This document is an amendment to a federal construction contract solicitation. The amendment provides direction to refurbish existing steel windows at the Alexandria VA Health Care System Pineville facility rather than installing new automatic roll-up doors and screens. It revises multiple architectural and structural drawings and deletes electrical work associated with the roll-up doors. Responding firms must be small business general construction contractors classified under the SBA 8(a), HUBZone, SDB, WOSB, SDVOSB, or VOSB programs with an approved NAICS Code 236220 and under $39.5 million in size. The related sources sought notice is from the Department of Veterans Affairs Office of Construction and Facilities Management to renovate an existing 8,000 square foot boiler plant and construct a 2,087 square foot addition. The estimated budget is between $10-20 million. Responses were due by October 3, 2019 to the contracting officer.

36C10F19R0086 0006 Amendment 6 - Summary.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Boiler Plant and Steam Distribution System, newest first.
File Type Posted
36C10F19R0086-0007002.pdf PDF
36C10F19R0086-0006003.pdf PDF
36C10F19R0086-0004000.docx DOCX document
36C10F19R0086-0003007.pdf PDF
36C10F19R0086-0003005.pdf PDF
36C10F19R0086-0003010.pdf PDF
36C10F19R0086-0003000.docx DOCX document
36C10F19R0086-0002004.jpg JPG image
36C10F19R0086-0002006.jpg JPG image
36C10F19R0086-0002037.pdf PDF
36C10F19R0086-0002029.pdf PDF
36C10F19R0086-0002013.jpg JPG image
36C10F19R0086-0002025.pdf PDF
36C10F19R0086-0002008.pdf PDF
36C10F19R0086-0002043.pdf PDF
36C10F19R0086-0002039.pdf PDF
36C10F19R0086-0002027.pdf PDF
36C10F19R0086-0002042.pdf PDF
36C10F19R0086-0002018.jpg JPG image
36C10F19R0086-0002044.pdf PDF
36C10F19R0086-0002047.pdf PDF
36C10F19R0086-0002035.pdf PDF
36C10F19R0086-0002030.pdf PDF
36C10F19R0086-0002020.jpg JPG image
36C10F19R0086-0002022.jpg JPG image
36C10F19R0086-0002003.jpg JPG image
36C10F19R0086-0002032.pdf PDF
36C10F19R0086-0001000.docx DOCX document
36C10F19R0086-0001001.pdf PDF
36C10F19R0086-035.pdf PDF
36C10F19R0086-020.pdf PDF
36C10F19R0086-018.pdf PDF
36C10F19R0086-004.docx DOCX document
36C10F19R0086-021.pdf PDF
36C10F19R0086-009.pdf PDF
36C10F19R0086-022.pdf PDF
36C10F19R0086-024.pdf PDF
36C10F19R0086-016.pdf PDF
36C10F19R0086-030.pdf PDF
36C10F19R0086-036.pdf PDF
36C10F19R0086-034.pdf PDF
36C10F19R0086-014.pdf PDF
36C10F19R0086-032.pdf PDF
36C10F19R0086-037.pdf PDF
36C10F19R0086-033.pdf PDF
36C10F19R0086-006.pdf PDF
36C10F19R0086-005.pdf PDF
36C10F19R0086-031.pdf PDF
36C10F19R0086-027.pdf PDF
36C10F19R0086-019.pdf PDF
Show all 50

Replace Boiler Plant and Steam Distribution System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Harrell Design Group, PC

AMENDMENT #6

April 9, 2020

REPLACE BOILER PLANT & STEAM DISTRIBUTION SYSTEM

ALEXANDRIA VA HEALTH CARE SYSTEM PINEVILLE, LA

VA Project Number 502-14-102V

I. Objective: Amendment 6 provides direction to refurbish and re-glaze existing steel windows. To retain existing steel windows, Amendment 6 also provides direction to delete all work associated with automatic roll-up doors and screens.

II. Specifications:

1. Section 00 01 00 Table of Contents:

A. Add spec section 08 51 23 Steel Windows.

B. Delete spec section 08 33 00 Coiling Doors and Grilles.

2. Section 08 33 00 Coiling Doors and Grilles: Delete section in entirety.

3. Section 08 51 23 Steel Windows: Add section in entirety.

4. Section 08 80 00, Part 2 – Product. Add the following:

“2.13 Shatter Resistant Window Film.

A. 7-mil.

B. Complies with GSA Test Standard GSA-TS01-2003.

C. Complies with ASTM Test Standard ASTM 1642-04.

D. Basis of Design: 3M Model S70.”

III. Structural:

1. Sheet SB101: delete new steel associated with roll-up doors and screens. Delete section cut D5/SF501 and enlarged plan detail D1/SF501.

2. Sheet SF501:

A. Detail D1/SF501: Delete detail D1/SF501 in entirety.

B. Detail D5/SF501: Delete new steel associated with new overhead coiling doors but retain new slab on grade.

IV.Architectural:

1. Sheet GI001 (Revised): added new Sheet AE603.

2. Sheet AE102 (Revised):

A. Deleted work associated with roll up doors.

B. Added window tags.

3. Sheet AE104 (Revised):

A. Deleted work associated with roll-up doors.

B. Added window tags.

4. Sheet AE201 (Revised):

A. Added window tags.

B. Added steel windows to be refurbished.

C. Added note to repaint existing structure to match new addition.

5. Sheet AE501 (Revised): updated detail D5 to remove steel associated with roll-up doors.

6. Sheet AE502 (Revised): updated detail D5 for new sill.

7. Sheet AE503 (Revised): added steel window details.

8. Sheet AE601 (Revised): added section cut information to detail D5.

9. Sheet AE603 (Newly Issued): newly issued sheet showing work associated with steel window refurbishment.

V. Electrical

1. Sheet EP101 (Revised): Removed circuits for automatic roll-up doors and screens.

2. Sheet EP701 (Revised): Removed circuits for automatic roll-up doors and screens from

Panel 14-HE-2.

END OF AMENDMENT #6