36C10F19R0040-019.pdf
PDF 23 MB Posted
- Attached to
- WESTERN NEW YORK NATIONAL CEMETERY PHASE 1A Federal contract opportunity
- Solicitation number
- 36C10F19R0040
About this file
36C10F19R0040 C27 936PC2002_WNYNC_391-444-DWG.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C10F19C0015-000.docx | DOCX document | |
| 36C10F19R0040-0002001.pdf | ||
| 36C10F19R0040-0002002.pdf | ||
| 36C10F19R0040-0002000.docx | DOCX document | |
| 36C10F19R0040-002.docx | DOCX document | |
| 36C10F19R0040-013.pdf | ||
| 36C10F19R0040-008.pdf | ||
| 36C10F19R0040-014.pdf | ||
| 36C10F19R0040-011.pdf | ||
| 36C10F19R0040-012.pdf | ||
| 36C10F19R0040-009.pdf | ||
| 36C10F19R0040-003.docx | DOCX document | |
| 36C10F19R0040-007.pdf | ||
| 36C10F19R0040-006.pdf | ||
| 36C10F19R0040-010.pdf | ||
| 36C10F19R0040-004.pdf | ||
| 36C10F19R0040-017.pdf | ||
| 36C10F19R0040-018.pdf | ||
| 36C10F19R0040-016.pdf | ||
| 36C10F19R0040-005.pdf | ||
| 36C10F19R0040-015.pdf | ||
| 36C10F19R0040-020.pdf | ||
| 36C10F19R0040-001.docx | DOCX document |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N O
R T
H
ABBREVIATIONS
STORM (ST)
LIQUID PROPANE GAS (LPG)
WASTE (W)
VENT (V)
HOT WATER RETURN (HWR)
HOT WATER (HW)
COLD WATER (CW)
BACKFLOW PREVENTER (BFP)
ELBOW DOWN
ELBOW UP
RISE OR DROP
PRESSURE GAUGE WITH GAUGE COCK (PG)
THERMOMETER (SPECIFY TYPE) (TH)
STRAINER
WALL CLEANOUT (CO)
CO CLEANOUT (CO)
FLOOR DRAIN (FD)
WH
HB
NON-FREEZE WALL HYDRANT (WH)
HOSE BIB (HB)
VALVE
UNION
CAPPED PIPING
CHECK VALVE (SHOWN W/FLOW)
BALANCING VALVE
FLOOR CLEANOUT (FCO)FCO
TRENCH DRAIN (TD)
SYMBOLS
BFP BACKFLOW PREVENTER
CFH CUBIC FEET PER HOUR
CO CLEANOUT
CONT. CONTINUED
CW COLD WATER
DN DOWN
DWG DRAWING
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
GW GARAGE WASTE
HW HOT WATER
HWR HOT WATER RETURN
INV. ELEV. INVERT ELEVATION
LPG LIQUID PROPANE GAS
S.F. SQUARE FOOT
ST STORM SEWER
TD TRENCH DRAIN
TMV THERMOSTATIC MIXING VALVE
TW TEMPERED WATER
TYP TYPICAL
V VENT
VTR VENT THRU ROOF
W WASTE
W/ WITH
WCO WALL CLEANOUT
WH WATER HEATER
P-TRAP
BOTTOM DROP
ST
LPG
METER AND BACKFLOW
PREVENTER
OPEN OFFICE
A-105
DIRECTOR
A-111ASST. DIRECTOR
A-115
ELECTRICAL
A-118 GEN. STORAGE
A-116
CORRIDOR
A-110
DATA / I.T.
A-117
MECHANICAL
A-119
PASSAGE
A-114
WOMEN'S
A-112
LUNCH ROOM
A-120 MEN'S
A-113
SECURE STORAGE
A-127
SEATING
A-106
LOBBY
A-100CORRIDOR
A-107
MULTI-PURPOSE
A-108
RECYCLE
A-104
VESTIBULE
A-122
MEN'S
A-101
FAMILY RESTROOM
A-102
HAC
A-121
WOMEN'S
A-103
VESTIBULE
A-126
2" CW ENTRANCE
P-301
P-301
P-202
P-201 P-101 P-103
P-405
P-302 P-501
P-301
P-301
P-101P-101 P-103 P-302
P-302
P-501 P-401
FD-A
FD-A
FD-E
P-102
P-102
P-102 P-801
P-801
P-801
P-801 P-802
P-802
BFP-1
2" LPG CONT.
ON SITE PLAN
698 CFH
CENTERLINE. ELEV.
863.00'
(SEE DETAIL 1-P-201)FD-A
FD-A
FD-A
FD-A
862.20'
FINISHED FLOOR
G
HW
HWR
CW
G
METER WITH
REMOTE READER
1 1/2" 1 1/2"
2"G C
W H
W H
W
R FD-A
PLUMBING NOTES:
1. FOR PIPE SIZES SEE RISER DIAGRAM SHEET P-901
P-801
BUILDING DOUBLE
CLEANOUT
BOILER (B-A-1)
(300 CFH)
DWCP-1
1/2" CW TO
REFRIGERATOR
ICE MAKER
THERMOSTATIC MASTER
MIXING VALVE (MMV-1)
WH-2 (199 CFH)
WH-2 (199 CFH)
FLOW CONTROL VALVING
SET AT 2 GPM
SEE 2D/P201
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
STORM CLEANOUT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
STORM CLEANOUT
STORM CLEANOUT
A.A
D.A
1.A 2.A 3.A 4.A
C.A
B.A
ELECTRONIC
TRAP SEAL
PRIMMER
(TP-1) ON
WALL
ELECTRONIC TRAP
SEAL PRIMMER
(TP-1) ON WALL
DOMESTIC WATER
BOOSTER PUMP
DWBP-1
3" VENT
THRU ROOF
DOMESTIC WATER
BOOSTER PUMP
ACCUMALATOR TANK
2" WASTE
UP TO P-501
3" WASTE
UP TO FD-A
3" WASTE
UP TO FD-A
4" WASTE UP TO
CLEANOUTS
3" WASTE
UP TO FD-A
3" WASTE
UP TO P-405
4" WASTE UP
2" WASTE UP
2" WASTE UP
4" WASTE UP
2" VENT UP3" WASTE
UP TO FD-A
4" WASTE UP
2" WASTE UP
3" WASTE
UP TO FD-B
2" VENT UP
4"
4" 4"
4" W CONT.
ON SITE PLAN
(I.E.= 856.70)
(80.5 DFU)
4"
3"
PLUMBING NOTES:
1. FOR PIPE SIZES SEE RISER DIAGRAM SHEET P-901
BUILDING
DOUBLE
CLEANOUT
2" CW CONT.
ON SITE PLAN
CENTERLINE. ELEV.
856.70
3" WASTE
UP TO FD-A
4" STORM
INV. ELEV. 859.00
(TYP AT ALL DOWNSPOUT
CONNECTIONS)
4" STORM UP
CONNECT TO
DOWNSPOUT
(763 SQ. FT.)
4" STORM UP
CONNECT TO
DOWNSPOUT
(729 SQ. FT.)
4" STORM UP
CONNECT TO
DOWNSPOUT
(729 SQ. FT.)
4" STORM UP
CONNECT TO
DOWNSPOUT
(763 SQ. FT)
4" STORM UP
CONNECT TO
DOWNSPOUT
(460 SQ. FT.)
4" STORM UP
TO CLEANOUT
4" STORM UP
TO CLEANOUT
4" STORM UP
TO CLEANOUT
4" 4"
4"
6"
6"
4"
6"
6"
6"
6" STORM CONNECT TO MAIN
STORM MAIN (I.E.=858.20)
(6038 SQ.FT.)
(SEE CIVIL FOR CONTINUATION)
4" SUBSOIL DRAIN
CONNECT INDEPENDENTLY TO
MAIN STORM MAIN (SEE CIVIL
FOR CONTINUATION)
4" SUBSOIL DRAINAGE PIPING
(I.E. = 857.70)
A.A
D.A
1.A 2.A 3.A 4.A
C.A
B.A
4" STORM UP
CONNECT TO
DOWNSPOUT
(460 SQ. FT.)
4" STORM UP
CONNECT TO
DOWNSPOUT
(1067 SQ. FT.)
4" STORM UP
CONNECT TO
DOWNSPOUT
(1067 SQ. FT.)
TRAP SEAL
PRIMMER PIPING
862.20'
FINISHED FLOOR
PROVIDE SLEEVE IN
SPREAD FOOTING
FOR DOMESTIC
WATER SERVICE
4 8 1608
1 inch = 8 feet
GRAPHIC SCALE
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:5
:3
A
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
P
P -2 m js p e lle rb e rg
.r v t
P-101
PLUMBING PLANS - ADMIN BLDG
DJD BDB
PLUMBING PLANS - ADMIN BLDG
ADMIN / PIC - PLUMBING
3401, 3001,1001
ADMIN / PIC SUBGRADE - PLUMBING
NORTH
Unoccupied
Unoccupied
PORCH
C-100
STORAGE
C-103
LOCKER
C-102
WOMEN'S
C-105
MECHANICAL
C-104
MEN'S
C-106
3/4" LPG CONT.
ON SITE PLAN
207 CFH
CENTERLINE. ELEV.
854.90'
(SEE DETAIL 2-P-201)
P-401
P-103
P-202
P-103
P-405
P-801
P-802
P-802
P-801
FD-A
FD-A
BFP-1
WH-1
854.60
FINISHED FLOOR
FD-E
FD-A
C W
H W
H W
R
G
REMOTE READ
WATER METER
P-501
BUILDING DOUBLE
CLEANOUT
P302
P302
P302
PLUMBING NOTES:
1. FOR PIPE SIZES SEE RISER DIAGRAM SHEET P-904
3/4" PROPANE
TO AHU-C-1
(300 MBH)
3/4" PROPANE TO
WH-1 (150 MBH)
FLOOR
C.O.
