36C10B25R0003 0001.pdf
PDF 1 MB Posted
- Attached to
- DA01--Independent Enterprise Testing and Support Services (IETSS) Federal contract opportunity
- Solicitation number
- 36C10B25R0003
About this file
This document is an amendment to Request for Proposal (RFP) 36C10B25R0003 entitled "Independent Enterprise Testing and Support Services (IETSS)". The RFP is issued by the Department of Veterans Affairs Technology Acquisition Center and seeks proposals for a hybrid firm-fixed-price and time-and-materials contract to provide test and evaluation support, testing and technology support, test systems engineering and implementation support, and test process and quality management support. Key details include:
The period of performance is 12 months from date of award with four 12-month option periods. Travel is on a time-and-materials, no fee basis. The contract includes an optional 180-day transition support task. The solicitation provides pricing schedules, a performance work statement, and details on deliverables. Proposals are due by the closing date and time specified in the RFP. This amendment revises pricing, the performance work statement, contract clauses, and solicitation provisions. All other terms and conditions remain unchanged.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 134
0001 11-21-2024
VA-24-00050415
Department of Veterans Affairs
Technology Acquisition Center
23 Christopher Way
Eatontown NJ 07724
Department of Veterans Affairs
Technology Acquisition Center
23 Christopher Way
Eatontown NJ 07724
To all Offerors/Bidders
36C10B25R0003
X
X X
X 1
***Please see Continuation Page
Jason King
Contracting Officer
36C10B25R0003 0001
Continuation Page:
The purpose of Amendment 0001 to Request for Proposal (RFP) 36C10B25P0003 entitled
“Independent Enterprise Testing and Support Services (IETSS)” is as follows:
1. To revise Sections B.4 Price Schedule, B.5 Performance Work Statement, Section C –
Contract Causes, and Section E – Solicitation Provisions. Updates in track changes below.
2. To incorporate revised Attachment 0001 – IETSS Price Evaluation Spreadsheet_v1 and revised Attachment 0004 - Memorandum of Independence Confirmation 11-21-24 at
Section D – Contract Documents, Exhibits, or Attachments.
3. All other terms and conditions remain in full force and effect.
B.4 PRICE SCHEDULE
Inspection/Acceptance//F.O.B: Destination.
Any resulting contract will be awarded on a hybrid firm-fixed-price (FFP) and Time and
Material (T&M) basis as defined by Federal Acquisition Regulation (FAR) Subpart 16.202.
Accordingly, the Contractor shall ensure that any and all costs associated with the Contractor’s proposed application(s), software products, software solution, and/or system, shall be included in the Contractor’s proposed firm-fixed price, and shall serve as the Contractor’s firm-fixed price for the life of any resulting contract. No additional costs or fees relative to the Contractor’s proposed application(s), software products, software solution, and/or system including, but not limited to, licensing costs and any associated licensing maintenance required for the development, delivery, integration, operation, and/or maintenance of the Contractor’s proposed solution will be allowed, accepted, and/or paid by the Government. Software shall be delivered within five business day of award.
NOTE: Vendors are instructed to see solicitation Section E for proposal submission instructions inclusive of the price proposal. Vendors are cautioned that alterations to the line items as specified below may render quotes unacceptable. All questions shall be directed to the Contract
Specialist, Dana Seeler, dana.seeler@va.gov and the Contracting Officer, Jason King, jason.king6@va.gov prior to the closing date and time specified in the Request for Proposal
(RFP). In accordance with FAR 25.401(a)(1), the subject procurement is exempt from the requirements of the Trade Agreements Act (TAA). Accordingly, Non-TAA compliant items may be quoted for this procurement, and ultimately delivered under any resulting order.
Inspection, Acceptance, and F.O.B.: Destination
Deliverables throughout the performance of this contract shall be provided via electronic submission to: VA Program Manager (PM), Contracting Officer’s Representative (COR), and
Contracting Officer (CO)
Product Service Code for all line items: DA01
Base Period
The base period of performance for this effort shall be 12 months from date of award
CLIN DESCRIPTION QTY UNIT
UNIT
PRICE
TOTAL
PRICE
0001 Project Management in accordance with
(IAW) Performance Work Statement
(PWS) Paragraph 5.1, inclusive of subparagraphs.
This FFP Contract Line Item Number
(CLIN) includes all labor and deliverables
(X001AA through X001AD) required for the successful completion of the services detailed in PWS paragraph 5.1 and all of its subparagraphs.
12 MO $ $
Period of Performance (PoP): 12 months from date of award.
0002 Test and Evaluation Support; Testing and Technology Support; Test Systems
Engineering and Implementation
Support; Test Process and Quality
Management Support T&M IAW PWS
Paragraphs 5.2 through 5.5 inclusive of all subparagraphs.
This T&M CLIN includes all labor and deliverables (X002AA through X002BT) required for the successful completion of the tasks associated with PWS Paragraphs
5.2 through 5.5, including all
This T&M CLIN is in IAW Federal
Acquisition Regulation (FAR) 52.232-7 for invoicing or billing purposes.
The NTE amount shall be calculated using the proposed rates for the labor categories and the estimated number of labor hours listed in Attachment 001.
The T&M rates for this CLIN will be incorporated at time of award as ceiling rates based on the offeror’s proposal.
PoP shall be 12 months from date of award.
1 LO Not-To-Exceed
(NTE) $
NTE $
0003 T&M TRAVEL IAW PWS Paragraph
4.3.
Travel shall be in accordance with the
Federal Travel Regulations (FTR). Travel requires advanced concurrence and shall be approved by the VA PM/COR in writing. Task orderContract travel within the local commuting area will not be reimbursed. The Contractor’s fixed handling rate as set forth herein may be applied to the billable travel cost and shall not exceed that set forth in the basic contract. Profit shall not be applied.
