36C10E21R0009 0004.docx
DOCX document 186 KB Posted
- Attached to
- Y1DZ--Hines Finance Center Renovation
- Solicitation number
- 36C10E21R0009
About this file
This solicitation is for a renovation project at the Hines Finance Center located in Hines, Illinois. Key details include renovating approximately 7,651 square feet of existing office and break room space including demolition of non-load bearing walls, replacement of the access flooring system, new finishes, casework and plumbing fixtures. Mechanical work involves reconfiguring the existing HVAC system to match the new layout including relocating heat pumps. Electrical work consists of replacing aging panels and providing new lighting, data cabling and security systems. The period of performance is 180 days after notice to proceed. The solicitation is expected to be released within 60 days by the Department of Veterans Affairs Veteran Benefits Administration for the described scope of interior renovation work.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 23 09 23.27.pdf | ||
| 23 31 13.pdf | ||
| 23 01 30.52.pdf | ||
| 36C10E21R0009 0005.docx | DOCX document | |
| 23 37 13.23.pdf | ||
| 23 09 93.11.pdf | ||
| Site Visit Sign In Sheet Page 1_10-19-2021.pdf | ||
| 36C10E21R0009 0003.docx | DOCX document | |
| Site Visit Sign In Sheet Page 2_10-19-2021.pdf | ||
| 36C10E21R0009 0002.docx | DOCX document | |
| 36C10E21R0009 0001.docx | DOCX document | |
| Hines Finance Center - Drawings 6-14-2021.pdf | ||
| Wage Determination for Cook County 9-24-2021.pdf | ||
| 201VB3032 Hines Finance Center - Specifications_6-14-2021.pdf | ||
| 36C10E21R0009.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-BID REQUEST FOR INFORMATION
| PROJECT NUMBER |
| 36C10E21R0009 |
| PROJECT NAME |
| Hines Finance Center Renovations |
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
VA
00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Division 1800 G. Street N.W.
Washington
DC
20006 00101 Department of Veterans Affairs Veterans Benefits Administration Acquisition Division 1800 G. Street N.W.
Washington
DC
20006 To all Offerors/Bidders
36C10E21R0009 11-02-2021
X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
NLT 12:00pm EST November 19, 2021 X The purpose of this Amendment is to provide responses to the Request for Information (RFI) received.
PRE-BID REQUEST FOR INFORMATION - 10/25/2021
| # |
| QUESTION |
| RESPONSE |
| 1 |
| Sign Schedule – There’s no sign schedule that I could find on the drawings. Can one be provided showing the quantities of the S1-S5 signs called out on AE-102? |
| Room sign locations provided on 1/AE-102. |
| 2 |
| Sign Types 1 and 2 – Can we get detailed dimensions on both sign types showing the frame and “wing” dimensions? To that point, the height of the smallest Vista extrusion is 4.73” which means the wing could only be approximately 1.75”H at its highest point which would be too short to include the room number in ADA on the wing assuming they wanted to stay with the 6.5” overall height. It may or may not be an issue for S2 but we won’t know that until we get the exact dimensions. Also, we’d like to know the thickness of the wings (I’m assuming 1/8”) and whether they are assuming the frame will be mounted on it (I’m assuming it is) versus the wing sitting separately above the frame. Can we get the color of the frame and end caps? The frame colors are brushed silver and black and the end caps are grey and black plastic. Finally, they call out a metal accent strip however the frame channel on the top actually serves that purpose so an accent strip would be redundant. I’ve attached the frame drawing for our WFFL11 frame which is basically what we’d use for the S1 sign type (except we’d make it 8.5”W) |
| Manufacturers are not specified in order to promote completive bidding. |
Please reference provided Basis of Design, Signage document.
| 3 |
| Sign Type S4 – Much like Sign Type S1 the WFFL11 frame at 8.5” wide is the narrowest/smallest extrusion that Vista offers and what we’d use for S1 and S4 sign types. The OD height is 4.73” so unless they change the overall height on both sign types, we would not be able to quote them. |
| Please clarify, what is the question being asked? |
Reference answer above, signage is provided as basis of design.