DWCP-3
FLOW
CONTROL
VALVING
SEE 2D/P201
4" STORM
CONNECT TO
DOWNSPOUT WITH
BOOT
4" STORM
CONNECT TO
DOWNSPOUT WITH
BOOT4" STORM
CONNECT TO
DOWNSPOUT WITH
BOOT
4" STORM
CONNECT TO
DOWNSPOUT
WITH BOOT
4.CD.GD.B1.C
E.C
D.C
MASTWER
MIXING VAVLE
(MMV-2)
2" CW CONT.
ON SITE PLAN
CENTER. ELEV.
849.60'
4" W CONT'D
ON SITE PLAN
(29.5 DFU)
BUILDING DOUBLE
CLEANOUT
2" WASTE UP
TO SINK
2" WASTE UP
TO DRINKING
FOUNTAIN
2" WASTE UP
TO MOP SINK
3" UP TO
FLOOR C.O.
3" UP TO
FLOOR DRAIN
3" UP TO
FLOOR DRAIN
2" WASTE
UP
4" WASTE
UP
3" UP TO
FLOOR DRAIN
PLUMBING NOTES:
1. FOR PIPE SIZES SEE RISER DIAGRAM SHEET P-904
4" STORM (2144 SQ.FT.)
CONNECT TO STORM MAIN (I.E.= 849.77)
(SEE CIVIL FOR CONTINUATION)
4" STORM
(I.E.= 851.30)
4" STORM UP CONNECT TO STORM
DOWNSPOUT WITH BOOT
(536 SQ.FT.)
4" STORM UP CONNECT TO
STORM DOWNSPOUT WITH BOOT
(536 SQ. FT.)
4" STORM UP
CONNECT TO STORM
DOWNSPOUT WITH
BOOT
(536 SQ.FT.)
4"
4"
4"
4" SUBSOIL DRAIN
CONNECT INDEPENDENTLY TO
STORM MAIN (I.E. = 850.10)
(SEE CIVIL FOR CONTINUATION)
4" SUBSOIL PIPE
SEE STRUCTRAL FOR
INVERT ELEVATION
4.CD.GD.B1.C
E.C
D.C
4" STORM UP CONNECT TO
STORM DOWNSPOUT WITH BOOT
(536 SQ.FT.)
I.E.=849.10
854.60'
FINISHED FLOOR
PROVIDE SLEEVE IN
SPREAD FOOTING
FOR DOMESTIC
WATER SERVICE
4" STORM
(I.E.= 851.30)
4 8 1608
1 inch = 8 feet
GRAPHIC SCALE
1.B 2B
A.B
D.B
B.B
C.B
1.2B 1.5B
1.4B
1.3B
4" STORM (493 SQ.FT.)
CONNECT TO DOWNSPOUT
WITH BOOT
4" SUBSOIL DRAINAGE PIPE
SEE STRUCTURAL FOR
INVERT ELEVATION
4" SUBSOIL DRAIN
(I.E. = 849.50
SEE CIVIL FOR
CONTINUATION
4" STORM DRAIN (1246 SQ.FT.)
(I.E. = 849.17)
SEE CIVIL FOR CONTINUATION
1.B 2B
A.B
B.B
5.B
4" STORM (493 SQ.FT.)
CONNECT TO
DOWNSPOUT WITH BOOT
4" STORM (130 SQ.FT.)
CONNECT TO DOWNSPOUT
WITH BOOT4" STORM (130 SQ.FT.)
CONNECT TO
DOWNSPOUT WITH BOOT
1.B 2B
A.B
D.B
B.B
C.B
1.2B 1.5B
1.4B
1.3B
4" STORM (493 SQ.FT.)
CONNECT TO DOWNSPOUT
WITH BOOT
4" SUBSOIL DRAINAGE PIPE
SEE STRUCTURAL FOR
INVERT ELEVATION
4" SUBSOIL DRAIN
(I.E. = 850.50)
SEE CIVIL FOR
CONTINUATION
4" STORM DRAIN (1246 SQ.FT)
(I.E. = 850.00)
SEE CIVIL FOR CONTINUATION
4" STORM (130 SQ.FT.)
CONNECT TO DOWNSPOUT
WITH BOOT
4" STORM (493 SQ.FT.)
CONNECT TO
DOWNSPOUT WITH BOOT
4" STORM (130 SQ.FT.)
CONNECT TO
DOWNSPOUT WITH BOOT
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:5
:3
A
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
P
P -2 m js p e lle rb e rg
.r v t
P-103
PLUMBING PLANS - HONOR GUARD
BLDG AND COMMITTAL SERVICE
SHELTER 1
DJD BDB
PLUMBING PLANS - HONOR GUARD
BLDG AND COMMITTAL SERVICE
SHELTER 1
HONOR GUARD - PLUMBING
HONOR GUARD SUBGRADE - PLUMBING COMMITTAL SERVICE SHELTER 1 - PLUMBING
COMMITTAL SERVICE SHELTER 2 - PLUMBING
1 VE OPTION NO. 8
ADD ALTERNATE 1
ADD ALTERNATE 1
N.I.C.
COMPACTED SUBGRADE
MINIMUM 12"
PEA GRAVEL
(STONE TYPE 1)
TURN-
BUCKLE
FRP STRAP
(TYPICAL)
EYELET
STRAP
PROPANE TANK
(SEE CIVIL DRAWINGS
FOR SIZE)
TANK BOTTOM
DEFLECTOR PLATE
(TYPICAL)
COMPACTED CRUSHED
AGGREGATE
1/2" BY 24" BENT
ANCHORS BOLTS (2
PER STRAP)
EMBED ANCHORS
INTO CONCRETE
PAD (TYP)
12".
12"(TYPICAL ALL 4 SIDES)
2 TO 6 INCHES MINIMUMTOP OF RELIEF VALVE
RISER HEIGHT 28"
PROVIDE TWO
17 POUND
MAGNESIUM
ANODES
ATTACHMENT
TO CADWELD
OR TANK RISER
18 INCHES MINIMUM
POLYETHYLENE TUBING
TO BUILDING (INCLUDE
TRACER WIRE AND
CAUTION TAPE
END OF REGULATOR VENT TUBE LOCATED
AT TOP INSIDE OF HOUSING DOME COVER.
SHOULD BE A MINIMUM OF 2" ABOVE
HIGHEST POSSIBLE WATER LEVEL.
GRADE GROUND DOWNWARD AND AWAY AROUND
HOUSING DOME A MINIMUM OF 3 INCHES. THIS
PREVENTS WATER COLLECTING AND RUNNING
INTO OR STANDING AROUND THE HOUSING DOME.
CONCRETE PAD WITH #6
REBAR 12" ON CENTER BOTH
WAYS - TOP AND BOTTOM
SECOND STAGE
REGULATOR (11" W.C.)
BUILDING
PROPANE VAPORIZER
(20 GAL/HR ADMIN BLDG)
SHUTOFF
VALVE
COORDINATE WIRE
SIZE WITH
MAGNESIUM ANODE
MANUFACTURER
25' MIN
FIRST STAGE REGULATOR
(10 PSI)
6" CONCRETE
PAD
SECOND STAGE
REGULATOR (11" W.C.)
DISTRIBUTION LINE
BUILDING
PROPANE VAPORIZER
(20 GAL/HR HONOR
GUARD BLDG)
(25 GAL.HR
MAINTENANCE BLDG)
SHUTOFF
VALVE
POLYETHYLENE TUBING
TO BUILDING (INCLUDE
TRACER WIRE AND
CAUTION TAPE
PROPANE TANK
(SEE CIVIL DRAWINGS
FOR SIZE)
BOLTED SUPPORTS W/
NEOPRENE PADS
(SEE MANUFACTURES
INSTALLATION)
25' MIN
MOISTURE SIGHT
GLASS INDICATOR
BALL VALVE (TYP)
DRYER BYPASS
PRESSURE GAGE
BRANCH WITH QUICK
CONNECT TO SERVE
MECH. RM.
REFRIGERATED AIR DRYER
DRAIN TO FLOOR DRAIN
D
4" HOUSEKEEPING PAD
OIL FILTER
COMPRESSED AIR
PRESSURE REGULATOR
SET AT 90 PSI
(ADJUSTABLE)
STRAINER
HW CIRCULATING PUMP W/
AQUASTAT CONTROLLER
CHECK VALVE (TYP.)
FLUE
SHUT-OFF VALVE (TYP.)
3/4" HWC
1" CW
UNION (TYP.)
5 GALLON
DIAPHRAGM TYPE
EXPANSION TANK
GAS COCK
DRAIN VALVE
WITH
HOSE
THREADS
TO FLOOR DRAIN
TEMPERATURE AND
PRESSURE RELIEF
VALVE
THERMOMETER (TYP.)
