NCOTA_Phase_III_Development_-_935PC2006_-_Package_A_Bid_Documents_-_Part_1_Pages_1-31.pdf

PDF 39 MB Posted

Attached to
National Cemetery of the Alleghenies Phase 3 Gravesite Development
Solicitation number
36C10F18R0651
Issued by

About this file

NCOTA_Phase_III_Development_-_935PC2006_-_Package_A_Bid_Documents_-_Part_1_Pages_1-31.pdf

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

GI001

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GRAVESITE YIELD SUMMARY

IN ACCORDANCE WITH PENNSYLVANIA STATE

LAW, THE CONTRACTOR SHALL CONTACT PA

ONE CALL (1-800-242-1776) AT LEAST THREE (3)

BUSINESS DAYS PRIOR TO EXCAVATION.

1-800-242-1776

Irrigation Design & Consulting 1230 Shadowbrooke Drive Dover, Pennsylvania 17315

717.491.1806 www.kovachdesignsolutions.com

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering A Service Disabled Veteran Owned Small Business www.miller-remick.com p lan n in g + la nds cap e a rch i tecture

712 Congress Avenue, Suite 300 Austin, Texas 78701

(512) 480-0032

1199 N. FAIRFAX STREET

SUITE 100

PH. 703-548-6699

ALEXANDRIA, VIRGINIA 22314

THE ONYX GROUP

WWW.ONYXGROUP.COM

MODJESKI AND MASTERS, INC.