Government Not to Exceed Travel Ceiling:
$156,200.00 + Fixed Handling Rate %
= Travel NTE Ceiling $ ________
1 LO NTE $ NTE $
(Inclusive of Government NTE travel ceiling + Fixed Handling Rate)
PoP shall be 12 months from date of award.
BASE PERIOD TOTAL $
OPTION PERIOD 1
This option period may be exercised in the sole discretion of the Government IAW FAR 52.217-9 Option to
Extend the Term of the Contract (MAR 2000). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of the base period.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1001 Project Management IAW PWS
Paragraph 5.1, inclusive of
This FFP CLIN includes all labor and deliverables (X001AA through X001AD) required for the successful completion of the services detailed in PWS paragraph 5.1 and all of its subparagraphs.
PoP: 12 months from expiration of base period, if exercised.PoP: 2 months from expiration of the base period, if exercised.
12 MO $ $
1002 Test and Evaluation Support; Testing and
Technology Support; Test Systems
Engineering and Implementation
Support; Test Process and Quality
Management Support Time and Material
(T&M) IAW PWS Paragraphs 5.2 through 5.5 inclusive of all required for the successful completion of the tasks associated with PWS Paragraphs 5.2 through 5.5, including all subparagraphs.
Acquisition Regulation (FAR) 52.232-7 for invoicing or billing purposes.
The NTE amount shall be calculated using the proposed rates for the labor categories
1 LO Not-To-Exceed
(NTE) $
NTE $
incorporated at time of award as ceiling rates based on the offeror’s proposal.
period, if exercisedPoP shall be 12 months from date of award.
1003 T&M TRAVEL IAW PWS Paragraph
4.3.
Travel shall be in accordance with the
Federal Travel Regulations (FTR). Travel requires advanced concurrence and shall be approved by the VA PM/COR in writing.
Task orderContract travel within the local commuting area will not be reimbursed. The
Contractor’s fixed handling rate as set forth herein may be applied to the billable travel cost and shall not exceed that set forth in the basic contract. Profit shall not be applied.
$152,956.00 + Fixed Handling Rate %
= Travel NTE Ceiling $ ________
(Inclusive of Government NTE travel ceiling
+ Fixed Handling Rate) period, if exercised.
OPTION PERIOD 1 TOTAL $
OPTION PERIOD 2
This option period may be exercised in the sole discretion of the Government IAW FAR 52.217-9 Option to modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of option period 1.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
2001 Project Management IAW PWS
This FFP CLIN includes all labor and deliverables (X001AA through X001AD) required for the successful completion of the
12 MO Not-To-Exceed
PoP: 12 months from expiration of option period 1, if exercised.
2002 Test and Evaluation Support; Testing and
Technology Support; Test Systems
Engineering and Implementation
Support; Test Process and Quality
Management Support Time and Material
(T&M) IAW PWS Paragraphs 5.2 required for the successful completion of the invoicing or billing purposes.
The NTE amount shall be calculated using the proposed rates for the labor categories period 1, if exercised.PoP shall be 12 months from date of award.
1 LO NTE $ NTE $
2003 T&M TRAVEL IAW PWS Paragraph requires advanced concurrence and shall be approved by the VA PM/COR in writing.
Task orderContract travel within the local commuting area will not be reimbursed.
The Contractor’s fixed handling rate as set forth herein may be applied to the billable travel cost and shall not exceed that set forth in the basic contract. Profit shall not be applied.
$145,025.44 + Fixed Handling Rate %
= Travel NTE Ceiling $ ________ period 1, if exercised.
OPTION PERIOD 2 TOTAL $
OPTION PERIOD 3
This option period may be exercised in the sole discretion of the Government IAW FAR 52.217-9 Option to modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of option period 2.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
3001 Project Management in accordance with
(IAW) Performance Work Statement
(PWS) Paragraph 5.1, inclusive of
This Firm-Fixed-Price (FFP) Contract Line
Item Number (CLIN) includes all labor and deliverables (X001AA through X001AD) required for the successful completion of the
Period of Performance (PoP): 12 months from date of awardexpiration of option period 2, if exercised.
12 MO $ $
3002 Test and Evaluation Support; Testing and
Technology Support; Test Systems
Engineering and Implementation
Support; Test Process and Quality
Management Support Time and Material
(T&M) IAW PWS Paragraphs 5.2 required for the successful completion of the tasks associated with PWS Paragraphs 5.2 through 5.5, including all subparagraphs.
1 LO Not-To-Exceed invoicing or billing purposes.
The NTE amount shall be calculated using the proposed rates for the labor categories period 2, if exercised.PoP shall be 12 months from date of award.
3003 T&M TRAVEL IAW PWS Paragraph requires advanced concurrence and shall be approved by the VA PM/COR in writing.
Task orderContract travel within the local commuting area will not be reimbursed. The
Contractor’s fixed handling rate as set forth herein may be applied to the billable travel
$147,969.46 + Fixed Handling Rate %
= Travel NTE Ceiling $ ________ period 2, if exercised.
OPTION PERIOD 3 TOTAL $
OPTION PERIOD 4
This option period may be exercised in the sole discretion of the Government IAW FAR 52.217-9 Option to modification is issued by the Contracting Officer. If exercised, this option shall commence immediately after expiration of option period 3.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
4001 Project Management IAW PWS
This Firm-Fixed-Price (FFP) Contract Line
Item Number (CLIN) includes all labor and deliverables (X001AA through X001AD) required for the successful completion of the period 3, if exercised.Period of Performance
(PoP): 12 months from date of award.
