36C10F19R0040-005.pdf

PDF 9 MB Posted

Attached to
WESTERN NEW YORK NATIONAL CEMETERY PHASE 1A Federal contract opportunity
Solicitation number
36C10F19R0040
Issued by
Department of Veterans Affairs Headquarters

About this file

36C10F19R0040 C28 936PC2002_Vol1-Specs.pdf

View the file

Other files for this federal contract opportunity

Other files attached to WESTERN NEW YORK NATIONAL CEMETERY PHASE 1A, newest first.
File Type Posted
36C10F19C0015-000.docx DOCX document
36C10F19R0040-0002001.pdf PDF
36C10F19R0040-0002002.pdf PDF
36C10F19R0040-0002000.docx DOCX document
36C10F19R0040-002.docx DOCX document
36C10F19R0040-013.pdf PDF
36C10F19R0040-008.pdf PDF
36C10F19R0040-014.pdf PDF
36C10F19R0040-011.pdf PDF
36C10F19R0040-012.pdf PDF
36C10F19R0040-009.pdf PDF
36C10F19R0040-003.docx DOCX document
36C10F19R0040-007.pdf PDF
36C10F19R0040-006.pdf PDF
36C10F19R0040-018.pdf PDF
36C10F19R0040-019.pdf PDF
36C10F19R0040-016.pdf PDF
36C10F19R0040-015.pdf PDF
36C10F19R0040-020.pdf PDF
36C10F19R0040-010.pdf PDF
36C10F19R0040-004.pdf PDF
36C10F19R0040-017.pdf PDF
36C10F19R0040-001.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

VOLUME 1

WESTERN NEW YORK

NATIONAL CEMETERY

VA PROJECT NUMBER: 936PC2002

PHASE 1A DEVELOPMENT

Town of Pembroke

Genesee County, New York

Prepared for:

United States Department of Veterans Affairs

Office of Construction and Facilities Management

810 Vermont Avenue, NW

Washington D.C., 20420

Prepared by:

Landscape Architecture & Engineering, P.C.

Bid Documents March 15, 2019

THIS PAGE INTENTIONALLY LEFT BLANK

WESTERN NEW YORK NATIONAL CEMETERY PROJECT NO. 936PC2002

PHASE 1A DEVELOPMENT 03-15-19

BID DOCUMENTS

PROFESSIONAL SEALS & SIGNATURES

00 01 07 - 1

SECTION 00 01 07

PROFESSIONAL SEALS & SIGNATURES

The design of this project conforms to all applicable provisions of the International Building Code (IBC), the VA Design Guidelines, the VA Fire Prevention Design Manual, as well as the ICC/ANSI A117.1-2 Accessible and Usable Buildings and Facilities

Civil

Landscape Architecture

Architecture

Mechanical

PROFESSIONAL SEALS & SIGNATURES

00 01 07 - 2

Electrical

Plumbing

Structural

Irrigation

TABLE OF CONTENTS

00 01 10 - 1

SECTION 00 01 10

VOLUME 1

DIVISION 00 - SPECIAL SECTIONS

00 00 00 Cover

00 01 07 Professional Seals & Signatures

00 01 10 Table of Contents

00 01 15 List of Drawing Sheets

DIVISION 01 - GENERAL REQUIREMENTS

01 00 01 General Requirements

01 32 16.13 Network Analysis Schedules

01 33 23 Shop Drawings, Product Data, and Samples

01 35 27 Safety Requirements for National Cemetery Projects

01 42 19 Reference Standards

01 45 00 Quality Control

01 45 29 Testing Laboratory Services

01 45 50 Special Inspections / Testing & Structural Observations

01 57 19 Temporary Environmental Controls

01 74 19 Construction Waste Management

01 81 11 Sustainable Design Requirements

01 81 11.01 LEED 2009 for New Construction and Major Renovation Project Scorecard

01 81 11.02 Guiding Principles Checklist

01 91 00 General Commissioning Requirements

DIVISION 02 – EXISTING CONDITIONS

02 41 10 Demolition and Site Clearing

DIVISION 03 – CONCRETE

03 30 53 Cast-in-Place Concrete

03 48 21 Precast Concrete Burial Crypts (Double Depth Lawn Crypt)

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring

04 05 16 Masonry Grouting

04 20 00 Unit Masonry

04 40 10 Cut Stone Assemblies

04 41 00 Dry Stone Wall System

04 43 00 Natural Stone Veneer

DIVISION 05 – METALS

05 05 13 Shop-Applied Coatings for Metal

05 12 00 Structural Steel Framing

05 31 00 Steel Decking

05 40 00 Cold-Formed Metal Framing

00 01 10 - 2

05 44 00 Cold-Formed Metal Trusses

05 50 00 Metal Fabrications

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry

06 20 00 Finish Carpentry

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 11 13 Bituminous Dampproofing

07 13 52 Modified Bituminous Sheet Waterproofing

07 21 13 Thermal Insulation

07 22 00 Roof and Deck Insulation

07 27 27 Self-Adhering Water Resistive Air Barrier

07 41 13 Standing Seam Metal Roofing

07 46 46 Cement Fiber Siding

07 60 00 Flashing and Sheet Metal

07 84 00 Firestopping

07 92 00 Joint Sealants

07 95 13 Expansion Joint Cover Assemblies

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames

08 14 00 Interior Wood Doors

08 31 13 Access Doors and Frames

08 41 13 Aluminum-Framed Entrances and Storefronts

08 51 13 Aluminum Windows

08 56 59 Service Window Unit

08 66 10 Operable Security Screens

08 71 00 Door Hardware

08 71 13.11 Low Energy Power Assist Door Operators

08 80 00 Glazing

08 90 00 Louvers and Vents

DIVISION 09 – FINISHES

09 22 16 Non-Structural Metal Framing

09 29 00 Gypsum Board

09 30 13 Tiling

09 51 00 Acoustical Ceilings

09 65 13 Resilient Base and Accessories

09 65 19 Resilient Tile Flooring

09 68 00 Carpeting

09 91 00 Painting

DIVISION 10 – SPECIALTIES

10 11 13 Markerboards

10 14 00 Exterior Signage

10 14 05 Interior Signage (with Attachment)

00 01 10 - 3

10 21 13 Toilet Compartments

10 28 00 Toilet and Bath Accessories

10 44 13 Fire Extinguisher Cabinets

10 51 13 Metal Lockers

10 75 00 Flagpoles

DIVISION 11 - EQUIPMENT

11 83 00 Global Navigation Satellite System (GNSS)

11 83 02 GNSS & GIS Mapping and Geodata

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades

12 48 13 Entrance Floor Mats and Frames

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 19 Metal Building Systems

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing

22 05 12 Gen. Motor Requirements for Plumbing Equipment

22 05 19 Meters and gages for Plumbing Piping

22 05 23 General-Duty Valves for Plumbing Piping

22 07 11 Plumbing Insulation

22 08 00 Commissioning of Plumbing Systems

22 11 00 Facility Water Distribution

22 11 23 Domestic Water Pumps

22 13 00 Facility Sanitary and Vent Piping

22 34 00 Fuel-Fired Domestic Water Heaters

22 40 00 Plumbing Fixtures

22 61 00 Facility Liquefied-Petroleum Gas Piping

00 01 10 - 4

VOLUME 2

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

(HVAC)

23 05 11 Common Work Results for HVAC

23 05 12 General Motor Requirements for HVAC Equipment

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 11 HVAC and Plumbing Insulation

23 08 00 Commissioning of HVAC Systems

23 09 23 Direct-Digital Control System for HVAC

23 21 13 Hydronic Piping

23 21 23 Hydronic Pumps

23 23 00 Refrigerant Piping

23 25 00 HVAC Water Treatment

23 31 00 HVAC Ducts and Casings

23 34 00 HVAC Fans

23 37 00 Air Outlets and Inlets

23 40 00 HVAC Air Cleaning Devices

23 51 00 Breechings, Chimneys and Stacks

23 52 25 Low-Pressure Water Heating Boilers

23 72 00 Air-to-Air Energy Recovery Equipment

23 73 00 Indoor Central - Station Air-Handling Units (ERV – A1, A2 & D2)

