35893 RFCQ Attachments.docx

DOCX document 56 KB Posted

Attached to
RFCQ - ESB Prineville Sanding Aggregate
Solicitation number
S-73000-00009146
Issued by
Crook County, Oregon

About this file

This document is the Service Agreement Form for the ESB Prineville Sanding Aggregate contract, which is governed by the State of Oregon General Conditions for Public Improvement Contracts. The project scope consists of supplying all labor, equipment, machinery and traffic control for producing and stockpiling or delivering and stockpiling 10,000 Cubic Yards of specified aggregate. The contract term is from the effective date until 11/1/2024 for Substantial Completion and Final Completion. The contract price is $____________. The contract is subject to various certifications and requirements, including compliance with ORS 279A.112 regarding prevention of sexual harassment, and the Oregon False Claims Act. Insurance, bonding, and other requirements are detailed in the document. No retainage will be held for this project.

The document also includes Supplemental General Conditions that modify certain sections of the General Conditions, such as the governing law, Title VI non-discrimination provisions, compliance with government laws and regulations, claims review process, and insurance requirements. Subcontractor payment reporting is also required.

View the file

Other files

File Type Posted
Plans 10-23-2023.pdf PDF
Technical Specifications and Special Provisions~1.docx DOCX document
Prospective Material Source Narrative - Grass Butte Cinder Pit.pdf PDF
35893 RFCQ.docx DOCX document
Prelim Bid Results~93.xlsx XLSX spreadsheet
RFP Engineering Services Pettit Trail and Pickleball.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT A –SAMPLE AGREEMENT FORM

PROSPECTIVE CONTRACTOR INSTRUCTIONS: Do not submit this document with your Competitive Quote. If you are the successful prospective Contractor, ODOT will fill in the blanks within this form and request your signature, which will represent your agreement to enter into a contract. PLEASE NOTE: There are some terms in this document that you will be agreeing to should you be awarded a contract; for instance, completion dates and liquidated damages. Please make sure you have read and understand this document before you submit a Competitive Quote.

STATE OF OREGON SERVICES AGREEMENT FORM

for the project

ESB Prineville Sanding Aggregate Contract Number

Resulting from Request for Competitive Quotes No. S-73000-00009146/35893

Note: The Contract described in this agreement form is not a Public Improvement contract as defined in Oregon’s procurement code. However, ODOT has chosen to use the State of Oregon General Conditions for Public Improvement Contracts (“General Conditions”) as the governing terms and conditions for this contract. When the terms “Public Improvement Agreement” or “Public Improvement Agreement Form” are used in the General Conditions, for this contract those terms mean “Services Agreement” or “Services Agreement Form.”

This Agreement (the “Agreement”), made by and between the State of Oregon, acting by and through the Department of Transportation, hereinafter called OWNER, and_____________________________________ hereinafter called CONTRACTOR, (collectively the “Parties”) shall become effective on the date this Agreement has been signed by all the Parties and all required State of Oregon governmental approvals have been obtained, whichever is later. Unless otherwise defined in the in this Agreement or its attachments, the capitalized terms used herein are defined in Section A.1 of the State of Oregon General Conditions for Public Improvement Contracts.

WITNESSETH:

1. Contract Price, Contract Documents and Work.

CONTRACTOR, in consideration of the sum of $_____________________ (the “Contract Price”), to be paid to CONTRACTOR by OWNER in the manner and at the time hereinafter provided, and subject to the terms and conditions provided in the Contract Documents, all of which are incorporated herein by reference, hereby agrees to perform all Work described and reasonably inferred from the Contract Documents. CONTRACTOR understands and agrees that various provisions incorporated from websites and Attachments to the Request for Competitive Quotes and other Contract Documents were not physically attached but were and are incorporated by reference and have the same force and effect as if fully set forth therein.