1" 140 DEGREE HW
LP
G
D
LP
G
D
OUTSIDE AIR
1-1/4" PROPANE
3/4"CONDENSATE DRAIN
TO FLOOR DRAIN
1" 130 DEGREE HW
1" CW
HI/LO THERMOSTATIC
MIXING VALVE
1" 140 DEGREE HW TO
EMERGENCY SHOWER ONLY
(MAINTENANCE BUILDING
ONLY)
1/2" HWC
1" PROPANE
1" PROPANE
1" 140 DEGREE HW
1" CW
1" CW
1" 140 DEGREE HW
FROM HW SOURCE
TO FINAL FIXTURE (OR
FIXTURE GROUP) ON BRANCH
TO CIRCULATING PUMPBALL VALVE
CIRCULATION CONTROL
VALVE WITH PETES PORTS
(SET TO 2 GPM)
CHECK VALVE
MARK
PLUMBING EQUIPMENT SCHEDULE
SAC-1
LOCATION
MAINTENANCE BLDG MEZZANINE
SERVES
MAINTENANCE BLDG
HP VOLT PH HZ
ELECTRICAL DATA
3.5 230 1 60
ACFM @
90 PSIG
MAX
PRESSURE
12.8 135
MMV-1 MECH ROOM
WATER FLOW
GPM
REMARKS
OUTPUT
TEMPERATURE
13011
AIR COMPRESSOR WITH 60 GALLON RECIEVER TANK AND REFRIGERATED DRYER
MMV-2 HONOR BLDG MECH ROOM 1304 LEAD FREE, LOW PRESSURE DROP HOT WATER MASTER MIXING VALVEDOMESTIC HOT WATER
DOMESTIC HOT WATER
DESCRIPTION
AIR COMPRESSOR
MASTER MIXING VALVE
MASTER MIXING VALVE
LEAD FREE, LOW PRESSURE DROP HOT WATER MASTER MIXING VALVE
BALL SHUTOFF
VALVE
AIR HOSE QUICK DISCONNECT
(MOUNT AT 72" (ADJUSTABLE)
CEILING
BALL STOP ON
AIR HOSE
(ADJUSTABLE)
HOSE REEL
MOUNT HOSE REEL TO STRUCTURAL
ROOF MEMBER PER
MANUFACTURERS RECOMMENDATION
AIR HOSE
3/4" CA
STRAINER
HW CIRCULATING PUMP W/
AQUASTAT CONTROLLER
CHECK VALVE (TYP.)
FLUE
SHUT-OFF VALVE (TYP.)
3/4" HWC
1" CW
UNION (TYP.)
5 GALLON
DIAPHRAGM TYPE
EXPANSION TANK
GAS COCK
DRAIN VALVE
WITH
HOSE
THREADS
TO FLOOR DRAIN
TEMPERATURE AND
PRESSURE RELIEF
VALVE
THERMOMETER (TYP.)
1" 140 DEGREE HW
LP
G
D
OUTSIDE AIR
3/4" PROPANE
CONDENSATEDRAIN
TO FLOOR DRAIN
1" 130 DEGREE HW
1" CW
HI/LO THERMOSTATIC
MIXING VALVE
1/2" HWC
1" CW
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:5
:3
A
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
P
P -2 m js p e lle rb e rg
.r v t
P-201
PLUMBING DETAILS AND SCHEDULES
DJD BDB
PLUMBING DETAILS AND SCHEDULES
1/8" = 1'-0"
UNDERGROUND PROPANE TANK
1/8" = 1'-0"
ABOVE GROUND PROPANE TANK
PLUMBING FIXTURE CONNECTION SCHEDULE
ABBREV. FIXTURE
DRAINAGE WATER
REMARKSW V CW HW
FD-A FLOOR DRAIN 3" 2" WITH TRAP SEAL PRIMMER CONNECTION (INSTALL TOP OF GRATE 1\2" BELOW FINISHED FLOOR ELEVATION.)
FD-C TRENCH DRAIN 4" 2" 12" WIDE TRENCH DRAIN WITH 3'x3'x3' DEEP SUMP AT END
FD-E FLOOR DRAIN 4" 2" WITH TRAP SEAL PRIMMER CONNECTION (INSTALL TOP OF GRATE 1\2" BELOW FINISHED FLOOR ELEVATION.)
P-101 WATER CLOSET (PUBLIC) 4" 2" 1" WALL MOUNTED BACK OUTLET WITH HARD WIRED SENSOR FLUSH VALVE
P-102 WATER CLOSET (PRIVATE ADA) 4" 2" 1" WALL MOUNTED BACK OUTLET WITH MANUAL FLUSH VALVE
P-103 WATER CLOSET (PUBLIC ADA) 4" 2" 1" WALL MOUNTED BACK OUTLET WITH HARD WIRED SENSOR FLUSH VALVE
P-201 URINAL (PUBLIC) 2" 2" 3/4" WALL MOUNTED BACK OUTLET WITH HARD WIRED SENSOR FLUSH VALVE
P-202 URINAL (PUBLIC ADA) 2" 2" 3/4" WALL MOUNTED BACK OUTLET WITH HARD WIRED SENSOR FLUSH VALVE
P-301 LAVATORY (PUBLIC ADA) 2" 1 1/2" 1/2" 1/2" HARD WIRED SENSOR FAUCET
P-302 LAVATORY (PRIVATE ADA) 2" 1 1/2" 1/2" 1/2" HARD WIRED SENSOR FAUCET
P-401 SINK 2" 1 1/2" 1/2" 1/2"
P-402 SINK 2" 1 1/2" 1/2" 1/2"
P-405 MOP SINK 3" 1 1/2" 3/4" 3/4"
P-501 ELECTRIC WATER COOLER (ADA) 1 1/2" 1 1/2" 1/2"
P-601 SHOWER 2" 1 1/2" 1/2" 1/2" Modular ADA compliant roll-in enclosure
P-701 ADA COMBINATION EYE/FACEWASH 0" 0" 1" 1" WITH ANSI Z358.1 COMPLIANT EMERGENCY MIXING VALVE
P-801 WALL HYDRANT 3/4"
P-802 INTERIOR WALL HYDRANT 3/4"
P-901 SINK 3" 2" 1/2" 1/2"
WATER HEATER SCHEDULE
ABBREV. QTY.
MANUFACTURER (BASIS OF
DESIGN) MODEL NO. DESCRIPTION FLOW AT TEMPERATURE RISE V / ph / Hz BMS CONN. ACCESSORIES LOCATION INPUT
WH-1 1 NAVIEN NPE-180A PREMIUM CONDENSING TANKLESS WATER HEATER 2.9 GPM @100º F RISE 120 / 1 / 60 Yes CONCENTRIC VENT KIT, PROPANE CONVERSION KIT C-104 150000.0 Btu/h
WH-2 2 NAVIEN NPE-240A PREMIUM CONDENSING TANKLESS WATER HEATER 3.9 GPM @ 100º F RISE 120 / 1 / 60 Yes CONCENTRIC VENT KIT, PROPANE CONVERSION KIT A-121 199900.0 Btu/h
WH-2 2 NAVIEN NPE-240A PREMIUM CONDENSING TANKLESS WATER HEATER 3.9 GPM @ 100º F RISE 120 / 1 / 60 Yes CONCENTRIC VENT KIT, PROPANE CONVERSION KIT D-120 199900.0 Btu/h
BACKFLOW PREVENTER SCHEDULE
ABBREV. QTY. SIZE
MANUFACTURER (BASIS OF
DESIGN) MODEL NO. DESCRIPTION REMARKS LOCATION
BFP-1 1 2" WATTS LF009-M2-QT REDUCED PRESSURE ZONE ASSEMBLY PROVIDE WITH STRAINER AND AIR GAP FITTING A-119
BFP-1 1 2" WATTS LF009-M2-QT REDUCED PRESSURE ZONE ASSEMBLY PROVIDE WITH STRAINER AND AIR GAP FITTING C-104
BFP-1 1 2" WATTS LF009-M2-QT REDUCED PRESSURE ZONE ASSEMBLY PROVIDE WITH STRAINER AND AIR GAP FITTING D-120
NONE
AIR COMPRESSOR DETAIL
NONE
DUPLEX GAS DOMESTIC WATER HEATER WITH PUMP
PUMP SCHEDULE
MARK LOCATION SERVES TYPE GPM
TOTAL HEAD FT
WG
MOTOR DATA
MIN EFF % NOTESHP RPM VOL PH HZ
DWBP-1 SEE PLANS ADMINISTRATION BUILDING DOMESTIC WATER PACKAGED
DUPLEX
66 30.00 1.00 3500 460 3 60 0
DWCP-1 SEE PLANS DOMESTIC WATER HOT WATER INLINE 2 20.00 0.08 2650 115 1 60 0
DWCP-2 SEE PLANS DOMESTIC WATER HOT WATER INLINE 2 20.00 0.08 2650 115 1 60 0
DWCP-3 SEE PLANS DOMESTIC WATER HOT WATER INLINE 2 10.00 0.07 2800 115 1 60 0
NONE
DOMESTIC HOT WATER CIRCULATING CONTROL
NANA
NONE
COMPRESSED AIR HOSE REEL DETAIL
NONE
SIMPLEX GAS DOMESTIC WATER HEATER WITH PUMP
ADMINISTRATION
1 VE OPTION NO. 6
HONOR GUARD - ADD ALTERNATE 1
HONOR GUARD - ADD ALTERNATE 1
HONOR GUARD ADD ALTERNATE 1
HONOR GUARD ADD ALTERNATE 1
HONOR GUARD ADD ALTERNATE 1
HONOR GUARD ADD ALTERNATE 1
HONOR GUARD ADD ALTERNATE 1
MAINTENANCE BLDG - N.I.C.
HONOR GUARD - ADD ALTERNATE 1
HONOR GUARD - ADD ALTERNATE 1
HONOR GUARD - ADD ALTERNATE 1
HONOR GUARD - ADD ALTERNATE 1
HONOR GUARD - ADD ALTERNATE 1
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
MAINTENANCE BLDG - N.I.C.
