- 333302-24RF-0010039 Gamboa Refurbishment of Facilities – BLDG. 56 Province of Colon, Republic of Panama
- Solicitation number
- 33330224RF0010039
- Issued by
-
Smithsonian Institution
About this file
This document is an amendment to Solicitation Number 33330224RF0010039 for the Gamboa Refurbishment of Facilities - BLDG. 56 in the Republic of Panama. The Smithsonian Institution's Tropical Research Institute (STRI) is seeking a contractor to provide all supervision, labor, materials, and equipment necessary to perform construction services for this project, estimated between $1,000,000 and $5,000,000. Key details include:
The proposal due date is September 25, 2024 at 3:00PM EST. Responses must acknowledge receipt of the amendment. A pre-bid conference and site visit were held in August 2024. Questions and clarifications were due by August 26, 2024. The applicable NAICS code is 236220 Commercial and Institutional Building Construction. The contract will be a fixed-price construction contract. Proposals must be submitted electronically via Dropbox links provided. All documents must be in English.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33330224RF0010039 Amendment 2.pdf | ||
| 33330224RF0010039 RFP.pdf | ||
| BLDG 56_Final Drawings.pdf | ||
| BLDG 56_Final Specifications.pdf | ||
| BID SHEET Gamboa Ref. BLDG. #56.xlsx | XLSX spreadsheet | |
| STRI Contactor Safety Regulations SPANISH.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330224RF0010039
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
OCON
OCON
Washington DC 20013-7012 PO Box 37012
MRC 1200
SMITHSONIAN INSTITUTION
07/09/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/09/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Solicitation Number 333302-24RF-0010039 Gamboa Refurbishment of Facilities ¿ BLDG. 56 amended as follows:
1. Responses to RFI's
THE PROPOSAL DUE DATE IS September 25, 2024, at 3:00PM EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine Grant
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
# Discipline Reference Query SF Reply Attachment
1 Electrical Dwg E-6-01 Provide technical specs for emergency generator, ATS & UPS ASAP
Drawings show a description of each piece of equipment on sheet E-
601. In specification 263213, six reference brands are indicated in the basis of design product. Encapsulated emergency generator 218 KW, 273 KVA, 2 PHASES, 4 WIRES, 60HZ, 120/208V, WITH FUEL TANK OF 62
GAL. AND BUILT-IN 800 A /3P PROTECTION.
01. Spec 26 3213-Engine Generators
2 Electrical Dwg E-1-02 Conflicts with DWG E-6-01 No conflict found.
3 Electrical Dwg E-1-03 Provide manufacturer and model for ceiling fan Refer to attachment. 03. Ceiling Fan
4 Electrical Dwg E-1-03 Lighting Fixture Schedule: Conflict with DIV 26 05 00 Para. 2.01.C. Pls advise ASAP All lighting products must comply with UL certification
5 Electrical Dwg E-1-06 Exposed and Embedded Conduit: Conflict with Section 26 05 33 Para. 3.1.B The specification lists 3 options, of which the plan specifies EMT. There is no conflict
6 Electrical Dwg T-0-01 Grounding Detail: provide cable size On page e-1-02, the ground wire size of the I.P is indicated as a 1/0 bare copper wire, which will be adjusted to a 2/0 cu wire. Refer to attached updated sheets.
06. Sheets E-102 & E-601 (U)
7 Administrative
RFP 52.211-
S0099 Para. 32: Would a local alternative be acceptable even if it does not meet the technical requirements?
Local alternatives must meet the technical requirements to be acceptable.
8 Administrative RFP Clause
52.213-S0094 Confirm precedence between technical specifications, RFP & drawings, for construction purposes
As mentioned in the RFP, precedence will be in the following order: 1.
The Schedule.
2. Solicitation, Instructions, and Conditions (RFP).
3. Amendments to the Solicitation.
4. Contract Clauses.
5. Specifications.
6. The Drawings: large scale details, small-scale details, standard size plans, sections and elevation drawings.
7. Other Documents, Exhibits, and Attachments.
Smithsonian Institution Office of Planning, Design and Construction Construction Division
STRI BRANCH
DATE: September 10, 2024 PROJECT NAME: Gamboa refurbishment of Facilities- Bldg. 56 PROJECT LOCATION: Gamboa, Colon PROJECT No.: 1580001
REQUEST FOR INFORMATION FINAL RESPONSE
9 Administrative RFP Section E Will the Designer be the designated Inspector? No, inspection is going to be performed by STRI.
10 Administrative RFP Section E Does the Inspection have the authority to stop any work activity?
No, inspection does not have the authority to stop any work activity.
Only the COTR has the authority to stop any work.
11 Administrative DIV 01 00 00 Paragraph 29: Weekly Meetings. Conflict with Section 013000 Para. 3.02.A. Meetings will be coordinated by the COTR.
12 Administrative DIV 01 30 00 Para. 3.04: What would be the response time of RFI's when the progress depend upon the decision?
The RFI will be addressed as soon as possible; however, the response time remains as specified.
13 Administrative DIV 01 31 00 Paragraph 1.6. Indicate applicable standards (including Chapter & Paragraph) for coordination drawings
The contractor is responsible to comply with all applicable codes and standards indicated in the contract documents and spec. Attached a reference list of posible applicable codes and standards for coordination drawings.