CONTRACTOR shall perform the Work for the Contract Price pursuant to the Request for Competitive Quotes identified above (including all Addenda thereto, if any), CONTRACTOR’S response to the Request for Competitive Quote, and the following attachments to the Request for Competitive Quotes, which were posted in OregonBuys as part of the Request for Competitive Quotes advertisement and are incorporated into the Contract by this reference:

Exhibit 1Technical Specifications and Special Provisions
Exhibit 2Plans 10-23-2023
Exhibit 3General and Supplemental General Conditions
Exhibit 4Contract Closeout Compliance Checklist
Exhibit 5Prospective Material Source Narrative – Grass Butte Cinder Pit

ATTACHMENTS INCORPORATED FROM WEBSITES:

ODOT’s Conflict of Interest Guidelines are available on ODOT’s website (see Guidance, Policy & Resources) and are incorporated into this Contract: http://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx

The Contract Price includes: Competitive Quote item #1

Bid Item #
Description
Amount
Unit
Unit Price
Total Price
1
Sanding Aggregate, as Specified
10,000
CuYd

2. Representatives.

Unless otherwise specified in the Contract Documents, OWNER designates the person listed below as its Authorized Representative in the administration of the Contract. The Owner’s Authorized Representative shall be the initial point of contact for matters related to performance, payment, authorization, and to carry out the responsibilities of OWNER. CONTRACTOR has named _______________________________________ its authorized representative to act on its behalf.

Owner’s Authorized Representative:

Ramon Alonso 63055 N. Hwy 97. Bldg. M Bend, OR 97701 Phone: (541) 419-9481 Email: Ramon.ALONSO@odot.oregon.gov

3. Contract Dates (See the General Conditions for definitions of Substantial and Final Completion):

Substantial Completion Date: 11/1/2024 Final Completion Date: 11/1/2024

4. Reserved

5. Certifications.

(a) Contractor certifies, in accordance with ORS 279A.112, that it has in place a policy and practice of preventing sexual harassment, sexual assault and discrimination against employees who are members of a “protected class”. As a material term and condition of this Agreement, Contractor must maintain, throughout the duration of this Agreement, a policy and practice that complies with ORS 279A.112, including but not limited to, giving employees written notice of the Contractor’s policy and practice.

(b) Contractor certifies that Contractor has no undisclosed liquidated and delinquent debt owed to the State or any department or agency of the State.

(c) Contractor certifies that all subcontractors performing Work described in ORS 701.005(2) (i.e., construction Work) will be registered with the Oregon Construction Contractors Board or licensed by the Oregon State Landscape Contractors Board in accordance with ORS 701.035 to 701.055 before the subcontractors commence Work under the Contract.

(d) Contractor certifies that it is certified by the State of Oregon as an “Emerging Small Business” per the guidelines of the Certification Office for Business Inclusion and Diversity (“COBID”), that it will comply with all requirements of the Emerging Small Business Assistance Program under Oregon Revised Statute (ORS) 200.160 through ORS 200.200, and that it will perform at least 51 percent of the labor for the Work using the Contractor's own workforce.

(e) Contractor has a Qualifying Drug Testing Program in place for its employees that includes, at a minimum, the following: (i) A written employee drug testing policy, (ii) Required drug testing for all new Subject Employees or, alternatively, required testing of all Subject Employees every 12 months on a random selection basis, and (iii) Required testing of a Subject Employee when the Offeror has reasonable cause to believe the Subject Employee is under the influence of drugs.

6. Integration.

THE CONTRACT DOCUMENTS CONSTITUTE THE ENTIRE AGREEMENT BETWEEN THE PARTIES. NO WAIVER, CONSENT, MODIFICATION OR CHANGE OF TERMS OF THE CONTRACT SHALL BIND EITHER PARTY UNLESS IN WRITING AND SIGNED BY BOTH PARTIES. SUCH WAIVER, CONSENT, MODIFICATION OR CHANGE, IF MADE, SHALL BE EFFECTIVE ONLY IN THE SPECIFIC INSTANCE AND FOR THE SPECIFIC PURPOSE GIVEN. THERE ARE NO OTHER UNDERSTANDINGS, AGREEMENTS, OR REPRESENTATIONS, ORAL OR WRITTEN, NOT SPECIFIED HEREIN REGARDING THIS CONTRACT. CONTRACTOR, BY THE SIGNATURE BELOW OF ITS AUTHORIZED REPRESENTATIVE, HEREBY ACKNOWLEDGES THAT IT HAS READ THE CONTRACT, UNDERSTANDS IT, AND AGREES TO BE BOUND BY ITS TERMS AND CONDITIONS.

