NCOTA_Phase_III_Development_-_935PC2006_-_Package_B_Bid_Documents_-_Part_1_Pages_1-18.pdf

PDF 13 MB Posted

Attached to
National Cemetery of the Alleghenies Phase 3 Gravesite Development
Solicitation number
36C10F18R0651
Issued by

About this file

NCOTA_Phase_III_Development_-_935PC2006_-_Package_B_Bid_Documents_-_Part_1_Pages_1-18.pdf

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

148 S Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

GI001

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

IN ACCORDANCE WITH PENNSYLVANIA STATE

LAW, THE CONTRACTOR SHALL CONTACT PA

ONE CALL (1-800-242-1776) AT LEAST THREE (3)

BUSINESS DAYS PRIOR TO EXCAVATION.

1-800-242-1776

Irrigation Design & Consulting 1230 Shadowbrooke Drive Dover, Pennsylvania 17315

717.491.1806 www.kovachdesignsolutions.com

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business www.miller-remick.com p lan n in g + la nds cap e a rch i tecture

712 Congress Avenue, Suite 300 Austin, Texas 78701

(512) 480-0032

1199 N. FAIRFAX STREET

SUITE 100

PH. 703-548-6699

ALEXANDRIA, VIRGINIA 22314

THE ONYX GROUP

WWW.ONYXGROUP.COM

MODJESKI AND MASTERS, INC.

100 STERLING PARKWAY, SUITE 302

MECHANICSBURG, PA 17050

www.modjeski.com

PHASE III DEVELOPMENT

PACKAGE "B" MORGAN ROAD BRIDGE CROSSING

PROJECT NUMBER 935 PC 2006

BID DOCUMENTS

DEPARTMENT OF

VETERANS AFFAIRS

NATIONAL CEMETERY OF THE ALLEGHENIES

CECIL TOWNSHIP

WASHINGTON COUNTY, PENNSYLVANIA

COVER SHEET

DRAWING INDEX

1. GI001 COVER SHEET

2. GI002 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

SITE/CIVIL

3. VL100 EXISTING CONDITIONS PLAN

4. BI100 SUBSURFACE BORING LOCATION PLAN

5. GI100 OVERALL SITE DEVELOPMENT PLAN

6. GC600 CONSTRUCTION SEQUENCING PLAN

7. CD101 SITE PREPARATION PLAN

8. GC101 PHASE I EROSION AND SEDIMENT CONTROL PLAN

9. GC201 PHASE II EROSION AND SEDIMENT CONTROL PLAN

10. GC501 EROSION AND SEDIMENT CONTROL DETAILS

11. GC001 EROSION AND SEDIMENT CONTROL NOTES

12. CS101 SITE LAYOUT PLAN

13. CG101 GRADING AND DRAINAGE PLAN

14. CS102 BRIDGE CROSSING AREA DETAIL

15. CT201 ROADWAY CENTERLINE PROFILE

16. CT501 ROADWAY CROSS SECTIONS & DETAILS

17. CT502 ROADWAY CROSS SECTIONS & DETAILS

18. CU261 STORM PROFILES AND COMPUTATIONS

STRUCTURAL

19. BD100 GENERAL PLAN, ELEVATION AND TYPICAL SECTION

20. BD001 GENERAL NOTES

21. BD101 STAKE-OUT PLAN

22. BD102 FOUNDATION PLAN AND CAISSON LAYOUT

23. BD201 BRIDGE PLAN

24. BD202 BRIDGE ELEVATIONS

25. BD501 MISCELLANEOUS DETAILS - 1

26. BD502 MISCELLANEOUS DETAILS - 2

27. BD503 MISCELLANEOUS DETAILS - 3

28. BD504 FOUNDATION DETAILS

29. BD505 PADOT DWG. #86-353 PE (CHANGE #2) - 1

30. BD506 PADOT DWG. #86-353 PE (CHANGE #2) - 2

31. BD507 PADOT DWG. #86-353 PE (CHANGE #2) - 3

32. BD508 PADOT DWG. #86-353 PE (CHANGE #2) - 4

33. BD509 PADOT DWG. #86-353 PE (CHANGE #2) - 5

34. BD510 PADOT DWG. #86-353 PE (CHANGE #2) - 6

35. BD511 PENNDOT STD DWG. BC-703M

36. BD512 PENNDOT STD DWG. BC-734M & BC-735M

37. BD513 PENNDOT STD DWG. BC-736M

38. BD514 PENNDOT STD DWG. BC-751M - 1

39. BD515 PENNDOT STD DWG. BC-751M - 2

40. BD516 PENNDOT STD DWG. BC-788M - 1

41. BD517 PENNDOT STD DWG. BC-788M - 2

42. BD518 PENNDOT STD DWG. BC-788M - 3

43. BD519 PENNDOT STD DWG. BC-798M

44. BD520 PENNDOT STD DWG. RC-11M & RC-12M

LANDSCAPE

45. LP101 PLANTING PLAN

46. LP102 PLANTING DETAILS AND LIST

NO. DRAWING DRAWING TITLE

GI002

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GENERAL NOTES, SYMBOLS AND

ABBREVIATIONS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

VL100

EXISTING CONDITIONS PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

BI102

SUBSURFACE BORING LOCATION

PLAN

mkrepsik Snapshot

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GI100

GENERAL NOTES:

OVERALL SITE DEVELOPMENT PLAN

LEGEND:

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GC600

CONSTRUCTION SEQUENCING PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

CD101

SITE PREPARATION PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GC101

PHASE I EROSION AND SEDIMENT

CONTROL PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GC201

PHASE II EROSION AND SEDIMENT

CONTROL PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GC501

EROSION AND SEDIMENT CONTROL

DETAILS

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

GC001

EROSION AND SEDIMENT CONTROL

NOTES

NOTE: THIS IS NOT NECESSARILY AN ALL-INCLUSIVE LIST.

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

CS101

SITE LAYOUT PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

CG101

GRADING AND DRAINAGE PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

CS102

BRIDGE CROSSING AREA DETAIL

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

CT201

ROADWAY CENTERLINE PROFILE

CT501

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

ROADWAY CROSS SECTIONS &

CT502

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

ROADWAY CROSS SECTIONS &

CU261

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

935PC2006

MAY 25, 2018 JPG MAC Dwg. of 46

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

BID DOCUMENTS

321 4 5 6 7 8 9 10

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "B"

STORM PROFILES AND

COMPUTATIONS

Str. # (in) (cfs) (ft) (ft) (ft) (ft/s) (ft) (cfs) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft) (ft)

(ft) (ac) (C) (in/hr) (cfs) (cfs) (cfs) (ft/ft) (ft/ft) (ft) (ft/ft) (cfs) (cfs) (ft) (sqft) (ft)

(ac) (C) (min) (in/hr) (cfs) (cfs) (cfs) (ft) (ft) (ft) (%) (in) (cfs) (ft/s) (min) (min) (ft)

File details come from the government source that posted it.