13. Standards and codes references for coordination.
14 Administrative DIV 02 41 00 Para. 1.01.A: provide details of existing hazardous materials & toxic substances
STRI doesnt have registered the presence of Asbestos in this building.
However, due to the age of the structure, proceed with caution and notify the STRI team if asbestos is found. Regarding fiberglass, which is highly likely to be present in the ducts, dispose of the waste in plastic bags labeled as fiberglass and transport it to a landfill. For further information on waste handling and personal protection, please refer to the attached Panama Canal regulation, which provides comprehensive guidelines for managing this type of waste.
14. Fiberglass
15 Administrative DIV 02 41 00 Para 1.06.A & 3.02.A.9: confirm requirement for this project. Contractor must comply with the mentioned requirements.
16 Administrative DIV 02 41 19 Para. 1.3.A: confirm that all demolition materiales becomes property of Contractor. Provide detailed list otherwise
As for the material to be discarded, it will coordinated during construction. For the material to be recycled, please refer to the replay on RFI 66.
17 Fire Stopping DIV 07 84 13 Para. 2.03: Conflict with DWG G-0-05
There is no conflict; paragraph 2.03 only states that in the case where there are walls requiring 4-hour fire resistance, 3-hour resistance may be used. All firestopping shall be at least in accordance with the fire resistance of the wall in which they are installed."
18 Administrative DIV 02 41 19 Para. 2.1.A: confirm requirement with US Environmental Protection Agency
COMPLY WITH THE REQUIREMENTS OF THE ENVIRONMENTAL IMPACT
STUDY (ATTACHED EIA Resolution).
18. BLDG 56 EIA REsolution
19 Electrical DIV 26 05 00 Para. 1.08: Indicate classification for bedrooms, lab, classroom and all indoor areas of the building
In the specifications, three types of areas are indicated: Outdoor, damp or corrosive; below grade; general purpose – Use general purpose for the spaces requested in the RFI.
20 Electrical DIV 26 05 00 Para 1.08.A.3: confirm that exposed boxes shoud be Nema 12
Exposed electrical boxes should indeed be rated NEMA 12 when they are installed in environments where protection against dust, dirt, and non-corrosive liquids is necessary. NEMA 12 enclosures are specifically designed for indoor use in industrial settings and provide adequate protection against these environmental factors.
21 Electrical DIV 26 05 26 Conflict between DWG E-6-01 and Paragraph 3.1.B Comply with the requirement on Sheet E-601.
22 Electrical DIV 26 05 26 Paragraph 3.2.D: provide design for Signal & Comm Equip.
The Structured cabling and equipments for Signal and Telecom are not included in the scope of this Bid. Only to provide and install the conduits, trays and other elements as indicated in the Contract documents.
23 Electrical DIV 26 05 26 Paragraph 3.5.B: Which one of the four options are applicable to the project?
On the plan, sheet E-601 attached in the Reply to RFI 6, the resistance is corrected to 10 ohms; Option 1 applies in the technical specification.
24 Electrical DIV 26 05 33 Para. 2.1.H, 2.1.I, 3.2.O, 3.2.P, 3.2.Q: clarify the intend of these requirements into the project. 2.1.H. All conduit fittings in the project only.
25 Electrical DIV 26 05 33 Para. 2.7: Where do them apply?
It would apply to any hand hole or box located in the ground, for example, inspection boxes for the grounding system.
26 Electrical DIV 26 05 44 Para. 1.2.B: Is the LEED certification applicable to the project? No
27 Electrical DIV 26 05 44 Para.3.1 & Dwg G-0-05: Identify non-fire rated walls. all penetration located in non marked walls in page G-0-05.
28 Electrical DIV 26 05 44 Para. 3.1.A: Confirm that a sealed sleeve is required at every penetration of electrical conduit thru non-fire rated walls.
It is necesary, see 3.1.B, 3.1.C, 3.1.D for specs for each type of wall assembly.
29 Electrical DIV 26 05 53 Para 2.1: Are A, B, C, & D four different options or they are all required? Different options
30 Electrical DIV 26 05 53 Para 2.5: Are A, B & C three different options or they are all required? Different options
31 Electrical DIV 26 24 13 Confirm to which equipment is this Section applicable? See Para. 1.04.B, 2.02.M, 2.03.A, 2.03.B.3, 2.04.A, 3.03.A, etc, etc.
This section does not apply to the project. Ignore that section because it would apply to switchboards over 2000 amps.
32 Electrical Div 27 05 28 Para. 1.4.B: Is the LEED certification applicable to the project? No
33 Electrical Div 27 05 28 Para. 1.5.C: provide a list of acceptable agencies that can issue the Seismic Qualification Certificates?
We will give a waiver for this requirement
34 Electrical Div 27 05 28 Para 2.1.H.1, 2.1.I, 2.6.D, 3.2W: where does it apply?
2.1H – The conditions where it applies are indicated / 2.1I the same.
2.6D – Does not apply. 3.2W – Does not apply, however, it does describe the situations where it could occur. In such a case, apply.
35 Electrical Div 27 05 28 Para. 3.5 & 3.6: sealed sleeves at all conduit penetrations? Fire rated and Non-fire rated? Yes
36 Electrical Div 27 05 28 Para 2.2.I: acceptable manufacturers for PVC cement approved by the California Department of Health Services.
Oatey Cements.
