This document contains Questions and Answers related to Solicitation 36C10B25R0003 for Independent Enterprise Testing and Support Services (IETSS) issued by the Department of Veterans Affairs Technology Acquisition Center Austin.
The key details are:
- This is not a brand new contract, as the incumbent contractor is Planned Systems International, Inc. (GS-35F598GA / 36C10B20F0076).
- No specific contract vehicle is required to submit an offer for this RFP.
- The scope is for testing and testing services support as detailed in the Performance Work Statement, not full Independent Verification and Validation (IV&V) support.
- The solicitation includes a pricing template with some errors that have been corrected in a revised version.
- The proposal due date will not be extended beyond the current due date.
- Key personnel roles, skills and abilities are components of the labor categories, rather than separate positions.
- The government will provide necessary hardware, software, and automation tools as Government-Furnished Equipment.
- Costs for data migration validation and service virtualization tools are to be included in the proposed labor rates, not billed separately.
- The Service Contract Labor Standards and associated clauses are not applicable to this professional services contract.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Veterans Affairs
Independent Enterprise Testing Support Services
Questions and Answers
November 21, 2024
Note: The answers provided below are for informational purposes, to assist potential Offerors in preparing proposals, and such answers do not themselves constitute an amendment to the Request for Proposal
(RFP). Where questions and answers necessitated such an amendment, such changes have been or will be incorporated into a formal amendment to the RFP. To the extent that any answers provided below conflict in any way with the RFP and any Amendments, the final RFP takes precedence.
# Reference Question Answer
1. We would like to know if this is a brand new contract OR if there is
(was) an incumbent performing these services.
If not brand new, could you please provide the current / previous contract number?
Planned Systems International, Inc. is the incumbent contractor (GS-
35F598GA / 36C10B20F0076)
2. Could you confirm whether a specific contract vehicle is required to submit an offer for the IETSS RFP?
No specific contract vehicle is required to submit an offer for this
RFP.
3. Q&A Question #2 The answer provided to the question references “...these IV&V testing services.” All other uses of the term
IV&V appear to reference the CRR
IV&V TC and or TMO operations.
The scope within PWS Paragraph 3.0 references what appears to be an organization, not the function of
“Independent Verification and
Validation (IV&V)?” Can the
Government clarify or define the use of the term IV&V and confirm if this
RFP seeks full IV&V support (if so, please define) or only the testing and testing services support indicated in the PWS?
IV&V is in reference to organizational naming. VA’s requirement is only for the tasks detailed within the PWS.
4. Attachment 001
(Pricing Template)
There are a series of errors in the template. Can the VA please correct the template, specifically addressing the following:
• Rate lookups in T&M Labor miss Business Analyst in
T&M Labor Rate Table
• Rate lookups in T&M Labor have inconsistent column lookups (ex I33 references
See revised Attachment 001 – IETSS
Excel Price Evaluation
Spreadsheet_v1.
Base rate instead of option 1 rate)
• In worksheet T&M Labor, cell B37 misspells Principal
Systems Analyst and throws lookup error
• T&M Labor Cell Y20 is missing last two rows in sum formula
• T&M Labor Cell Y60 is missing first two rows in sum formula
• T&M Labor Cell V74 is missing 5.6 Transition Out total in sum formula
5. Please confirm whether the PWS requirements and CLIN structure of this Solicitation are entirely consistent with and supported by any
FITARA-based review that was conducted.
FITARA review has been completed and acquisition approved to proceed.
6. Kindly would the government grant a
2 week extension, moving the due date for this opportunity to December
11, 2024, to allow offerors to craft a more robust thorough solution based on the requirements? We appreciate your consideration.
No extension will be provided at this time.
7. 36C10B25R0003
IETSS RFP.pdf;
148 of 153 and 152 of 153; E.15
Submission
Instructions; 2.b page limitations table and 2.b(v)
2.b(v) References "Attachment 001-
IETSS Price Evaluation
Spreadsheet.xlsx" however the
Volume V Price file name in the page limitations table has an .XLS file type extension. Can the government clarify whether the submitted file type for Volume V Price/Cost should be .XLSX or .XLS
RFP updated to .XLSX
8. 36C10B25R0003
IETSS RFP.pdf;
148 of 153 and 151 of 153; E.15
Submission
Instructions; 2.b page limitations table and 2.b(iv)
Can the government confirm whether
.xlsx file type is acceptable for the
Small Business Participation portion of Volume IV?