100 STERLING PARKWAY, SUITE 302

MECHANICSBURG, PA 17050

www.modjeski.com

DRAWING INDEX

1. GI001 COVER SHEET

2. GI002 GENERAL NOTES, SYMBOLS AND ABBREVIATIONS

SITE/CIVIL

3. VL100 OVERALL EXISTING CONDITIONS PLAN

4. VL101 EXISTING CONDITIONS PLAN 1

5. VL102 EXISTING CONDITIONS PLAN 2

6. VL103 EXISTING CONDITIONS PLAN 3

7. VL104 EXISTING CONDITIONS PLAN 4

8. VL105 EXISTING CONDITIONS PLAN 5

9. VL106 EXISTING CONDITIONS PLAN 6

10. VL107 EXISTING CONDITIONS PLAN 7

11. BI100 PHASE II SUBSURFACE BORING LOCATION PLAN

12. BI101 PHASE III SUBSURFACE BORING LOCATION PLAN

13. BI301 SUBSURFACE BORING CROSS SECTIONS

14. BI302 SUBSURFACE BORING CROSS SECTIONS

15. BI303 SUBSURFACE BORING CROSS SECTIONS

16. BI304 SUBSURFACE BORING CROSS SECTIONS

17. BI305 SUBSURFACE BORING CROSS SECTIONS

18. BI306 SUBSURFACE BORING CROSS SECTIONS

19. GI100 OVERALL SITE DEVELOPMENT PLAN

20. GC600 CONSTRUCTION SEQUENCING PLAN

21. GC601 CONSTRUCTION SEQUENCING PLAN NOTES

22. CD101 SITE PREPARATION PLAN AREAS A & C

23. CD102 SITE PREPARATION PLAN AREA B

24. GC100 OVERALL EROSION AND SEDIMENT CONTROL PLAN

25. GC101 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 1

26. GC102 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 2

27. GC103 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 3

28. GC104 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 4

29. GC105 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 5

30. GC106 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 6

31. GC107 STAGE I EROSION AND SEDIMENT CONTROL PLAN AREA 7 & 8

32. GC201 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 1

33. GC202 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 2

34. GC203 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 3

35. GC204 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 4

36. GC205 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 5

37. GC206 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 6

38. GC207 STAGE II EROSION AND SEDIMENT CONTROL PLAN AREA 7 & 8

39. GC501 EROSION AND SEDIMENT CONTROL DETAILS

40. GC502 EROSION AND SEDIMENT CONTROL DETAILS

41. GC001 EROSION AND SEDIMENT CONTROL NOTES

42. CS100 OVERALL SITE LAYOUT PLAN

43. CS101 SITE LAYOUT PLAN AREA 1

44. CS102 SITE LAYOUT PLAN AREA 2

45. CS103 SITE LAYOUT PLAN AREA 3

46. CS104 SITE LAYOUT PLAN AREA 4

47. CS105 SITE LAYOUT PLAN AREA 5

48. CS106 SITE LAYOUT PLAN AREA 6

49. CS107 SITE LAYOUT PLAN AREA 7

50. CS108 BURIAL SECTION 14 NUMBERING PLAN (EARLY TURNOVER AREA)

51. CS109 BURIAL SECTION 8 NUMBERING PLAN

52. CS110 BURIAL SECTION 9 NUMBERING PLAN

53. CS111 BURIAL SECTION 11 NUMBERING PLAN

54. CS112 BURIAL SECTION 12 NUMBERING PLAN

55. CS113 BURIAL SECTION 13 NUMBERING PLAN

56. CS114 BURIAL SECTION C8, C9, & C10 NUMBERING PLAN

57. CG100 OVERALL GRADING AND DRAINAGE PLAN

58. CG101 GRADING AND DRAINAGE PLAN AREA 1

59. CG102 GRADING AND DRAINAGE PLAN AREA 2

60. CG103 GRADING AND DRAINAGE PLAN AREA 3

61. CG104 GRADING AND DRAINAGE PLAN AREA 4

62. CG105 GRADING AND DRAINAGE PLAN AREA 5

63. CG106 GRADING AND DRAINAGE PLAN AREA 6

64. CG107 GRADING AND DRAINAGE PLAN AREA 7

65. CG108 BURIAL SECTION GRADING ENLARGEMENT 1

66. CG109 BURIAL SECTION GRADING ENLARGEMENT 2

67. CG110 BURIAL SECTION GRADING ENLARGEMENT 3

68. CG111 BURIAL SECTION GRADING ENLARGEMENT 4

69. CG112 BURIAL SECTION GRADING ENLARGEMENT 5

70. CG113 BURIAL SECTION GRADING ENLARGEMENT 6

71. CG114 BURIAL SECTION GRADING ENLARGEMENT 7

72. CG501 GRADING AND DRAINAGE DETAILS

73. CG502 GRADING AND DRAINAGE DETAILS

74. CT201 ROADWAY CENTERLINE PROFILE

75. CT202 ROADWAY CENTERLINE PROFILE

76. CT501 ROADWAY CROSS SECTIONS & DETAILS

77. CU261 STORM PROFILES

78. CU262 STORM PROFILES

79. CU263 STORM PROFILES

80. CU264 STORM COMPUTATIONS

81. CU265 STORM COMPUTATIONS