HONOR GUARD ADD ALTERNATE 1
HONOR GUARD ADD ALTERNATE 1
WH-2
WH-2
BFP-1
METER
3/4"
3/4"
3/4"
2"
3/4"
3/4"
2"
2"
P-102
P-101
P-101
P-802
P-301
P-301 P-302
P-501
P-801
P-801
P-801
P-801
P-801
P-302
P-302 P-501
P-102
P-102
P-401
P-301
P-301
P-201
P-202
P-101
P-102
1 1/2"
1"
1/2"
1/2"
1/2"
1/2"
1 1/2"
2"
2"
2"
2"
2"
2"
2"
1 1/2"
1/2"
1/2"
2"
1/2"
1/2"
1/2" 3/4"
2" 2"
2"
2"
P-802
1" 3/4"
3/4"
3/4"
3/4"
3/4"
1"
3/4"
3/4"
1/2"
2"
3/4"
3/4"
3/4"
1/2"
1/2"
2"
1" 1/2"
1/2"
1/2"
1/2"
1/2" 3/4"
3/4"
2"
1/2"
3/4"
1"
3/4"
1"
P-405
1"
2"
1/2"
1/2"
WATER HAMMER
ARRESTOR (TYP)
3/4"
1/2" CW VALVED
CONNECTION TO
REFRIGERATOR ICE
MAKER
DWCP-1
FLOW CONTROL VALVING
SET AT 2 GPM
SEE 2D/P201
ELECTRONIC TRAP
SEAL PRIMMER (TP-1)
ELECTRONIC TRAP SEAL
PRIMMER PIPING
ELECTRONIC
TRAP SEAL
PRIMMER (TP-1)
BEHIND WATER
HEATER
2" ISOLATION
VALVE
DOMESTIC WATER
BOOSTER PUMP
DWBP-1
DOMESTIC WATER
BOOSTER PUMP
ACCUMALATOR
TANK
2"
2"
4"
4"
4"
2 1/2"
1 1/2"
1 1/4"
1 1/2"
3"
4"
4"
4" VENT
THRU ROOF
3" VENT
THRU ROOF
4" VENT
THRU ROOF
FD-A
FD-A
P-102
P-102
P-302
P-302
P-501
3"
3"
FD-E
FD-A
FD-A
FD-A
FD-A
FD-A P-102
P-102
P-405
P-101
P-101
P-101
P-202
P-201
P-301 P-301
P-301
P-301
P-501
BUILDING
DOUBLE
CLEANOUT
FLOOR
C.O.
4"
4"
4"
2"
2 1/2"
2"
2"
2"
1 1/2"
2"
1 1/2"
1 1/2"
1 1/2"
3"
3" 1 1/2"
3"
3"
2"
4"
4"4"
3"
4"
3"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N
TI
D
STA
E
U
EN
T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of Construction
LEO A DALY Company 2017
/2
/2
:1
:4
A
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
P
P -2 m js p e lle rb e rg
.r v t
P-901
ADMIN/PIC BLDG - PLUMBING RISER
DIAGRAMS
DJD BDB
ADMIN/PIC BLDG - PLUMBING RISER
DIAGRAMS
ADMIN/PIC BLDG WATER SUPPLY
3401,1001
ADMIN/PIC BLDG SANITARY
3/4"
2" 3/4"
3/4"WH-1
BFP-1
METER
P-401
P-501
P-601
P-302
P-302
P-102 P-302
P-102
P-202
P-801
P-801
2"
1/2"
1/2"
1/2" 1"
3/4"
2"
3/4"
1"
3/4"
2"
1"
3/4"
1"
3/4"1/2"
1/2"
1"
1 1/2"
2"
2"
1/2"
1/2"
1/2" 1/2"
3/4"
DWCP-3
FLOW CONTROL VALVING
SET AT 2 GPM
SEE 2D/P201
2" ISOLATION
VALVE
MASTER MIXING
VALVE (MMV-2)
1" 1"
2"2"
4"
4"
4"
2" 3"
4"
4"
3"
2"
1 1/2"
2"
1 1/4"
2"
4"
4"
1 1/2"
2"
2 1/2"3"
1 1/4"
1 1/4"1 1/4"
1 1/2"
1 1/2"
3"
4"4"
FD-A
P-102
P-401
P-501
P-601
FD-B
FD-A
FD-A
P-102
P-301
P-301
P-301
4" VENT
THRU ROOF
BUILDING
DOUBLE
CLEANOUT
CLEANOUT
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:5
:4
A
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
P
P -2 m js p e lle rb e rg
.r v t
P-904
HONOR GUARD BLDG - PLUMBING
RISER DIAGRAMS
DJD BDB
HONOR GUARD BLDG - PLUMBING
RISER DIAGRAMS
HONOR GUARD BLDG WATER SUPPLY 2
HONOR GUARD BLDG SANITARY
1 VE OPTION NO. 6
ADD ALTERNATE 1 ADD ALTERNATE 1
DUCT FURNACE
DF-D-1
(400 CFH)
WATER HEATER
WH-2
(199 CFH)
WATER HEATER
WH-2
(199 CFH)
BOILER
B-D-1
(190 CFH)
2"
2"
1 1/4"
1 1/4" 1 1/2"
1 1/4"
LPG TO TANK
988 CFH
(SEE DETAIL 2-P-201)
BOILER
B-A-1
(300 CFH)
WATER HEATER
WH-2
(199 CFH)
WATER HEATER
WH-2
(199 CFH)
GAS SHUT OFF
VALVE (TYP)
1 1/2"
1 1/2"
2"
1 1/2"
1 1/4"
LPG TO TANK
698 CFH
(SEE DETAIL 1-P-201)
3/4" PROPANE
TO AHU-C-1
(57 MBH)
1" TO WH-1
(150 MBH)
1" LPG CONT.
ON SITE PLAN
207 CFH
INV. ELEV. 854.90'
(SEE DETAIL 2-P-201)
1"
3/4"
1"
3/4" TO COMPRESSED
AIR OULTET WITH
QUICK CONNECT
3/4" COMPRESSED
AIR OULTET WITH
QUICK CONNECT
3/4" COMPRESSED
AIR OULTET WITH
QUICK CONNECT
3/4" COMPRESSED
AIR OULTET WITH
QUICK CONNECT
AIR COMPRESSOR
WITH DRYER
3/4" TO COMPRESSED AIR
HOSE REEL MOUNTED
BELOW CELING WITH QUICK
CONNECT HOSE AT 72" AFF
3/4" COMPRESSED AIR
FOR PRESSURE
WASHING SYSTEM
3/4"
1"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
2"
1 1/2"
1 1/2"
1"
3/4"
3/4" 2"
3/4"
3/4" TO COMPRESSED AIR
HOSE REEL MOUNTED
BELOW CELING WITH QUICK
CONNECT HOSE AT 72" AFF
3/4" TO COMPRESSED AIR
HOSE REEL MOUNTED
BELOW CELING WITH QUICK
CONNECT HOSE AT 72" AFF
3/4" TO COMPRESSED AIR
HOSE REEL MOUNTED
BELOW CELING WITH QUICK
CONNECT HOSE AT 72" AFF
2"
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:5
:4
A
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
P
P -2 m js p e lle rb e rg
.r v t
P-905
PROPANE AND AIR COMPRESSOR
PIPING RISER DIAGRAMS
DJD BDB
PROPANE AND AIR COMPRESSOR
PIPING RISER DIAGRAMS
MAINTENANCE BLDG GAS
ADMIN/PIC BLDG GAS
HONOR GUARD BLDG GAS
MAINTENANCE BLDG AIR COMPRESSOR PIPING
1 VE OPTION NO. 6
ADD ALTERNATE 1
1. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR ALL
CEILING AIR DEVICE LOCATIONS.
2. REFER TO ARCHITECTURAL ELEVATION DRAWINGS FOR LOCATION
OF WALL MOUNTED MECHANICAL ITEMS.
3. LOCATE ALL DUCT BALANCING DAMPERS ABOVE ACCESSIBLE
CEILINGS. WHERE DAMPERS CANNOT BE INSTALLED ABOVE
ACCESSIBLE CEILINGS PROVIDE YOUNG OPERATOR WITH OPERATOR
LOCATED IN AN ACCESSIBLE LOCATION, OR PROVIDE ACCESS DOORS.
MINIMUM ACCESS DOOR SIZE SHALL BE 18x18 UNLESS OTHERWISE
APPROVED BY ENGINEER.
4. DUCTWORK NOT SIZED IS GENERALLY SMALLER BRANCH ZONE
DUCTS. COORDINATE ELEVATIONS AND PROVIDE NECESSARY
OFFSETS. DUCTWORK SHALL BE SIZED PER THE BRANCH
DUCTWORK SCHEDULE.
5. PROVIDE VOLUME DAMPERS AT ALL SUPPLY, RETURN AND EXHAUST
DUCT TAKE-OFFS. SEE DUCT CONSTRUCTION DETAILS.
6. BLANK-OFF AREAS OF LOUVERS NOT USED WITH 20 GAGE SHEET METAL
DOUBLE WALL BLANK-OFF PANEL INSULATED WITH 2" RIGID
FIBERBOARD. SEAL AIR TIGHT.
7. INSTALL RIGID 1/2"x1/2" GALVANIZED STEEL WIRE MESH AT ALL OPEN
ENDED DUCTS IN OCCUPIED AREAS OR EXPOSED TO VIEW.
8. ALL HWS AND HWR PIPING SERVING RADIATION SHALL BE
CONCEALED IN WALLS OR FINTUBE ENCLOSRES UNLESS
OTHERWISE NOTED.
9. COORDINATE INSTALLATION OF DUCTWORK AND PIPING WITH
BUILDING STRUCTURE, DUCTWORK, PIPING, ELECTRICAL CONDUIT,
LIGHTING, ETC.
10. INSTALL ALL FLOOR MOUNTED HVAC EQUIPMENT, INCLUDING AHUS,
PUMPS, ETC. ON 4" MINIMUM HEIGHT CONCRETE HOUSEKEEPING
PAD. EXTEND PAD MINIMUM 4" BEYOND EQUIPMENT AT ALL SIDES.
11. ALL HYDRONIC BRANCH PIPING SHALL BE 3/4" UNLESS NOTED
OTHERWISE.
12. PROVIDE POSITIVE DRAINAGE OF ALL PLENUMS CONNECTED TO
OUTSIDE LOUVERS. WATERPROOF BOTTOM OF PLENUMS. SLOPE
PLENUM BOTTOM TO LOUVER OR PROVIDE DRAIN POINTS WITH
DISCHARGE TO DRAIN.