Confirmed
9. 36C10B25R0003
IETSS RFP.pdf;
147 of 153; E.15
Submission
Section 2.b Content requirements does not include a Summary Volume, is this a required volume, and if so what are the content requirements?
See Amendment 0001.
Instructions; 2.a
Format
10. Attachment 001- -
IETSS Price
Evaluation
Spreadsheet; T&M
Labor Tab
Total Labor Hours and Total Labor -
Total (cells X35 and Y35) excludes rows 34 & 35 from the sum. Per the
Instructions tab, "(1) Offeror shall not input any information in this tab.
T&M Labor tab automatically calculates the total T&M labor price."
May we update the formulas to pull the correct total amounts, or will a revised pricing sheet be posted?
See revised Attachment 001– IETSS
Excel Price Evaluation
Spreadsheet_v1.
11. Attachment 001- -
IETSS Price
Evaluation
Spreadsheet;
Evaluated Price
Summary
Cell E9, Unit Price for Travel
(T&M), is missing the formula reference to cell F9, Total Price. To stay consistent with the other Travel
(T&M) Line Items for the option years, may we adjust the formula, or will a revised pricing sheet be posted?
See revised Attachment 001– IETSS
Excel Price Evaluation
Spreadsheet_v1.
12. Attachment 001- -
IETSS Price
Evaluation
Spreadsheet;
Quality Assurance Specialist is listed in the Labor Category Description tab however not listed as a labor category on any other T&M labor tab.
Confirming this is not a labor category to bid.
See revised Attachment 001– IETSS
Excel Price Evaluation
Spreadsheet_v1.
13. Attachment 001- -
IETSS Price
Evaluation
Spreadsheet; T&M
Labor Tab
T&M Labor Rate tab, cell B37 contains "Principle Systems Analyst, and the vlookup for the yearly hourly rates points to row 25, please confirm this is the same labor category as
Principal Systems Analyst and the vlookup formula should point to the corresponding LCAT.
See revised Attachment 001– IETSS
Excel Price Evaluation
Spreadsheet_v1.
14. 36C10B25R0003
IETSS RFP.pdf;
151; E.15
Submission
Instructions, (ii)
Volume 3 Past
Performance Files;
(3) Section 3 -
Subcontracts
Can the government clarify whether the outline of how the effort required by the solicitation will be assigned for performance within the Offeror’s corporate entity and among the proposed subcontractors is required to be provided for all subcontractors or only major subcontractors?
See Amendment 0001.
15. 36C10B25R0003
IETSS RFP.pdf;
General
The RFP does not provide a proposal validity timeframe, request the government provide the proposal validity timeframe
The RFP at section E.15(2)(b)(v) states, “All Offerors should propose using an estimated award date of
February 14, 2025.” Please make proposal valid through February 2025 at a minimum.
16. 36C10B25R0003
IETSS RFP.pdf; 27;
2.0 Applicable
Documents; 1
The list of applicable documents contains "69. EHRM-IO Joint Master
Test Plan (JMTP)"
Question: Will the government provide this document?
Not at this time. This Document will be provided the IETSS contractor post-award.
17. 36C10B25R0003
IETSS RFP.pdf;
Page 9 of 153;
CLIN 0003; CLIN
Description;
The period of performance (PoP) for
CLIN X003 is not defined within the
CLIN X003 written description. Will the Government please add "PoP shall be 12 months from date of award" within the CLIN 0003 written description?
See Amendment 0001.
18. 36C10B25R0003
IETSS RFP.pdf;
Page 10 of 153;
CLIN 1001; CLIN
Description
Is the referenced text intended to be
"12 months from expiration of the base period, if exercised"? If so, will the Government please revise the
CLIN 1001 written description to reflect this?
See Amendment 0001
19. 36C10B25R0003
IETSS RFP.pdf;
Page 10 of 153;
CLIN 1002; CLIN
Description
Is the referenced text intended to be
"PoP: 12 months from expiration of the Base Period, if exercised"? If so, will the Government please revise the
CLIN 1002 written description to reflect this?
See Amendment 0001
20. 36C10B25R0003
IETSS RFP.pdf;
Page 16 of 153;
CLIN 5001; CLIN
Description
The referenced text cites "…the follow-on ETSSS order." Please confirm that this reference is intended to be "...the follow-on ETSSS contract." If so, will the Government please revise the CLIN 5001 written description to reflect this?
See Amendment 0001.