82. DT500 PRECAST CONCRETE DOUBLE-DEPTH LAWN CRYPT DETAILS

83. DT501 DOUBLE-DEPTH LAWN CRYPT INSTALLATION (TYPE B) & MISC. GRAVE

DETAILS

84. LS100 SITE SIGNAGE EXISTING INVENTORY

85. LS800 EXISTING SIGN INVENTORY (PHOTOS)

86. LS101 SITE SIGNAGE PLAN

87. LS501 SITE SIGNAGE DETAILS

88. LS502 SITE SIGNAGE DETAILS

GPS

89. GS100 GPS PLAN

SITE/CIVIL CONTINUED

90. CS401 ENLARGED COLUMBARIUM LAYOUT PLANS

91. CS402 ENLARGED COLUMBARIUM WALK LAYOUT PLANS

92. CS403 ENLARGED MEMORIAL WALL & OSSUARY LAYOUT & GRADING PLAN

93. CG401 ENLARGED COLUMBARIUM GRADING PLANS

94. CI700 COLUMBARIUM WALL NUMBERING PLANS

95. CI701 MEMORIAL WALL NUMBERING PLANS

96. CI702 GENERAL COLUMBARIUM DETAILS

97. CI703 COLUMBARIUM PIER PLAN DETAILS (SINGLE-SIDED)

98. CI704 COLUMBARIUM PIER PLAN DETAILS (DOUBLE-SIDED)

99. CI705 COLUMBARIUM ELEVATIONS WALLS 1-6

100. CI706 COLUMBARIUM ELEVATIONS WALLS 7-12

101. CI707 COLUMBARIUM ELEVATIONS WALLS 13-18

102. CI708 COLUMBARIUM ELEVATIONS

103. CI709 COLUMBARIUM SECTIONS AND DETAILS 1

104. CI710 COLUMBARIUM SECTIONS AND DETAILS 2

105. CI711 COLUMBARIUM SECTIONS AND DETAILS 3

106. CI712 COLUMBARIUM PRECAST NICHE DETAILS

107. CI713 COLUMBARIUM DETAILS 1

108. CI714 COLUMBARIUM DETAILS 2

109. CI720 MEMORIAL WALL DETAILS

110. CI721 MEMORIAL WALL PLAZA DETAILS 1

111. CI722 MEMORIAL WALL PLAZA DETAILS 2

112. CI730 OSSUARY DETAILS

113. CI731 OSSUARY ELEVATIONS & DETAILS

114. CI732 OSSUARY SECTIONS

115. CI750 CAP LOCATION PLAN

116. CI751 CAP PLAN ENLARGEMENTS 1

117. CI752 CAP PLAN ENLARGEMENTS 2

118. CI753 CAP PLAN ENLARGEMENTS 3

119. CI754 CAP PLAN ENLARGEMENTS 4

120. CI755 CAP PLAN ENLARGEMENTS 5

121. CI756 CAP PLAN ENLARGEMENTS 6

122. CI757 CAP PLAN ENLARGEMENTS 7

123. CI758 STONE ENLARGEMENTS

LANDSCAPE

124. L-500 PLANTING PLAN 1

125. L-501 PLANTING PLAN 2

126. L-502 PLANTING PLAN 3

127. L-503 PLANTING PLAN 1 ENLARGEMENT

128. L-504 PLANTING DETAILS AND LIST

129. L-505 SITE AMENITY DETAILS

IRRIGATION

130. I-101 OVERALL IRRIGATION PLAN

131. I-102 IRRIGATION PLAN

132. I-103 IRRIGATION PLAN

133. I-104 IRRIGATION PLAN

134. I-105 IRRIGATION PLAN

135. I-106 IRRIGATION PLAN

136. I-201 IRRIGATION NOTES & DETAILS

137. I-202 IRRIGATION DETAILS

138. I-203 IRRIGATION DETAILS

ARCHITECTURAL

139. A-001 SYMBOLS AND ABBREVIATIONS

140. A-003 CODE COMPLIANCE PLANS - MEZZANINE PLAN

141. A-101 COVERED WALKWAY PLAN, ELEVATION AND SECTIONS

142. A-102 COVERED WALKWAY & MEZZANINE REFLECTED CEILING PLAN

143. A-103 TEMPORARY COMMITTAL SERVICE SHELTER PLAN & DETAILS

144. A-201 MAINTENANCE MEZZANINE PLAN, ELEVATION AND SECTIONS

145. A-202 SECTIONS AND PLAN DETAILS

146. A-203 SECTIONS AND DETAILS

ELECTRICAL

147. E-001 ELECTRICAL ABBREVIATIONS AND SYMBOLS

148. E-002 ELECTRICAL NOTES AND CONDITIONS

149. E-100 ELECTRICAL SITE - PLAN

150. E-101 ELECTRICAL ADMIN BLDG - FLOOR PLAN

151. E-102 ELECTRICAL - POWER & LIGHTING MAINT BLDG - FLOOR PLAN

152. E-103 ELECTRICAL - PIC BLDG LIGHTING & FIRE ALARM FL PLAN

153. E-501 ELECTRICAL DETAILS

154. E-601 ELECTRICAL SINGLE LINE DIAGRAM

STRUCTURAL

155. S-001 STRUCTURAL ABBREVIATIONS AND NOTES

156. SF101 STRUCTURAL FOUNDATION AND FRAMING PLAN

157. SF102 STRUCTURAL FOUNDATION PLAN

158. S-501 STRUCTURAL SECTIONS AND DETAILS

159. S-502 STRUCTURAL SECTIONS AND DETAILS

160. S-503 STRUCTURAL SECTIONS AND DETAILS

PLUMBING

161. P-001 PLUMBING NOTES, LEGENDS, AND SCHEDULES

162. P-100 PLUMBING MAINT BLDG - PLAN

SECURITY

163. SE101 SECURITY SITE PLAN 1

164. SE102 SECURITY SITE PLAN 2

NO. DRAWING DRAWING TITLE NO. DRAWING DRAWING TITLE

PHASE III DEVELOPMENT

PACKAGE "A" CEMETERY IMPROVEMENTS

PROJECT NUMBER 935 PC 2006

BID DOCUMENTS

DEPARTMENT OF

VETERANS AFFAIRS

NATIONAL CEMETERY OF THE ALLEGHENIES

CECIL TOWNSHIP

WASHINGTON COUNTY, PENNSYLVANIA

COVER SHEET

NO. DRAWING DRAWING TITLE

GIS INC.