13. THE MAINTENANCE - BUILDING 3001 STRUCTURE SUPPORTED
ATTACHMENTS OF PERMANENT EQUIPMENT AND NON-STRUCTURAL
COMPONENTS SHALL BE DESIGNED TO SEISMIC CATEGORY D
STANDARDS.
MECHANICAL ABBREVIATIONS
CD-2 CONSTRUCTION DOCUMENTS
(SUBMISSION2)
CENT CENTRIFUGAL
CFM CUBIC FEET PER MINUTE
CO CLEAN OUT
CO2 CARBON DIOXIDE
CU CONDENSING UNIT
CH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
BAS BUILDING AUTOMATIC SYSTEM (DDC)
BDD BACKDRAFT DAMPER
BHP BRAKE HORSEPOWER
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
A/E ARCHITECT / ENGINEER
AC AIR CONDITIONER
ACD AUTOMATIC CONTROL
DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL
DAMPER,TWO POSITION
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AHU AIR-HANDLING UNIT
AMP AMPERE
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
C CENTIGRADE (CELCIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS
(SUBMISSION1)
D DAMPER - AUTOMATIC
Db DECIBELS
DB DRY-BULB TEMPERATURE
DD-1 DESIGN DEVELOPMENT
(SUBMISSION1)
DD-2 DESIGN DEVELOPMENT
(SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DUCT FURNACE
DIA DIAMETER
DPS DIFFERENTIAL PRESSURE SENSOR
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EF EXHAUST FAN
EG EXHAUST GRILLE
EJ EXPANSION JOINT
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FLOOR REGISTER
FS FLOW SWITCH
FSTAT FREEZESTAT
GA GAUGE
GAL GALLONS
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
FT FEET
FT-LB FOOT-POUND
FV FACE VELOCITY
H HUMIDIFER
HAC HOUSEKEEPING AID CLOSET
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HORSEPOWER
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
LAT LEAVING AIR TEMPERATURE
LF LINEAR FOOT (FEET)
LSD LINEAR SLOT DIFFUSER
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
kW KILOWATT kWh KILOWATT HOUR
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
RA RETURN AIR
RDS ROOM DATA SHEETS
REA RELIEF AIR
RET COMMON RETURN WATER
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RV RELIEF VALVE
P PUMP
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ?ABSOLUTE
PSIG POUNDS PER SQUARE INCH ?GAGE
PSV PRESSURE SAFETY VALVE
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SCFM STANDARD CUBIC FEET PER MINUTE
SD SMOKE DETECTOR
SAD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
YR YEAR
W WATTS
Wb WET-BULB (TEMPERATURE)
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VA VETERANS ADMINISTRATION
VI VIBRATION ISOLATOR
VSD VARIABLE SPEED DRIVE
UL UNDERWRITERS LABORATORY
DPR DAMPER
SAE SOUND ATTENUATOR - EXHAUST
SAS SOUND ATTENUATOR - SUPPLY
B BOILER
DH DUCT HEATER
ERV ENERGY RECOVERY VENTILATOR
ET EXPANSION TANK
HC HEATING COIL
IDU INDOOR UNIT (VRF)
ODU OUTDOOR UNIT (VRF)
UH UNIT HEATER
VRF VARIABLE REFRIGERANT FLOW
BMS BUILDING MANAGEMENT SYSTEM
PIPING SYMBOLS VALVE SYMBOLS CONTROLS SYMBOLS
DRAWING SYMBOLS DUCTWORK SYMBOLS
M
1-MH101
1-MH101
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
FLOW METER
IDU-C-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
ITEM NUMBER (UNIT NO. 1)
EQUIPMENT ABBREVIATION
(INDOOR UNIT SHOWN)
BUILDING DESIGNATION
A - ADMIN/PC
C - HONOR GUARD
D - MAINTENANCE
DRAWING NUMBER WHERE DRAWN
(WALL TYPE)
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
LINEAR SLOT DIFFUSER
FC
10x8
FLEXIBLE CONNECTION, EQUIPMENT,
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
COMBINATION SMOKE/FIRE DAMPER
F/S DPR
VIBRATION, OR SEISMIC
DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)
SUPPLY
RETURN45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
MANUAL SPLITTER DAMPER
45°
2 1
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE 1/24
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
CONVECTOR OR RADIATOR (RECESSED)
CONVECTOR OR RADIATOR (WALL HUNG)
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLYHWS
HWR
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
FLOW ELEMENTFE
PIPE UP
PIPE DOWN
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENT
MV
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
FLEXIBLE CONNECTION
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
T ROOM TEMPERATURE SENSOR/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
TSL TEMPERATURE SWITCH, LOW (FREEZESTAT)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
PDS PRESSURE DIFFERENTIAL SWITCH
TSH TEMPERATURE SWITCH, HIGH
LTCP LOCAL TEMPERATURE CONTROL PANEL
HVAC HVAC CONTROL PANEL
ECC INTEGRATE CONTROL POINT ON REMOTE GRAPHICS
WORKSTATION AT ENERGY CONTROL CENTER
TC
TEMPERATURE CONTROLLER. SEE SEQUENCE OF
OPERATION
VSMC VARIABLE SPEED MOTOR CONTROLLER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
AFS AIR FLOW SWITCH
PC ATU/ CONTROLLER
TE THERMOSTAT/TEMPERATURE SENSOR
FE FLOW ELEMENT
CS CURRENT SENSOR
SST START STOP
ALM ALARM
STA STATUS
LENGTH IN DUCT WHEN SPACE PERMITS.)
A
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES MINIMUM
SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
VD
MANUAL VOLUME DAMPER
FIRE DAMPER
FD
M0101
SECTION INDICATOR TOP INDICATES
SECTION NUMBER BOTTOM
INDICATES SHEET NUMBER
200-5
200-2
SUPPLY AIR DEVICE -
(REFER TO SCHEDULE FOR SIZE)
FIRST NO. CFM, SECOND NO. TYPE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
LINEAR DIFFUSER
200-14 10x8
SUPPLY/ RETURN/EXHAUST SIDEWALL GRILLE-
FIRST NO. CFM, SECOND NO. TYPE
BOTTOM NO. WIDTH BY HEIGHT OF GRILLE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
RETURN AIR DEVICE -
(REFER TO SCHEDULE FOR SIZE)
FIRST NO. CFM, SECOND NO. TYPE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
EXHAUST AIR DEVICE -
(REFER TO SCHEDULE FOR SIZE)
FIRST NO. CFM, SECOND NO. TYPE
(REFER TO SPECIFICATION FOR AIR DEVICE TYPE)
CALLOUT INDICATOR TOP INDICATES
NUMBER ON THE SHEET BOTTOM
INDICATES SHEET NUMBER
M0101
200-5
250-7
CFM
TYPE
LENGTH
NO. OF SLOTS
SLOT WIDTH (INCHES)
4LF-2-1
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:1
:5 P
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
M
H -2 m js p e lle rb e rg
.r v t
M-001
SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
DJD MJB
SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
GENERAL NOTES
1001, 3001, 3401
VD
V D
VD
VD
VD
V D
VD
V D
VD VD
VD
V D V D
VD
VD
V D
V D
V D
V D
V D
VD
VD
V D
VD
VD
VD
VD
V D
1A
MH101
ELECTRICAL
A-118
ASST. DIRECTOR
A-115
DIRECTOR
A-111
OPEN OFFICE
A-105
SECURE STORAGE
A-127
C O
R R
ID
O
R
A -1
OPERATIONAL CENTER
A-109
MULTI-PURPOSE
A-108
MEN'S
A-113
WOMEN'S
A-112
CORRIDOR
A-110
PASSAGE
A-114LUNCH ROOM
A-120
DATA / I.T.
A-117
MECHANICAL
A-119
IN
F
O R
M A
T
IO
N
A -1
RECYCLE
A-104
RECEPTION
A-124
GRAVE LOC. CL.