23 81 00 Unitary HVAC Equipment

23 81 43 Variable Refrigerant Flow Air-Source Unitary Heat Pumps (VRF)

23 82 00 Convection Heating (Radiators)

23 82 16 Air Coils

23 82 39 Unit Heaters

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations

26 05 21 Low-Voltage Electrical Power Conductors and Cables (600 Volts and Below)

26 05 26 Grounding and Bonding for Electrical Systems

26 05 33 Raceway and Boxes for Electrical Systems

26 05 41 Underground Electrical Construction

26 05 48 Seismic Protection for Electrical Devices

26 05 71 Electrical System Protective Device Study

26 08 00 Commissioning of Electrical Systems

26 09 23 Lighting Controls

26 22 00 Low-Voltage Transformers

26 24 16 Panelboards

26 27 13 Electric Metering

26 27 26 Wiring Devices

26 29 11 Motor Starters

26 29 21 Disconnect Switches

26 41 00 Facility Lightning Protection

26 43 13 Surge Protective Devices

26 51 00 Interior Lighting

00 01 10 - 5

26 56 00 Exterior Lighting

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations

27 05 26 Grounding and Bonding for Communications Systems

27 05 33 Raceways and Boxes for Communications Systems

27 08 00 Commissioning of Communications Systems

27 10 00 Control, Communication and Signal Wiring

27 11 00 Telecommunications Room Fittings

27 15 00 Communications Structured Cabling

27 31 00 Voice Communications Switching and Routing Equipment

27 51 16 Public Address Systems

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security

28 05 26 Grounding and Bonding for Electronic Safety and Security

28 05 28.33 Conduits and Backboxes for Electronic Safety and Security

28 08 00 Commissioning of Electronic Safety and Security Systems

28 10 00 Access Control

28 13 16 Physical Access Control System and Database Management

28 16 00 Intrusion Detection System

28 23 00 Video Surveillance

28 26 00 Electronic Personal Protection System

28 31 00 Fire Detection and Alarm

DIVISION 31 – EARTHWORK

31 20 00 Earth Moving

31 23 19 Dewatering

31 23 23.33 Flowable Fill

31 40 00 Soil Stabilization (Erosion Control)

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements

32 12 16 Asphalt Paving

32 17 23 Pavement Markings

32 30 00 Site Furnishings

32 31 13 Chain Link Fences and Gates

32 82 00 Irrigation Pumps

32 84 00 Planting Irrigation

32 90 00 Planting

00 01 10 - 6

DIVISION 33 – UTILITIES

33 08 00 Commissioning of Site Utility Systems

33 10 00 Water Utilities

33 30 00 Sanitary Sewerage Utilities

33 32 00 Sewage Effluent Pump Station

33 34 00 Septic System

33 40 00 Storm Sewer Utilities

33 46 13 Foundation Drainage

VOLUME 3

APPENDIX "A" – GEOTECHNICAL REPORT

APPENDIX “B” – MEMORANDUM OF AGREEMENT

APPENDIX “C” – AVOIDANCE PLAN LETTER

- - - END - - -

LIST OF DRAWING SHEETS

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed in the table below accompanying this specification form a part of the contract