21. 36C10B25R0003
IETSS RFP.pdf;
Page 16 of 153;
CLIN 5001; CLIN
Description
The referenced text cites "…a formal task order modification..." Please confirm that this reference is intended to be "...a formal contract modification..." If so, will the
Government please revise the CLIN
5001 written description to reflect this?
See Amendment 0001.
22. Attachment 001 -
IETSS Price
Evaluation
Spreadsheet; T&M
Labor worksheet;
General
The T&M Labor worksheet within
Attachment 001 - IETSS Price
Evaluation Spreadsheet does not include columns titled "Labor Hours
(For Evaluation Purposes Only), "Hourly Labor Rate," and "Total
Labor" for CLIN 5001, Optional Task
See revised Attachment 001– IETSS
Excel Price Evaluation
Spreadsheet_v1.
– Transition Support (T&M) IAW
PWS Paragraph 5.6.
Will the Government please add columns titled "Labor Hours (For
Evaluation Purposes Only), "Hourly
Labor Rate," and "Total Labor" for
CLIN 5001, Optional Task –
Transition Support (T&M) IAW PWS
Paragraph 5.6, within Attachment 001
- IETSS Price Evaluation
Spreadsheet, T&M Labor worksheet?
Otherwise, how are Offerors to compute a total not-to-exceed (NTE) price for Line Item (i.e., CLIN) 5001 that is to be entered within the
Attachment 001 - IETSS Price
Evaluation Spreadsheet worksheet titled "Evaluated Price Summary?
23. 36C10B25R0003
IETSS RFP.pdf;
Page 29 of 153;
Section 5.1.2;
Paragraph 1
Please confirm that each offeror must propose, at minimum, the Key
Personnel positions specified within the reference text, consisting of the following Key Personnel positions:
Contract Program Manager, Project
Manager, and Division Lead(s).
No. Key Personnel roles, knowledge, skills and abilities are a component of one or more LCAT.
24. 36C10B25R0003
IETSS RFP.pdf;
Page 29 of 153;
Section 5.1.2;
Paragraph 1
"The Contractor shall assign a single individual to serve as the Contract
Program Manager to support the contract, as well as any other key personnel deemed necessary for support of the contract. Any change of key personnel, defined as Contract
Program Manager, Project Manager, and Division Leads shall require the, CO, and COR and IETSS VA Senior
Management notification and a transition plan to ensure minimum disruption to services delivered via the IETSS contract."
The Key Personnel positions specified within the reference text, consisting of the Key Personnel positions Contract Program Manager and Division Lead(s) are not present within Attachment 001 - IETSS Price
Evaluation Spreadsheet. Will the
Government publish a revised
Attachment 001 - IETSS Price
No. Key Personnel roles, knowledge, skills and abilities are a component of one or more LCAT.
Evaluation Spreadsheet that includes these "RFP LCATs?"
25. 36C10B25R0003
IETSS RFP.pdf;
Page 29 of 153;
Section 5.1.2;
Paragraph 1
"The Contractor shall assign a single individual to serve as the Contract
Program Manager to support the contract, as well as any other key personnel deemed necessary for support of the contract. Any change of key personnel, defined as Contract
Program Manager, Project Manager, and Division Leads shall require the, CO, and COR and IETSS VA Senior
Management notification and a transition plan to ensure minimum disruption to services delivered via the IETSS contract."
The Key Personnel positions specified within the reference text, consisting of the Key Personnel positions Contract Program Manager, and Division Lead(s) are not present within Attachment 001 - IETSS Price
Evaluation Spreadsheet. Will the
Government publish a revised
Attachment 001 - IETSS Price
Evaluation Spreadsheet that includes the LCAT description for each of these positions?
No, the Government will not revise labor categories to incorporate key personnel.
26. 36C10B25R0003
IETSS RFP.pdf;
Page 36 of 153;
Section 5.2.5.4;
Subparagraph b.
Please confirm that the automation tools for development and execution of scripts as needed/appropriate are
Government-Furnished Equipment
(GFE).
Confirmed, the automation tools for development and execution of scripts as needed/appropriate will be provided as GFE.
27. 36C10B25R0003
IETSS RFP.pdf;
Page 36 of 153;
Section 5.2.5.4;
Subparagraph b.
If the automation tools for development and execution of scripts as needed/appropriate are not
Government-Furnished Equipment
(GFE), please confirm that the offeror is to include the price for any such tools within the firm-fixed-price
(FFP) within the x001 CLINs for
Project Management IAW PWS
Paragraph 5.1, inclusive of subparagraphs.