37 Scope Questions/Clarifi cations We request an extension for the questions/clarifications period of at least 10 days (September 5th) due to the many details in the different disciplines, which may take longer to review.
Not possible.
38 Existing Conditions A-101
In the existing conditions plans there are no details of the existing foundation to demolish and remove and, during the August 13th site visit, the client could not answer a question regarding the existing foundation due to not finding the original as built plans. We kindly request if it can be indicated an homologous foundation type and quantity to demolish so all bidders are in the same condition field at the moment of quoting this activity.
Refer to attachment. 38. Binder-ACP plans
39 Existing Conditions A-101 During the site visit, we saw 2 air conditioning UC's in good condition. Per the A-101 demolition floor plan, these units will probably have a future re-use. Please confirm if these units will be re-utilized for this project or new units shall be furnished and installed.
Non of the existing AC units will be reused in this project. New units shall be furnished and installed.
40 Structure S-106, S-205
In the structure plan S-106, the D-A detail of the eave structure, which is detailed in the plan S-205 doesn't seem to match. In the plan S-205 it shows a double and triple channel C4x5.4 (see sections 1-1 through 4-4), which don't appear in the plan S-106 and are drawn as the W8x10 beam after the concrete beam. Please confirm which element will be installed in the eaves.
USE DETAIL D-A, W8X10 BEAM ENDS AT THE TIE BEAM AND THEN
OVERLAPS THE DOUBLE CHANNEL 2C 4X5.4
41 Structure S-106, S-205 In the structure plan S-106, the D-A detail of the eave structure, which appear in the plan S-205 doesn't seem to match. In the plan S-205 it shows a 2x6 purlin (detail D-B), which is not drawn in the plan S-106. Please confirm if the 2x6 purlin will be installed in the perimeter of the eave.
DETAIL D-A AND D-B MUST BE USED
42 Architecture A-604
In the architecture plan A-604, the finish schedule indicates that the PI4 (vinyl flooring) shall be accompanied by the baseboard Z-3 which is described as a wood baseboard, instead of the Z-4 which is described as a vinyl base board. Please confirm if the Z-3 base board will be used with the vinyl flooring.
For PI-4 flooring, baseboard Z-4 must be used. Refer to updated Sheet A604.
42. Sheet A604 (U)
43 Architecture A-604
In the architecture plan A-604, the finish schedule indicates that the PI5 (original wood flooring) and PI6 (new wood flooring) shall be accompanied by the baseboard Z-2 which is described as a concrete-colored ceramic tile base board, instead of the Z-3 which is described as a wood base board. Please confirm if the Z-2 base board will be used with the wood flooring.
FOR WOOD FLOORING, USE WOOD BASEBOARD Z-3. Refer to Attachement for RFI 42
44 Interior I-101, I-102 In the interior finish and furniture plans I-101 and I-102, the flooring types PI2 and PI7 have the same description. Reviewing the finish schedule plan A-604, the PI7 flooring doesn't exist. Please confirm if the PI2 and PI7 floors are the same flooring type.
ONLY PI2 AND PI3 WILL BE USED; FOR WET AREAS, AN ANTI-SLIP FLOOR
MUST BE USED.
44. Sheets I101 & I102 (U)
45 Elevator Scope of Work Please confirm if the furnishing and installation of the elevator is part of the general contractors' scope.
YES, THE ELEVATOR IS PART OF THE CONTRACTOR SCOPE
Laboratory Fume
Hood Scope of Work
Please confirm if the furnishing and installation of the Laboratory Fume Hood is part of the scope. It is not seen in the drawings but is part of the project specifications
Yes, it is part of the scope to provide and install this equipment.
Telecom. And
Security Scope of Work
There are no specifications regarding the access control and CCTV systems (i.e. brands, models, etc).
Please confirm if these systems are part of the scope.
Under this bid the scope for Security and telecomunication systems is to provide empty conduit, boxes, trays, etc. as indicated in the contract documents.
48 Electricity Specifications In the delivered Specification Book, the sections 26 2726 - Wiring Devices through 26 3600 - Transfer Switches are missing. We kindly ask if you could provide us these sections
Refer to SPEC 26 36 00 Attached. 48. Specs 26 36 00 Transfer Switches
49 Existing Conditions Site Visit (August
13th)
During the site visit, we saw that in the main corridor of the existing building that there is acoustic ceiling with smoke detectors and lamps and a steel ladder for attic access. These elements are not noted in the demolition plans. Please confirm if the removal and disposal/storage is part of the scope of work. THEY MUST BE DEMOLISHED.
50 Demolition A-101, A-102 In the demolition plans, the demolition note D05 indicates the removal of flooring wood beams.
This note in the drawing appears next to the D07 note (remove wood flooring). Please specify if there is any spacing and sizes to consider for these beams.
ONLY THE FLOORING SHOULD BE REUSED.
51 Structure S-402 In the structural drawing S-402, the ground floor slab detail says "# @0.30 Wire Mesh 6mm @ 0.20". Please confirm if rebar will be used (and which size) or 6mm wire mesh 0.20 x 0.20.
USE #3 @ .30 IN A/D, DO NOT USE THE MESH
52 Architecture A-107 There are no details regarding the pump room roof eaves shown in the architectural plan A-107.
We kindly ask for the details of these eaves
SEE STRUCTURAL SHEET S-402.