NO. SHEET NO. SHEET NAME

VOLUME I

GENERAL

1. GI001 COVER SHEET - VOLUME 1

2. GI002 INDEX TO DRAWINGS - VOLUME 1

SURVEY

3. V-100 BOUNDARY SURVEY & TOPOGRAPHIC MAP

4. V-101 BOUNDARY SURVEY & TOPOGRAPHIC MAP

5. V-102 BOUNDARY SURVEY & TOPOGRAPHIC MAP

6. V-103 BOUNDARY SURVEY & TOPOGRAPHIC MAP

7. V-104 BOUNDARY SURVEY & TOPOGRAPHIC MAP

8. V-105 BOUNDARY SURVEY & TOPOGRAPHIC MAP

9. V-106 BOUNDARY SURVEY & TOPOGRAPHIC MAP

10. V-107 BOUNDARY SURVEY & TOPOGRAPHIC MAP

11. V-108 BOUNDARY SURVEY & TOPOGRAPHIC MAP

12. V-109 BOUNDARY SURVEY & TOPOGRAPHIC MAP

13. V-110 BOUNDARY SURVEY & TOPOGRAPHIC MAP

14. V-111 BOUNDARY SURVEY & TOPOGRAPHIC MAP

15. V-112 BOUNDARY SURVEY & TOPOGRAPHIC MAP

16. V-113 BOUNDARY SURVEY & TOPOGRAPHIC MAP

17. V-114 BOUNDARY SURVEY & TOPOGRAPHIC MAP

18. V-115 BOUNDARY SURVEY & TOPOGRAPHIC MAP

19. V-116 BOUNDARY SURVEY & TOPOGRAPHIC MAP

20. V-117 BOUNDARY SURVEY & TOPOGRAPHIC MAP

21. V-118 BOUNDARY SURVEY & TOPOGRAPHIC MAP

22. B-101 SUBSURFACE BORING LOCATION PLAN NORTH

23. B-102 SUBSURFACE BORING LOCATION PLAN SOUTH

SITE/CIVIL

24. GC100 OVERALL SITE DEVELOPMENT PLAN

25. GC101 OVERALL SITE DEVELOPMENT PLAN (ALTERNATES)

26. GC102 OVERALL CONSTRUCTION SEQUENCING PLAN

27. GC103 CONSTRUCTION SEQUENCING PLAN PHASE 1A AREA A

28. GC104 CONSTRUCTION SEQUENCING PLAN PHASE 1A AREA B

29. GC105 CONSTRUCTION SEQUENCING PLAN PHASE 1A AREA C (N.I.C.)

30. GC106 CONSTRUCTION SEQUENCING PLAN PHASE 1B AREA A

31. GC107 CONSTRUCTION SEQUENCING PLAN PHASE 1B AREA B

32. GC108 CONSTRUCTION SEQUENCING PLAN PHASE 1B AREA C (N.I.C.)

33. GC109 CONSTRUCTION SEQUENCING PLAN PHASE 1C AREA A

34. GC110 CONSTRUCTION SEQUENCING PLAN PHASE 1C AREA B

35. GC111 CONSTRUCTION SEQUENCING PLAN PHASE 1C AREA C (N.I.C.)

36. GC120 OVERALL EROSION AND SEDIMENT CONTROL PLAN

37. GC121 EROSION AND SEDIMENT CONTROL PLAN AREA A

38. GC122 EROSION AND SEDIMENT CONTROL PLAN AREA B

39. GC123 EROSION AND SEDIMENT CONTROL PLAN AREA C (N.I.C.)

40. GC501 EROSION AND SEDIMENT CONTROL DETAILS 1

41. GC502 EROSION AND SEDIMENT CONTROL DETAILS 2

42. GC510 TEMPORARY FACILITIES DECKING LAYOUT PLAN ENLARGEMENT 1

43. GC511 TEMPORARY FACILITIES DECKING LAYOUT PLAN ENLARGEMENT 2

44. GC512 TEMPORARY SITE DECKING DETAILS

45. GC520 TEMPORARY TRAILER FACILITIES

46. GC521 TEMPORARY STRUCTURES 1

47. GC522 TEMPORARY STRUCTURES 2

00 01 15 - 2

48. CD100 OVERALL SITE PREPARATION PLAN

49. CD101 SITE PREPARATION PLAN AREA A

50. CD102 SITE PREPARATION PLAN AREA B

51. CD103 SITE PREPARATION PLAN AREA C (N.I.C.)

52. CD104 OVERALL TEMPORARY FACILITIES DEMOLITION PLAN

53. CD105 TEMPORARY FACILITIES DEMOLITION PLAN 1

54. CD106 TEMPORARY FACILITIES DEMOLITION PLAN 2

55. CP100 OVERALL ROADWAY GEOMETRY PLAN

56. CP101 ROADWAY GEOMETRY PLAN AREA 1

57. CP102 ROADWAY GEOMETRY PLAN AREA 2

58. CP103 ROADWAY GEOMETRY PLAN AREA 3

59. CP104 ROADWAY GEOMETRY PLAN AREA 4

60. CP105 ROADWAY GEOMETRY PLAN AREA 5

61. CP106 ROADWAY GEOMETRY PLAN AREA 6

62. CP107 ROADWAY GEOMETRY PLAN AREA 7

63. CP108 ROADWAY GEOMETRY PLAN AREA 8

64. CP109 ROADWAY GEOMETRY PLAN AREA 9 (N.I.C.)

65. CP110 ROADWAY GEOMETRY PLAN AREA 10 (N.I.C.)

66. CP111 ROADWAY GEOMETRY PLAN AREA 11 (N.I.C.)

67. CP201 ROAD PROFILES 1

68. CP202 ROAD PROFILES 2

69. CP203 ROAD PROFILES 3

70. CP204 ROAD PROFILES 4 (N.I.C.)

71. CP205 ROAD PROFILES 5 (N.I.C.)

72. CP301 TYPICAL ROAD CROSS SECTIONS 1

73. CP302 TYPICAL ROAD CROSS SECTIONS 2

74. CP401 HIGHWAY WORK PERMIT GENERAL PLAN 1

75. CP402 HIGHWAY WORK PERMIT GENERAL PLAN 2

76. CP403 HIGHWAY WORK PERMIT GENERAL PLAN 3

77. CP404 HIGHWAY WORK PERMIT WZTC SIGNING PLAN

78. CP405 HIGHWAY WORK PERMIT STANDARD SHEET 1

79. CP406 HIGHWAY WORK PERMIT STANDARD SHEET 2

80. CP407 HIGHWAY WORK PERMIT STANDARD SHEET 3

81. CP408 HIGHWAY WORK PERMIT STANDARD SHEET 4

82. CP409 HIGHWAY WORK PERMIT STANDARD SHEET 5

83. CP410 HIGHWAY WORK PERMIT STANDARD SHEET 6

84. CP411 HIGHWAY WORK PERMIT STANDARD SHEET 7

85. CP412 HIGHWAY WORK PERMIT STANDARD SHEET 8

86. CP413 HIGHWAY WORK PERMIT STANDARD SHEET 9

87. CP414 HIGHWAY WORK PERMIT STANDARD SHEET 10

88. CP415 HIGHWAY WORK PERMIT STANDARD SHEET 11 (N.I.C.)

89. CP416 HIGHWAY WORK PERMIT STANDARD SHEET 12 (N.I.C.)

90. CP501 PAVEMENT DETAILS 1

91. CP502 PAVEMENT DETAILS 2

92. CP503 PAVEMENT DETAILS 3

93. CS100 OVERALL SITE LAYOUT PLAN

94. CS101 SITE LAYOUT PLAN AREA 1

95. CS102 SITE LAYOUT PLAN AREA 2

96. CS103 SITE LAYOUT PLAN AREA 3

97. CS104 SITE LAYOUT PLAN AREA 4

98. CS105 SITE LAYOUT PLAN AREA 5

99. CS106 SITE LAYOUT PLAN AREA 6

100. CS107 SITE LAYOUT PLAN AREA 7

101. CS108 SITE LAYOUT PLAN AREA 8

102. CS109 SITE LAYOUT PLAN AREA 9 (N.I.C.)

103. CS110 SITE LAYOUT PLAN AREA 10 (N.I.C.)

104. CS111 SITE LAYOUT PLAN AREA 11 (N.I.C.)

105. CS112 OVERALL TEMPORARY FACILITIES RESTORATION SITE LAYOUT PLAN

106. CS113 TEMPORARY FACILITIES RESTORATION SITE LAYOUT PLAN 1

107. CS114 TEMPORARY FACILITIES RESTORATION SITE LAYOUT PLAN 2

108. CS401 TEMPORARY FACILITIES SITE PLAN ENLARGEMENT 1

00 01 15 - 3

109. CS402 TEMPORARY FACILITIES SITE PLAN ENLARGEMENT 2

110. CS403 TEMPORARY FACILITIES SITE PLAN ENLARGEMENT 3

111. CS404 TEMPORARY FACILITIES SITE PLAN ENLARGEMENT 4

112. CS405 TEMPORARY FACILITIES SITE PLAN ENLARGEMENT 5

113. CS406 MAIN ENTRANCE SITE PLAN ENLARGEMENT

114. CS407 PIC / ADMINISTRATION AREA SITE PLAN ENLARGEMENT

115. CS408 US FLAG / ASSEMBLY AREA SITE PLAN ENLARGEMENT

116. CS409 COLUMBARIUM SITE PLAN ENLARGEMENT (N.I.C.)

117. CS410 P.O.W./M.I.A. PLAZA SITE AND GRADING PLAN ENLARGEMENT

118. CS411 COMMITTAL SERVICE SHELTER 1 SITE PLAN ENLARGEMENT

119. CS412 COMMITTAL SERVICE SHELTER 2 SITE PLAN ENLARGEMENT (N.I.C.)

120. CS413 MAINTENANCE AREA SITE PLAN ENLARGEMENT (N.I.C.)

121. CS420 GRAVESITE NUMBERING PLAN SECTION 2 (OVERSIZED CRYPTS)

122. CS421 GRAVESITE NUMBERING PLAN SECTION 2 (PRIVATE VAULTS)

123. CS422 GRAVESITE NUMBERING PLAN SECTION 1

124. CS423 GRAVESITE NUMBERING PLAN SECTION 3 (ALTERNATE)

125. CS424 GRAVESITE NUMBERING PLAN SECTION 18 (N.I.C.)

126. CS425 GRAVESITE NUMBERING PLAN SECTION 18 (ALTERNATE) (N.I.C.)

127. CS426 GRAVESITE NUMBERING PLAN SECTION 18 (ALT. CONT.) (N.I.C.)

128. CS427 GRAVESITE NUMBERING PLAN SECTION 9 & 10

129. CS428 GRAVESITE NUMBERING PLAN SECTION 23 (N.I.C.)

130. CS430 ADD ALTERNATE BURIAL SECTION 3 & 18 SITE PLAN ENLARGEMENT

131. CS431 ADD ALTERNATE COLUMBARIUM WALLS 15, 16, 17, & 18 SITE PLAN ENLARGEMENT

(N.I.C.)

132. CS432 ADD ALTERNATE COLUMBARIUM WALLS 13, 14, 19, & 20 SITE PLAN ENLARGEMENT

(N.I.C.)

133. CS433 ADD ALTERNATE MAINTENANCE AREA SITE PLAN ENLARGEMENT (N.I.C.)

134. CS434 ADD ALTERNATE CEMETERY ID FEATURES SITE PLAN ENLARGEMENTS (N.I.C.)

135. CS435 ADD ALTERNATE STONE WALL SITE PLAN ENLARGEMENT (N.I.C.)

136. CS436 ADD ALTERNATE HEADSTONE SUPPORTS SITE PLAN ENLARGEMENT (N.I.C.)

137. CS437 ADD ALTERNATE WIND SCREEN WALL 1 SITE & GRADING PLAN ENLARGEMENT

(N.I.C.)

138. CS438 ADD ALTERNATE WIND SCREEN WALL 2 SITE & GRADING PLAN ENLARGEMENT

(N.I.C.)