A-125
LOBBY
A-100
FAMILY RESTROOM
A-102
HAC
A-121
MEN'S
A-101
WOMEN'S
A-103IDU-A-8
IDU-A-9
IDU-A-7
IDU-A-5
IDU-A-4
IDU-A-3
IDU-A-1
ERV-A-1
EXHAUST
AIR
OUTSIDE
AIR
VRF INDOOR UNIT
LOCATE IN
CEILING SPACE
(TYP)
GEN. STORAGE
A-116
MH301
VESTIBULE
A-126
VESTIBULE
A-122
ALCOVE
A-130
LOCKERS
A-128
ROUTE DUCT IN
2 HR ENCLOSURE
AT HIGH LEVEL IN
ELECTRICAL
ROOM
IDU-A-6
IDU-A-2
305-4
370-5
305-4
350-5
75-14
100-15 70-15
180-4
180-4
165-4
225-5230-5
75-5
SEATING
A-106
160-4
315-5
345-4
340-4
COMBINATION
COMBUSTION
AIR AND FLUE
75-5
240-4
315-4
255-5
75-5
275-4
275-5
285-4 280-4
285-5
280-5 75-5
75-5
150-2
165-2
HC-A-2
AC-A-1
FD FD
75-5
175-14 12x6
150-15 12x6
80-5
315-5
60-5
BLANK OFF
UNUSED PORTION
OF LOUVER (TYP)
ERV-A-2
14/8 OA 16/8 SA
12/8 EA
FILTER
BOX (TYP)
10/8 RA
14/8 OA
18/8 SA 16/8 SA
12/10 SA
14ø EA
14/10 RA
16/8 SA
16/8 SA
14ø OA
14ø EA
16/8 SA
10/10
10/10
315-5
10/8 RA
16/8 RA8/6 SA
10ø EA
14/6 SA
14/6 SA
8ø SA
8/4 OA
6ø EA
10/8 EA
14/6 SA
6ø EA
8ø SA
14/6 SA
12/6 SA
6ø EA
8/6 OA
8/4 RA
12/6 RA
8ø SA
8ø SA
10/8 RA
8/6 EA 8/6 OA
14/10 SA
6ø SA
6ø EA
10/8 OA
8ø EA
10/8 EA
6ø EA
10/8 OA
8/6 OA (TYP)
240-5
75-4
8/6 SA
8/8 SA
10/6 RA
(TYP)
(TYP)
8/6 SA
8/6 EA
16/8 RA
16/8 SA
380-5
(BELOW)
14/10 OA
685-16
(BELOW)
FD
6 5
8 3 4
12ø SA
A.A
B.A
C.A
4.A3.A2.A1.A
D.A
14/6 SA
8x6
12/12
RA
12/6 RA
18/12 OA18"x12" OUTSIDE AIR LOUVER
(SEE ARCHITECTURAL)
ODU-A-2
18/12 EA
18"X12" EXHAUST LOUVER
(SEE ARCHITECTURAL) 36/16 OA
36/16 EA
ODU-A-1
FD
FD
FD
FD
FD
FD
FD
PORCH
C-100
MECHANICAL
C-104
STORAGE
C-103
HONOR GUARD
C-101
WOMEN'S
C-105
L O
C K
E R
C -1
MEN'S
C-106
VAULT
C-108
CLOSET
C-1078
MH301
250-4
305-5
305-5
75-4
95-15
EF-C-1
175-15
16"X16" EXHAUST
AIR LOUVER (SEE
ARCHITECTURAL)
50-15 10x6
50-2
70-2
70-15
14/10 RA
14/10 SA
18/10 SA
14/10 RA
MH301
MH301
250-4
255-4
12/6 RA
10ø SA10ø SA
8/6 EA
12/6 EA
8/8 SA
8/6 EA
12/10 SA
10ø SA
12/8 RA
12/6 RA
6ø SA
8/6 RA
50-4
1.C D.B D.G 4.C
E.C
D.C
16/16 EA
FD
(TYP.)
VEHICLE - EQUIP
STORAGE
D-122
WASH BAY
D-123
MECHANICAL
D-120
WORK AREA
D-119
TELECOM
D-113
PARTS & TOOL
STORAGE
D-112
CORRIDOR
D-127
BOOT HOLDING / WASH
D-109
MULTI-PURPOSE ROOM
D-106
W O
M E
N 'S
D -1
FOREMAN
D-105
STORAGE RM
D-115
CARETAKER
WORKSTATIONS
D-102
ERV-D-2
IDU-D-1
IDU-D-2
IDU-D-4
IDU-D-5
STAINLESS STEEL
12 INCHES AFF
(TYP OF 4)
VEHICLE - EQUIP
D-121 ALCOVE
D-128
E L E
C T
R
IC
A L
D -1
LOCKER RM
D-118
CORRIDOR
D-126
CORRIDOR
D-101
COTR OFFICE
D-103
295-4 290-4 295-4
290-4
385-5 380-5 380-5
75-4
205-4
HC-D-1
125-4
215-5
215-5
130-4
150-2
165-5
65-2
200-4
50-5
155-5 185-4
225-5
265-4
215-5
65-15
ALCOVE
D-125
375-14 14x8
330-15 14x8
MH301
H.A.C.
D-104
MEN'S
D-117
2A
MH101
16/8 SA16/10 SA
18/12 SA
1500-8 18x30
MH301
12/8 SA
18/10 EA 16/10 EA
18/10 EA
16/12 OA
10/10 SA
10ø SA
10ø RA
18/12 OA
12/12 SA
10/10 RA
16/10 OA
14/6 SA
AC-D-1
10ø SA
6ø SA 10ø SA
10ø SA
10ø SA10ø SA
10ø SA
8ø SA
14/6 SA
25/10 RA
10ø EA
8ø EA
8/6 EA
12/8 SA
8/6 SA
12/6 EA
12/8 EA
36/10 RA
8/6 OA
12/8 RA
12/10 RA
16/12 OA
8ø OA
10ø OA
6ø OA
8ø OA
/8
O A
8/6 EA
8/6 EA
8/6 EA
65-15
70-15
12/10 SA
48/14 RA
IDU-D-3
14/12 RA
(TYP)
165-7
280-4
14/6 SA
8ø SA
12/6 SA
900-14 16x10
UP
12/12 EA
900-15 12x12
1.D 2.D 3.D 4.D 5.D 6.D 7.D 9.D 11.D 14.D 16.D
H.D
I.D
G.D
F.D
D.D
B.D
A.D
14/10 RA
FD
FD
FD
FD
50-2
FD
6ø SA
FD
156"X26" OUTSIDE
AIR INTAKE
LOUVER
(SEE
ARCHITECTURAL)
24x10 STAINLESS
STEEL RA RISER
DOWN (TYP OF 4)
MECHANICAL
D-202
WASH BAY
D-123
VEHICLE - EQUIP
STORAGE
D-122
VEHICLE - EQUIP
D-121
SD
SD
MH301
120"X30" EXHAUST AIR
LOUVER (DISCHARGE
OUT THE SIDE AT HIGH
LEVEL)
18/10 EA
22/16 SA
26/16 EA
30/26 OA
/1
E
A
26/26 SA26/22 SA22/22 SA18/16 SA
/1
E
A
600-14 12x10
(TYP OF 10)
156"x26"x36"
DEEP INSULATED
INTAKE PLENUM
18/12 OA
30/26 EA
24/10 EA
6000-8 60x24
60/24 RA
26/30 OA
12/12 EA
EF-D-3
12/12 EA
DOWN
1.D 2.D 3.D 4.D 5.D 6.D 7.D
G.D
F.D
D.D
B.D
A.D
FD
FD FD
FD
ERV-A-2
IDU-A-3
IDU-A-6
OPERATIONAL CENTER
A-109
CORRIDOR
A-110
GEN. STORAGE
A-116
D.A
315-460-5
6ø EA
6/8 OA
8/12 EA
IDU-A-7
315-5
16/8 RA
75-575-5
10/8 EA
36/10 RA
MEZZ LEVEL
10' - 0"
ERV-D-2
IDU-D-1
LOCKER RM
D-118
H.A.C.
D-104
CORRIDOR
D-127
BOOT HOLDING / WASH
D-109
H.D
65-15
65-15 75-4
70-15
75-5
10/18 EA
10/14 RA
HC-D-1
16/10 EA
6/8 SA
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:1
:0 P
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
M
H -2 m js p e lle rb e rg
.r v t
MH101
LEVEL ONE - HVAC DUCTWORK
PLANS
DJD MJB
LEVEL ONE - HVAC DUCTWORK
PLANS
1/8" = 1'-0"
ADMIN/PIC - BUILDING 1001
1/8" = 1'-0"
HONOR GUARD - BUILDING 3401
1/8" = 1'-0"
MAINTENANCE - BUILDING 3001 - GROUND FLOOR PLAN
1/8" = 1'-0"
MAINTENANCE - BUILDING 3001 - MEZZANINE PLAN
1001, 3001, 3401
1/8" = 1'-0" 1A
ADMIN/PIC - BUILDING 1001 - DUCTWORK SECTION
1/8" = 1'-0" 2A
MAINTENANCE - BUILDING 3001 - DUCTWORK SECTION
KEYED NOTES:
14x10 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 685 CFM.
16x8 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 305 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 90 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 105 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 45 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 25 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 85 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 45 CFM.
8x6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 40 CFM.
14/8 OA ABOVE AND 14/8 EA BELOW.
INSTALL SIDEWALL BAR GRILLE 12" ABOVE ALCOVE CEILING. SIDEWALL
GRILLE SHALL BE 9LF LONG, TYPE-16, AND BALANCE TO 685 CFM.
AIRFLOW MEASURING STATION.
8X6 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 45 CFM.
16x8 VOLUME DAMPER, BALANCE OUTSIDE AIR TO 685 CFM.
8"Ø VOLUME DAMPER, BALANCE OUTSIDE AIR TO 230 CFM.
6"Ø VOLUME DAMPER, BALANCE OUTSIDE AIR TO 50 CFM.
6"Ø VOLUME DAMPER, BALANCE OUTSIDE AIR TO 70 CFM.
GRILLE TYPE -5. BALANCE TO 75 CFM.
DUCTWORK CONTINUED ON 4/MH301.
PROVIDE VOLUME DAMPER AT 6'-0" AFF.
AIR TRANSFER DUCT AND GRILLES. GRILLE TYPE SHALL BE TYPE-5
WITH 10" NECK ON EACH SIDE OF WALL.
KEYED NOTES:
12/12 EA DN TO EF-D-3 ON STEEL FRAMED STAND 30" A.F.F.
KEYED NOTES:
GENERAL NOTES:
BALANCE RETURN AIR DAMPERS TO AIRFLOWS SHOWN AT GRILLES.
GENERAL NOTES:
BALANCE RETURN AIR DAMPERS TO AIRFLOWS SHOWN AT GRILLES.
N.I.C.
N.I.C.