53 Architecture A-110 In the architecture drawing A-110, there is a partition wall drawn, separating the classroom #1 from classroom #2. We don't see any details regarding this partition wall. Please confirm if the furnishing and installation of it is part of the scope.
SEE PARTITION DETAIL ON SHEET A-504, BRAND: MAMPORT.
54 Architecture A-504 In the architectural drawing A-504, the wall and corner protectors indicates a stainless steel channel guard but doesn't specify the height of the piece, shape, thickness. We kindly ask for more specification regarding these pieces.
QUOTE THE CORNER GUARDS AT A HEIGHT OF 1.00 FROM FINISHED
FLOOR LEVEL, PROPOSE THICKNESS, AND IF ADJUSTMENTS ARE
NEEDED, THEY WILL BE SUBMITTED THROUGH SUBMITTALS.
55 Architecture A-505 In the architecture drawing A-505, general details, it is shown the different roofing details with each element (i.e. flashings, fascia, etc.). It is not detailed the type of material and the gauge of each element. Please specify the type of material and gauges of these flashings, fascias, end laps.
FLASHING: USE THE SAME MATERIAL AND THICKNESS AS THE ROOF TO
AVOID CORROSION
FASCIAS: SAME MATERIAL AS THE ROOF, USE 20 GAUGE
ENDLAPS: SAME MATERIAL AS THE ROOF, USE 22 GAUGE
56 Architecture A-603
In the architecture drawing A-603, window grilles and paint schedule, there is a specification discrepancy between the window grilles elevations and the typical detail. The grille frame indicates 2" x 2" caliber 16 square frame, while the typical detail indicates a 2" x 2" x 1/8" Cal. 16 square metal frame. Please clarify which will be the thickness of these elements.
1/8" GAUGE MUST BE USED
57 Electrical E-103 In the electrical drawing E-103, ground floor lighting plan, the legend H indicates a ceiling fan. This ceiling fan doesn't show a product number. Please specify which brand and model of ceiling fan is required to be furnished and installed or if it can be a generic ceiling fan.
Refer to reply on RFI 03.
58 Electrical E-601
In the electrical single line diagram in drawing E-601, the emergency generator is listed with the required specs but doesn't specify a brand, if it will have a standby or prime rating or if the enclosure is weather-proof or weather and sound-proof . Please confirm if any generator brand is acceptable as long as it complies with these specifications, confirm the generator rating and the type of enclosure.
Refer to the reply of RFI 01.
59 Electrical E-601
In the electrical single line diagram in drawing E-601, after the CTS #3 it appears the symbol of an ATS but there is no information or specification about its capacity. In the drawing E-102, there is information regarding an 800 AMP capacity ATS. Please confirm if this ATS refers to the one in the single line diagram.
The ATS must be compatible with the generator to be purchased, it shall be define accordingly. Refer to the updated sheets of the reply for
RFI 06.
60 Electrical E-601 In the electrical single line diagram in drawing E-601, at the end of the TUP1 line, before the UPS appears the symbol of an ATS but there is no information or specification about its capacity. Please share the specification of this ATS.
The capacities of the ats are 800 amp / 3p / 120/208v as shown on the drawing on page e-1-02. On the other hand, on page t-1-02, the ups is described as 20 kva / 3p / 120/208v; it is also written on the electrical single line diagram. Refer to the updated sheets of the reply for RFI 06.
61 Electrical E-103 In the electrical drawing E-103, lighting plan, in the pump room plant shows an electrical car's charging station. There is no information regarding this station. Please confirm that this charging station is not part of the scope of work
The contractor shall provide the previsions as requested in the construction drawings. The installation of the equipment is not part of the scope of this Bid.
62 Fire Alarm System E-108
In the drawing E-108, in the fire alarm symbology it is specified that the smoke detectors can be MIRCOM. When reviewing the Section 283111 - Addressable Fire Systems Revised in the specifications book, MIRCOM doesn't appear as part of the Available Manufacturers. Please confirm if this brand falls into the category of "Approved Equal".
It can be mircom
63 Fire Alarm System E-502
Reviewing the Fire Alarm system operation index, the duct smoke detector only shuts down the associated air handler unit. Nonetheless, it is notorious that it doesn't activates the fire alarm system as a smoke detector or a manual pull station would. Please confirm if this is a mistake or if it will work as indicated?
The detectors are addressable, meaning they are intelligent and have the installation option. The detector must send a signal to the alarm panel, and the panel will send a signal to turn off the air conditioning units
64 Scope of Work Plumbing Please confirm if the furnishing and installation of the water heater is part of the scope of work.
YES
65 Civil C-501 In the civil plan C-501, paving details, we don't see details regarding the rebar distribution, control joints and dowels in concrete, joint between fresh and old pavement. Please share these pavement details
Details of slab replacement, joints, and splices are added. Refer to the updated Sheet C-501
65. Sheet C-501 (U)
66 Scope of Work Demolition In the demolition plans there is a note that reads "the following activities will require careful removal by contractor, storage and delivery of recycled material to client for possible reuse". Please confirm if the storage of the materials shall be in the project site or a location offsite.
The only things to consider regarding that note:
1- The existing wood finish floor that will be reused on this project.
Refer to reply on RFI 171.
2- The exisiting HVAC or other equipments that the STRI will keep are going to be unistalled by the STRI before the start of the demolition.
Refer to reply on RFI 122.