139. CG100 OVERALL GRADING & DRAINAGE PLAN

140. CG101 GRADING & DRAINAGE PLAN AREA 1

141. CG102 GRADING & DRAINAGE PLAN AREA 2

142. CG103 GRADING & DRAINAGE PLAN AREA 3

143. CG104 GRADING & DRAINAGE PLAN AREA 4

144. CG105 GRADING & DRAINAGE PLAN AREA 5

145. CG106 GRADING & DRAINAGE PLAN AREA 6

146. CG107 GRADING & DRAINAGE PLAN AREA 7

147. CG108 GRADING & DRAINAGE PLAN AREA 8

148. CG109 GRADING & DRAINAGE PLAN AREA 9 (N.I.C.)

149. CG110 GRADING & DRAINAGE PLAN AREA 10 (N.I.C.)

150. CG111 GRADING & DRAINAGE PLAN AREA 11 (N.I.C.)

151. CG112 OVERALL TEMPORARY FACILITIES GRADING & DRAINAGE RESTORATION PLAN

152. CG113 TEMPORARY FACILITIES GRADING & DRAINAGE RESTORATION PLAN 1

153. CG114 TEMPORARY FACILITIES GRADING & DRAINAGE RESTORATION PLAN 2

154. CG201 STORM SEWER PROFILES 1

155. CG202 STORM SEWER PROFILES 2

156. CG203 STORM SEWER PROFILES 3

157. CG401 MAIN ENTRANCE GRADING PLAN ENLARGEMENT

158. CG402 PIC / ADMINISTRATION AREA GRADING PLAN ENLARGEMENT

159. CG403 US FLAG / ASSEMBLY AREA GRADING PLAN ENLARGEMENT

160. CG404 COLUMBARIUM GRADING PLAN ENLARGEMENT (N.I.C.)

161. CG405 COMMITTAL SERVICE SHELTER 1 GRADING PLAN ENLARGEMENT

162. CG406 COMMITTAL SERVICE SHELTER 2 GRADING PLAN ENLARGEMENT (N.I.C.)

163. CG407 MAINTENANCE AREA GRADING PLAN ENLARGEMENT (N.I.C.)

164. CG410 ADD ALTERNATE BURIAL SECTION 3 & 18 GRADING PLAN ENLARGEMENT

165. CG411 ADD ALTERNATE HONOR GUARD GRADING PLAN ENLARGEMENT

00 01 15 - 4

166. CG412 ADD ALTERNATE COLUMBARIUM WALLS 13, 14, 19, & 20 GRADING PLAN

ENLARGEMENT (N.I.C.)

167. CG413 ADD ALTERNATE CEMETERY ID FEATURES GRADING PLAN ENLARGEMENTS

(N.I.C.)