In witness whereof, OWNER executes this Agreement and CONTRACTOR does execute the same as of the day and year indicated below.

CONTRACTOR’S INFORMATION:

NAME & ADDRESS: __

CONTACT INFORMATION: __

CONTRACTOR’S CCB #: __ CCB EXPIRATION DATE: __

CONTRACTOR’S ESB #: ___

CONTRACTOR’S AUTHORIZED SIGNATURE:

Title Date

OWNER’S AUTHORIZED SIGNATURE:

Title Date

Exhibit 1

TECHNICAL SPECIFICATIONS

ESB Prineville Sanding Aggregate

Technical Specifications and Special Provisions will be available as a separate attachment in Oregon Buys on the Attachments Tab during project advertisement.

Technical Specifications and Special Provisions will be inserted here prior to award of the final Contract.

http://www.oregon.gov/ODOT/HWY/SPECS/Pages/standard_specifications.aspx

Exhibit 2

PLANS 10-23-2023

ESB Prineville Sanding Aggregate Plans will be available as a separate attachment in Oregon Buys on the Attachments Tab during project advertisement.

Plans for the project required under this Contract are incorporated by reference as published on OregonBuys with the RFCQ.

Exhibit 3

GENERAL CONDITIONS AND SUPPLEMENTAL GENERAL CONDITIONS

This Request for Competitive Quotes and the resulting Contract for the ESB Sisters Sanding Rock are governed by the STATE OF OREGON GENERAL CONDITIONS FOR PUBLIC IMPROVEMENT CONTRACTS, January 1, 2012 Edition (“General Conditions”) which, although not physically attached, is incorporated herein by reference as an Attachment with the same force and effect as though fully set forth herein:

http://www.oregon.gov/das/Procurement/Guiddoc/GenCon4PI.pdf

Supplemental General Conditions: The following supplements modify the General Conditions this project. Where a portion of the General Conditions is modified or deleted by these Supplemental General Conditions, the unaltered portions of the General Conditions shall remain in effect.

SGC-1 Add the following after A.3.4 under INTERPRETATION OF CONTRACT DOCUMENTS

A.3.5 The characterization of provisions of the Contract as material provisions or the failure to comply with certain provisions as a material breach of the Contract shall in no way be construed to mean that any other provisions of the Contract are not material or that failure to comply with any other provisions is not a material breach of the Contract.

A.3.6 Electronic Signatures. Contractor and Owner agree that signatures, and other forms of authorized representative certification, showing on documents, including but not limited to copies of the Contract, bonds, Change Orders and amendments, submitted or received via email or other electronic means, when submittal or receipt in that manner is required or allowed by Owner are “Electronic Signatures” under ORS Chapter 84 and bind the signing party and are intended to be and can be relied upon by the parties. Owner reserves the right at any time to require Contractor to deliver the hard copy originals of any documents.

SGC-2 Add the following after Section A.7 GOVERNMENT EMPLOYMENT STATUS:

A.8 TITLE VI NON-DISCRIMINATION PROVISIONS

During the performance of the Contract, Contractor, for itself, its assignees and successors in interest (hereinafter referred to as the “Contractor”) agrees as follows:

a. Compliance with Regulations: Contractor shall comply with the Regulations relative to nondiscrimination in Federally-assisted programs of the Department of Transportation Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of the Contract.

b. Nondiscrimination: Contractor, with regard to the work performed by it during the Contract, shall not discriminate on the grounds or race, color, sex, or national origin in the selection and retention of subcontractors, including procurements of materials and leases of equipment. Contractor shall not participate either directly or indirectly in the discrimination prohibited by section 21.5 of the Regulations, including employment practices when the Contract covers a program set forth in Appendix B of the Regulations.

c. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by Contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontractor or supplier shall be notified by Contractor of Contractor’s obligations under the Contract and the Regulations relative to nondiscrimination on the grounds of race, color, sex, or national origin.