3- At the time of this Bid, the only elements that the STRI wants to keep are the (vintage - antique looking) Hardware of doors, closets and bathroom partitions. Prior the start of the construction a detailed list (inventory) will be provided to the contractor. The contractor shall unistall, storage and deliver to Tupper office this elements on boxes as clarify on the reply to RFI 123. The storage of this elements by the contractor is only until all elements has been completly uninstalled and a delivery day has been coordinated with the COTR. The storage location is to be determined by the contractor, considering that will be his responsability if any element gets missing. As a preliminary estimated amount of hardwares to have a general idea of the volume:
- Hinges of 20 doors @ 3 each = 60 hinges
- Panic push bars at main doors = 2 Panic Bars
- Hinges of 10 bathrooms partition doors @ 3 each = 30 hinges.
- Hinges of 24 closet doors @ 3 each = 72 hinges.
67 Scope of Work Scope Please confirm that landscaping is not part of the scope of work. The contractor must replace the grass areas with San Agustin grass.
68 Interior I-201, I-202 In the interior drawings I-201 and I-202, the countertop symbology indicates stainless steel envelope and furnitures. It doesn't indicate the type of stainless steel or thickness of the sheets to use. Please share these specifications.
USE TYPE 304 STAINLESS STEEL, WITH #4 SATIN FINISH AND 16 GAUGE
THICKNESS.
69 Architecture A-601 In the architecture drawing A-601, the stalls schedule doesn't show enough information to quote the stalls, regarding the thickness, color, hardware, etc. Please share us the specifications required for the bathroom stalls.
USE FD CENTER BATHROOM PARTITIONS, SEE ATTACHED DATA SHEET. 69. PARTICIONES BAÑOS
70 Architecture Windows / A-602
Our window provider comments the following: Can the window system for window V-05, V-07 and V-08 have a reduced width of 1.20 m to a maximum of 0.88 m. With these dimensions the insulation weight might not be a factor in the eventual malfunctioning of the balancer, due to these having a weight limitation. If the height and width were to remain the same, by experience, the balancers may fail by the wear and tear. The other option is the possibility of changing the system from vertical sliding (Single Hung/Guillotine) to horizontal sliding or exterior projectable window, with the dimensions shown on the drawings.
MAINTAIN DESIGN AESTHETICS, CAN BE EVALUATED LATER THROUGH
SUBMITTALS.
71 Civil C-104 In the civil drawing C-104, general plant of storm water system, the type B storm water box at the start of the 14.99 m line collides with the trench for the A/C piping. Please confirm if that will be the box's final position or it can be moved to avoid collision.
Yes, can be moved to avoid collision.
72 Civil C-104 In the civil drawing C-104, general plant of storm water system, the piping network is shown but it doesn't specify if these are PVC or reinforced concrete pipes. Please specify which type of pipe is required.
REINFORCED CONCRETE AND PVC PIPES ARE SPECIFIED, RESPECTIVELY.
Refer to the attachments.
72. Sheet C-104 (U) 72.FT Tubería TDP F 949
73 Civil C-106 In the civil drawing C-106, general plant of potable water system, in the potable piping layout appears a water meter but it's not specified in the Parts schedule of the drawing. Please confirm if the water meter and water meter box are part of the scope of work.
Yes, they are part of the scope.
74 Architecture A-107
In the architecture drawing A-107 appears drawn a floor trench for the A/C piping. This detail only applies to the section in the ground floor slab. Please specify the type of trench for the section between the ground floor slab and the pad for the A/C system, seen in civil drawings (open trench with grating, concrete encased or other).
DETAIL 2-503 CONTINUES FROM THE BUILDING TO THE A/C PAD
75 Fire Protection Fire Protection
Pump
Our fire protection provider recommends that, since the fire protection pump specified is a vertical turbine pump, the water tank requires a pump sump at the bottom, which does not appear in the structure and architecture drawings. Please confirm if the modification will be performed to allow for the placement of the pump.
AGREED, TO BE CONSIDERED
76 Scope of Work Project Start Date
In the RFP Conference it was mentioned by STRI that the project is expected to begin in June/July 2025. We do not see any information regarding these project start dates on the RFP or Specifications. Please clarify when will bid be awarded and when will construction be allowed to begin.
The award time will depend on the availability of OCON (contract office); however, it must be awarded before the end of this calendar year. Construction will be allowed to begin by July 14, 2025.
77 Scope of Work Permits In the RFP Conference it was mentioned by STRI that the project is expected to start in June/July 2025. If the contract is awarded immediately when will construction permit proccesses be required to take begin?
The construction permit processes can be expedited as necessary to ensure that the permit is ready by July 14, 2025.
78 Scope of Work Bonds and Insurances
In the RFP Conference it was mentioned by STRI that the project is expected to begin in June/July 2025. If the contract is awarded immediatly will the bonds and insurances be required to be valid since the project award until its completion, or only during the construction phase? RFP indicates the bonds and insurances to be submitted within 10 days of project award. Please clarify
Bonds and insurance must be submitted as indicated in the RFP, 10 days after the project award, and must cover until the completion of the project, considering that construction will begin on July 14, 2025.
79 Scope of Work Material Prices
In the RFP Conference it was mentioned by STRI that the project is expected to begin in June/July 2025. If the contract is awarded immediately, will there be any sort of review of the prices prior to the start in case there is significant price increases in materials such as, concrete, steel, electrical cable, pvc, etc.