168. CG501 DRAINAGE DETAILS 1

169. CG502 DRAINAGE DETAILS 2

170. CI100 OVERALL SITE FURNISHINGS PLAN

171. CI101 SITE FURNISHINGS PLAN AREA A

172. CI102 SITE FURNISHINGS PLAN AREA B

173. CI110 OVERALL SITE SIGNAGE PLAN

174. CI111 TEMPORARY SITE SIGNAGE PLAN AREA A

175. CI112 TEMPORARY SITE SIGNAGE PLAN AREA B

176. CI113 SITE SIGNAGE PLAN AREA A

177. CI114 SITE SIGNAGE PLAN AREA B

178. CI115 SITE SIGNAGE PLAN AREA C (N.I.C.)

179. CI501 SITE FURNISHING DETAILS 1

180. CI502 SITE FURNISHING DETAILS 2

181. CI510 GPS DETAILS

182. CI520 FENCING DETAILS 1

183. CI521 FENCING DETAILS 2

184. CI530 TEMPORARY SITE SIGNAGE DETAILS 1

185. CI531 TEMPORARY SITE SIGNAGE DETAILS 2

186. CI540 SITE SIGNAGE DETAILS 1

187. CI541 SITE SIGNAGE DETAILS 2

188. CI542 SITE SIGNAGE DETAILS 3

189. CI601 TEMPORARY SITE SIGNAGE SCHEDULE

190. CI602 SITE SIGNAGE SCHEDULE

191. CI700 COLUMBARIUM NUMBERING PLAN (N.I.C.)

192. CI701 COLUMBARIUM ELEVATIONS 1 (N.I.C.)

193. CI702 COLUMBARIUM ELEVATIONS 2 (N.I.C.)

194. CI703 COLUMBARIUM ELEVATIONS 3 (N.I.C.)

195. CI704 COLUMBARIUM SECTIONS 1 (N.I.C.)

196. CI705 COLUMBARIUM SECTIONS 2 (N.I.C.)

197. CI706 COLUMBARIUM SECTIONS 3 (N.I.C.)

198. CI707 COLUMBARIUM SECTIONS 4 (N.I.C.)

199. CI708 COLUMBARIUM PLAN SECTIONS 1 (N.I.C.)

200. CI709 COLUMBARIUM PLAN SECTIONS 2 (N.I.C.)

201. CI710 COLUMBARIUM DETAILS (N.I.C.)

202. CI711 COLUMBARIUM STONE DETAILS 1 (N.I.C.)

203. CI712 COLUMBARIUM STONE DETAILS 2 (N.I.C.)

204. CI713 COLUMBARIUM STONE DETAILS 3 (N.I.C.)

205. CI714 COLUMBARIUM STONE DETAILS 4 (N.I.C.)

206. CI715 COLUMBARIUM STONE DETAILS 5 (N.I.C.)

207. CI716 COLUMBARIUM STONE DETAILS 6 (N.I.C.)

208. CI717 COLUMBARIUM STONE DETAILS 7 (N.I.C.)

209. CI718 COLUMBARIUM STONE DETAILS 8 (N.I.C.)

210. CI719 COLUMBARIUM CAP DETAILS 1 (N.I.C.)

211. CI720 COLUMBARIUM CAP DETAILS 2 (N.I.C.)

212. CI721 COLUMBARIUM CAP DETAILS 3 (N.I.C.)

213. CI722 COLUMBARIUM CAP DETAILS 4 (N.I.C.)

214. CI723 COLUMBARIUM CAP DETAILS 5 (N.I.C.)

215. CI724 COLUMBARIUM OVERLOOK RAILING DETAILS 1 (N.I.C.)

216. CI725 COLUMBARIUM OVERLOOK RAILING DETAILS 2 (N.I.C.)

217. CI726 COLUMBARIUM STEP DETAILS 1 (N.I.C.)

218. CI727 COLUMBARIUM STEP DETAILS 2 (N.I.C.)

219. CI730 COLUMBARIUM STEP HANDRAIL ELEVATIONS (N.I.C.)

220. CI731 COLUMBARIUM RAMP HANDRAIL ELEVATIONS 1 (N.I.C.)

221. CI732 COLUMBARIUM RAMP HANDRAIL ELEVATIONS 2 (N.I.C.)

222. CI740 MEMORIAL WALL NUMBERING PLAN (N.I.C.)

223. CI741 MEMORIAL WALL ELEVATIONS (N.I.C.)

224. CI742 MEMORIAL WALL SECTIONS (N.I.C.)

00 01 15 - 5

225. CI743 MEMORIAL WALL DETAILS 1 (N.I.C.)

226. CI744 MEMORIAL WALL DETAILS 2 (N.I.C.)

227. CI745 MEMORIAL WALL DETAILS 3 (N.I.C.)

228. CI746 MEMORIAL WALL DETAILS 4 (N.I.C.)

229. CI750 OSSUARY DETAILS 1 (N.I.C.)

230. CI751 OSSUARY DETAILS 2 (N.I.C.)

231. CI752 OSSUARY DETAILS 3 (N.I.C.)

232. CI753 OSSUARY DETAILS 4 (N.I.C.)

233. CI760 ENTRY WALL ELEVATIONS 1

234. CI761 ENTRY WALL ELEVATIONS 2

235. CI762 ENTRY WALL SECTIONS 1

236. CI763 ENTRY WALL SECTIONS 2

237. CI764 ENTRY WALL PLAN SECTIONS 1

238. CI765 ENTRY WALL PLAN SECTIONS 2

239. CI766 ENTRY WALL STONE DETAILS

240. CI767 ENTRY WALL CAP DETAILS 1

241. CI768 ENTRY WALL CAP DETAILS 2

242. CI769 ENTRY GATE DETAILS

243. CI770 ASSEMBLY AREA ELEVATIONS 1

244. CI771 ASSEMBLY AREA ELEVATIONS 2

245. CI772 ASSEMBLY AREA WALL AND STEP DETAILS 1

246. CI773 ASSEMBLY AREA WALL AND STEP DETAILS 2

247. CI774 ASSEMBLY AREA STEP DETAILS

248. CI775 ASSEMBLY AREA CAP DETAILS 1

249. CI776 ASSEMBLY AREA HANDRAIL DETAILS

250. CI780 CEMETERY I.D. FEATURE AT I-90 ELEVATIONS (N.I.C.)

251. CI781 CEMETERY I.D. FEATURE AT I-90 SECTION (N.I.C.)

252. CI782 CEMETERY I.D. FEATURE AT INDIAN FALLS ROAD ELEVATIONS (N.I.C.)

253. CI783 CEMETERY I.D. FEATURE AT INDIAN FALLS ROAD SECTIONS (N.I.C.)

254. CI784 CEMETERY I.D. FEATURE AT INDIAN FALLS ROAD DETAILS 1 (N.I.C.)

255. CI785 CEMETERY I.D. FEATURE AT INDIAN FALLS ROAD DETAILS 2 (N.I.C.)

256. CI790 COMMITTAL SERVICE SHELTER WIND SCREEN WALL ELEVATIONS 1

257. CI791 COMMITTAL SERVICE SHELTER WIND SCREEN WALL ELEVATIONS 2 (N.I.C.)

258. CI792 COMMITTAL SERVICE SHELTER WIND SCREEN WALL ELEVATIONS 1 ADD ALT.

(N.I.C.)

259. CI793 COMMITTAL SERVICE SHELTER WIND SCREEN WALL ELEVATIONS 2 ADD ALT.

(N.I.C.)

260. CI794 COMMITTAL SERVICE SHELTER WIND SCREEN WALL DETAILS

261. CI800 CRYPT INSTALLATION DETAILS

262. CI801 GRAVESITE DETAILS

263. CI802 OVERSIZED CRYPT INSTALLATION DETAILS

264. CU100 OVERALL SITE UTILITY PLAN

265. CU101 SITE UTILITY PLAN AREA A

266. CU102 SITE UTILITY PLAN AREA B

267. CU103 SITE UTILITY PLAN AREA C (N.I.C.)

268. CU201 WASTEWATER PROFILES

269. CU210 WATER LINE PROFILES 1 (N.I.C.)

270. CU211 WATER LINE PROFILES 2

271. CU212 WATER LINE PROFILES 3

272. CU501 SITE UTILITY DETAILS 1

273. CU502 SITE UTILITY DETAILS 2

274. CU503 SITE UTILITY DETAILS 3

275. CU504 SITE UTILITY DETAILS 4

276. CU505 SITE UTILITY DETAILS 5

277. LP100 OVERALL PLANTING PLAN

278. LP101 PLANTING PLAN AREA 1

279. LP102 PLANTING PLAN AREA 2

280. LP103 PLANTING PLAN AREA 3

281. LP104 PLANTING PLAN AREA 4

282. LP105 PLANTING PLAN AREA 5

283. LP106 PLANTING PLAN AREA 6

00 01 15 - 6

284. LP107 PLANTING PLAN AREA 7

285. LP108 PLANTING PLAN AREA 8

286. LP109 PLANTING PLAN AREA 9 (N.I.C.)

287. LP110 PLANTING PLAN AREA 10 (N.I.C.)

288. LP111 PLANTING PLAN AREA 11 (N.I.C.)

289. LP112 OVERALL TEMPORARY FACILITIES RESTORATION PLANTING PLAN

290. LP113 TEMPORARY FACILITIES RESTORATION PLANTING PLAN 1

291. LP114 TEMPORARY FACILITIES RESTORATION PLANTING PLAN 2

292. LP120 OVERALL ADD ALTERNATE PLANTING PLAN

293. LP401 MAIN ENTRANCE PLANTING PLAN ENLARGEMENT

294. LP402 PIC / ADMINISTRATION AREA PLANTING PLAN ENLARGEMENT

295. LP403 US FLAG / ASSEMBLY AREA PLANTING PLAN ENLARGEMENT

296. LP404 COLUMBARIUM PLANTING PLAN ENLARGEMENT (N.I.C.)

297. LP405 P.O.W./M.I.A. PLAZA PLANTING PLAN ENLARGEMENT

298. LP406 COMMITTAL SERVICE SHELTER 1 PLANTING PLAN ENLARGEMENT

299. LP407 COMMITTAL SERVICE SHELTER 2 PLANTING PLAN ENLARGEMENT (N.I.C.)

300. LP408 ADD ALTERNATE BURIAL SECTION 3 & 18 PLANTING PLAN ENLARGEMENT

301. LP409 ADD ALTERNATE COLUMBARIUM WALLS 15, 16, 17, & 18 PLANTING PLAN

ENLARGEMENT (N.I.C.)

302. LP410 ADD ALTERNATE COLUMBARIUM WALLS 13, 14, 19, & 20 PLANTING PLAN

ENLARGEMENT (N.I.C.)

303. LP411 ADD ALTERNATE CEMETERY ID FEATURE PLANTING PLAN ENLARGEMENT 1

(N.I.C.)

304. LP412 ADD ALTERNATE CEMETERY ID FEATURE PLANTING PLAN ENLARGEMENT 2

(N.I.C.)