2100 RIVERCHASE CENTER

SUITE 105

BIRMINGHAM, AL 35244

PH. 205-941-0442

WWW.GISINC.COM

GI002

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSGENERAL NOTES, SYMBOLS AND

ABBREVIATIONS

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL100

OVERALL EXISTING CONDITIONS

PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL101

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 1

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL102

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 2

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL103

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 3

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL104

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 4

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL105

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 5

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL106

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 6

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

VL107

KEY MAP

(NOT TO SCALE)

EXISTING CONDITIONS PLAN 7

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

BI100

PHASE II SUBSURFACE BORING

LOCATION PLAN

mkrepsik Snapshot

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

BI101

PHASE III SUBSURFACE BORING

LOCATION PLAN

APPROX. TEST BORING LOCATION

APPROX. TEST PIT LOCATION

LEGEND

WASHINGTON COAL SEAM (EL 1200)

WAYNESBURG A COAL SEAM (EL 1140)

WAYNESBURG COAL SEAM (EL 1080)

APPROX. CROSS SECTION LOCATION

ECSB-#

ECSTP-#

APPROX. SOIL FERTILITY TEST AREA LOCATION

APPROX. BORING/TEST PIT LOCATION (ROBERT B. BALTER 2013)

APPROX. BORING/TEST PIT LOCATION (CEC 2003 & 2013)

ECSTS-#

RBB-#

CECB-#

APPROX. STABILITY SECTION LOCATION

A A'

1 1'

TOE KEY

INTERMEDIATE BENCH

NOTES:

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

EL

EV

AT

IO

N

ELEVATIO

N

CROSS SECTION A-A'

1200 1200

ECS-B-44

80/10

50/0

SM

ML

CL

GC/CL

GC/CL WR

SILTSTONE

SHALE

SILTSTONE

SILTSTONE

SILTSTONE

SHALE

SHALE

SHALE

SHALE

EOB @ 60.0'

EL 1204.34

( DRY)

SHALE

ECS-B-45

50/4

70/10

CL

GC

GC/CL

GC/CL WR

GM/ML WR

AR @ 22.8'

EL 1219.59

COAL

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

EL

EV

AT

IO

N

ELEVATIO

N

CROSS SECTION B-B'

1200 1200

ECS-B-45

50/4

70/10

CL

GC

GC/CL

GC/CL WR

GM/ML WR

AR @ 22.8'

EL 1219.59

RBB-7

50/4

50/4

50/4

CL

CL

COAL

SC

EOB @ 29.4'

EL 1201.60

( DRY)

SC WR

COAL

BI301

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSSUBSURFACE BORING CROSS

SECTIONS

PT - PEATML - LOW PLASTICITY SILT

MH - HIGH PLASTICITY SILT

CL - LOW PLASTICITY CLAY SP - POORLY GRADED SAND

SM - SILTY SAND

SC - CLAYEY SAND

CH - HIGH PLASTICITY CLAY

OH - HIGH PLASTICITY ORGANIC SILTS AND CLAYS

OL - LOW PLASTICITY ORGANIC SILTS AND CLAYGM - SILTY GRAVEL

OF ALL TYPES.

GP - POORLY GRADED GRAVEL

GW - WELL GRADED GRAVEL GC - CLAYEY GRAVEL

SW - WELL GRADED SAND

FILL - FILL ( POSS/PROB)

SEDIMENTARY

METAMORPHIC

IGNEOUS

GRAVEL

ASPHALT

TOPSOIL CONCRETE

VOID WATER LEVEL - AFTER 24 HOURS

WATER LEVEL - AFTER CASING REMOVAL

WATER LEVEL - SEASONAL HIGH WATER TABLE

ROCK TYPES SYMBOL LEGENDSURFACE MATERIALSSOIL CLASSIFICATION LEGEND

RC - ROCK COREST - SHELBY TUBE PM - PRESSURE METER

WR - WEATHERED

ROCK

WATER LEVEL - DURING DRILLING/SAMPLING

[66.1]%

PLASTIC

LIMIT %

MOISTURE

CONTENT %

LIQUID

LIMIT %

LEGEND

PROPOSED GRADE

EXISTING GRADE

ESTIMATED TOP OF WEATHERED ROCK

NOTES:

1. MATERIALS ON RBB AND CEC LOGS CONSISTENT WITH THE

WEATHERED ROCK DEFINITION UTILIZED IN OUR REPORT

HAVE BEEN SHADED GREEN FOR CONSISTENCY WITH ECS

LOGS AND PROFILES.