12 MO $ $
4002 Test and Evaluation Support; Testing and
Technology Support; Test Systems
Engineering and Implementation
Support; Test Process and Quality
Management Support Time and Material
(T&M) IAW PWS Paragraphs 5.2 required for the successful completion of the invoicing or billing purposes.
The NTE amount shall be calculated using the proposed rates for the labor categories period 3, if exercised.PoP shall be 12 months from date of award.
1 LO Not-To-Exceed
(NTE) $
NTE $
4003 T&M TRAVEL IAW PWS Paragraph
Travel shall be in accordance with the
Federal Travel Regulations (FTR). Travel requires advanced concurrence and shall be approved by the VA PM/COR in writing.
Task orderContract travel within the local commuting area will not be reimbursed. The
Contractor’s fixed handling rate as set forth herein may be applied to the billable travel
$150,973.24 + Fixed Handling Rate %
= Travel NTE Ceiling $ ________ period 3, if exercised.
OPTION PERIOD 4 TOTAL $
OPTIONAL TASK – TRANSITION SUPPORT
This is an optional task, FAR 52.217-7, Option for Increased Quantity – Separately priced Line Item (MAR
1989). Work shall not commence until, and unless, a formal modification is issued by the Contracting Officer.
This optional task may be exercised anytime, in whole or in part, within the Base Period or Option Periods 1 through 4.
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
5001 Optional Task – Transition Support
(T&M) IAW PWS Paragraph 5.6.
deliverables required for the successful completion of the tasks associated with
PWS Paragraph 5.6.
This T&M CLIN is in IAW FAR 52.232-7 for invoicing or billing purposes.
The NTE amount shall be calculated using the proposed rates for the labor categories incorporated at time of award as ceiling rates based on the offeror’s proposal.
1 LO Not-To-Exceed
NOTE: Activities related to this task will be performed if a Contractor other than the incumbent Contractor is awarded the follow-on IETSS contract/order
Task 5.6 is designated as an Optional Task and will be exercised at the discretion of the
Government in accordance with FAR
52.217-7.
If exercised, the period of performance will be up to a total of 180 days. The period of performance for the optional task will not exceed 180 days past the expiration date of the period in which it is exercised.
The Contractor shall prepare a comprehensive Transition Plan within 21 calendar days of exercise of the optional task. The Contractor shall attend regularly scheduled meetings with ETS for the remaining 150-days after receipt of the
Transition Plan.
Work shall not commence until a formal task ordercontract modification has been issued by the Contracting Officer.
5001AA Contract Transition Team Roster IAW PWS
Paragraph 5.6
Due/Frequency: 21 days after optional task if exercised
1 LO NSP NSP
5001AB Transition-Out Plan IAW PWS Paragraph
5.6
Due/Frequency: 30 days after optional task if exercised
1 LO NSP NSP
OPTIONAL TASK TOTAL $
TOTAL CONTRACT (INCLUSIVE OF ALL OPTIONS) NTE $
RECURRING DELIVERABLES
(Base and Option Periods)
CLIN DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
X001AA Contractor Project Management Plan IAW
PWS Paragraph 5.1.1
1 LO NSP NSP
Due 30 days after award and updated monthly thereafter.
X001AB PM - Monthly Progress Reports IAW
PWS Paragraph 5.1.3
Due the seventh day of each month throughout the period of performance.
1 LO NSP NSP
X001AC PM - Memorandum of Independence
Confirmation IAW PWS paragraph 5.1.4
Due annually or within three business days of changes.
1 LO NSP NSP
X001AD PM - Contractor Staff Roster IAW PWS paragraph 6.2.2
Due within three business days after award, and updated roster is due within three business days of changes.
1 LO NSP NSP
X002AA TE - Work Product Review Analysis
Report IAW PWS paragraph 5.2.1
Due: Due the seventh day of each month throughout the PoP.
1 LO NSP NSP
X002AB TE - Risk Analysis Summary IAW PWS paragraph 5.2.3
Due: Ad hoc throughout the PoP.
X002AC TE - Test Plan Summary IAW PWS paragraph 5.2.4
X002AD TE - Test Analysis Summary IAW PWS paragraph 5.2.6
X002AE TE - Patient Safety Issue Testing Report
IAW PWS paragraph 5.2.6
X002AF TTS - Configuration Management Plan of the Virtual Services IAW PWS paragraph
5.3
Due/Frequency: Monthly
X002AG TTS - Change Management Plan of the
Virtual Services IAW PWS paragraph 5.3
X002AH TTS - Change Management Plan of the
Automation Testing IAW PWS paragraph
X002AJ TTS - Virtual Service Creation and
Deployment Process IAW PWS paragraph
X002AK TTS - Test Data Management Plan IAW
PWS paragraph 5.3
X002AL TTS - Test Data Creation Process and
Strategy IAW PWS paragraph 5.3
X002AM TTS - Architecture Diagrams for Major
Programs IAW PWS paragraph 5.3
Due/Frequency: As required
X002AN TTS - Test Environment Logical
Requirements Document IAW PWS paragraph 5.3
Due/Frequency: As required
X002AP TTS - Interoperability Management
Process IAW PWS paragraph 5.3
X002AQ TTS - Data Migration Validation Strategy
IAW PWS paragraph 5.3
X002AR TTS - Data Migration Validation Test
Cases and Scripts IAW PWS paragraph
X002AS TTS - Interoperability Management
Process IAW PWS paragraph 5.3
X002AT TTS - Data Migration Validation Services
IAW PWS paragraph 5.3
X002AU TSEI – Revised TC System Architecture
Documentation 5.4.1
Due/Frequency: Due annually, by the seventh day of the month following contract or option period award, or when architecture changes require updates.