305. LP501 PLANTING DETAILS 1

306. LP502 PLANTING DETAILS 2

307. LP601 PLANTING SCHEDULE (BASE BID)

IRRIGATION

308. LI100 IRRIGATION NOTES AND LEGEND

309. LI101 OVERALL IRRIGATION PLAN

310. LI102 IRRIGATION PLAN

311. LI103 IRRIGATION PLAN

312. LI104 IRRIGATION PLAN

313. LI105 IRRIGATION PLAN

314. LI106 IRRIGATION PLAN

315. LI107 IRRIGATION PLAN

316. LI108 IRRIGATION PLAN

317. LI109 IRRIGATION PLAN

318. LI110 IRRIGATION PLAN (N.I.C.)

319. LI111 IRRIGATION PLAN (N.I.C.)

320. LI112 IRRIGATION PLAN (N.I.C.)

321. LI113 IRRIGATION PLAN TEMPORARY FACILITIES

322. LI500 IRRIGATION DETAILS

323. LI501 IRRIGATION DETAILS

324. LI502 IRRIGATION DETAILS

325. LI503 IRRIGATION DETAILS

326. LI504 IRRIGATION BOOSTER PUMP & BACKFLOW

VOLUME II

GENERAL

327. GI003 COVER SHEET - VOLUME 2

328. GI004 INDEX TO DRAWINGS - VOLUME 2

STRUCTURAL

329. S-001 STRUCTURAL NOTES

330. SB101 PIC / ADMINISTRATION BUILDING FOUNDATION PLAN

331. SB102 MAINTENANCE BUILDING FOUNDATION PLAN (N.I.C.)

00 01 15 - 7

332. SB103 COMMITTAL SERV. SHELTER, HONOR GUARD, MAT. STORAGE BIN, & POLE BARN

FOUNDATION PLAN

333. SB104 PIC / ADMINISTRATION BUILDING SLAB PLAN

334. SB105 MAINTENANCE BUILDING SLAB PLAN (N.I.C.)

335. SB106 MAINTENANCE BUILDING MEZZANINE SLAB PLAN (N.I.C.)

336. SB107 COMMITTAL SERV. SHELTER, HONOR GUARD, MAT. STORAGE BIN, & POLE BARN

SLAB PLAN

337. SF101 PIC / ADMINISTRATION BUILDING FRAMING PLAN

338. SF102 PIC / ADMINISTRATION BUILDING FRAMING PLAN

339. SF103 MAINTENANCE BUILDING FRAMING PLAN (N.I.C.)

340. SF104 MAINTENANCE BUILDING MEZZANINE FRAMING PLAN (N.I.C.)

341. SF105 MAINTENANCE BUILDING FRAMING PLAN (N.I.C.)

342. SF106 COMMITTAL SERV. SHELTER, HONOR GUARD, MAT. STORAGE BIN, & POLE BARN

FRAMING PLAN

343. SF107 COMMITTAL SERV. SHELTER, HONOR GUARD, MAT. STORAGE BIN, & POLE BARN

FRAMING PLAN

344. SF301 STRUCTURAL SECTIONS

345. SF302 STRUCTURAL SECTIONS (N.I.C.)

346. SF303 STRUCTURAL SECTIONS

347. SF304 STRUCTURAL SECTIONS

348. SF501 STRUCTURAL DETAILS

349. SF502 STRUCTURAL DETAILS

350. SF503 STRUCTURAL DETAILS

351. SF504 STRUCTURAL DETAILS

352. SS501 SITE STRUCTURAL DETAILS

353. SS502 SITE STRUCTURAL DETAILS

354. SS503 SITE STRUCTURAL DETAILS

ARCHITECTURAL

355. A-101 ADMINISTRATION BUILDING CODE COMPLIANCE PLAN

356. A-103 MAINTENANCE BUILDING CODE COMPLIANCE PLAN (N.I.C.)

357. A-104 HONOR GUARD BUILDING CODE COMPLIANCE PLAN

358. AE001 SYMBOLS & ABBREVIATIONS

359. AE101 PIC / ADMINISTRATION BUILDING FLOOR PLAN

360. AE102 COMMITTAL SERVICE SHELTER FLOOR PLAN, ROOF PLAN AND ELEVATIONS

361. AE103 MAINTENANCE BUILDING FIRST FLOOR / MEZZANINE PLAN AND ROOF PLAN

(N.I.C.)

362. AE104 HONOR GUARD BUILDING FLOOR PLAN, ROOF PLAN AND ELEVATIONS

363. AE105 COVERED MATERIALS STORAGE BINS FLOOR PLAN, EXTERIOR ELEVATIONS AND

SECTION (N.I.C.)

364. AE106 POLE BARN, FLOOR PLAN, EXTERIOR ELEVATIONS AND SECTION (N.I.C.)

365. AE121 PIC / ADMINISTRATION BUILDING REFLECTED CEILING PLAN

366. AE122 COMMITTAL SERVICE SHELTER REFLECTED CEILING PLAN AND CEILING DETAILS

367. AE123 MAINTENANCE BUILDING REFLECTED CEILING PLANS (N.I.C.)

368. AE124 HONOR GUARD BUILDING REFLECTED CEILING PLAN

369. AE151 PIC / ADMINISTRATION BUILDING ROOF PLAN

370. AE152 POLE BARN ROOF PLAN (N.I.C.)

371. AE201 PIC / ADMINISTRATION BUILDING EXTERIOR ELEVATION

372. AE202 PIC / ADMINISTRATION BUILDING EXTERIOR ELEVATIONS

373. AE204 MAINTENANCE BUILDING EXTERIOR ELEVATIONS (N.I.C.)

374. AE301 PIC / ADMINISTRATION BUILDING SECTIONS

375. AE302 COMMITTAL SERVICE SHELTER BUILDING SECTIONS

376. AE303 MAINTENANCE BUILDING SECTIONS AND MISCELLANEOUS DETAILS (N.I.C.)

377. AE304 HONOR GUARD BUILDING SECTIONS

378. AE311 EXTERIOR WALL SECTIONS (N.I.C.)

379. AE312 EXTERIOR WALL SECTIONS

380. AE313 EXTERIOR WALL SECTIONS

381. AE401 MAINTENANCE BUILDING PARTIAL FIRST FLOOR PLAN AND STAIR SECTIONS

(N.I.C.)