NEW FILL

ESTIMATED BEDROCK CONTOUR

SOIL MANTLE

WEATHERED ROCK

BEDROCK

SOIL MANTLE

WEATHERED ROCK

BEDROCK

NEW FILL

CROSS SECTION C-C'

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

ECS-B-46

50/4

50/6

50/6

50/5

90/10

50/5

50/5

CL

GC

CL

CL WR

CL/SC WR

COAL

GM WR

SHALE

SHALE

SHALE

SHALE

EOB @ 56.0'

EL 1191.70

( DRY)

SHALE

RBB-7

50/4

50/4

50/4

CL

CL

COAL

SC

EOB @ 29.4'

EL 1201.60

( DRY)

SC WR

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

CROSS SECTION D-D'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

ECS-B-46

50/4

50/6

50/6

50/5

90/10

50/5

50/5

CL

GC

CL

CL WR

CL/SC WR

COAL

GM WR

SHALE

SHALE

SHALE

SHALE

EOB @ 56.0'

EL 1191.70

( DRY)

SHALE

RBTP-3

SC

CL

COAL

CL

EOB @ 10.0'

EL 1213.00

( DRY)

CL

BI302

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSSUBSURFACE BORING CROSS

SECTIONS

PT - PEATML - LOW PLASTICITY SILT

MH - HIGH PLASTICITY SILT

CL - LOW PLASTICITY CLAY SP - POORLY GRADED SAND

SM - SILTY SAND

SC - CLAYEY SAND

CH - HIGH PLASTICITY CLAY

OH - HIGH PLASTICITY ORGANIC SILTS AND CLAYS

OL - LOW PLASTICITY ORGANIC SILTS AND CLAYGM - SILTY GRAVEL

OF ALL TYPES.

GP - POORLY GRADED GRAVEL

GW - WELL GRADED GRAVEL GC - CLAYEY GRAVEL

SW - WELL GRADED SAND

FILL - FILL ( POSS/PROB)

SEDIMENTARY

METAMORPHIC

IGNEOUS

GRAVEL

ASPHALT

TOPSOIL CONCRETE

VOID WATER LEVEL - AFTER 24 HOURS

WATER LEVEL - AFTER CASING REMOVAL

WATER LEVEL - SEASONAL HIGH WATER TABLE

ROCK TYPES SYMBOL LEGENDSURFACE MATERIALSSOIL CLASSIFICATION LEGEND

RC - ROCK COREST - SHELBY TUBE PM - PRESSURE METER

WR - WEATHERED

ROCK

WATER LEVEL - DURING DRILLING/SAMPLING

[66.1]%

PLASTIC

LIMIT %

MOISTURE

CONTENT %

LIQUID

LIMIT %

LEGEND

PROPOSED GRADE

EXISTING GRADE

ESTIMATED TOP OF WEATHERED ROCK

NOTES:

1. MATERIALS ON RBB AND CEC LOGS CONSISTENT WITH THE

WEATHERED ROCK DEFINITION UTILIZED IN OUR REPORT

HAVE BEEN SHADED GREEN FOR CONSISTENCY WITH ECS

LOGS AND PROFILES.

ESTIMATED BEDROCK CONTOUR

NEW FILL

SOIL MANTLE

WEATHERED ROCK

BEDROCK

NEW FILL

SOIL MANTLE

WEATHERED ROCK

BEDROCK

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

CROSS SECTION E-E'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

RBTP-3

SC

CL

COAL

CL

EOB @ 10.0'

EL 1213.00

( DRY)

CL

ECS-B-47

50/4

50/3

50/5

50/4

50/4

CL

SC/GC

GC/CL WR

GC/CH WR

GM/SM WR

GM WR

AR @ 37.1'

EL 1195.59

( DRY)

GM WR

COAL

COAL

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

CROSS SECTION F-F'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

240 250 260 270 280 290 300

ECS-B-47

50/4

50/3

50/5

50/4

50/4

CL

SC/GC

GC/CL

GC/CH WR

GM/SM WR

GM WR

AR @ 37.1'

EL 1195.59

( DRY)

GM WR

RBB-5

ML

ML

CL

ML

ML

EOB @ 10.0'

EL 1192.30

( DRY)

ML

COAL

COAL

BI303

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSSUBSURFACE BORING CROSS

SECTIONS

PT - PEATML - LOW PLASTICITY SILT

MH - HIGH PLASTICITY SILT

CL - LOW PLASTICITY CLAY SP - POORLY GRADED SAND

SM - SILTY SAND

SC - CLAYEY SAND

CH - HIGH PLASTICITY CLAY

OH - HIGH PLASTICITY ORGANIC SILTS AND CLAYS

OL - LOW PLASTICITY ORGANIC SILTS AND CLAYGM - SILTY GRAVEL

OF ALL TYPES.

