment 6 4/09/2020
BOILER RM LEVEL
138' - 7 1/2"
08.27
08.28
OPERABLE
VENTILATOR
(6 QTY)
EXISTING WINDOW TO BE REFURBISHED
D5
AE501
C5
AE503
D5
AE503
12' - 11" F.V.
0"
F .V
BOILER RM LEVEL
138' - 7 1/2"
EXISTING WINDOW TO BE RECONSTRUCTED FROM
DEMOLISHED WINDOWS
OPERABLE
VENTILATOR
C3
AE503
C5
AE503
7' - 4" F.V.
4'
2" F
.V
BOILER RM LEVEL
138' - 7 1/2"
OPERABLE
VENTILATOR
EXISTING WINDOW TO BE REFURBISHED
C5
AE503
C3
AE503
7' - 4" F.V.
4'
2" F
.V
BOILER RM LEVEL
138' - 7 1/2"
08.27
08.28
OPERABLE
VENTILATOR
(6 QTY)
EXISTING WINDOW TO BE REFURBISHED
D5
AE501
D5
AE503
C5
AE503
12' - 11" F.V.
0"
F .V
BOILER RM LEVEL
138' - 7 1/2"
08.27
08.28
OPERABLE
VENTILATOR
(6 QTY)
EXISTING WINDOW TO BE REFURFISHED
D5
AE501
D5
AE503
C5
AE503
12' - 11" F.V.
0"
F .V
BOILER RM LEVEL
138' - 7 1/2"
OPERABLE
VENTILATOR
EXISTING WINDOW TO BE REFURBISHED
C5
AE503
C3
AE503
7' - 4" F.V.
4'
2" F
.V
MEZZANINE LEVEL
153' - 3 1/2"
OPERABLE
VENTILATOR
EXISTING WINDOW TO BE REFURBISHED
C3
AE503
C5
AE503
3' - 2" F.V.
4'
F.
V.
MEZZANINE LEVEL
153' - 3 1/2"
EXISTING WINDOW TO BE RECONSTRUCTED FROM
DEMOLISHED WINDOWS
C5
AE503
C3
AE503
3' - 2" F.V.
3'
6" F
.V
MEZZANINE LEVEL
153' - 3 1/2"
OPERABLE
VENTILATOR
FULL TILT
OPERATION
FULL TILT
OPERATION
OPERABLE
VENTILATOR
EXISTING WINDOW TO BE REFURBISHED
C5
AE503
C3
AE503
4'
F.
V.
3' - 2" F.V.
MEZZANINE LEVEL
153' - 3 1/2"
EXISTING WINDOW TO BE REFURBISHED
C5
AE503
C3
AE503
3'
6" F
.V
3' - 2" F.V.
MEZZANINE LEVEL
153' - 3 1/2"
EXISTING WINDOW TO BE REFURBISHED
C5
AE503
C3
AE503
3' - 2" F.V.
4'
F.
V.
6" th re e in ch es o ne fo ot
6" th re e qu ar te rs in ch o ne fo ot
6" on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot on e ha lf in ch o ne fo ot
6" th re e ei gh th s in ch o ne fo ot on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot 1 2 3 4 5
Drawing Title:Seal:
FULLY SPRINKLERED
ARCHITECT / ENGINEERS:
Project Title:
Date:
Project Number:
Drawing Number:
Drawn:Checked:
Building Number:
D C
B A
Revisions:
8016 TOWER POINT DRIVE
CHARLOTTE, NC 28227
P 704.814.1320 F 704.321.0833
Project Phase:
D C
B A
1 2 3 4 5 6
Location:
CONSULTANTS:
Office of
Construction and Facilities Management
MAIN OFFICE
BIM 360://16009 Alexandria Boiler Plant/16009 - ARCH - R2018.rvt
HDG PROJECT: 16009 AE603
WINDOW ELEVATIONS
BID DOCUMENTS
REPLACE BOILER PLANT &
STEAM DISTRIBUTION
SYSTEM
JUNE 14, 2019
ALEXANDRIA VA HEALTH CARE SYSTEM
PINEVILLE, LA
502-14-102V
E3E4E5 E2 E1E6
E7E9 E8E10E11
No. Description Date
1 Amendment 6 4/09/2020
2'0 4' 8'
A. ALL EXISTING WINDOWS TO BE REFURBISHED AND
RECONSTRUCTED.
B. IT IS REQUIRED TO REUSE DEMOLISHED WINDOWS ON WEST
ELEVATION FOR NEW PARTS AND SEGMENTS.