The automation tools for development and execution of scripts as needed/appropriate will be provided as
GFE. VA will provide the required hardware and software for the delivery of services and execution of this contract.
28. 36C10B25R0003
IETSS RFP.pdf;
Page 36 of 153;
Section 5.2.5.4;
Subparagraph b.
Please confirm that the automation tools for executing SCQC services are Government-Furnished
Equipment (GFE).
Confirmed, the automation tools for executing SCQC services will be provided as GFE.
29. 36C10B25R0003
IETSS RFP.pdf;
Page 36 of 153;
Section 5.2.5.4;
Subparagraph b.
If the automation tools for executing
SCQC service are not Government-
Furnished Equipment (GFE), please confirm that the offeror is to include the price for any such tools within the firm-fixed-price (FFP) within the x001 CLINs for Project Management
IAW PWS Paragraph 5.1, inclusive of subparagraphs.
The automation tools for executing
SCQC services will be provided as
GFE.
30. 36C10B25R0003
IETSS RFP.pdf;
Page 39 of 153;
Section 5.3;
Paragraph 1
The costs related to the creation & maintenance of tools to support data migration validation and service virtualization functionality are not able to be accurately estimated prior to contract award. Please confirm that the costs for the creation & maintenance of tools to support data migration validation and service virtualization functionality are billable to the Government as an
Other Direct Cost (ODC) during contract performance.
No. The costs for the creation & maintenance of tools to support data migration validation and service virtualization functionality are NOT billable to the Government as an Other
Direct Cost (ODC) during contract performance.
Execution and delivery of services and support is inclusive of creation, configuration, and maintenance of data migration validation and service virtualization services.
31. 36C10B25R0003
IETSS RFP.pdf;
Page 39 of 153;
Section 5.3;
Paragraph 1
If the costs for the creation & maintenance of tools to support data migration validation and service virtualization functionality are not billable to the Government as an
Other Direct Cost (ODC) during contract performance, please clarify how these costs are to be recovered by the contractor.
See Amendment 001. Execution and delivery of services and support is inclusive of creation, configuration, and maintenance of data migration validation and service virtualization services.
32. 36C10B25R0003
IETSS RFP.pdf;
Page 49 of 153;
Section 5.5.1;
Paragraph 3
REFERENCE TEXT: "Sting processes."
It appears that this sentence has been inadvertently truncated. Please provide the intended verbiage.
See Amendment 0001.
33. 36C10B25R0003
IETSS RFP.pdf;
Page 50 of 153;
Section 5.5.3;
Paragraph 1
Is the reference to "QA Artifact
Review process" intended to be the
QC Artifact Review process that is included within Attachment 002 b?
Yes, for these purposes, the use of QA and QC are interchangeable.
34. 36C10B25R0003
IETSS RFP.pdf;
Page 65 of 153;
Section 6.5;
Paragraph 4
The CLINs and related CLIN descriptions for Option Periods 1 - 4, as well as the Optional Task, are replicated at the end of PWS Section
6.5
Is this the intended incorporation of these CLINs and CLIN descriptions?
35. 36C10B25R0003
IETSS RFP.pdf;
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(1)
REFERENCE TEXT: "[X] (1)
52.222-41, Service Contract Labor
Standards (AUG 2018) (41 U.S.C.
chapter 67)."
QUESTION: The resultant contract does not require the delivery of
"service employee" personnel as defined within the context of the
Service Contract Labor Standards
(SCLS). Please confirm that FAR
52.222-41 is not applicable to the resultant contract.
Service Contract Labor Standards
(SCLS) (formally Service Contract
Act) is not applicable to professional services labor categories. However, the contractor shall be responsible for ensuring compliance with SCLS for any proposed applicable Labor
Categories. See Amendment 0001
36. 36C10B25R0003
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(1)
REFERENCE TEXT: "[X] (1)
52.222-41, Service Contract Labor
Standards (AUG 2018) (41 U.S.C.
QUESTION: If FAR 52.222-41 does apply to the resultant contract, please provide the applicable Wage
Determination(s).
If it does apply, Wage Determination is dependent on the location of the
Contractors facility.
37. 36C10B25R0003
IETSS RFP.pdf;
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
REFERENCE TEXT: "[X] (2)
52.222-42, Statement of Equivalent
Rates for Federal Hires (MAY 2014)
(29 U.S.C.206 and 41 U.S.C. chapter
67)."