d. Information and Reports: Contractor shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by ODOT, FHWA or the Federal Transit Administration (“FTA”) as appropriate, to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of Contractor is in the exclusive possession of another who fails or refuses to furnish this information, Contractor shall so certify to ODOT, FHWA or FTA as appropriate, and shall set forth what efforts it has made to obtain the information.

e. Sanctions for Noncompliance: In the event of Contractor’s noncompliance with the nondiscrimination provisions of the Contract, ODOT shall impose such Contract sanctions as ODOT, FHWA or FTA may determine to be appropriate, including, but not limited to:

(i) Withholding of payments to Contractor under the Contract until Contractor complies, and/or

(ii) Cancellation, termination or suspension of the Contract, in whole or in part.

f. Incorporation of Provisions: Contractor shall include the provisions of paragraphs (a) through (e) in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. Contractor shall take such action with respect to any subcontract or procurement as ODOT of the federal government may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that, in the event Contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, Contractor may request ODOT, and, in addition, Contractor may request the United States to enter into such litigation to protect the interests of the United States.

SGC-3 Make the following revisions to Section B.5 COMPLIANCE WITH GOVERNMENT LAWS AND REGULATIONS:

· Add the following to the end of Section B.5.1:

All rights and remedies available to Owner under applicable federal, state and local laws are also incorporated by reference herein and are cumulative with all rights and remedies under the Contract.

· Delete Section B.5.2(a) and replace with the following:

(a) Pursuant to ORS 279A.110, Contractor shall not discriminate against a disadvantaged business enterprise, a minority-owned business, a woman-owned business, a business that a service-disabled veteran owns or an emerging small business, in the awarding of subcontracts.

· Add the following Section B.5.2(c):

(c) Compliance with ORS 279C.520 also includes (i) As required by ORS 279C.520, the Contractor must comply with ORS 652.220 and shall not unlawfully discriminate against any of Contractor’s employees in the payment of wages or other compensation for work of comparable character on the basis of an employee’s membership in a protected class. “Protected class” means a group of persons distinguished by race, color, religion, sex, sexual orientation, national origin, marital status, veteran status, disability, or age. The Contractor’s compliance with this section constitutes a material element of this Contract and a failure to comply constitutes a breach that entitles Agency to terminate this Contract for cause,

(ii) The Contractor shall not prohibit any of its employees from discussing the employee’s rate of wage, salary, benefits and other compensation with another employee or another person, and shall not retaliate against an employee who discusses the employee’s rate of wage, salary, benefits or other compensation with another employee or another person.

· Add the following Section B.5.2(d):

(d) Respecting certification as a disadvantaged business enterprise, minority-owned business, woman-owned business, business that a service-disabled veteran owns or an emerging small business under ORS 200.055, as and when applicable, the Contactor shall maintain the certifications, and require in its subcontracts that subcontractors maintain the certifications required by ORS 279A.107.

· Add the following Section B.5.2(e):

(e) It is a material term of the Contract that the Contractor certifies by entering into the Contract that Contractor has a written policy and practice that meets the requirements described in ORS 279A.112 (HB 3060, 2017) for preventing sexual harassment, sexual assault and discrimination against employees who are members of a protected class and that the Contractor shall maintain the policy and practice in force during the entire term of the Contract.

SGC-4 Delete Section B.15 GOVERNING LAW in its entirety and replace with the following:

B.15 GOVERNING LAW. This Contract shall be governed by and construed and enforced in accordance with the laws of the State of Oregon without regard to principles of conflicts of laws.

SGC-5 Add the following after Section D.3 CLAIMS REVIEW PROCESS

D.4 FALSE CLAIMS (OREGON FALSE CLAIMS ACT)

D.4.1 Contractor understands and acknowledges it is subject to the Oregon False Claims Act (ORS 180.750 to 180.785) and to any liabilities or penalties associated with the making of a false claim under that Act. By its execution of the Contract, Contractor certifies the truthfulness, completeness, and accuracy of any statement or claim it has made, it makes, it may make, or cause to be made that pertains to the Contract or the Project for which the services are being performed, including but not limited to Contractor’s statement of proposal and any invoices, reports, or other deliverables.