1 LO NSP NSP
X002AV TSEI - TC O&M Plan IAW PWS paragraph 5.4.2 contract or option period award
1 LO NSP NSP
X002AW TSEI - Revised Patch Management Plan
IAW PWS paragraph 5.4.2 contract or option period award.
1 LO NSP NSP
X002AX TSEI - Revised Configuration and Change
Management Documents IAW PWS paragraph 5.4.2.
contract or option period award
1 LO NSP NSP
X002AZ TSEI - TC O&M Monthly Status Report contract or option period award
1 LO NSP NSP
X002BA TSEI - Revised Disaster Recovery Plan contract or option period award
1 LO NSP NSP
X002BB TSEI - Revised Database Backup &
Recovery Plan IAW PWS paragraph 5.4.2
X002BC
TSEI - After Action Reports IAW PWS paragraph 5.4.2
Due/Frequency: Due ad hoc throughout the PoP.
X002BD TSEI - Revised Configuration and Change
Management Documents IAW PWS paragraph 5.4.3 contract or option period award, and as needed.
1 LO NSP NSP
X002BE TSEI - TC Database Administration Plan
IAW PWS paragraph 5.4.3 contract or option period award, and as needed.
1 LO NSP NSP
X002BF TSEI - Database Performance Report IAW
PWS paragraph 5.4.3
Due/Frequency: Due ad hoc throughout the period of performance (PoP).
1 LO NSP NSP
X002BG TSEI - Create and maintain Standard
Operating Procedures IAW PWS 5.4.3 contract or option period award, and as needed.
1 LO NSP NSP
X002BH TSEI - Tools Assessment Report IAW
PWS paragraph 5.4.5 contract or option period award, and as needed.
1 LO NSP NSP
X002BJ TPQM - Continuous Quality Improvement
Process Plan IAW PWS paragraph 5.5.1
Due/Frequency: Due three business days after the end of each quarter
1 LO NSP NSP
X002BK TPQM - Lessons Learned Repository
IAW PWS paragraph 5.5.2
Due/Frequency: Ongoing requirement to maintain
1 LO NSP NSP
X002BL TPQM - Lessons Learned Report IAW
PWS paragraph 5.5.2
Due/Frequency: Due 30 business days after each Lessons Learned Meeting
X002BM TPQM - Quality Review Report IAW
PWS paragraph 5.5.2
Due/Frequency: Quarterly
X002BN TPQM - Artifact Review Findings Report
IAW PWS paragraph 5.5.3
Due/Frequency: Due 15 days after the end of each month
1 LO NSP NSP
X002BP TPQM - Artifact Corrective Plan of
Action IAW PWS paragraph 5.5.3
Due/Frequency: Due 15 days after the end of each month
1 LO NSP NSP
X002BQ TPQM - Updated Measurement and
Metric Plan IAW PWS paragraph 5.5.6
Due/Frequency: Due the seventh day of the month following contract or option period award, but actual metrics are ongoing updates as required on SharePoint site.
1 LO NSP NSP
X002BR TPQM - CQIP Orientation and Overview
Briefing IAW PWS paragraph 5.5.7
Due/Frequency: Due three business days after the beginning of the month
1 LO NSP NSP
X002BS TPQM - Root Cause Analysis Incident
Report IAW PWS paragraph 5.5.8
Due/Frequency: Due 15 calendar days after completion of the Root Cause
Analysis
1 LO NSP NSP
X002BT Technical Data - IAW Contract Section
C.16, Data Rights
Due/Frequency: As Required
B.5 PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
DEPARTMENT OF VETERANS AFFAIRS (VA)
Office of Information and Technology (OIT)
Electronic Health Record Modernization Integration Office (EHRM-IO)
Independent Enterprise Testing and Support Services (IETSS)
Date: October 18,November 20, 2024
TAC-24-00050415
PWS Version Number: 3.12
1.0 BACKGROUND
The mission of Department of Veterans Affairs (VA), Office of Information & Technology
(OIT) is to collaborate with business partners to create the best experience for Veterans. In meeting these goals, OIT strives to provide high quality, effective, and efficient Information
Technology (IT) services to those who provide care to Veterans at point-of-care as well as throughout all points of each Veteran’s health care, in an effective, timely and compassionate manner. VA depends on Information Management/Information Technology (IM/IT) systems to meet mission goals.
OIT is the steward of VA’s IT resources and is responsible for ensuring the efficient and effective operation of VA’s IT Management System to meet mission requirements defined by the
VA Secretary and other key VA officials. OIT partners with other VA business units to deliver available, adaptable, secure, and cost-effective technology services to VA. Technology services are introduced into VA via two primary approaches: in-house development or acquisition of
Commercial Off The Shelf (COTS) and Government Off The Shelf (GOTS). These approaches follow industry, Government, and VA standards for technology, including but not limited to the phases of Software Development LifeCycle (SDLC) for development and Software Acquisition, Configuration, and Implementation (SACI) for COTS and GOTS.
The EHRM-IO Program is the program executive office charged with the preparation, deployment, and transition to a new electronic health record (EHR) within VA. The program will ensure that the process of deploying the new EHR is done in a manner that meets VA needs and supports seamless healthcare to Veterans and qualified beneficiaries. The Integrated Testing program within the EHRM-IO manages and oversees the execution of the test and evaluation activities across the EHRM program and its products. The testing community that makes up the
EHRM-IO Integrated Testing Program is comprised of three main organizations: Integrated
Testing Enterprise Test (IntT-ET), Office of Functional Champion, Functional Test & Evaluation
(OFC Test/OFCt), and the Oracle Health Testing & Quality Assurance (T&QA). The resources delivering these services are a mix of EHRM-IO IntT VA resources and IntT-ET contractor services through this IETSS contract; OFC Test VA; and OIT Test Management and Operations
(TMO) and Test Center (TC) VA resources.