382. AE402 ENLARGED FLOOR PLANS

383. AE501 ENLARGED DETAILS

00 01 15 - 8

384. AE502 ENLARGED DETAILS

385. AE503 ENLARGED DETAILS

386. AE601 PARTITION TYPES

387. AE602 WINDOW / DOOR OPENING SCHEDULE

388. AI201 INTERIOR ELEVATIONS

389. AI501 INTERIOR DETAILS

390. AF601 COLOR LEGEND AND ROOM FINISH SCHEDULE

391. AG101 PIC / ADMINISTRATION BUILDING SIGNAGE PLAN

392. AG102 MAINTENANCE BUILDING SIGNAGE PLAN (N.I.C.)

393. AG103 HONOR GUARD BUILDING SIGNAGE PLAN

PLUMBING

394. P-101 PLUMBING PLANS - ADMIN BLDG

395. P-102 PLUMBING PLANS - MAINTENANCE BLDG (N.I.C.)

396. P-103 PLUMBING PLANS - HONOR GUARD BLDG AND COMMITTAL SERVICE SHELTERS

397. P-201 PLUMBING DETAILS AND SCHEDULES

398. P-901 ADMIN/PIC BLDG - PLUMBING RISER DIAGRAMS

399. P-902 MAINTENANCE BLDG - SANITARY SEWER RISER DIAGRAM (N.I.C.)

400. P-903 MAINTENANCE BLDG - DOMESTIC WATER RISER DIAGRAM (N.I.C.)

401. P-904 HONOR GUARD BLDG - PLUMBING RISER DIAGRAMS

402. P-905 PROPANE AND AIR COMPRESSOR PIPING RISER DIAGRAMS

MECHANICAL

403. M-001 SYMBOLS, ABBREVIATIONS AND GENERAL NOTES

404. MH101 LEVEL ONE - HVAC DUCTWORK PLANS

405. MH301 ENLARGED DUCTWORK PLANS AND SECTIONS

406. MH501 DUCTWORK DETAILS

407. MH601 SCHEDULES

408. MP101 LEVEL ONE - HVAC PIPING PLANS

409. MP301 ENLARGED HVAC PIPING PLANS AND SECTIONS

410. MP501 PIPING DETAILS

411. MP502 PIPING DETAILS

412. MI601 FLOW AND CONTROL DIAGRAMS

413. MI602 FLOW AND CONTROL DIAGRAMS

414. MI603 FLOW AND CONTROL DIAGRAMS

ELECTRICAL

415. E-001 ELECTRICAL SYMBOLS & ABBREVIATIONS

416. ES101 ELECTRICAL SITE PLAN AREA A

417. ES102 ELECTRICAL SITE PLAN AREA B

418. ES103 ELECTRICAL SITE PLAN AREA C (N.I.C.)

419. EL101 LIGHTING FLOOR PLANS

420. EL102 LIGHTING FLOOR PLANS (N.I.C.)

421. EP101 POWER FLOOR PLANS

422. EP102 POWER FLOOR PLANS (N.I.C.)

423. E-501 ELECTRICAL DETAILS

424. E-601 POWER RISER DIAGRAMS

425. E-602 LIGHTING SCHEDULES

426. E-603 ELECTRICAL PANEL SCHEDULES

427. E-604 ELECTRICAL PANEL SCHEDULES

428. E-605 ELECTRICAL PANEL SCHEDULES (N.I.C.)

TELECOMMUNICATIONS

429. T-001 TELECOMMUNICATIONS LEGENDS, SYMBOLS & ABBREVIATIONS

430. TA101 AUDIO VISUAL FLOOR PLAN

431. TA501 AUDIO VISUAL DETAILS

432. TN101 TELECOMMUNICATIONS SITE PLAN AREA A

433. TN102 TELECOMMUNICATIONS SITE PLAN AREA B

434. TN103 TELECOMMUNICATIONS SITE PLAN AREA C (N.I.C.)

435. TN104 TELECOMMUNICATIONS PLAN

436. TN401 TELECOMMUNICATIONS ENLARGED PLANS

437. TN501 TELECOMMUNICATIONS DETAILS

00 01 15 - 9

438. TN601 TELECOMMUNICATIONS BACKBONE DISTRIBUTION RISER

439. TY101 SECURITY SITE PLAN AREA A

440. TY102 SECURITY SITE PLAN AREA B

441. TY103 SECURITY SITE PLAN AREA C (N.I.C.)

442. TY104 SECURITY FLOOR PLAN

443. TY501 SECURITY DETAILS

444. TY502 SECURITY DETAILS

445. FA101 LEVEL ONE - FIRE ALARM PLANS

446. FA102 FIRE ALARM RISER DIAGRAM

447. FP101 LEVEL ONE - FIRE PROTECTION PLANS

- - - END - - -

00 01 15 - 10

THIS PAGE INTENTIONALLY LEFT BLANK

GENERAL REQUIREMENTS - TOC

01 00 01 - i

SECTION 01 00 01

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION SECURITY REQUIREMENTS

1.5 FIRE SAFETY

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS (NIC)

1.8 ENVIRONMENTAL CONTROLS

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING CULTURAL RESOURCES, VEGETATION, STRUCTURES,

EQUIPMENT, UTILITIES, AND IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA

1.13 PROFESSIONAL SURVEYING SERVICES

1.14 LAYOUT OF WORK

1.15 AS-BUILT DRAWINGS (PRINT AND ELECTRONIC)

1.16 USE OF ROADWAYS

1.17 RE/COR'S FIELD OFFICE

1.18 TRAILER FACILITIES

1.19 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.20 TEMPORARY TOILETS

1.21 EARLY TURNOVER COMMITTAL SERVICE SHELTER

1.22 AVAILABILITY AND USE OF UTILITY SERVICES

1.23 NEW COMMUNICATIONS EQUIPMENT

1.24 TESTS

1.25 INSTRUCTIONS

GENERAL REQUIREMENTS - TOC

01 00 01 - ii

1.26 GOVERNMENT-FURNISHED PROPERTY

1.27 RELOCATED ITEMS (NIC)

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.30 CONSTRUCTION DIGITAL IMAGES

1.31 FINAL ELEVATION DIGITAL IMAGES

1.32 HISTORIC PRESERVATION

1.33 PROJECT HEALTH AND SAFETY PLAN

1.34 PROJECT SUSTAINABILITY GOALS

1.35 PORTABLE REFUELING SYSTEM

1.36 VA TRIRIGA CPMS

WESTERN NEW YORK NATIONAL CEMETERY PROJECT NO. 936CM2002

PHASE IA DEVELOPMENT 03-15-19

BID DOCUMENTS

GENERAL REQUIREMENTS

01 00 01 - 1

SECTION 01 00 01

1.1 GENERAL INTENTION

A. Completely prepare site for building operations, including demolition and removal of existing structures, and furnish all work, including, but not limited to: labor, materials, manpower, tools and equipment required to perform the construction of the Western New York National

Cemetery, as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the Cemetery Director.

C. Offices of The LA Group, P.C., Landscape Architecture & Engineering Co., as

Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by the Resident

Engineer/duly authorized Contracting Officer Representative (RE/COR).

D. All Testing Laboratory services will be retained and paid for by the Contractor (see Spec.

Section 01 45 29 Testing Laboratory Services). However, the Department of Veterans Affairs may elect to retain its own Testing Laboratory for any purpose. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans

Affairs, the notify the RE/COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.

Such prior notice shall not be less than three working days unless otherwise designated by the RE/COR.

E. All employees of general contractor and subcontractors shall comply with VA security management program.

F. Prior to commencing work, general contractor shall provide proof that an OSHA certified

“competent person” (CP) as defined in 29 CFR 1926.20(b)(2) will maintain a presence at the work site whenever the general contractor or subcontractors are present.

G. Training:

1. All employees of general contractor or subcontractors having supervisory responsibilities shall have the 30-hour OSHA certified Construction Safety course and/or other relevant competency training, as determined by VA CP.

2. All other employees of general contractor or subcontractors shall have the 10-hour OSHA certified Construction Safety course and/or other relevant competency training. Relevant competency training shall be as determined acceptable by the VA CP.

3. Submit training records of all such employees for approval before the start of work.

1.2 STATEMENT OF BID ITEM(S)

A. CLIN 001 - BASE BID: The total performance period for the Base Bid Item is 900 calendar days from Notice to Proceed. By the end of the performance period, all work

BID DOCUMENTS

01 00 01 - 2 shall be satisfactorily completed and ready for custody transfer and acceptance by NCA, all punch list items shall be satisfactorily addressed, all commissioning completed, and all training accomplished. The Base Bid work of the Contract includes phased construction requirements. These phases are referred to as Phase 1A Early Turn Over (ETO), Phase 1A

Remainder and Phase 1A Restoration. The Phase 1A ETO work shall be completed within the established time frame indicated in the Contract. Completion of the Phase 1A ETO work will follow procedures similar to those for final completion and acceptance; with the facilities within the Phase 1A ETO being completed and turned over to the Cemetery for use to begin operation of the Cemetery while the remaining work is completed. Phase 1A ETO shall be complete and accepted by NCA for operation within 480 calendar days from Notice to

Proceed. Phase 1A ETO requires the Contractor to perform work and provide facilities that will be of a temporary nature, being replaced with permanent facilities prior to the overall project completion. While the Phase 1A ETO work is being performed, work for the Phase

1A Remainder portion of the project can also be performed. Because of the specific requirements for the Phase 1A (ETO) work, to be completed well ahead of the final project completion, the overall work is going to require coordination. Work sequencing is going to be a critical component of the overall project. The Contract Plans and Specifications have been created with these conditions in mind. There are specific requirements identified throughout these documents that are intended to facilitate the Contractor and the government staff overseeing the project to ensure a successful progression through the project, while meeting the performance milestones and allowing the NCA to begin serving the area veterans as intended. The general scope of the project construction will include work from many trades as specifically needed to create a new National Cemetery from generally vacant (previously farmed) parcels of land into a shrine to our Veterans. The new Cemetery will generally contain all of the various types of interment facilities found at National Cemeteries, as well as the roads, infrastructure, buildings, aesthetic elements, and landscaping that are required to create and operate a National Cemetery meeting the intended shrine status for the facilities being constructed to serve the area Veterans, their families and friends.

B. CLIN 002 – Manufacture, deliver, off-load and store 1,200 pre-placed double-depth crypts and 650 oversized pre-placed double-depth crypts.

C. CLIN 003 – BID ALTERNATE NO. 1 (ADD): Install Honor Guard Building (with appurtenances) and associated sitework.

D. CLIN 004 – BID ALTERNATE NO. 2 (ADD): Install 972 pre-placed crypts and associated sitework.

E. CLIN 005 - BID ALTERNATE NO. 3 (ADD): Manufacture, deliver, off-load and store 972 pre-placed double-depth crypts.

BID DOCUMENTS

01 00 01 - 3

F. CLIN 006 - BID ALTERNATE NO. 4 (ADD): Install fully functional GIS/GPS system, and collect, organize, store and display all Geo-Data as specified herein for this project.