D.4.2. Contractor shall immediately disclose (in writing) to Agency whenever, in connection with the award, performance or closeout of the Contract, or any subcontract thereunder, Contractor has credible evidence that a principal, employee, agent, or subcontractor of Contractor has committed—

(i) A violation of the Oregon False Claims Act; or

(ii) A violation of State or Federal criminal or civil law involving fraud, conflict of interest, bribery, gratuity or similar misconduct.

D.4.3. Contractor must include subsections D.4.1 and D.4.2 of this section in each subcontract Contractor may award in connection with the performance of the Contract. In doing so, Contractor may not modify the terms of those subsections, except to identify the subcontractors or sub grantee that will be subject to those provisions.

SGC-6 Section E.5 RETAINAGE (Reserved – not required for this project)

No retainage will be held for this project.

SGC-7 Add the following at the end of Section E PAYMENTS:

E.7 REPORT OF SUBCONTRACTORS PAID: Following each payment to Contractor, including final payment and any progress payments, Contractor shall submit to the Owner ODOT Form 734-2882, Paid Summary Report. Contractor shall complete and submit the form as specified in the form instructions, which are available online, along with the form at: http://www.oregon.gov/ODOT/Forms/2ODOT/2882.pdf

SGC-8 Amend the first sentence of Section G.2.1 as follows (deletions shown in strikethrough):

G.2.1 When the Contract Price is $100,000 or more (or $50,000 or more in the case of Contracts for highways, bridges and other transportation projects) the Contractor shall furnish and maintain in effect at all times during the Contract Period a performance bond in a sum equal to the Contract Price, and a separate payment bond also in a sum equal to the Contract Price.

SGC-9 Delete Section G.3 INSURANCE in its entirety and replace with the following:

G.3 INSURANCE

G.3.1 Contractor: The Contractor shall obtain the insurance specified below prior to the execution of the Contract. The Contractor shall maintain the insurance in full force at the Contractor’s expense throughout the duration of the Contract and all warranty periods that apply.

G.3.1.2 Subcontracting: If the Contractor specifies prior to the execution of the Contract that a Subcontractor will satisfy an insurance requirement, that is permitted to be satisfied by a Subcontractor, the Contractor shall obtain Owner approval of Subcontractor and Subcontractor’s insurance coverage(s), at least 35 Calendar Days prior to commencement of subcontracted work. After the Contractor receives Owner approval of the Subcontractor, the Contractor may contractually obligate the Subcontractor to obtain and maintain, at the Subcontractor's expense or at the Contractor's expense, the insurance permitted.

G.3.1.3 The Contractor shall require that all Subcontractors carry insurance coverage that the Contractor deems appropriate based on the risks of the subcontracted work. The Contractor shall obtain proof of the required insurance coverages, as applicable, from any Subcontractor providing services related to the Contract.

G.3.1.4 Neither the insurance provided by Subcontractor(s) nor any agreements Contractor or Subcontractor(s) may enter into shall place any limitation on the liability or indemnification obligations of the Contractor under applicable law or the Contract.

G.3.1.5 Insurance Provisions: The Contractor and Subcontractor(s), if any, shall obtain insurance from insurance companies or entities that are authorized to transact the business of insurance and issue coverage in the State and that are acceptable to Owner. Insurance coverage shall be primary and noncontributory with any other insurance and self-insurance, with the exception of Workers’ Compensation/Employer’s Liability. The Contractor, or appropriate Subcontractor, but not Owner, shall pay for all deductibles, self-insurance retentions and self-insurance, if any.

G.3.2 Workers' Compensation and Employer’s Liability:

G.3.2.1 All employers, including the Contractor and Subcontractor(s), if any, that employ subject workers, as defined in ORS 656.027, shall comply with ORS 656.017 and shall provide Workers’ Compensation Insurance coverage, unless such employers meet the requirement for an exemption under ORS 656.126(2). The coverage shall include Employer’s Liability Insurance with coverage limits of not less than $500,000 for each accident. Contractors who perform the Work without the assistance or labor of any employee need not obtain such coverage if the Contractor certifies so in writing. Contractor shall ensure that each of its Subcontractors complies with these requirements. The Contractor shall require proof of such Workers’ Compensation by receiving and keeping on file a certificate of insurance from each Subcontractor or anyone else directly employed by either the Contractor or its Subcontractors.