GP - POORLY GRADED GRAVEL

GW - WELL GRADED GRAVEL GC - CLAYEY GRAVEL

SW - WELL GRADED SAND

FILL - FILL ( POSS/PROB)

SEDIMENTARY

METAMORPHIC

IGNEOUS

GRAVEL

ASPHALT

TOPSOIL CONCRETE

VOID WATER LEVEL - AFTER 24 HOURS

WATER LEVEL - AFTER CASING REMOVAL

WATER LEVEL - SEASONAL HIGH WATER TABLE

ROCK TYPES SYMBOL LEGENDSURFACE MATERIALSSOIL CLASSIFICATION LEGEND

RC - ROCK COREST - SHELBY TUBE PM - PRESSURE METER

WR - WEATHERED

ROCK

WATER LEVEL - DURING DRILLING/SAMPLING

[66.1]%

PLASTIC

LIMIT %

MOISTURE

CONTENT %

LIQUID

LIMIT %

LEGEND

PROPOSED GRADE

EXISTING GRADE

ESTIMATED TOP OF WEATHERED ROCK

NOTES:

1. MATERIALS ON RBB AND CEC LOGS CONSISTENT WITH THE

WEATHERED ROCK DEFINITION UTILIZED IN OUR REPORT

HAVE BEEN SHADED GREEN FOR CONSISTENCY WITH ECS

LOGS AND PROFILES.

ESTIMATED BEDROCK CONTOUR

NEW FILL

SOIL MANTLE

WEATHERED ROCK

BEDROCK

SOIL MANTLE

WEATHERED ROCK

BEDROCK

NEW FILL

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=20'

EL

EV

AT

IO

N

ELEVATIO

N

CROSS SECTION G-G'

ECS-B-48

50/4

50/1

50/4

CL

COAL

CL

CL

CL

GC/CL DR

COAL

GC WR

GC WR

GC WR

SHALE

SHALE

SHALE

SHALE

EOB @ 56.0'

EL 1169.11

( DRY)

SHALE

ECS-B-49

50/6

95/12

CL

COAL

CL

COAL

CL/ML

CL/ML

CL/ML WR

AR @ 22.9'

EL 1187.03

( DRY)

CL/ML WR

RBB-4

50/2

ML

CL

CL

SC

SC

EOB @ 18.7'

EL 1175.90

( DRY)

SC WR

50/4

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=20'

EL

EV

AT

IO

N

ELEVATIO

N

CROSS SECTION H-H'

RBB-2

50/3

ML

ML

CL

CL

CL-CH

SC WR

LIMESTONE

WR

EOB @ 29.0'

EL 1177.80

LIMESTONE

RBTP-2

SC

CL

CL

EOB @ 10.0'

EL 1183.00

( DRY)

CL

BI304

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSSUBSURFACE BORING CROSS

SECTIONS

PT - PEATML - LOW PLASTICITY SILT

MH - HIGH PLASTICITY SILT

CL - LOW PLASTICITY CLAY SP - POORLY GRADED SAND

SM - SILTY SAND

SC - CLAYEY SAND

CH - HIGH PLASTICITY CLAY

OH - HIGH PLASTICITY ORGANIC SILTS AND CLAYS

OL - LOW PLASTICITY ORGANIC SILTS AND CLAYGM - SILTY GRAVEL

OF ALL TYPES.

GP - POORLY GRADED GRAVEL

GW - WELL GRADED GRAVEL GC - CLAYEY GRAVEL

SW - WELL GRADED SAND

FILL - FILL ( POSS/PROB)

SEDIMENTARY

METAMORPHIC

IGNEOUS

GRAVEL

ASPHALT

TOPSOIL CONCRETE

VOID WATER LEVEL - AFTER 24 HOURS

WATER LEVEL - AFTER CASING REMOVAL

WATER LEVEL - SEASONAL HIGH WATER TABLE

ROCK TYPES SYMBOL LEGENDSURFACE MATERIALSSOIL CLASSIFICATION LEGEND

RC - ROCK COREST - SHELBY TUBE PM - PRESSURE METER

WR - WEATHERED

ROCK

WATER LEVEL - DURING DRILLING/SAMPLING

[66.1]%

PLASTIC

LIMIT %

MOISTURE

CONTENT %

LIQUID

LIMIT %

LEGEND

PROPOSED GRADE

EXISTING GRADE

ESTIMATED TOP OF WEATHERED ROCK

NOTES:

1. MATERIALS ON RBB AND CEC LOGS CONSISTENT WITH THE

WEATHERED ROCK DEFINITION UTILIZED IN OUR REPORT

HAVE BEEN SHADED GREEN FOR CONSISTENCY WITH ECS

LOGS AND PROFILES.