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. AFTER AWARD OF CONTRACT, three (3) full-sized hardcopy drawing sets and three (3) hardcopy sets of specifications will be furnished as well as an electronic (pdf) set of plans and specifications.

B. Additional sets of drawings may be made by the Contractor, at Contractor's expense.

1.4 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. Assure that all sub-contractors working on the project and their employees also comply with these regulations. Dismissal of violators may be directed by the RE/COR.

B. Security Procedures:

1. Contractor’s employees shall not enter the project site without an appropriate badge.

They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, give 3 days' notice to the RE/COR so that security arrangements can be made for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the RE/COR.

4. VA reserves the right to close down or shut down the project site and order Contractor’s employees off the premises in the event of a national emergency. Return to the site only with the written approval of the RE/COR.

C. Guards:

1. Provide unarmed guards at the project site, if deemed necessary because of vandalism or theft within the contract work areas.

2. Secure the project site, work in progress, materials, tools, equipment and any other materials within the project site that are not under operational control of the Cemetery staff. The use of guards is a Contractor responsibility, if deemed necessary because of ongoing theft and/or vandalism within the project work area. Coordinate the use of guards with the RE following input from the Cemetery Operations through the RE. Any guards provided shall be able to communicate with the local police.

D. Key Control:

1. Provide duplicate keys and lock combinations to the RE/COR for the purpose of security inspections of every area of project including tool boxes and parked machines and to take any emergency action(s).

BID DOCUMENTS

01 00 01 - 4

2. Turn over all permanent lock cylinders to the VA locksmith for permanent installation.

Coordinate the lock cylinder and key system work and shall provide the devices required to comply with the facility security system, as approved by the RE/COR. See Section 08

71 00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, submit an electronic security memorandum, from the Contractor and each Subcontractor describing the actions to be performed to achieve the goals of maintaining confidentiality of “sensitive information”.

2. Perform safekeeping procedures for all drawings, project manual and other project information. This information from these shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law

Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the RE/COR upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of the RE/COR.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify RE/COR immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in a specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

1.5 FIRE SAFETY

A. Applicable Publications: Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by the basic designation only. Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified.

BID DOCUMENTS

01 00 01 - 5

1. American Society for Testing and Materials (ASTM):

E84-2013 Surface Burning Characteristics of Building Materials

2. National Fire Protection Association (NFPA):

10-2013 Standard for Portable Fire Extinguishers

30-2012 Flammable and Combustible Liquids Code

51B-2014 Standard for Fire Prevention During Welding, Cutting and

Other Hot Work

70-2011 National Electrical Code

241-2013 Standard for Safeguarding Construction, Alteration, and

Demolition Operations

3. Occupational Safety and Health Administration (OSHA):

29 CFR 1926 Safety and Health Regulations for Construction

B. Fire Safety Plan: Establish and maintain a fire protection program in accordance with 29 CFR

1926. Prior to start of work, prepare a plan detailing project-specific fire safety measures, including periodic status reports, and submit to RE/COR/Cemetery Director for review for compliance with contract requirements in accordance with Section 01 33 23, SHOP

DRAWINGS, PRODUCT DATA AND SAMPLES. Prior to any worker for the contractor or subcontractor’s beginning work, they shall undergo a safety briefing provided by the

Contractor’s competent person per OSHA requirements. This briefing shall include information on the construction limits, safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of NCA equipment, etc. Documentation shall be provided to the RE/COR that individuals have undergone the Contractor’s safety briefing.

C. Site and Building Access: Maintain free and unobstructed access to emergency services and for fire, police and other emergency response forces in accordance with NFPA 241.

D. Separate temporary facilities, such as trailers, storage sheds, and dumpsters, from existing buildings and new construction by distances in accordance with NFPA 241. For small facilities with less than 20 feet exposing overall length, separate by 10 feet.

E. Temporary Construction Partitions (NIC)

F. Temporary Heating and Electrical: Install, use and maintain installations in accordance with

29 CFR 1926, NFPA 241 and NFPA 70.

G. Means of Egress: Do not block exiting for occupied buildings, including paths from exits to roads. Minimize disruptions and coordinate with RE/COR/Cemetery Director.

H. Egress Routes for Construction Workers: Maintain free and unobstructed egress. Inspect daily. Report findings and corrective actions weekly to RE/COR.

I. Fire Extinguishers: Provide and maintain extinguishers in construction areas and temporary storage areas in accordance with 29 CFR 1926, NFPA 241 and NFPA 10.

BID DOCUMENTS

01 00 01 - 6

J. Flammable and Combustible Liquids: Store, dispense and use liquids in accordance with 29

CFR 1926, NFPA 241 and NFPA 30.

K. (NIC)

L. Smoke Detectors: Prevent accidental operation. Remove temporary covers at end of work operations each day. Coordinate with RE/COR.

M. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and

NFPA 51B. Coordinate with RE/COR. Obtain permits from RE/COR at least 24 hours in advance. Designate the Contractor's responsible project-site fire prevention program manager to permit hot work.

N. Fire Hazard Prevention and Safety Inspections: Inspect entire construction areas weekly.

Coordinate with, and report findings and corrective actions weekly to RE/COR.

O. Smoking: Smoking is prohibited in and adjacent to construction areas inside existing buildings and additions under construction. In separate and detached buildings under construction, smoking is prohibited except in designated smoking rest areas.

P. Dispose of waste and debris in accordance with NFPA 241 and Construction Waste

Management Plan required under Section 01 74 19, CONSTRUCTION WASTE

MANAGEMENT. Remove from buildings daily.

Q. Perform other construction, alteration and demolition operations in accordance with 29 CFR

1926.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the RE/COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage trailers, office trailers) and utilities may be erected by the

Contractor only with the approval of the RE/COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the RE/COR, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the RE/COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the RE/COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall

BID DOCUMENTS

01 00 01 - 7 repair or pay for the repair of any damaged curbs, sidewalks, or roads. Paragraphs 1.6.A thru 1.6.C are from (FAR 52.236-10)

D. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the

Contractor.

E. Working space and space available for storing materials shall be as shown on the drawings and/or as determined by the RE/COR.

F. Workmen are subject to rules of the Cemetery regarding their conduct and dress code.

G. Execute work so as to interfere as little as possible with normal functioning of Cemetery as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others.

1. Do not store materials and equipment in other than assigned areas.

2. Where access by Cemetery personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements. All such actions shall be coordinated with the Utility Company involved and the RE/COR.

H. Phasing: To insure such executions, furnish the RE/COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, notify the RE/COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof.

Arrange such dates to insure accomplishment of this work in phases as is mutually agreeable to the Cemetery Director, RE/COR and Contractor. Before construction operations begin, the

Contractor shall provide a chain link construction fence, seven feet minimum height, around the construction area indicated on the drawings. The construction fence shall be provided with materials to produce a visual barrier to the public from the adjoining properties into the

Contractor work areas. The visual barrier shall allow for the wind to flow through, without causing the fence to bend or fall over. Provide submittals of the proposed construction fence system for review and approval by the RE/COR following discussion with the Cemetery

Operations. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 15 inches. Bottom of fences shall extend to one inch above grade. Remove the fence when directed by RE/COR. More specific information regarding the temporary fencing located elsewhere in these documents shall take precedence.

NOTE: The contractor is responsible for performing regular grass trimming/weed control around the construction fence when the fence is adjacent to existing

BID DOCUMENTS

01 00 01 - 8 landscaped areas and/or burial sections. The trimming shall be performed as often as the lawn adjoining the fence is cut by the Cemetery. The Contractor trimming shall be from where the Cemetery mowing ended to the fence and shall be at the same height as the grass was mowed. Contractor shall also water and mow any other areas outside of the temporary fence between the fence and closest hardscape surface to keep the areas neat and keep weeds down. Contractor shall maintain the areas inside of the fences so they do not become unsightly.

This is the start of the file's text. The full file is on GovTribe.