G.3.2.2 All employers, including the Contractor and Subcontractor(s), if any, exempt under ORS 656.126(2) and subject to any other state’s Workers’ Compensation law, shall provide Workers’ Compensation Insurance coverage as required by applicable Workers’ Compensation laws. The coverage shall also include Employer’s Liability Insurance with limits not less than $500,000 each accident.

G.3.3 Liability Insurance:

G.3.3.1 Commercial General Liability: The Contractor shall obtain, at Contractor's expense, and keep in effect during the term of this Contract, Commercial General Liability Insurance written on an occurrence basis and covering bodily injury and property damage. This insurance shall include personal and advertising injury liability, products and completed operations, and contractual liability coverage. When Work to be performed includes operations or activity within 50 feet of any railroad property, bridge, trestle, track, roadbed, tunnel, underpass or crossing, the Contractor shall provide the Contractual Liability – Railroads CG 24 17 endorsement, or equivalent, on the Commercial General Liability policy. Combined single limit per occurrence shall not be less than the dollar amount specified in the Contract. The annual aggregate limit shall not be less than the dollar amount specified in the Contract.

Per Occurrence
Annual Aggregate
Commercial General Liability
$1,000,000
$2,000,000

G.3.3.2 Commercial Automobile Liability: The Contractor shall obtain, at Contractor's expense, and keep in effect during the term of this Contract, Automobile Liability Insurance covering owned, non-owned, and hired vehicles for bodily injury and property damage. This coverage may be written in combination with the Commercial General Liability Insurance with separate limits for Commercial Automobile Liability and Commercial General Liability. Combined single limit per occurrence shall not be less than the dollar amount specified in the Contract.

Combined Single Limit Per Occurrence

Commercial Automobile Liability
$1,000,000

G.3.3.3 Extended Reporting: If any of the required liability insurance is permitted to be and is on a "claims made" basis, the Contractor or Subcontractor who provided the insurance coverage, shall obtain an extended reporting period on the claims made policy or maintain the claims made policy for a duration of at least 24 months from the date the applicable work has been completed and accepted by Owner or the date of Final Completion. This extended reporting requirement shall be satisfied with documentation of one of the following:

· Maintaining the applicable continuous claims made policy with liability coverage;

· Extended Reporting Endorsement; or

· Tail Coverage.

G.3.3.4 Excess/Umbrella Liability: A combination of primary and Excess/Umbrella Liability insurance may be used to meet the required limits of insurance. Excess/Umbrella Liability coverage must be at least as broad as that provided by the underlying primary insurance policies. In addition, the limits of the underlying primary insurance must be sufficient to prevent any gap between such minimum limits and the attachment point of the coverage provided by the Excess/Umbrella Liability policy.

G.3.3.5 Additional Insured: The liability insurance coverages, except Professional Liability and Workers’ Compensation/Employer’s Liability, if included, shall include an Additional Insured Endorsement endorsing the “State of Oregon, the Oregon Transportation Commission and the Department of Transportation, and their respective officers, members, agents, and employees” as Additional Insureds, but only with respect to the Contractor's activities to be performed under this Contract. Coverage shall be primary and non-contributory with any other insurance and self-insurance. The liability coverages that are permitted by Owner to be obtained by an appropriate Subcontractor shall include all of the foregoing as Additional Insureds and shall also include the Contractor and its officers and employees as Additional Insureds. Additional Insured Endorsements shall be submitted with the Certificate(s) of Insurance and must be acceptable to Owner.

G.3.3.6 Additional Insured – Commercial General Liability: Additional Insured Endorsements on the Commercial General Liability shall be written on ISO Form CG 20 10 07 04, or equivalent, with respect to liability arising out of ongoing operations and ISO Form CG 20 37 07 04, or equivalent, with respect to liability arising out of completed operations. Additional Insured Endorsements shall be submitted with the Certificate(s) of Insurance and must be acceptable to Owner.