C. ALL EXISTING WINDOWS TO BE REGLAZED WITH NEW GLASS
TYPE IL-2.
D. ALL EXISTING STEEL WINDOWS TO BE REMOVED FOR
RERURBISH WORK. IN SHOP, SANDBLAST WINDOW FRAMES
AND REPAINT. REGLAZE, REINSTALL, REINSTALL HARDWARE.
SEPARATELY, WHILE WINDOWS ARE REMOVED, SANDBLAST
AND REPAINT EMBED ANGLES, PRIOR TO REINSTALLING
REFURBISHED WINDOWS.
E. TYPICAL PAINT COLOR IS WHITE.
F. ALL WINDOW CHAINS, LATCHES, WEIGHTS, HINGES, HANDLES
AND OTHER WINDOW HARDWARE TO BE RECONDITIONED,
REPAINTED AND RE-INSTALLED TO OPERATING CONDITION.
HARDWARE FROM DEMO'ED WINDOWS TO BE REUSED
WHERE POSSIBLE. IF HARDWARE IS UNAVAILABLE, SOURCE
FROM ARCHITECTURAL SALVAGE COMPANIES FOR
HISTORICAL ACCURACY.
G. REMOVE ALL RUST PRIOR TO REPAINTING.
H. ALL EXISTING AND NEW WINDOWS TO RECEIVE SOLID
SURFACE WINDOW SILL.
I. ALL EXISTING AND NEW WINDOWS TO RECEIVE NEW PLASTER
REPAIR/PAINT TO SURROUNDING HEAD, JAMBS AND WALLS.
J. GLASS TYPE IL-2:
1. OUTDOOR LITE: CLEAR FULLY TEMPERED, LAMINATED
FLOAT GLASS, 6 MM THICK.
2. 7-MIL ANTI-SHATTER FILM
3. INTERIOR LITE: CLEAR FULLY TEMPERED, LAMINATED
FLOAT GLASS, 6 MM THICK.
4. VISIBLE LIGHT TRANSMITTANCE: 70 PERCENT
MINIMUM.
5. SOLAR HEAT GAIN COEFFICIENT: .33 MAXIMUM
6. SAFETY GLAZING LABEL REQUIRED.
7. WINDBORNE DEBRIS-RESISTANCE GLAZING UNIT
REQUIRED.
8. BLAST RESISTANCE: PROVIDE UNITS MEETING THE
FOLLOWING: PERFORMANCE CONDITION 1.
GENERAL SHEET NOTES
08.27 REMOVE EXISTING STRUCTURAL TEE SUPPORTS FOR
INSTALLATION OF NEW BOILERS. REINSTALL AND REWELD TO
ORIGINAL CONDITION AFTER BOILER INSTALLATION.
08.28 CAREFULLY DEMO INTERIOR CEMENTITIOUS WINDOW SILL
PRIOR TO REMOVING WINDOW. INSTALL NEW SILL.
- SHEET KEYNOTES
1/4" = 1'-0"
D3 WINDOW ELEVATIONS
| 16009 - ARCH - R2018 - Sheet - GI001 - TITLE SHEET |
| Sheets |
| GI001 - TITLE SHEET |
| 16009 - ARCH - R2018 - Sheet - AE102 - FIRST FLOOR PLAN - PHASE 2 |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE201 - EXTERIOR ELEVATIONS |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE501 - WALL SECTIONS |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE502 - WALL SECTIONS |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE503 - ENLARGED DETAILS |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 16009 - ARCH - R2018 - Sheet - AE603 - WINDOW ELEVATIONS |
| Sheets |
| AE102 - FIRST FLOOR PLAN - PHASE 2 |
| AE104 - MEZZANINE FLOOR PLAN - PHASE 2 AND PARTIAL MEZZANINE FLOOR PLAN - PHASE 1 |
| AE201 - EXTERIOR ELEVATIONS |
| AE501 - WALL SECTIONS |
| AE502 - WALL SECTIONS |
| AE503 - ENLARGED DETAILS |
| AE601 - DOOR SCHEDULES & WINDOW LOUVER DETAILS |
| AE603 - WINDOW ELEVATIONS |
| 2020-04-09T18:47:09-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:47:58-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:48:36-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:49:23-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:50:06-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:50:45-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:51:22-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:52:12-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
| 2020-04-09T18:53:03-0400 | |
| Jonathan M. Carr, AIA, NCARB, CDT |
File details come from the government source that posted it. Updated .