The IETSS Contract will provide services in support of EHRM-IO IntT and OFC Test and OIT
TMO and Test Center (TC) VA resources. IETSS resources will work closely and collaboratively with the Oracle Health T&QA team to ensure an integrated approach and schedule for the EHRM-IO Test and Evaluation lifecycle, the IETSS Contractor shall coordinate services with OIT and EHRM-IO. The IETSS Contract will provide services in support of
EHRM-IO as well as VA OIT current legacy and future major programs requiring test service support.
2.0 APPLICABLE DOCUMENTS
In the performance of the tasks associated with this Performance Work Statement, the Contractor shall comply with the most current version of the following:
1. “Federal Information Security Modernization Act of 2014”
2. Federal Information Processing Standards (FIPS) Publication 140-3, “Security
Requirements for Cryptographic Modules”, March 22, 2019
3. FIPS Pub 199. “Standards for Security Categorization of Federal Information and
Information Systems,” February 2004
4. FIPS Pub 200, “Minimum Security Requirements for Federal Information and
Information Systems,” March 2006
5. FIPS Pub 201-3, “Personal Identity Verification of Federal Employees and
Contractors,” January 2022
6. 10 U.S.C. § 2224, "Defense Information Assurance Program"
7. 5 U.S.C. § 552a, as amended, “The Privacy Act of 1974”
8. Public Law 109-461 (P.L. 109-461), Veterans Benefits, Health Care, and
Information Technology Act of 2006, Title IX, Information Security Matters
9. 42 U.S.C. § 2000d “Title VI of the Civil Rights Act of 1964”
10. VA Directive 0710, “Personnel Security and Suitability Program,” June 4, 2010, https://www.va.gov/vapubs/index.cfm
11. VA Handbook 0710, “Personnel Security and Suitability Program,” May 2, 2016, https://www.va.gov/vapubs/index.cfm
12. VA Directive and Handbook 6102, “Internet/Intranet Services,” August 5, 2019
13. 36 C.F.R. Part 1194 “Information and Communication Technology Standards and
Guidelines,” January 18, 2017
14. Office of Management and Budget (OMB) Circular A-130, “Managing Federal
Information as a Strategic Resource,” July 28, 2016
15. 32 C.F.R. Part 199, “Civilian Health and Medical Program of the Uniformed
Services (CHAMPUS)”
16. NIST SP 800-66 Rev. 1, “An Introductory Resource Guide for Implementing the
Health Insurance Portability and Accountability Act (HIPAA) Security Rule,”
October 2008
17. Sections 504 and 508 of the Rehabilitation Act (29 U.S.C. § 794d), as amended, January 18, 2017
18. Homeland Security Presidential Directive (12) (HSPD-12), August 27, 2004
19. VA Directive 6500, “VA Cybersecurity Program,” February 24, 2021
20. VA Handbook 6500, “Risk Management Framework for VA Information Systems
VA Information Security Program,” February 24, 2021
21. VA Handbook 6500.2, “Management of Breaches Involving Sensitive Personal
Information (SPI),” June 30, 2023
22. VA Handbook 6500.5, “Incorporating Security and Privacy into the System
Development Lifecycle,” March 22, 2010
23. VA Handbook 6500.6, “Contract Security,” March 12, 2010 (Appendix C updated
April 22, 2024
24. VA Handbook 6500.8, “Information System Contingency Planning,” April 6, 2011
25. VA Handbook 6500.10, “Mobile Device Security Policy,” February 15, 2018
26. VA Handbook 6500.11, “VA Firewall Configuration,” August 22, 2017
27. OIT Process Asset Library (PAL), https://www.va.gov/process/ . Reference Process
Maps at https://www.va.gov/process/maps.asp and Artifact templates at https://www.va.gov/process/artifacts.asp
28. One-VA Technical Reference Model (TRM) (reference at https://www.va.gov/trm/TRMHomePage.aspx)
29. VA Directive 6508, “Implementation of Privacy Threshold Analysis and Privacy
Impact Assessment,” October 15, 2014
30. VA Handbook 6510, “VA Identity and Access Management,” January 15, 2016
31. VA Directive and Handbook 6513, “Secure External Connections,” October 12,
32. VA Directive 6300, “Records and Information Management,” September 21, 2018 https://www.va.gov/vapubs/index.cfm https://www.va.gov/vapubs/index.cfm http://www.va.gov/vapubs http://www.va.gov/vapubs https://www.va.gov/process/ https://www.va.gov/process/maps.asp https://www.va.gov/process/artifacts.asp https://www.va.gov/trm/TRMHomePage.aspx
33. VA Handbook, 6300.1, “Records Management Procedures, “March 24, 2010
34. NIST SP 800-37 Rev 2, “Risk Management Framework for Information Systems and
Organizations: A System Life Cycle Approach for Security and Privacy,” December
35. NIST SP 800-53 Rev. 5, “Security and Privacy Controls for Federal Information
Systems and Organizations,” September 23, 2020 (includes updates as of
12/10/2020)
36. VA Directive 0735, “Homeland Security Presidential Directive 12 (HSPD-12)
Program,” October 26, 2015
37. VA Handbook 0735, “Homeland Security Presidential Directive 12 (HSPD-12)
Program,” March 24, 2014
38. OMB Memorandum 05-24, “Implementation of Homeland Security Presidential
Directive (HSPD) 12 – Policy for a Common Identification Standard for Federal
Employees and Contractors,” August 5, 2005
39. OMB Memorandum M-19-17, “Enabling Mission Delivery Through Improved
Identity, Credential, and Access Management,” May 21, 2019
40. OMB Memorandum, “Guidance for Homeland Security Presidential Directive
(HSPD) 12 Implementation,” May 23, 2008
41. Federal Identity, Credential, and Access Management (FICAM) Architecture, June
30, 2023 (https://arch.idmanagement.gov/#what-is-the-ficam-architecture)
42. NIST SP 800-116 Rev 1, “Guidelines for the Use of Personal Identity Verification
(PIV) Credentials in Facility Access, “June 2018