| 4 |
| Are we using our own forms for price breakdown proposals? |
| VA: Yes you can use your own forms to provide a detailed price breakdown in accordance with the Price/Cost Schedule |
| 5 |
| Form 1442 – 13a – do mailed copies have to arrive prior to bid date and time? |
| VA: No mailed copies are necessary. Please email proposals to tiffany.garfield@va.gov |
| 6 |
| What is existing ceiling height and existing height of sprinkler mains? |
| The ceiling throughout is 9 feet tall. The sprinklers protrude 1 to 2 inches. |
| 7 |
| What is infection control plan? It does not specify in drawings or specs. |
| For non-clinical construction projects, infection control is not required. Please refer to Sheet GI-001, General Notes, Item 4 and Sheet AD-100, General Demolition Notes, Item 3 for dust mitigation requirements. Tape and seal existing doors connecting to adjacent spaces not in contract. |
| 8 |
| Are workstations to be built by contractor? |
| No. |
| 9 |
| Furniture / Fixture equipment. No specs for the items on the schedule except for FEC cabinets and defib cabinets. Is this a contractor or owner provide? |
| Owner to provide all items not specified. |
| 10 |
| Relevancy assessment asks for past performance to be $1-$2 million. Can it be over $2million or only between the range given? |
| Past Performance can exceed the dollar threshold but not less than $1M. |
| 11 |
| Are RFI’s going to be answered during walk thru or can there be an extension to address additional questions. |
| All RFIs are to be submitted in writing to tiffany.garfield@va.gov no later than 12:00pm EST on October 26, 2021 |
| 12 |
| Can you share the contact information for the window Vendor? |
| Manufacturers are not specified in order to promote completive bidding. |
| 13 |
| Can the owner provide written permission to remove and replace a window to remove waste out of the building? |
| As long as the contractor replaces the window at the end of the work day, we can provide a written disctiption. |
| 14 |
| Please provide a specification for the access flooring. |
| Reference Specification 09 69 00 and Basis of Design for Access Flooring |
| 15 |
| Can the existing access flooring system be reused or shall the entire flooring system be demolished and new? |
| Reference the Design Narrative, Page 1. |
Reference AD-100, Demo Keynote 2.04.
The existing access flooring was observed to be in poor condition and should be demolished and replaced with new system.
PRE-BID REQUEST FOR INFORMATION - 10/27/2021
| # |
| QUESTION |
| RESPONSE |
| 1 |
| Drawing EP-103, per general notes D, please confirm that the harness is for data and not power? If Data, could the EOR provide a detail of the junction box and terminations? |
| There are harnesses for both power and data. Sheet EP-103 is a plan for low voltage systems. Refer to sheet EP-101 for power requirements. |
| 2 |
| Drawing EP-103, per general notes D, since splicing data cabling is not allowed, and to comply with the warranty testing is required from the patch panel to the device jack, should the face plate be installed directly to the systems furniture per detail 4, on EP-300? |
| The furniture selected for basis of design is Herman Miller prefabricated furniture and is shown in the architectural drawings. Specific connections and installation requirements will need to be coordinated with the final furniture selection provided by that division. |
| 3 |
| Drawing EP-103, per general notes D and E. please clarify line “D” indicates 2 data and 1 phone for the standard drop. However, line“E” indicates 3 data and 1 phone? |
| Note “D” refers to modular worksations connected in groups. Note “E” refers to the larger workstations in offices. |
| 4 |
| Will workstation WS-4 (2 desks), AE-101 & EP-300 , require 4 data and 2 voice? |
| 3 data and 2 voice |
| 5 |
| AXIS Cameras -Specification and symbol list indicate new AXIS cameras, if so, please confirm locations on drawings. |
| There are no new cameras. |
| 6 |
| Drawing EP-103, Fire Alarm General Notes, Note A, will the contractor be responsible for the design of the fire alarm system? |
| Contractor is responsible for the submittals outlined in the ADDRESSABLE FIRE-ALARM SYSTEMS Specification Section 284621.11. |
| 7 |
| Will existing furniture be removed and stored or disposed of? |
| VBA to determine. |
| 8 |
| Will new Herman Miller furniture be supplied by government or general contractor? |
| Furniture purchase and installation to be addressed by separate contract. |
| 9 |
| What are the makes and models of the existing heat pumps? |
| Johnson Controls, RG Series, Specific Model #’s are listed out on schedule on MH-101. |
| 10 |
| Is conference room 200.05 the only room with raised floors? |
| 11 |
| In addition to the conference room, are there any other rooms that require dimmable lighting? |
| No, only the conference room will need dimmable lighting. |
| 12 |
| What brand of faucet should be installed in double bowl sink in the breakroom 200Q? |
| Yes, every room showing a dimming control switch requires dimmable lighting. |
| 13 |
| Can we include Tec Crete 1500 product to be used on this project? See attached Cut sheet and product specifications, as well as a list of projects the product was used on. |
| No cut sheet to review. |
| 14 |
| What is required for the cost proposal breakdown? The solicitation instructions need further clarification as to how the breakdown is to address line items and how it should be shown since the bid form is a lump sum. |
Will the VA be responsible for removing all technology in the area, including computers, phones, cables, etc.?