If necessary, the contractual regulations regarding price adjustment will be followed.
80 Scope of Work Submittals In the RFP Conference it was mentioned by STRI that the project is expected to begin in June/July 2025. If the project is awarded immediatly, will the STRI accept and review submittal information prior to the start of the project in order to allow for a faster excecution once construction begins?
STRI will accept and review submittal information after the Notice to Proceed has been issued.
81 Fire Protection F-502, F-504
In the fire protection drawings, there is a discrepancy in the fire pump specifications. In the drawing F-502, in the pump table the pump HP is specified as 60 HP, meanwhile in the drawing F-504, the pump description specifies a 50 HP electrical engine. Please confirm which of the 2 engine powers will be required.
THE PUMP MUST BE 60 HP, BUT IT MUST MEET THE PRESSURE AND
FLOW PARAMETERS, REGARDLESS OF ITS POWER.
82 Electricity E-601
During the August 13th site visit, the STRI personnel communicated that all electrical work was to be performed from the existing pole-mounted transformers onwards. In the single line diagram of drawing E-601, it is specified that "... it is recommended to replace the CTX21 - 3T -18GP1, for a conventional 3 x 75 kVA 120/208V ABC phases TX bank". Please confirm if the transformers are required to be replaced.
IT NEEDS TO BE CHANGED; THIS RECOMMENDATION IS DUE TO THE
REQUIRED LOAD AND HAS ALREADY BEEN APPROVED BY NATURGY.
THE REQUIRED TRANSFORMERS WILL BE INSTALLED WHEN THE WORK
IS NEARING COMPLETION AND SHOULD BE REQUESTED FROM
NATURGY AFTER THE OCCUPANCY PERMIT.
DIV 21 FIRE
SUPPRESION
What would be the length of the stem? It is needed to be able to give a price to the pumps.
The length of the Turbine (if that is whats is getting ask on this Query) depend on the brand/model to be purchased and installed for this equipment. The contractor shall submit for approval a pump with vertical turbine, that comply with the design parameters of the pump indicated in the construction documents. The free high of the water tank per design is 4.45m + 20cm of the slab where the pump sits on, depending on the equipment that is chosed, if needed, minor adjustments for the correct fitting of this equipment will be provided.
DIV 27
COMMUNICATIONS
T101 & T102
SIMBOLOGY
Are the Tel-Data outputs double or single outputs? DOUBLE OUTPUTS
DIV 32 EXTERIOR
IMPROVEMENTS
A503 General Details
Are the areas where the fences are installed on the AC machine slab and on the electric generator?
Please confirm
Yes, AS DESIGNED
86 Chain link fence Div 32 31 13 The diameters of the line posts, corner posts and top&botton bar indicated in the DWG A-5-04 & S- 4-02 do not match those requested in the specifications. Which prevails?
ACCORDING TO DRAWING
87 Chain link fence Div 32 31 13 DWG A-5-04 indicate mesh gauge 11, but DWG-S-4-02 mesh gauge 9 Which prevail? ACCORDING TO DRAWING
88 Site plan DWG G-1-02
In the area where the new parking lots, new sanitary line, drainage system, electrical duct beams will be built, there is currently a green area with several trees and palm. The question is: how many trees or palm must be cut down to build these new improvements according to the new design?
Refer to the Demolition Site Plan, note DS7 indicate which ones are considered to be removed.
89 Concrete Pavings Div 32 13 13 In DWG C-5-01 you can see a detail of a curb gutter and a detail of a curb. Please indicate on the general plan where each detail applies.
ONLY CURB DETAIL IS USED
90 Concrete Pavings Div 32 13 13
In DWG C-5-01 it is specified that for the parking lot a 650 psi concrete with 0.15m thickness without reinforcement will be used, however, the specifications it request a 4000 psi concrete with
0.125 thickness with reinforcement, please confirm which one applies.
MINIMUM OF 650 PSI FROM MOP IS USED. PREVIOUSLY, 3000 PSI WAS
USED DUE TO PROXIMITY TO THE SEA AND CORROSION EFFECTS.
91 Site Cearing Div 31 10 00 What rule will be used to define how many compaction tests to perform on the fillings to be carried out?
General Guidelines: Intervals of Every 100 to 200 m²: For large areas of uniform fill. Depth Intervals: Tests are usually performed every 150 mm to 300 mm (6 to 12 inches) of compacted fill. Changes in Material: If there is a change in soil type or material being used, additional testing is required.
92 Termite Control 31 3116 In which specific areas of the project should termite control be applied? apply to all buildings foundations and slabs on grade.
93 Structural DWG S-4-01 Please confirm the thickness of the tank walls, in plan it appears 0.35 but in section it appears 0.45
IT MUST BE .45 ON THE TOP PLAN AND ON THE BOTTOM PLAN
94 Structural DWG S-4-01 Would a cold joint at mid-height of the wall of the tank be acceptable? FOAM FENCE IS CONSIDERED
95 Structural DWG S-4-01 Define the size of the water stop 6" MUST BE USED
96 Architecture standing seam roof Please indicate where detail R1 & R2 on roof types (sheet 36) applies.
The Roof is Standing seam type for all the cases. As the differences in each details seft explain, R1 applies where the ceiling below the roof is gypsum, and R2 where it is 2"x2".