G.3.3.7 Notice of Cancellation or Change: The Contractor shall provide at least 30 Calendar Days written notice to Owner before cancellation of, material change to, potential exhaustion of aggregate limits, or non-renewal of the required insurance coverages. If a Subcontractor is providing insurance to meet the contract requirements, the Contractor shall provide at least 30 Calendar Days written notice to Owner before cancellation of, material change to, potential exhaustion of aggregate limits, or non-renewal of the required insurance coverage(s). Any failure to comply with the reporting provisions of this insurance shall not affect the coverage(s) provided to the State, Owner, County, City, or other applicable political jurisdiction or to Owner's governing body, board, or Commission and its members, and Owner's officers, agents, and employees.

G.3.3.8 Certificate(s) of Insurance: As evidence of the insurance coverages required by this Contract, the Contractor shall furnish Certificate(s) of Insurance to Owner prior to execution of the Contract. As evidence of insurance coverages required by the Contract but permitted by Owner to be obtained by an appropriate Subcontractor, the Contractor shall furnish Certificate(s) of Insurance to Owner for approval on such coverages at least 35 Calendar Days prior to commencement of subcontracted work. The Certificate(s) shall:

· List the “State of Oregon, the Oregon Transportation Commission and the Department of Transportation, and their respective officers, members, agents and employees” as a Certificate Holder and endorse as an Additional Insured;

· Include all required endorsements or copies of the applicable policy language effecting coverage required by the Contract;

· Specify that all liability insurance coverages shall be primary and non-contributory with any other insurance and self-insurance, with exception of Professional Liability and Workers’ Compensation/Employer’s Liability; and

· Include a list of all policies that fall under the Excess/Umbrella Liability insurance if Excess/Umbrella Liability insurance is used to meet the minimum insurance requirement.

G.3.3.9 Owner Acceptance: All insurance and insurance providers are subject to Owner acceptance. In addition, all of the following are subject to Owner acceptance and, if requested by Owner, the Contractor shall provide complete copies of the following to Owner’s representatives responsible for verification of the insurance coverages required by the Contract: insurance policies, endorsements, self-insurance documents and related insurance documents.

G.3.3.10 Insurance Requirement Review: The Contractor agrees to periodic review of insurance requirements by Owner under the Contract and to provide updated requirements as mutually agreed upon by the Contractor and Owner.

G.3.4 Builder’s Risk Insurance and Builder’s Risk Installation Floater (RESERVED – NOT REQUIRED FOR THIS PROJECT)

SGC-10 Add the following at the end of Section H.2 SCHEDULE:

H.2.2 The Project Work schedule is essential to the Owner. The Contractor’s failure to provide the schedule, schedule information, progress reports, or schedule updates when required will be cause to suspend the Work, or to withhold Contract payments as necessary to protect the Owner, until the Contractor provides the required information to the Owner’s Authorized Representative.

SGC-11 Add a new subsection to Section J.4.1 as subsection (f) and renumber existing subsection (f) as subsection (g) as follows:

(f) If Contractor has liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State of Oregon;

(g) If Contractor is otherwise in material breach of any part of the Contract.

SGC-12 Delete Section J.4.2 in its entirety and replace it with the following:

J.4.2 At any time that any of the above occurs, Owner may exercise all rights and remedies available to Owner at law or in equity, including, in the event of the conditions set forth in Section J.4.1 (f) regarding Contractor’s liquidated and delinquent debt, by offset or garnishing all monies due for any and all Work performed by the Contractor when appropriate, and otherwise recovering any liquidated and delinquent debt owed to the State of Oregon or any department or agency of the State of Oregon. In addition, Owner may take possession of the premises and of all materials and appliances and finish the Work by whatever method it may deem expedient. In such case, Contractor shall not be entitled to receive further payment until the Work is completed. If Owner’s cost of finishing the Work exceeds the unpaid balance of the Contract Price, Contractor shall pay the difference to the Owner.

SGC-13 Add the following Section J.4.3 to Section J.4 OWNER’S RIGHT TO TERMINATE CONTRACT:

If a termination under this Section J.4 is determined by a court of competent jurisdiction to be unjustified, the termination shall be deemed a termination for convenience. (See Section J.5 TERMINATION FOR CONVENIENCE.)

SGC-14 Add the following at the beginning of Section K CONTRACT CLOSEOUT:

As a condition of final payment, Contractor shall complete and sign the Contract Closeout Checklist form provided by Owner. If accepted by Owner, Contractor’s delivery of the certification as required in K.3 of the Checklist will be deemed to be compliance with the requirements of Section K.3 below and Contractor’s delivery of the information required in K.7 of the Checklist will be deemed to be compliance with the requirements of Section K.7 below.

SGC-15 Delete Section K.4.1 and replace with the following:

K.4.1 Contractor shall provide Owner notice of Substantial Completion. The notice of Substantial Completion shall state the date of Substantial Completion, and shall be submitted to the Owner’s Authorized Representative. The notification may be communicated verbally to the Owner’s Authorized Representative, sent electronically via email, or sent as a hard copy in the mail. Upon receipt of notification of Substantial Completion, the Owner’s Authorized Representative will perform a final project inspection and provide the Contractor with the project Punchlist, which shall also serve as the Owner’s written notice of Substantial Completion. Once all Punchlist items have been completed to the satisfaction of the Owner’s Authorized Representative, the Owner’s Authorized Representative will provide Contractor with a Contract Closeout Checklist form. Contractor shall complete and sign the form and submit it to the Owner’s Authorized Representative. The Owner’s Authorized Representative will provide the final signature on the form upon which date Final Completion shall take effect.

Exhibit 4

CONTRACT CLOSEOUT COMPLIANCE CHECKLIST

Contract Number

Contract Name

Contractor

Owner Authorized Rep.

This checklist is intended to assist Agency and Contractor in complying with the Contract Closeout and Final Payment requirements in the General Conditions for Public Improvement Contracts, Sections K and E.6 : http://www.oregon.gov/das/Procurement/Guiddoc/GenCon4PI.pdf

Owner will mark “NA” by any requirement that is not applicable to the Contract. Contractor’s and Owner’s Authorized Representatives shall place their initials by each requirement listed below that has not been marked “NA” by Owner, and provide a signature at the end of the Checklist.

ODOT: Keep a copy of the signed form in the Contract Administration file. Email a copy to the ODOT Procurement Office. For ESB contracts, also email a copy to your Office of Civil Rights Field Coordinator.

Requirements
Mark NA if not applicable
Date completed
Contractor initials
Owner

initials

K.1 Record Documents submitted

K.2 O & M Manuals submitted

K.3 Certification/Release of Claims

By Contractor’s signature below, Contractor certifies and agrees to the following:

All Subcontractors and suppliers have been paid in full or will be paid in full out of the final payment, and in compliance with all prompt payment requirements. All disputes with property owners have been resolved, all obligations on the project have been satisfied, all monetary claims and indebtedness have been paid, and, to the best of the Contractor's knowledge, there are no claims of any kind outstanding against the project.

K.4 Completion notices submitted

Substantial Completion notice Date of substantial completion:

Final Completion notice Date of final completion:

K.5 Training sessions scheduled

K.6 Extra materials provided (List individually):

K.7. Environmental Clean-up:

Contractor hereby notifies Owner that all environmental cleanup that was performed as a part of this contract has been disposed of in accordance with all applicable rules, regulations, laws, and statutes of all agencies having jurisdiction over such environmental pollution.

K.8 Certificate of Occupancy received by Owner

K.9 Other Contractor Responsibilities (List individually):

E.6 Contractor’s final payment request submitted

Final payment request approved by Owner

CONTRACTOR’S AUTHORIZED REPRESENTATIVE:

Printed Name Title

Signature Date

OWNER’S AUTHORIZED REPRESENTATIVE:

Printed Name Title

Signature Date

Exhibit 5 Zimmerman Site Narrative

ESB Prineville Sanding Aggregate The Prospective Material Source Narrative – Grass Butte Cinder Pit will be available as a separate attachment in Oregon Buys on the Attachments Tab during project advertisement.

The Prospective Material Source Narrative – Grass Butte Cinder Pit attachment for the project required under this Contract is incorporated by reference as published on OregonBuys with the RFCQ.

Rev 01/2022 Page 17 of 20

File details come from the government source that posted it. Updated .