43. NIST SP 800-63-3, 800-63A, 800-63B, 800-63C, “Digital Identity Guidelines,” updated March 02, 2020
44. NIST SP 800-157, “Guidelines for Derived PIV Credentials,” December 2014
45. NIST SP 800-164, “Guidelines on Hardware-Rooted Security in Mobile Devices
(Draft),” October 2012
46. Draft National Institute of Standards and Technology Interagency Report (NISTIR)
7981, “Mobile, PIV, and Authentication,” March 2014
47. VA Memorandum, VAIQ #7100147, “Continued Implementation of Homeland
Security Presidential Directive 12 (HSPD-12),” April 29, 2011 (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
48. IAM Identity Management Business Requirements Guidance document, May 2013, (reference Enterprise Architecture Section, PIV/IAM (reference https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514)
49. VA Memorandum “Personal Identity Verification (PIV) Logical Access Policy
Clarification,” July 17, 2019, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896
50. Trusted Internet Connections (TIC) 3.0 Core Guidance Documents, https://www.cisa.gov/publication/tic-30-core-guidance-documents
51. OMB Memorandum M-19-26, “Update to the Trusted Internet Connections (TIC)
Initiative,” September 12, 2019
52. OMB Memorandum M-08-23, “Securing the Federal Government’s Domain Name
System Infrastructure,” August 22, 2008
53. Sections 524 and 525 of the Energy Independence and Security Act of 2007, (P.L.
110–140), December 19, 2007
54. Section 104 of the Energy Policy Act of 2005, (P.L. 109–58), August 8, 2005
55. Executive Order 14057, “Catalyzing Clean Energy Industries and Jobs through
Federal Sustainability, 12/8/2021 https://arch.idmanagement.gov/#what-is-the-ficam-architecture https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/documentlistpublic.aspx?NodeID=514 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4896 https://www.cisa.gov/publication/tic-30-core-guidance-documents
56. Executive Order 13221, “Energy-Efficient Standby Power Devices,” August 2, 2001
57. VA Directive 0057, “VA Environmental Management Program,” October 25, 2022
58. Office of Information Security (OIS) VAIQ #7424808 Memorandum, “Remote
Access,” January 15, 2014, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
59. Clinger-Cohen Act of 1996, 40 U.S.C. §11101 and §11103
60. “Veteran Focused Integration Process (VIP) Guide 4.0,” January 2021, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371
61. VA Memorandum “Proper Use of Email and Other Messaging Services,” January 2, 2018, https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28
62. “Product Line Management Transformation Playbook” version 3.1, August 2023, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946
63. NIST SP 500-267B Revision 1, “USGv6 Profile,” November 2020
64. OMB Memorandum M-21-07, “Completing the Transition to Internet Protocol
Version 6 (IPv6),” November 19, 2020
65. Social Security Number (SSN) Fraud Prevention Act of 2017
66. Section 240 of the Consolidated Appropriations Act (CAA) 2018, March 23, 2018
67. “VIP Release Process Guide”, Version 1.4, May 2016, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4411
68. “POLARIS User Guide”, Version 1.9, March 2017, https://www.voa.va.gov/DocumentView.aspx?DocumentID=4412
69. EHRM-IO Joint Master Test Plan (JMTP)
3.0 SCOPE OF WORK
The Contractor shall provide support in the areas of test and evaluation of software, infrastructure, environments, and operations of the Independent Verification and Validation
(IV&V) TC, operations for TC environments hosted in VA Enterprise Cloud, and continuous quality process and program management support.
OIT and major program offices each require specific services during the period of performance to support all areas of daily operations. This work includes test and evaluation of existing legacy solutions, and VA applications in support of VA modernization initiatives. These applications include but are not limited to EHRM solutions and all systems integration to the EHR, Financial
Management Business Transformation (FMBT), future modernization programs, and other
GOTS and COTS applications. The required services also involve testing-related activities associated with Legacy Veterans Health Information Systems and Technology Architecture
(VistA) (Mumps, Delphi), modernized applications (Java/Oracle, Microsoft.Net / Structured
Query Language (SQL)), and other middleware and custom interface and data exchange systems.
While OIT TMO and TC may cover any application in this arena, primary focus is on modernization initiatives, data migration, major system interoperability, and data exchange applications while concurrently supporting testing activities during the transition from VA legacy systems.
3.1 CONTRACT TYPE
The effort shall be a hybrid Firm-Fixed-Price (FFP) and Time-and-Materials (T&M) contract.
https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4371 https://www.voa.va.gov/DocumentListPublic.aspx?NodeId=28 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4946 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4411 https://www.voa.va.gov/DocumentView.aspx?DocumentID=4412
4.0 PERFORMANCE DETAILS
4.1 PERFORMANCE PERIOD
The Period of Performance (PoP) shall be 12 months from date of award with four 12-month option periods. The contract includes one optional task to provide Transition Support. If exercised, the period of performance of the optional task will be a total of 180 days. The period of performance for the optional task will not exceed 180 days past the expiration date of the period in which it is exercised.