ESTIMATED BEDROCK CONTOUR

NEW FILL

SOIL MANTLE

WEATHERED ROCK

BEDROCK

SOIL MANTLE

BEDROCK

WEATHERED ROCK

NEW FILL

CROSS SECTION I-I'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

240 250 260 270 280 290 300

1170 1170

1160 1160

1150 1150

1140 1140

1130 1130

RBTP-2

SC

CL

CL

EOB @ 10.0'

EL 1183.00

( DRY)

CL

RBB-3

SM

CL

CL

ML

EOB @ 15.0'

EL 1169.10

( DRY)

ML WR

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

CROSS SECTION J-J'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

240 250 260 270 280 290

1170 1170

1160 1160

1150 1150

1140 1140

1130 1130

1120 1120

1110 1110

RBB-33

50/4

50/2

CL

ML

CL

CL

CL

GM WR

CL

EOB @ 18.7'

EL 1152.70

( DRY)

CL WR

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

BI305

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSSUBSURFACE BORING CROSS

SECTIONS

PT - PEATML - LOW PLASTICITY SILT

MH - HIGH PLASTICITY SILT

CL - LOW PLASTICITY CLAY SP - POORLY GRADED SAND

SM - SILTY SAND

SC - CLAYEY SAND

CH - HIGH PLASTICITY CLAY

OH - HIGH PLASTICITY ORGANIC SILTS AND CLAYS

OL - LOW PLASTICITY ORGANIC SILTS AND CLAYGM - SILTY GRAVEL

OF ALL TYPES.

GP - POORLY GRADED GRAVEL

GW - WELL GRADED GRAVEL GC - CLAYEY GRAVEL

SW - WELL GRADED SAND

FILL - FILL ( POSS/PROB)

SEDIMENTARY

METAMORPHIC

IGNEOUS

GRAVEL

ASPHALT

TOPSOIL CONCRETE

VOID WATER LEVEL - AFTER 24 HOURS

WATER LEVEL - AFTER CASING REMOVAL

WATER LEVEL - SEASONAL HIGH WATER TABLE

ROCK TYPES SYMBOL LEGENDSURFACE MATERIALSSOIL CLASSIFICATION LEGEND

RC - ROCK COREST - SHELBY TUBE PM - PRESSURE METER

WR - WEATHERED

ROCK

WATER LEVEL - DURING DRILLING/SAMPLING

[66.1]%

PLASTIC

LIMIT %

MOISTURE

CONTENT %

LIQUID

LIMIT %

LEGEND

PROPOSED GRADE

EXISTING GRADE

ESTIMATED TOP OF WEATHERED ROCK

NOTES:

1. MATERIALS ON RBB AND CEC LOGS CONSISTENT WITH THE

WEATHERED ROCK DEFINITION UTILIZED IN OUR REPORT

HAVE BEEN SHADED GREEN FOR CONSISTENCY WITH ECS

LOGS AND PROFILES.

ESTIMATED BEDROCK CONTOUR

NEW FILL

SOIL MANTLE

WEATHERED ROCK

BEDROCK

SOIL MANTLE

WEATHERED ROCK

BEDROCK

( ASSUMED BASED ON ESTIMATED BEDROCK CONTOURS ON SHEET SP-2)

( ASSUMED BASED ON ESTIMATED BEDROCK CONTOURS ON SHEET SP-2)

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

CROSS SECTION K-K'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

1170 1170

1160 1160

1150 1150

1140 1140

1130 1130

1120 1120

1110 1110

ECS-B-51

50/4

50/5

50/4

CL

GM

ML

CL

COAL

CL WR

ML WR

AR @ 19.0'

EL 1140.97

( DRY)

ML WR

RBTP-1

CL

CL

CL

EOB @ 6.5'

EL 1153.50

( DRY)

CL

SCALE

VERTICAL SCALE 1"=10'

HORIZONTAL SCALE 1"=10'

CROSS SECTION L-L'

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230

EL

EV

AT

IO

N

ELEVATIO

N

240 250 260

1170 1170

1160 1160

1150 1150

1140 1140

1130 1130

1120 1120

1110 1110

BI306

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTSSUBSURFACE BORING CROSS

SECTIONS

PT - PEATML - LOW PLASTICITY SILT

MH - HIGH PLASTICITY SILT

CL - LOW PLASTICITY CLAY SP - POORLY GRADED SAND

SM - SILTY SAND

SC - CLAYEY SAND

CH - HIGH PLASTICITY CLAY

OH - HIGH PLASTICITY ORGANIC SILTS AND CLAYS

OL - LOW PLASTICITY ORGANIC SILTS AND CLAYGM - SILTY GRAVEL

OF ALL TYPES.