Please reference the Price/Cost Schedule in the solicitation (page 4) where it instructs contractors to breakdown their price by elements. Copy of the information is below:
PRICE PROPOSAL
1. The following cost elements shall be addressed:
1. Labor (Direct & Indirect),
1. Materials, Material Markups, Materials overhead,
1. Equipment
1. Subcontractor Cost
1. Other Direct Costs
1. Overhead expenses
1. Indirect Cost
1. General & Administrative (G&A) expenses,
1. Profit
1. ***Estimate to include a detailed line-item breakdown of all G&A expenses inclusive of all Project Staff and General Requirements OF THE PRIME CONTRACTOR and shall be indicative of the 15% of contract performance that will be incurred for SDVOSB personnel in accordance with FAR 52.219-27 – Limitations on Subcontracting. ***
| 15 |
| Drawing AE101 provides a Furniture, Fixtures, Equipment Schedule however, the table does not indicate who is to provide these items. Will these items be Owner Furnished and Contractor Installed? If these items are to be Contractor Furnished and Installed, please provide a specification for each item, including manufacturers, make, model, etc. |
| FF&E items including purchase and installation to be addressed by separate contract. Confirm with VBA regarding contractor installation of wall-hung equipment (televisions, monitors, etc.) |
| 16 |
| Is the contractor responsible for commissioning or will the VA have a 3rd party commissioning agent for this project? |
| Commissioning not shown to be required for this project; TAB requirements apply. |
| 17 |
| Please identify the temperature controls system in the building. |
| Existing Alerton Controls currently being replaced with Johnson Controls. |
| 18 |
| Will the VA be providing an electronic submittal program, or is it expected that the general contractor provides this? Are there programs or software that is acceptable? |
| General Contractor to provide submittals via electronic submittal program. VBA to determine preferred program. |
| 19 |
| Sheet: N/A |
Spec: General Conditions Topic: Management Question: Please confirm personnel requirements for this project. Can (1) superintendent fulfill SSHO requirements? Or does (1) superintendent and (1) SSHO need to be on site full-time?
Superintendent may fulfill SSHO responsibilities.
| 20 |
| Sheet: N/A |
Spec: N/A Topic: Work Hours Question: Please confirm work hours for this project. Are there any specific tasks or trade division that must be on overtime (01 Infection Control, 02 Demolition, 02 Abatement)? Are there any areas of work that must be on overtime (Hallways, Occupied Areas, Etc.)?
Oncethe contractors have been cleared by security and have a PIV badges, they can come on site to work at any time.
| 21 |
| Sheet: N/A |
Spec: 25 13 00 Topic: BAS Controls Question: Is there a proprietary DIV25 controls contractor at the facility? If so, please provide company and point of contact.
Johnson Controls. Coordinate with VA for POC.
JCI POC:
Michael Cousins michael.s.cousins@jci.com 334-224-6828.
| 22 |
| Sheet: N/A |
Spec: 28 31 00 Topic: Fire Alarm Contractor Question: Is there a proprietary DIV28 Fire Alarm contractor at the facility? If so, please provide company and point of contact.
Last known contact was R. Davis at Kinetix.
Email: rdavis@kinetixfire.com (contact not verified)
| 23 |
| Sheet: N/A |
Spec: General Conditions Topic: Material Staging Question: Please confirm if contract has material staging location at facility. If so, where is it? Is prime contractor responsible for any costs associated with staging?