T
MH301
MH301
COMBINATION
COMBUSTION AIR
AND FLUE
ERV-D-1
14x12 OA INTAKE
LOUVER
275-15 10x6
EF-D-4
EF-D-2
10/6 EA
10/6 EA
MECHANICAL
D-202
120"X30" EXHAUST AIR
LOUVER (DISCHARGE
OUT THE SIDE AT HIGH
LEVEL)
EF-D-1
FD
26/26 SA
FD
10/6 EA
CONCENTRIC
ADAPTER
INSULATED EXHAUST
PLENUMVFD FOR EF-D-1
VFD FOR AHU-D-1
26/30 EA
AHU-D-1
30/26 OA
(BELOW)
18/10 EA 12/12 EA
34/26 EA
6.D 7.D
G.D
M
M
LEVEL 01
100'-0"
MEZZANINE
110'-0"
MH301
COMBINED
COMBUSTION
AIR AND FLUE
EF-D-4
10/18 EA
10/6 EA
10/6 EA
B-D-1
FD
FD
EF-D-1
MECHANICAL
D-202
MECHANICAL
D-120
26/26 SA
FD
12/12 EA
G.D
3"Ø COMBUSTION
AIR AND VENT
AHU-D-1
6"Ø
COMBUSTION
AIR AND VENT
LEVEL 01
100'-0"
MEZZANINE
110'-0"
MH301
6.D 7.D
ERV-D-1
MECHANICAL
D-202
MECHANICAL
D-120
EXHAUST AIR LOUVER
(DISCHARGE OUT THE
SIDE AT HIGH LEVEL)
6"Ø COMBINATION
COMBUSTION AIR
AND VENT
EF-D-4275-15
10x6
250-7 10x6
18/42 SA
6/10 EA
EF-D-2
EF-D-1OA
EA
24" SERVICE CLEARANCE
30/26 EA
INSULATED EXHAUST
PLENUM
6/10 EA
B-D-1
COMBINATION
COMBUSTION AIR
AND VENT
FD
AHU-D-1
10/16 OA
26/26 SA
14/64 EA
6.D 7.D
3"Ø
COMBUSTION AIR
AND VENT
FD
MECHANICAL
A-119
B-A-1 75-15 8x670-14
8x6
COMBINED
COMBUSTION
AIR AND VENT
MH301
3"Ø BOILER
COMBUSTION
AND VENT
FD
(TYP.)
LEVEL 02
111'-0"
MEZZANINE
110'-0"
B-A-1
75-15 8x6
70-14 8x6
MECHANICAL
A-119
3"Ø BOILER
COMBUSTION
AIR AND VENT
1.C
D.C
MH301
16x16 OUTSIDE AIR INTAKE LOUVER
AND INSULATED PLENUM
AHU-C-1
MECHANICAL
C-104
MH301
10/8 OA
18/10 SA
1.C
D.C
LEVEL 01
100'-0"
AHU-C-1
/1
S
A
8/10 OA
/1
R
A /1
R
A
MH301
16x16 OUTSIDE AIR
INTAKE LOUVER
AND INSULATED
PLENUM
MECHANICAL
C-104
1.C
LEVEL 01
100'-0"
MH301
/1
S
A
/1
R
A
8/10 OA
14/10 RA
AHU-C-1
MECHANICAL
C-104
MP301
D.C
MH301
MH301
16/10 OA
10/6 EA
250-7 10x6
FD
B-D-1
EA UP WITH
FD AT SLAB
COMBINED BOILER
AIR INTAKE AND
VENT.
36x12 OA INTAKE
LOUVER
MECHANICAL
D-120
16/10 OA
14/12 OA
6.D 7.D
G.D
3"Ø BOILER
COMBUSTION
AIR AND VENT
MM
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:1
:1 P
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
M
H -2 m js p e lle rb e rg
.r v t
MH301
ENLARGED DUCTWORK PLANS AND
SECTIONS
DJD MJB
ENLARGED DUCTWORK PLANS AND
SECTIONS
1/4" = 1'-0"
MAINTENANCE - BUILDING 3001 - MECHANICAL ROOM D-202 - PLAN
1/4" = 1'-0"
MAINTENANCE - BUILDING 3001 - MECHANICAL ROOMS
D-120/D-202 - SECTION
1/4" = 1'-0"
MAINTENANCE - BUILDING 3001 - MECHANICAL ROOMS
D-120/D-202 - SECTION
1/4" = 1'-0"
ADMIN/PIC - BUILDING 1001 - MECHANICAL ROOM A-119 - PLAN
1/4" = 1'-0"
ADMIN/PIC - BUILDING 1001 - MECHANICAL ROOM A-119 - SECTION
1/4" = 1'-0"
HONOR GUARD - BUILDING 3401 - MECHANICAL ROOM C-104 -
PLAN
1/4" = 1'-0"
HONOR GUARD - BUILDING 3401 - MECHANICAL ROOM C-104 -
SECTION
1/4" = 1'-0"
HONOR GUARD - BUILDING 3401 - MECHANICAL ROOM C-104 -
SECTION
1. LOCATE UNIT ON 4" CONCRETE PAD.
NOTES:
1001, 3001, 3401
1/4" = 1'-0"
MAINTENANCE - BUILDING 3001 - MECHANICAL ROOM D-102 - PLAN
ADD ALTERNATE 1 ADD ALTERNATE 1 ADD ALTERNATE 1
N.I.C.
N.I.C.
DISTANCE = NECK
SIZE (8" TYP.)
AIR
FLOW
BRANCH
DUCT
METAL OR PLASTIC
SECURING BAND
FLEX (NO BENDS GREATER THAN 45°)
(MAX 4'-0")
OPPOSED BLADE DAMPER(WHERE
SCHEDULED)CEILING
DIFFUSER OR
REGISTER
AIR
FLOW
METAL OR PLASTIC
SECURING BAND (TYP)
CEILING
DIFFUSER OR
REGISTER
RIGID METAL ELBOW,
SECURED AND SEALED TO
DIFFUSER
FLEX
(MAX. 4'-0")
* ENSURE ADEQUATE
ACCESS FOR
MAINTENANCE
FLEX HOSE (TYP.)
CONDENSATE DRAIN TRAP
ACCESS
(VARIES)
1" PLEATED FILTER, 2" MERV
8 FILTER: CAMFIL 30/30
(VERTICAL UNITS) OR
EQUIVALENT (SEE CHART)
SIDE/BOTTOM
FILTER ACCESS
FAN, MOTOR
ACCESS
(VARIES)*
CEILING
VRF UNIT
SECTION "A"
RETURN
"A"
VRF UNIT
SUPPLY
"A"
PLAN VIEW
V A
R
IE
S
CFM FILTER SIZE
NOTES:
1. PROVIDE UNIT DUCT CONFIGURATIONS AS INDICATED ON
THE FLOOR PLANS.
2. PROVIDE CONCRETE HOUSEKEEPING PADS FOR ALL
VERTICAL UNITS.
3. PROVIDE 1" FLEXIBLE DUCTWORK CONNECTION.
0-475 20x14
476-1000 24x20
1001-1200 24x24
1201-1920 40x24
ACOUSTICALLY LINED DUCT
(AS APPLICABLE)
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:1
:1 P
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
M
H -2 m js p e lle rb e rg
.r v t
MH501
DUCTWORK DETAILS
DJD MJB
DUCTWORK DETAILS
1001, 3001, 3401
SCALE: NONE1
DIFFUSER CONNECTION
SCALE: NONE2
DIFFUSER CONNECTION
SCALE: NONE3
INDOOR UNIT DETAIL
BRANCH DUCTWORK SCHEDULE
DUCT CFM SQUARE INCHES MINIMUM
RECOMMENDED DUCT SIZE (INCHES)
UNLABELED DUCTS ARE GENERALLY SMALLER BRANCH DUCTS. COORDINATE ELEVATIONS AND PROVIDE ALL NECESSARY OFFSETS, UNLESS OTHERWISE INDICATED. DUCTS SHALL BE SQUARE, RECTANGULAR, OR ROUND OF THE
FOLLOWING CROSS SECTIONAL AREA:
0 - 100 28 8x4
RECTANGULAR ROUND (Ø)
125 - 225 48 8x6 8
250 - 400 78 10x8 10
425 - 650 128 16x8 12
675 - 950 180 18x10 14
975 - 1300 216 18x12 16
AIR DEVICE SCHEDULE
TYPE
1, 2, 3, 4
1, 2, 3, 4
1, 2, 3, 4
1, 2, 3, 4
1, 2, 3, 4
SERVICE STYLE
SUPPLY
RETURN/EXHAUST
PERFORATED
FACE
SIZE
(IN)
24 x 24
NECK
SIZE
(IN)
6" Ø
AIR FLOW
RANGE
(CFM)
0 - 100
REMARKS
PERFORATED 24 x 24 8" Ø 101 - 175
PERFORATED 24 x 24 10" Ø 176 - 250
PERFORATED 24 x 24 12" Ø 251 - 350
PERFORATED 24 x 24 14" Ø 351 - 450
SUPPLY
SUPPLY
SUPPLY
SUPPLY
RETURN/EXHAUST
RETURN/EXHAUST
RETURN/EXHAUST
RETURN/EXHAUST
PERFORATED
PERFORATED
PERFORATED
PERFORATED
PERFORATED
24 x 24
24 x 24
24 x 24
24 x 24
24 x 24
10" Ø
12" Ø
14" Ø
15 x 15
6" Ø
201 - 325
326 - 450
451 - 600
601 - 950
0 - 100
15 RETURN/EXHAUST LOUVERED 8 x 8 8 x 8 0 - 100
15 RETURN/EXHAUST 12 x 8 12 x 8 101 - 200
15 RETURN/EXHAUST 14 x 10 201 - 400
15 RETURN/EXHAUST 16 x 12 401 - 600
LOUVERED
LOUVERED
LOUVERED
14 x 10
16 x 12
5 RETURN/EXHAUST PERFORATED 24 x 24 8" Ø 101 - 200
7 RETURN/EXHAUST SINGLE FIXED BLADE 10 x 6 10 x 6 75 - 175
8 RETURN/EXHAUST SINGLE FIXED BLADE - - -
16 SUPPLY - -LINEAR BAR -
ALUMINUM CONSTRUCTION 35º BLADE
ALUMINUM CONSTRUCTION 35º BLADE
14 SUPPLY DOUBLE DEFLECTION - - -
4" HIGH 7/32" BLADE THICKNESS
SEE PLANS FOR SIZE, PROVIDE W/ O.B.D.