"service employee" personnel as defined within the context of the
Please see Amendment 0001.
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(2)
Service Contract Labor Standards
(SCLS). Please confirm that FAR
52.222-42 is not applicable to the resultant contract.
38. 36C10B25R0003
IETSS RFP.pdf;
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(2)
REFERENCE TEXT: "[X] (2)
52.222-42, Statement of Equivalent
Rates for Federal Hires (MAY 2014)
(29 U.S.C.206 and 41 U.S.C. chapter
QUESTION: If FAR 52.222-42 does apply to the resultant contract, please provide the applicable data required in accordance with this contract clause.
Please see Amendment 0001.
39. 36C10B25R0003
IETSS RFP.pdf;
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(3)
REFERENCE TEXT: "[X] (2)
52.222-43, [X] (3) 52.222-43, Fair
Labor Standards Act and Service
Contract Labor Standards—Price
Adjustment (Multiple Year and
Option Contracts) (AUG 2018) (29
U.S.C. 206 and 41 U.S.C.chapter
"service employee" personnel as defined within the context of the
Service Contract Labor Standards
(SCLS). Please confirm that FAR
52.222-43 is not applicable to the resultant contract.
Please see Amendment 0001.
40. 36C10B25R0003
IETSS RFP.pdf;
REFERENCE TEXT: "[X] (4)
52.222-44, Fair Labor Standards Act
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(4) and Service Contract Labor
Standards—Price Adjustment (MAY
2014) (29 U.S.C 206 and 41 U.S.C.
"service employee" personnel as defined within the context of the
Service Contract Labor Standards
(SCLS). Please confirm that FAR
52.222-44 is not applicable to the resultant contract.
41. 36C10B25R0003
IETSS RFP.pdf;
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(7)
REFERENCE TEXT: "[X] (7)
52.222-55, Minimum Wages for
Contractor Workers Under Executive
Order 14026 (JAN 2022)."
"service employee" personnel as defined within the context of the
Service Contract Labor Standards
(SCLS). Please confirm that FAR
52.222-55 is not applicable to the resultant contract.
Please see Amendment 0001.
42. 36C10B25R0003
IETSS RFP.pdf;
Page 102 of 153;
Section C.3., CONTRACT
TERMS AND
CONDITIONS
REQUIRED TO
IMPLEMENT
STATUTES OR
EXECUTIVE
ORDERS—
COMMERCIAL
PRODUCTS AND
REFERENCE TEXT: "[X] (8)
52.222-62, Paid Sick Leave Under
Executive Order 13706 (JAN 2022)
(E.O. 13706)."
"service employee" personnel as defined within the context of the
Service Contract Labor Standards
(SCLS). Please confirm that FAR
52.222-62 is not applicable to the resultant contract.
COMMERCIAL
SERVICES (MAY
2024);
Subparagraph (c)
(8)
43. 36C10B25R0003
IETSS RFP.pdf;
General
Are responses / representations required from the offeror for various solicitation provisions and contract clauses that are incorporated by reference (i.e., as opposed to incorporated by full text within the solicitation) to be included as an addendum to Volume VI?
Yes, please submit responses / representations required from the offeror for various solicitation provisions and contract clauses at
Volume VI.
44. 36C10B25R0003
IETSS RFP.pdf;
Page 141 of 153;
E.5 52.216-1 TYPE
OF CONTRACT
(APR 1984));
Paragraph 1;
The referenced text cites "…task order..." Please confirm that this reference is intended to be
"...contract..." If so, will the
Government please revise the referenced text to reflect this?
See Amendment 0001.
45. 36C10B25R0003
IETSS RFP.pdf;
Page 143 of 153;
E.10 VAAR
852.239-71
INFORMATION
SYSTEM
SECURITY PLAN
AND
ACCREDITATION
(FEB 2023);
Paragraph 1
Within which proposal Volume is the approach for completing the security plan and accreditation requirements in clause 852.239–70, Security
Requirements for Information
Technology Resources, to be provided?
Please address the approach for completing the security plan and accreditation requirements in clause
852.239-70, Security Requirements for Information Technology Resources at Volume VI. This approach will not be evaluated.
46. 36C10B25R0003
Page 143 of 153;
E.10 VAAR
852.239-71
INFORMATION
SYSTEM
SECURITY PLAN
AND
ACCREDITATION
(FEB 2023);
Paragraph 1
Are there any page limitations governing the offeror response to the security plan and accreditation requirements in clause 852.239–70, Security Requirements for
Information Technology Resources?