The contractor will be responsible for the staging. We will be providing an area and location to stage the equipment and materials.
The staging will be outside of the renovation site (East parking lot, next to the windows).
| 24 |
| Sheet: N/A |
Spec: N/A Topic: Phasing Question: Are there any phasing constraints on this job?
None.
| 25 |
| Sheet: EP-300 |
Spec: 26 09 23 Topic: Lighting Control Devices Question: Project documents say to use LUTRON lighting control devices as shown on prints. However, drawing EP-300 only denotes WATTSTOPPER brand type lighting controls. Please confirm which we are to use.
All new fixtures, wall controls, and sensors must be compatable and to tie into the existing Lutron Quantum system. The local Lutron Rep is Nate Spears and is familiar with the system in the building and aware of this project.
Nate Spears, Director, Commercial Systems 537 W. Wrightwood Ave | Elmhurst, IL 60126 Direct: (773) 558-5771 | Main: (630) 833-7377 | Fax: (630) 833-6279
| 26 |
| Sheet: N/A |
Spec: N/A Topic: Missing Spec Sections Question: The Table of contents lists multiple specification sections that are not included in the specifications. Please provide missing specification sections.
01 35 16 Provided but not included in TOC 10 14 26.16 should be 10 14 23.16 21 07 00 not included; will confirm if required 21 13 13 not included; will confirm if required Division 22 not included; will confirm if required 23 01 30.52 included with this response.
23 04 23.12 provided but not inlcuded in TOC 23 09 23.11 included with this response 23 09 23.27 included with this response 23 31 13.23 included with this response 26 05 00 provided but not included in TOC
| 27 |
| Sheet: N/A |
Spec: N/A Topic: Raised Floor height Question: What is the height from the L2 slab to the top of the raised floor? Please confirm.
Between 5 and 6 inches.
| 28 |
| Sheet: N/A |
Spec: N/A Topic: Electrical Requirements Question: Are plenum fixtures, boxes, and whips required for above ceiling and below raised floor applications in this space? Please confirm.
Yes, plenum ratings are required for above ceiling and below raised floor applications in this space. Follow all requirements outlined in NFPA 70: National Electrical Code with Chicago Amendments.
| 29 | |
| Sheet: RFP |
Spec: RFP Topic: Technical Past Performance Question: Page 5 of 60 in the solicitation notes Evaluation Factor #3- Past Performance. There are conflicting notes in regard to projects ‘recency’, it notes both 5 years from solicitation release date and three years from solicitation release date. Please confirm, what is considered ‘recent’ experience criteria for this solicitation.
This is indeed an error in the language for Factor 3. This will be corrected in the next Amendment. It should read:
The projects shall be recent (completion date to be within 3 years of the solicitation release date), relevant, and meet or exceed the proposed magnitude and scope of the proposed Project
| 30 |
| Sheet: n/a |
Spec: 26 05 33 Topic: Raceway Requirements for Card Access Question: Please confirm raceway requirements for card access system. Is card access wiring to be installed in conduit or can it be installed free-air?
Per specification section 28 15 00, Part 3, 3.3 Cabling, Item D, Wiring Method: Install wiring in raceway and cable tray except within consoles, cabinets, desks, and counters and except in accessible ceiling spaces and in gypsum board partitions where unenclosed wiring method may be used. Use NRTL-listed plenum cable in environmental airspaces, including plenum ceilings. Conceal raceway and cables except in unfinished spaces.
| 31 |
| Sheet: AE102 |
Spec: 10 14 26.16 Topic: Signage Question: Signage type S4 is detailed on page AE102 but not shown anywhere on the overhead drawing. Please confirm sign type S4 is not required on this project.
Refer S4 notes on Sheet AE-102; signs to be tape mounted to workstations
| 32 |
| Sheet: AE101 |
Spec: N/A Topic: Furniture, Fixtures, Equipment Schedule Question: The “Furniture, Fixture, Equipment Schedule” provided on AE101 does not indicate whether each item listed is to be furnished and/or installed by the VA or contractor. Are we to assume all items in this schedule are to be furnished and installed by the contractor?
Only specified items to be provided and installed by contractor (fire extinguisher cabinet, AED cabinet). Confirm with VBA regarding contractor installation of wall-hung equipment (televisions, monitors, etc.) All other items provided by VBA