36A77619Q0073-0003001.docx

DOCX document 19 KB Posted

Attached to
Gainesville - IOT&A IDIQ
Solicitation number
36A77619Q0073
Issued by

About this file

36A77619Q0073 0003 36A77619Q0073 0003.docx

View the file

Other files

File Type Posted
36A77619Q0073-0004000.docx DOCX document
36A77619Q0073-0002001.docx DOCX document
36A77619Q0073-0002000.docx DOCX document
36A77619Q0073-0002003.docx DOCX document
36A77619Q0073-0002002.docx DOCX document
36A77619Q0073-0001000.docx DOCX document
36A77619Q0073-0001001.xls XLS spreadsheet
36A77619Q0073-002.doc DOC document
36A77619Q0073-015.docx DOCX document
36A77619Q0073-001.docx DOCX document
36A77619Q0073-010.pdf PDF
36A77619Q0073-005.pdf PDF
36A77619Q0073-006.xls XLS spreadsheet
36A77619Q0073-012.xlsx XLSX spreadsheet
36A77619Q0073-000.docx DOCX document
36A77619Q0073-019.docx DOCX document
36A77619Q0073-018.docx DOCX document
36A77619Q0073-003.xlsx XLSX spreadsheet
36A77619Q0073-008.docx DOCX document
36A77619Q0073-017.pdf PDF
36A77619Q0073-011.docx DOCX document
36A77619Q0073-016.pdf PDF
36A77619Q0073-014.pdf PDF
36A77619Q0073-007.pdf PDF
36A77619Q0073-004.xlsx XLSX spreadsheet
36A77619Q0073-013.pdf PDF
36A77619Q0073-009.docx DOCX document
36A77619Q0073.docx DOCX document
Attachment_A_-_Gainesville_IOTA_IDIQ_Draft_PWS.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04/29/2019

NONE

36A776 Department of Veterans Affairs Program Contracting Activity Central 6150 Oak Tree Blvd, Suite 300 Independence

OH

44131 00776 Department of Veterans Affairs Department of Veterans Affairs 6150 Oak Tree Blvd, Suite 300 Independence

OH

44131 To all Offerors/Bidders

36A77619Q0073 04-29-2019

X X X x The purpose of this Amendment #3 is to answer questions received for the subject solicitation.

HEIDI J. GALLAHER

CONTRACTING OFFICER

CONTINUATION PAGE

Gainesville IOTA IDIQ questions

1. Are there any page margin requirements for this submission?

Answer: no.

2. Are cover letters and title pages included in the page max count?

Answer: Title pages are exempt from the page count. All other pages count.

3. Outside of font size, are there any font style/types that are required?

Answer: no.

4. We would like to confirm single-spaced lines are acceptable for our submission.

Answer: Acceptable, as long as the page limit requirements are met.

5. Will the site issue contractor facility badges until the appropriate security investigations are completed and badges are issued?

Answer: Yes, If contractors are required to be on site during security badging, Flash badges will be issued.

6. Have there been initial work conducted to develop activation schedules and management plans?

Answer: The facility has a Program Charter in place that outlines the facilities guideline for the VA Choice 2.0 projects. Activation schedules were developed by the project managers in VACO, CFM and Real Properties.

7. Has the site assigned a dedicated activation program / project manager and activation team to lead the effort?

Answer: There is a dedicated Program Manager for NG/SGVCH, the project manager job has been advertised for the project and is awaiting HR action.

10. Are there two POCs for this effort or one POC for both sites?

Answer: One POC for both sites. The Gainesville project, although two separate projects, will be managed by one.

11. Has a Program Charter been developed for this effort?

Answer: The facility has a Program Charter for the Choice 2.0 Projects.

12. Has the Integrated Product Team (IPT) methodology been used at these locations before?

Answer: Yes, we use the IPT on all our minor and major projects.

13. In the schedules provided for both locations, contractor provided training occur prior to the installation of equipment. Is it the intent of the facility to conduct new equipment training at the vendor facility? Regarding equipment testing during this same period, does this refer to testing of existing equipment for reuse?

Answer: This needs to be adjusted after the equipment is installed. The intent is to have the Vendor conduct the training at the Gainesville facilities for new equipment. If we reuse equipment, we will have to determine if the testing of that equipment has to be completed by the vendor or local bio-medical personnel. The only high-end equipment that may be moved, would be the Pyxis machines for both Primary Care and Mental Health. This will have to be moved and calibrated (tested) under our service contract with the vendor. The activation vendor can coordinate having this set up with our Bio-Medical Engineer.

End of Document