B
A
C
D
E
F
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BID DOCUMENTS
ATIONAL
EMETERY
DMINISTRATIONA
C
N
Drawing Title
GENESEE COUNTY, NEW YORK
Project Title
Location
Date Checked Drawn
936PC2002
Drawing Number
Building Number
Project Number
Management
03-15-19 Dwg of
V
T
N T I
D
STA
E
U
E
N T
OF
I
C
ES OF
R I
AM
E
R
A
S
S
ETERAN
AF
F A
Revisions:
VA FORM 08-6231, OCT 1978
CONSULTANTS:
Date
ARCHITECT/ENGINEER:
ATIONAL
EMETERY
DMINISTRATIONA
C
N
WESTERN NEW YORK
NATIONAL CEMETERY
PHASE 1A DEVELOPMENT and Facilities
Office of
Construction
LEO A DALY Company 2017
/2
/2
:1
:1 P
M C
U s e rs
\m js p e lle rb e rg
\D o c u m e n ts
\A u to d e s k \R e v it
P ro je c ts
\V A
C e m e te ry W
N Y
M
H -2 m js p e lle rb e rg
.r v t
MH601
SCHEDULES
DJD MJB
SCHEDULES
BOILER SCHEDULE
UNIT
NO. TYPE
MIN.
BOILER
EFFICIENCY
(% AFUE)
BURNER CAPACITY
FLUE
VENT
DIA. (IN)
HOT WATER
RELIEF
VALVE
SETTING
(PSI)
ELECTRICAL DATA
MAX
OPERATING
WEIGHT (LBS) REMARKS
INPUT
(MBH)
GROSS
OUTPUT
(MBH)
MIN. INLET
PROPANE
PRESS. (IN.
WG) FUEL GPM EWT (ºF) LWT (ºF)
MAX
PRESS.
DROP
(FT) V/PH/HZ
CONTROL
VOLTAGE
UNIT
FLA
UNIT
MCA
UNIT
MOCP
B-A-1 CONDENSING 95 155 144 10 PROPANE 3 17 120 140 6.0 30 120/1/60 24 15A 300 1
B-D-1 CONDENSING 95 155 144 10 PROPANE 3 13 120 140 4.0 30 120/1/60 24 15A 300 1
PUMP SCHEDULE
UNIT
NO. SYSTEM TYPE
FLUID
TYPE
CAPACITY
(GPM)
HEAD
(FT)
EFFICIENCY
(%) SUCTION (IN)
DISCHARGE
(IN)
MOTOR
REMARKSHP RPM VSD (1) V/PH/HZ
P-A-1 ADMIN. VARIABLE SPEED WET ROTOR WATER 17 42 41 1.5 1.5 0.5 3600 YES 208/1/60 PROVIDE WITH ECM MOTOR
P-A-2 ADMIN. VARIABLE SPEED WET ROTOR WATER 17 42 41 1.5 1.5 0.5 3600 YES 208/1/60 PROVIDE WITH ECM MOTOR
P-D-1 MAINT. VARIABLE SPEED WET ROTOR WATER 13 36 41 1.5 1.5 0.5 3600 YES 208/1/60 PROVIDE WITH ECM MOTOR
P-D-2 MAINT. VARIABLE SPEED WET ROTOR WATER 13 36 41 1.5 1.5 0.5 3600 YES 208/1/60 PROVIDE WITH ECM MOTOR
ENERGY RECOVERY VENTILATOR SCHEDULE
UNIT
NO.
SUPPLY FAN EXHAUST FAN OUTSIDE AIR CONDITIONS (SUPPLY) EXHAUST AIR CONDITIONS FILTER ELECTRICAL
UNIT
DIMENSIONS
(LxWxH)
UNIT
WEIGHT
(LBS) REMARKSCFM
ESP (IN
WC) DRIVE HP CFM
ESP (IN
WC) DRIVE HP
SUMMER WINTER SUMMER WINTER
NO. MERV FLA MCA MOPD V/PH/HZ
INLET OUTLET INLET OUTLET INLET OUTLET INLET OUTLET
DB (ºF) WB (ºF) DB (ºF) WB (ºF)
TOTAL
EFF. DB (ºF) WB (ºF) DB (ºF) WB (ºF)
TOTAL
EFF. DB (ºF) WB (ºF) DB (ºF) WB (ºF) DB (ºF) WB (ºF) DB (ºF) WB (ºF)
ERV-A-1 990 0.5 DIRECT 1.0 890 1.0 DIRECT 1.0 85 73 78.2 68.1 56% 6 0 49.7 36.1 72% 75 62.5 - - 70 50 - - 2 8 2x2.2 5.0 15 208/3/60 35x54x54 340
ERV-A-2 455 1.0 DIRECT 0.75 355 1.25 DIRECT 0.75 85 73 78.3 67.7 69% 6 0 48.8 36.0 83% 75 62.5 - - 70 50 - - 2 8 2x2.2 5.2 15 208/3/60 24x55x36 211
ERV-D-1 6000 1.27 6000 1.27 85 73 85 73 0 6 0 43.8 31.4 67 85 73 85 73 60 43.9 - - 16 8 - - - - 36x74x86 700
ERV-D-2 1080 1.5 DIRECT 1.5 985 1.5 DIRECT 1.5 85 73 77.9 67.9 60% 6 0 51.6 37.6 60% 75 62.5 - - 70 50 - - 4 8 2x4.5 5.2 15 208/3/60 61x3x36 414 WITH INTEGRAL VFD
VARIABLE REFRIGERANT FLOW SYSTEM (VRF) INDOOR UNIT
UNIT NO. AREA SERVED ESP CFM MIN OA CFM
COOLING COIL HEATING COIL ELECTRICAL DATA
DIMENSIONS
(WxHxD)
WEIGHT
(LBS) REMARKS
EAT DB/WB
(°F)
TOTAL
CAPACITY
(MBH) EAT (°F)
HEATING
(MBH) V/PH/HZ MOCP
IDU-A-1 TOILET ROOMS 0.6 685 475 78.2/68.1 24.1 70 26.9 208/1/60 15 56x12x28 79
IDU-A-2 LOBBY 0.6 685 450 78.2/68.1 24.1 70 26.9 208/1/60 15 40x12x28 79
IDU-A-3 OPEN OFFICE 0.6 685 95 76.0/63.6 21.1 70 26.9 208/1/60 15 40x12x28 79
IDU-A-4 OPERATIONAL CENTER 0.4 315 30 76.0/63.6 6.6 70 8.4 208/1/60 15 22x12x28 55
IDU-A-5 MULTI-PURPOSE 0.6 685 80 76.0/63.6 21.1 70 26.9 208/1/60 15 40x12x28 79
IDU-A-6 DIRECTOR 0.4 315 35 76.0/63.6 8.3 70 19.5 208/1/60 15 40x12x28 55
IDU-A-7 CORRIDOR 0.4 315 150 76.0/63.6 6.6 70 8.4 208/1/60 15 22x12x28 55
IDU-A-8 LUNCH ROOM 0.6 685 75 76.0/63.6 15.8 70 19.9 208/1/60 15 40x12x28 79
IDU-A-9 ASSISTANT DIIRECTOR 0.4 450 50 76.0/63.6 10.5 70 13.5 208/1/60 15 28x12x28 62
IDU-D-1 WORK AREA 0.4 450 175 76.0/63.0 10.3 70 13.5 208/1/60 15 40x12x28 62
IDU-D-2 WOMEN'S/MEN'S 0.6 685 400 77.0/67.6 24.0 70 26.9 208/1/60 15 56x12x28 79
IDU-D-3 MULTI-PURPOSE 0.6 1375 205 76.0/63.0 41.2 70 53.9 208/1/60 15 56x12x28 101
IDU-D-4 FOREMAN 0.4 315 50 76.0/63.0 8.1 70 10.5 208/1/60 15 28x12x28 62
IDU-D-5 CARETAKER/COTR 0.4 450 60 76.0/63.0 10.3 70 13.5 208/1/60 15 28x12x28 62
VARIABLE REFRIGERANT FLOW SYSTEM (VRF) OUTDOOR UNIT
UNIT NO.
COOLING
(MBH)
HEATING
(MBH) IEER
ELECTRICAL DIMENSIONS
(WxHxD)
WEIGHT
(LBS) NOTESMCA V/PH/HZ
ODU-A-1 48.3 37.9 16.0 29.1 208/1/60 37x39x12 176 95°F AMBIENT, R410A
ODU-A-2 102.7 84.9 21.4 36.3 208/3/60 50x68x30 527 95°F AMBIENT, R410A
ODU-D-1 105.1 84.9 21.4 36.3 208/3/60 50x68x30 527 95°F AMBIENT, R410A
FAN SCHEDULE
UNIT
NO. TYPE CFM
SP (IN.
WC)
WHEEL
TYPE
MIN
WHEEL
DIA (IN)
FAN
RPM DRIVE CLASS
SOUND DATA (AT FAN INLET) MOTOR
WEIGHT REMARKSSONES
SOUND POWER AT OCTAVE BAND (Db), RE 10 ̄¹² W
BHP HP RPM VSD V/PH/HZ1/63 2/125 3/250 4/500 5/1K 6/2K 7/4K 8/8K
CF-B-1 CEILING 19,000 0.1 PROP 72 140 DIRECT - - - - - - - - - - - 0.25 140 YES 120/1/60 52 1
EF-C-1 CABINET 270 0.625 FC 6.75 1220 DIRECT 1 3.5 60 59 55 56 55 49 46 41 - - - NO 120/1/60 23 2
EF-D-1 IN-LINE 6000 2.25 MIXED 24.5 1575 BELT 2 - 74 78 78 77 76 74 68 62 3.5 5.0 1725 YES 480/3/60 500
EF-D-2 IN-LINE 250 1.0 BI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.