Any work at a Government site shall not take place on Federal holidays or weekends unless directed by the Contracting Officer (CO). (If required, the CO may designate the Contractor to work during holidays and weekends)
There are 11 Federal holidays set by law (USC Title 5 Section 6103) that VA follows:
Under current definitions, five are set by date:
New Year's Day January 1
Juneteenth June 19
Independence Day July 4
Veterans Day November 11
Christmas Day December 25
If any of the above falls on a Saturday, then Friday shall be observed as a holiday. Similarly, if one falls on a Sunday, then Monday shall be observed as a holiday.
The other six are set by a day of the week and month:
Martin Luther King's Birthday Third Monday in January
Washington's Birthday Third Monday in February
Memorial Day Last Monday in May
Labor Day First Monday in September
Columbus Day Second Monday in October
Thanksgiving Fourth Thursday in November
4.2 PLACE OF PERFORMANCE
Tasks under this PWS shall be performed at Contractor facilities.
All support will be within the Continental United States (inclusive of Alaska, Hawaii, and US
Territories). Some tasks under this PWS require the on-site presence of contractor resources and shall be performed at a VA location designated by the VA PM.
4.3 TRAVEL (T&M)
The Government anticipates the need for travel events to perform tasks associated with the effort, and to attend program-related meetings or conferences throughout the PoP. Below are travel estimates for the base period and each option period; however, the number, location and duration of travel events listed below are subject to change and will be based on operational requirements.
Travel is on a T&M, no fee basis and shall be in accordance with the Federal Travel Regulations
(FTR) and requires advance concurrence by the Contracting Officer Representative (COR). The
Contractor shall provide cost estimates with each travel request to the COR. Each Contractor invoice must include copies of all requested, applicable, and required receipts (FTR §301-11.25:
required for lodging, regardless of amount, and a receipt for every authorized expense over $75) that support the travel costs claimed in the invoice.
Contractor travel within the local commuting area of 50-miles, as well as contractor participation in virtual meetings, will not be reimbursed. Travel performed for personal convenience and daily travel to and from work at the Contractor’s facility will not be reimbursed. Contractor travel within the local commuting area will not be reimbursed.
Travel will be performed in accordance with Federal Travel Regulations and will be billed after performance.
Estimated Travel per Year
EHRM
OIT
Type of Meeting Location Number of Trips
Number of
Persons
Number of
Days
EHRM Testing at
Deployment Site
(6 events)
TBD pending operational requirements 6 3 5
EHRM Integrated
Testing Team
Meetings Washington DC 2 12 5
OIT IV&V Strategic
Planning Austin, TX 1 9 5
5.0 SPECIFIC TASKS AND DELIVERABLES
The Contractor shall perform the following in accordance with VA processes to be provided to the contractor.
5.1 PROJECT MANAGEMENT (FFP)
5.1.1 Contractor Project Management Plan
The Contractor shall deliver a Contractor Project Management Plan (CPMP) that lays out the
Contractor’s approach, timeline, and tools to be used in execution of the contract. The CPMP shall take the form of both a narrative and graphic format that displays the schedule, milestones, risks, and resource support. The CPMP shall also include how the Contractor shall coordinate and execute planned, routine, and ad hoc data collection reporting requests as identified within the PWS. The initial baseline CPMP shall be concurred upon and updated monthly thereafter.
The Contractor shall update and maintain the VA-approved CPMP throughout the period of performance.
Deliverable:
Contractor Project Management Plan
5.1.2 Contract Key Personnel
The Contractor shall assign a single individual to serve as the Contract Program/Project Manager to support the contract, as well as any other key personnel deemed necessary for support of the contract. Any change of key personnel, defined as Contract Program/Project Manager, Project
Manager, and Division Leads shall require the, CO, and COR and IETSS VA Senior
Management notification and a transition plan to ensure minimum disruption to services delivered via the IETSS contract.
Any personnel the Contractor offers as substitutes shall have capabilities and qualifications at least equal to the key personnel being replaced, meaning that candidates shall have experience in program and project management, leadership, and testing services at an equivalent or greater level to the key personnel being replaced. If any change to a key personnel position becomes necessary, the Contractor shall immediately notify the VA PM in writing. Whenever possible the
Contractor shall notify the VA PM of substitutions of personnel in writing 30 calendar days prior to making any change in key personnel. The notification should provide a detailed explanation of the circumstances necessitating the proposed substitution and shall demonstrate that the proposed replacement is of at least substantially equal ability and qualifications as the individual originally proposed for that position.
The Contractor agrees that it has a contractual obligation to mitigate the consequences of the loss of key personnel and shall promptly secure any necessary replacements in accordance with this
PWS section. Failure to replace key personnel without a break in performance of the labor category at issue shall be considered a condition endangering contract performance and may provide grounds for termination.
5.1.3 Reporting Requirements & Management Meetings
The Contractor shall provide the COR with Monthly Progress Reports in electronic form in
Microsoft Word or Excel formats. The report shall include detailed explanations for each required area and ensure that data is accurate and consistent. These reports shall reflect data as of the last day of the preceding month.
The Contractor shall conduct weekly management meetings that summarizes services delivered for the past week, active or open services, issues resolved and issues still under consideration that are relevant for VA management visibility and related to the requirements review. Weekly management meetings are attended by VA and Contractor management and team leads with meeting notes generated as an artifact and distributed to the Government.
The Monthly Progress Reports shall cover all work completed during the reporting period and work planned for the subsequent reporting period. The report shall also identify any problems that arose and a description of how the problems were resolved. If problems have not been completely resolved, the Contractor shall provide an explanation including its plan and timeframe for resolving the issue. The Contractor shall monitor performance against the CPMP and report any deviations. It is expected that the Contractor will keep in communication with VA accordingly so that when issues arise, they are visible to both parties, to enable solutions to be developed without escalation. The Monthly Progress Report shall organize the report into the
EHRM-IO Integration Testing Section & OIT Section.