GP - POORLY GRADED GRAVEL

GW - WELL GRADED GRAVEL GC - CLAYEY GRAVEL

SW - WELL GRADED SAND

FILL - FILL ( POSS/PROB)

SEDIMENTARY

METAMORPHIC

IGNEOUS

GRAVEL

ASPHALT

TOPSOIL CONCRETE

VOID WATER LEVEL - AFTER 24 HOURS

WATER LEVEL - AFTER CASING REMOVAL

WATER LEVEL - SEASONAL HIGH WATER TABLE

ROCK TYPES SYMBOL LEGENDSURFACE MATERIALSSOIL CLASSIFICATION LEGEND

RC - ROCK COREST - SHELBY TUBE PM - PRESSURE METER

WR - WEATHERED

ROCK

WATER LEVEL - DURING DRILLING/SAMPLING

[66.1]%

PLASTIC

LIMIT %

MOISTURE

CONTENT %

LIQUID

LIMIT %

LEGEND

PROPOSED GRADE

EXISTING GRADE

ESTIMATED TOP OF WEATHERED ROCK

NOTES:

1. MATERIALS ON RBB AND CEC LOGS CONSISTENT WITH THE

WEATHERED ROCK DEFINITION UTILIZED IN OUR REPORT

HAVE BEEN SHADED GREEN FOR CONSISTENCY WITH ECS

LOGS AND PROFILES.

ESTIMATED BEDROCK CONTOUR

NEW FILL

SOIL MANTLE

WEATHERED ROCK

BEDROCK

( NO BORING DATA ALONG SECTION)

NEW FILL

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GI100

AREA 6

GRAVESITE YIELD SUMMARY

GENERAL NOTES:

AREA 3

AREA 5

AREA 2

AREA 4

AREA 1

AREA 7

OVERALL SITE DEVELOPMENT PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC600

GENERAL NOTES:

CONSTRUCTION SEQUENCING PLAN

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC601

GENERAL NOTES:

CONSTRUCTION SEQUENCING

NOTES

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

CD101

KEY MAP

(NOT TO SCALE)

A B

C

SITE PREPARATION PLAN AREAS A

& C

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

CD102

KEY MAP

(NOT TO SCALE)

A B

C

SITE PREPARATION PLAN AREA B

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC100

AREA 6

AREA 3

AREA 5

AREA 2

AREA 4

AREA 1

AREA 7

OVERALL EROSION AND SEDIMENT

CONTROL PLAN

AREA 7

AREA 8, SEE MATCHLINE THIS SHEET

AREA 8, SEE MATCHLINE THIS SHEET

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC101

KEY MAP

(NOT TO SCALE)

STAGE I EROSION AND SEDIMENT

CONTROL PLAN AREA 1

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC102

KEY MAP

(NOT TO SCALE)

CONTROL PLAN AREA 2

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC103

KEY MAP

(NOT TO SCALE)

CONTROL PLAN AREA 3

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC104

KEY MAP

(NOT TO SCALE)

CONTROL PLAN AREA 4

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC105

KEY MAP

(NOT TO SCALE)

CONTROL PLAN AREA 5

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC106

KEY MAP

(NOT TO SCALE)

CONTROL PLAN AREA 6

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

MAY 25, 2018 JPG MAC

148 S. Queen Street, Suite 201 Martinsburg, WV 25401

Phone: 304-725-8456 www.gordon.us.com

Dwg. of 164

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

Revisions: Date:

Drawing Title

Approved:

Phase

Project Director

Building Number

CONSTRUCTION DOCUMENTS 2 SUBMISSION

NATIONAL CEMETERY

OF THE ALLEGHENIES

PHASE III DEVELOPMENT

PACKAGE "A"

935PC2006BID DOCUMENTS

GC107

KEY MAP

(NOT TO SCALE)

CONTROL PLAN AREA 7 & 8

File details come from the government source that posted it.