97 Architecture window grilles Please confirm window grilles 2"x2" tube gauge 16 on typical detail shows 1/8" cal.16 (sheet 45) Refer to reply on RFI 56.
Fire sprinkler and stanpipe systems
Section 211000 1.6 Hydraulic Design. ¿the design is part of the contract? No. Follow design provided in drawings.
Fire sprinkler and stanpipe systems
Section 211000 1.9.A Quality Conrol. ¿The engineer may be local and have the required experience in fire protection systems.?
Engineer can be local, with Mecanical Engineering license and NFPA certified.
Wet pipe Sprinkler
Systems Section 211313
1.04 Systems Description A.C. The design submitted for the tender does not consider these points?
Yes or no
The design considers the points
101 Plumbing Shee119 of 137 Typical Air conditioning Drainage. We require specifications of the insulation to be installed and its thickness.
1/2" THICK TUBULAR PLASTIC FOAM INSULATION. Refer to spec attached.
101. Spec 22 0719-Plumbing Piping Insulation
General
Requirements
52.247-S0090 Evaluation factors
**Regarding the technical proposal**: What is the evaluation method and how the technical proposals will be the scoring method. Can the FAR be referenced? In which section is this information detailed?
During the review of proposals, the technical proposal (plan of accomplishment, key personnel, and past performance) is evaluated first, where scores from 1 to 5 are assigned: 1 (Unacceptable), 2 (Marginal), 3 (Acceptable), 4 (Good), and 5 (Outstanding). This evaluation checks that the requirements in the RFP are met and that it is applicable to the project being bid on. After this, prices are evaluated; however, only the prices of bidders who have obtained a score of 3 (Acceptable) or higher in their technical proposal are considered.
General
Requirements **Regarding FAR**: Please clarify what type of contract under FAR will apply to the project, considering that it will not be awarded based on the lowest price but on the technical proposal.
Fixed-price construction contract.
General
Requirements Please provide soil analysis test of the current existing conditions. SEE ATTACHED FILE. 104. STRI 56 - Estudio de Suelo
General
Requirements
Rather than construction permit by the Colon municipality, is there any additional permits with ACP, Utilities company or local government that need to be address. Who will be responsible if communication with ACP is required?
Only the construction permit by the Colon Municipality is needed.
General
Requirements Could we maintain the existing power meter for temporary power to construction or the contractor will be required to add one?
The existing power meter is to be removed. Contractor will need to add one por temporary power.
107 Metals Will bolted connections be permitted if meet AISC guidelines?
Will bolted connections require a shop drawing signed by a Panama licensed civil engineer? MAINTAIN DESIGN, CAN BE EVALUATED LATER THROUGH SUBMITTALS
108 Fire protection
DWG
F-1-01
The fire protection system reading in plane F-1-01 indicates that the pump is horizontal with a split casing (carcasa partida), but the pump frame in drawing F-5-02 indicates that it is a 500gpm vertical turbine pump @ 140 psi, 60hp engine. Please clarify the type and characteristics of the pump.
THE PUMP IS A VERTICAL TURBINE TYPE AS INDICATED IN THE
EQUIPMENT SCHEDULE AND ITS CHARACTERISTICS ON PAGE F-502.
Refer to the attached updated sheets.
108. Sheets E-103, E-108, E-602 & E-604 (U)
109 Fire protection 21 13 13
We are not designers and we are going to install the sprinkler system that is found in approved drawings and that must comply with the specifications of the NFPA 13 and Smithsonian standard.
Please confirm that the design meets all requirements including that indicated in specifications 211313 point 1.04.A, 1.04.B and 1.04.C. y 1.05G, 1.05H, 1.05I
The design provided complies
110 Fire protection 21 13 13
1.05.E
Specification 211313 point 1.05.E indicates that the system must be designed for protection against earthquakes and in the drawing antiseismic support can be indicated, although the same calculations cannot be carried out. Please confirm that in the design the calculation of anti-seismic support was carried out and that we can follow the location of supports and details indicated in plans.
Provide Antiseismic supports per design.
111 Fire protection In the fire sprinkler system drawings there are no fireproof passes through the wall. If required, please indicate in the drawings.
Refer to pages A-5-05, A-5-06 and A-5-07 for details of Fire Stop Seals
112 Fire protection 21 31 10 Please confirm that the design and choice of the pump meets all design requirements of NFPA 20 and specifications of Smithsonian 213110.
The design provided complies
113 Fire protection
DWG F-1-01, A-1-
10)
In drawing F-1-01 you can appreciate the bomb, which appears to be a vertical turbine because the tank as seen in the drawing is buried (plan A-1-10), but it appears that the pump is a side of the tank, not inside the tank. Please clarify if part of the underground tank falls into the pump room so that the vertical turbine pump can suck water.
THE LIMIT OF THE WATER TANK SECTION IS EXTENDED. Refer to the attache sheet updated.
113. Sheet A-110 (U)
114 Fire protection 21 31 10
2.07B
Specification 213110 point 2.07.B does not indicate the fire pump controller starter type, it mentions all the startups that are available. Please indicate which of all the indicated ones we should use since the price between different types of main pump controller starter varies.
"Drawing F504 specifies the pump and the control panel. All the listed starters comply and are therefore valid options."