A. Monthly Progress Report
5.1.4 Testing Independence
Under the terms of this contract/order, the Contractor or its subcontractors shall not test VA major IT program projects if they are acting as prime or subcontractor on a VA contract that provides IT project management, software development services as defined in Section C.14. To maximize transparency, the Government and Contractor will take an active role in ensuring that independence is established prior to contract award and maintained throughout the life of the contract.
The Contractor shall submit an annual Memorandum of Independence Confirmation that will enable VA to verify and monitor independence of Contractor and their subcontractors.
Additionally, throughout the period of performance of this contract, the Contractor shall immediately notify the CO, in writing, if it or its subcontractors intends on pursuing VA business opportunities for software development or IT project management. Thereafter, the Contractor agrees to comply with the directions of the CO that, in his or her discretion, deems necessary in order to ensure its independence. The ultimate responsibility for complying with this independence requirement remains with the Contractor. A CO’s response, or lack of response, to any notification made pursuant to this clause is not a representation of compliance with the independence requirement. Noncompliance with the independence requirement may lead to possible termination of this contract. These procedures will increase contract management effectiveness and will demonstrate Government due diligence.
A. Memorandum of Independence Confirmation
5.2 TEST AND EVALUATION SUPPORT (T&M)
The Contractor shall execute the following tasks in support of EHRM-IO Integrated Testing &
OIT. The Contractor shall support EHRM-IO Integrated Testing & OIT and execute required testing and testing-related activities. The EHRM-IO program services required from TMO and
TC cover the full scope of test and evaluation services needed for the successful implementation of the EHR COTS solutions across all waves of EHRM-IO deployment. In addition, the EHRM-
IO services required from TMO cover the large-scale data migration test and evaluation of legacy production data into the new EHR solutions.
5.2.1 Work Product Reviews
The Contractor shall conduct reviews of work products generated by organizations external to
TMO, TC and EHRM-IO Integrated Testing. Documents to be reviewed include task orders, test plans and other documents or products directly or indirectly related to testing activities. The
Contractor shall provide a Work Product Review Analysis Report that provides a summary of the product reviewed, highlighting positive areas as well as areas of concern. For EHRM-IO products tracked within the EHRM-IO deliverables review system, the Contractor shall conduct reviews of the assigned work products with the review comments being logged within the
EHRM-IO deliverables review system.
For informational purposes only, the current average monthly deliverable review workload is 55 artifacts, which is expected to ramp up significantly over the period of performance.
A. Work Product Review Analysis Report
5.2.2 Information Gathering/Requirements Analysis
The Contractor shall participate as a member of requirements reviews as requested by TMO and
TC in coordination with the project team responsible for the system under test (SUT). The
Contractor shall engage with a project team’s requirement management resources to understand the requirements management process for SUT, to determine processes for establishing traceability between test cases and SUT requirements and to provide input and feedback on the testability of the product software requirements under review. The Contractor shall use a specific approach agreed to between TMO and the project team PM prior to beginning work. The
Contractor shall coordinate the testability review of the requirements with other members of the review team.
Historically, there have been approximately 139 product requirement reviews per 12-month period.
5.2.3 Testing Intake Assessment/Criticality Analysis and Risk Assessment
The Contractor shall perform the Testing Intake Assessment (TIA) and Criticality Analysis and
Risk Assessment (CARA) processes on products and/or workflows for major programs utilizing the predefined processes. The Contractor shall provide detailed risk analyses, documenting the various aspects of competing risks and provide findings to IETSS management.
The Contractor shall:
a. Perform TIA process by accessing the project’s required repositories, such as GitHub, or other VA requirements sources such as contract task orders or performance work statements, or exports of requirements from Vendor requirements repository for COTS products.
b. Collaborate with the project team to resolve any issues with the data gathered via the
TIA. Review available documentation (e.g., Epics, User Stories) for initial completeness;
work with the project team to clarify any questions or issues pertaining to the documentation.
c. Generate Product/Project Assessment Summary (PAS) as applicable from TIA processes.
The Contractor shall use Government provided templates for the PAS.
d. Generate Build Assessment Summary (BAS) as applicable from TIA processes. The
Contractor shall use Government provided templates for the BAS.
e. Perform CARA process to evaluate, score and assess for criticality and risk of requirements and quality of the SUT documentation.
f. Conduct an Analysis Committee Meeting or Analysis Committee Review Briefing
(ACM/ACRB) with diverse expertise representation to consider the risk scores and other factors (e.g., availability of testing environment, quality of project documentation, resource availability) to determine the testing services recommended for a specific SUT.
g. Generate Risk Analysis Summary (RAS) as applicable as the output of the TIA, CARA and ACM/ACRB processes. The Contractor shall use Government provided templates for the RAS.
h. Perform a Quality Assurance Review of the RAS by submitting the RAS into the Change
Management tool and executing the QA Review Process for each project/product in the approved project artifact repository.
i. File all RAS documents in the approved project artifact repository.
Historical numbers of TIAs, CARAs, and RAS for the 12-month period are shown in the table below. Actual numbers will vary per requirements. CARA services in support of EHRM are based on historical workflow estimates with each workflow undergoing a CARA process. RAS produced in support of EHRM-IO IntT on EHRM workflows historically have been compiled as batches, thus the delta between CARA performed and RAS produced.
Table 5.2.3-1: Historical 12-month estimate for TIAs, CARAs, and RAS
OIT EHRM
TIA/Workflows 492 81
CARA 135 81
RAS 135…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .