35919_Addendum #1_Final.docx

DOCX document 66 KB Posted

Attached to
K21683 I-84 (Westbound): Union Pacific Railroad Bridge (Hood River)
Solicitation number
S-73000-00009348
Issued by
Hood River County, Oregon

About this file

This document is an Addendum #1 to a Mini-RFP (Request for Proposal) issued by the Oregon Department of Transportation (ODOT) for the I-84 (Westbound) Union Pacific Railroad Bridge (Hood River) project. The purpose of this Addendum is to remove the Key Staff Resume requirement from the Mini-RFP, as it was determined to not be necessary during the evaluation of proposals. The Mini-RFP has a due date and time for addendum protests of July 30, 2024, at 3:00 p.m. Pacific Time.

The contract opportunity is for the I-84 (Westbound) Union Pacific Railroad Bridge project located in Hood River County, Oregon. The Addendum revises the Mini-RFP document by removing the requirement for Key Staff Resumes and changing the corresponding section to "RESERVED." No other changes to the Mini-RFP have been made, and all other areas not modified by this Addendum remain in full force and effect.

View the file

Other files

File Type Posted
20242032_G1_Notice of Award.pdf PDF
35919_Mini RFP Att A Cover Sheet.doc DOC document
35919_ITA.docx DOCX document
35919_Final_ Mini_v2.docx DOCX document
35919_Final_Attachment B_SOW.docx DOCX document
35919_QA 1_Final.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form S003-B080715

ODOT Procurement Office 355 Capitol St MS 51 Salem, OR 97301

Telephone: 503-871-7881 Email: david.brudnok@odot.oregon.gov

Date:07/26/2024
To:Mini-RFP #S-73000-00009348 (PCMS #35919, PA holders)

From: David Brudnok, Procurement and Contracts Specialist

Re: Mini-RFP #S-73000-00009348 I-84 (Westbound) Union Pacific Railroad Bridge (Hood River)

ADDENDUM # 1

to Mini-RFP #S-73000-00009348

This Addendum modifies the Request for Proposal (“Mini-RFP”) document(s) only to the extent indicated herein. All other areas not changed or otherwise modified by this Addendum shall remain in full force and effect. This Addendum is hereby made an integral part of the Mini-RFP document. Proposer must be responsive to any requirements of this Addendum as if the requirements were set forth in the Mini-RFP. Failure to do so may result in Proposal rejection. See the Mini-RFP regarding requests for clarification or change and protests of this Addendum, and the deadlines for the foregoing.

Due date and time for addendum protests:

Protests to this Addendum must be submitted to the Single Point of Contact for this Mini-RFP via email, no later than 07/30/2024, 3:00 p.m. Pacific Time, or they will not be considered.

The purpose of this Addendum is to:

Remove the Key Staff Resume requirement from the Mini-RFP. It was determined to not be necessary during evaluation of proposals.

Revisions to Mini-RFP:

Added text is indicated by bold underlined font, deleted text is indicated by strikethrough font.

1.4.7 SUBMITTAL FILE SIZE AND REQUIRED FORMS (REQUIRED) (RESERVED)

The total combined size of all files for Proposal, Coversheet and any forms must not exceed 15 megabytes.

· (REQUIRED) Key Staff Resumes form (using Agency form and minimum 11-point font). Key Staff Resumes form is, available at: https://www.oregon.gov/odot/Business/Procurement/DocsPSK/keystaff.docx.

Level 3 - Restricted

Level 3 - Restricted

Level 3 - Restricted image1.jpg

File details come from the government source that posted it. Updated .