No.
47. 36C10B25R0003
IETSS RFP.pdf;
& Page 144 of 153;
(ii) VOLUME III –
Past performance in the private (i,e., commercial) sector is not included within the Contractor Performance
Assessment Reporting System
(CPARS). As private (i.e., Please see RFP Section E.15.2(ii) –
“Offerors shall submit no more than six contracts (including Federal, State and local government and private)…”
PAST
PERFORMANCE
FILES & Section
E.14; Paragraph 1
& Paragraph 2 commercial) past performance will be considered by the Government in conducting the Past Performance evaluation, will the Government please amend the VA IETSS solicitation to add a written explanation of the procedures for evaluating private (i.e., commercial) past performance?
48. 36C10B25R0003
IETSS RFP.pdf;
Page 153 of 153;
VOLUME VI -
SOLICITATION,
OFFER AND
AWARD
DOCUMENTS
AND
CERTIFICATIONS
/REPRESENTATIO
NS.; Paragraph b.
Please confirm that Adobe electronic signatures are acceptable for all authorized official signatures required within the SF 1449 and anywhere else within the solicitation that requires an authorized official signature, in accordance with the
FAR 2.101 definition of "Signature" which states "Signature or "signed' means the discrete, verifiable symbol of an individual that, when affixed to a writing with the knowledge and consent of the individual, indicates a present intention to authenticate the writing. This includes electronic symbols."
Confirmed, Adobe electronic signatures are acceptable for all authorized official signatures required within the SF 1449 and anywhere else within the solicitation that requires an authorized official signature.
49. Attachment 003 -
Small Business
Participation
Report; Page 115 of
153; Section C.15;
Paragraph 5
Please confirm that solicitation
Attachment 003, Small Business
Participation Report, is to be submitted to the Contracting Officer on a quarterly basis and is not the template to be utilized for proposal
Volume IV, Small Business
Participation Commitment.
Confirmed. There is no template for
Volume IV but a sample is provided at
RFP Section E.15(2)(b)(iv).
50. 36C10B25R0003
IETSS RFP.pdf;
113; C.14
Organizational
Conflict of Interest;
b;
The Government states: "The
Contracting Officer has determined that significant organizational conflicts of interest exist in the performance of independent testing for Contractors currently participating as a prime or subcontractor on VA IT project management services contracts or software development services contracts for VA/GOTS/COTS software." FAR Section 9.6
Contractor Team Arrangements
(CTAs) means an arrangement in which -"
The Independence Requirement is applicable to all types
Prime/Subcontractor teaming arrangements including Joint Ventures.
(1) Two or more companies form a partnership or joint venture to act as a potential prime contractor; or
(2) A potential prime contractor agrees with one or more other companies to have them act as its subcontractors under a specified
Government contract or acquisition program has a history awarding contacts to entities comprised as a
CTA or SBA-approved Joint Venture entity."
Further, Section C.14 (b) states: "The
Contracting Officer has determined that significant organizational conflicts of interest exist in the performance of independent testing for Contractors currently participating as a prime or subcontractor on VA IT project management services contracts or software development services contracts for VA/GOTS/COTS software."
Since the VA has awarded numerous contracts for IT Project Management and services or software development services for VA/GOTS/COTS to CTA and Joint Venture entities, please confirm the VA includes all types
Prime/Subcontractor teaming arrangements including Joint
Ventures or personal investments in companies as applicable to this section?
51. 36C10B25R0003
IETSS RFP.pdf;
141; E.7 VAAR
852.209-70
ORGANIZATION
AL CONFLICTS
OF INTEREST
(OCT 2020); b
This Section conflicts with Section
C14 Organizational Conflicts of
Interest. Governments response to
Question # 4 in the Q&A states: "If an OCI exists as described by the independence requirement, it cannot be mitigated." Please clarify Section
E.7 as this section seems to be outdated or superseded by the
Government's recent Q&A response noted above.
52. 36C10B25R0003
145; 3.
VETERANS
INVOLVEMENT
EVALUATION
APPROACH;
Paragraph 2
Please confirm that solely those proposed subcontractors that are
VOSB and/or SDVOSB are required to be registered and verified in the
VETCert Program
(veterans.certify.sba.gov).
This requirement applies to prime vendors as well who are including their SDVOSB/VOSB status as credit for the Small business Participation
Commitment requirement.
File details come from the government source that posted it. Updated .