115 Fire Protection 21 05 16
2.3
In specification 210516 in point 2.3 it indicates the use of expansion joints for the fire protection system, but in the drawings there is no place that indicates that their use is necessary. Please indicate if necessary and indicate in the drawings the places and pipes that will be needed for these expansion joints to be able to take them into account in our assumption.
The use of the expansion joints recalled in the cited spec, depends on the need of having loop type connections. The use of a loop type connections could be changed in regards to the installer criteria; in which case, this spec will apply.
116 General General Is water and electricity consumed by the Smithsonian?
Yes, SI will provide water and electricity but the temporary facilities are responsability of the contractor.
117 General General Please indicate material specifications for perimeter enclosure
It is interpretated that the Query is related to the temporary perimeter fence for the construction.
If that is the case, contractor shall consider a perimeter fence to provide security and delimitate the construction zone. We recommend the contractor to consider a temporary fence to be @ 7 feet high, with double layer of low transparency Saran mesh (max. 30%), black color.
118 General General Will the taxes for felling trees be reimbursed or should we include it in our costs? Taxes shall be included in the contractors costs.
119 General General Will they have the names of the trees to be cut down?
We don’t have the names of the vegetation to be cut down. The attached document have references photos of them.
119. GAMBOA BLDG 56 - VEGETATION
120 General General Please share the environmental impact study Refer to reply on RFI 18
121 General General Just to confirm, they indicated that you would be in charge of the monitoring reports for the Environmental Impact Study
Confirmed. It is not part of the scope for the contractor to be in charge of the monitoring reports for the EIS.
122 General General Just to confirm, they indicated that you would be in charge of some dismantling such as air conditioning machines, pump equipment, temporary water tanks and internal equipment. Is it still considered the same?
Yes, confirmed. The STRI will remove all the exisitng equipment that are in good conditions and that want to keep, before the start of the construction.
123 Demolition A-1-01 On the demolition plan there is a note with details indicating which elements we must deliver to the Smithsonian for possible reuse. We want to know where these elements will be delivered and how they should be delivered, whether packaged or otherwise.
These elements must be delivered at Tupper and the coordination shall be managed with the COTR during the construction phase.
124 Demolition A-1-01 They agreed to check if they had plans of the existing foundations to consider in the demolition.
Refer to reply on RFI 38.
125 Landscaping Landscaping Should we include grass replacement? Please indicate with a floor plan, which areas it would be, since we do not visualize in the plans the green areas to be left.
Refer to reply on RFI 67. Also, attached a reference image highlighitng grass areas.
125. Grass areas reference
126 Architecture A-5-02 Would the slats indicated on the exterior walls be used cut cement sheets? They can tell us what width it should be; we only see the thickness but not the width.
IT WILL BE FIBER CEMENT FOR WALLS, WIDTH VARIES DEPENDING ON
SUPPLIER, CAN BE 8 FEET OR MORE DEPENDING ON SUPPLIER.
127 Architecture A-5-03 All the decorative moldings that the plans indicate, what material will they be? And if you can send a larger detail of them since some cannot be seen well because the measurements are very close together.
Refer to the attachment. 127. Decorative molding details
128 Architecture A-5-03 There is a detail of roof channels but in the sections of the plans they look different, which detail would apply?
DETAIL OF ROOF CHANNELS APPLIES
129 Architecture A-5-03 Please indicate where you would apply the cat ladder in detail 7, is it the same as the water tank?
since this looks much longer than this detail. Also please indicate what type of paint should be used for this type of elements.
This detail is mainly for the ladder that go up to the Attic to access the AC Room #3001 & 3002. The water tank ladder is a little different, but can be use as a reference in terms of the spacing of the structur; also, material, type and gauge of elements.
For the water tank ladder, epoxy paint for immersion must be applied;
it is important that it is certified for contact with potable water.
130 Structure General Confirm if the elevator pit should be waterproofed YES, IT MUST
131 Architecture A-5-04 Where does the partition type partitions in detail D-06 apply? If you tell us if the same applies, requires a structural support on the ceiling, send details.
refer to reply on RFI-54.
132 Architecture A-5-02 We do not understand the detail R1 and R2 of the type of roofs indicated in the plans, if you can send a better section
APPLIES IN THE VESTIBULE OF LEVEL 000, WITH THE NOMENCLATURE
CG AND WG, SHEET A-108
133 Plumbing C-1-04 For the outside main system pipes going to the boxes, they do not have the pipe specifications. Refer to reply on RFI 72
134 Plumbing C-1-04 For the new outdoor rainwater collection boxes, there are no dimensions of the boxes (widthxlength), only the height is available.
Refer to the attachment.
134. C-502 DETALLE PLUVIAL
135 Plumbing A-3-03 The rainwater downspouts from the roofs indicate in the nomenclature description that they are 24 gauge, but the material is not specified? It seems that they are metallic? Can you please send more details and how do you want the completion of those downspouts?
SEE DETAIL 3 ON SHEET A-503 AND SUPPLEMENT WITH reply to RFI-55
136 Earth Movement C-1-02 The cut and fill levels seen in these plans are up to what level? base? or sub-base? If you can confirm which one you are referring to?
IT IS AT SUBGRADE LEVEL. LOWER LEVEL OF SUB-BASE
137 Demolition C-1-02 On this plan there is a note that indicates that a minimum of 20cm below the floor must be demolished, but we really have no idea what the foundations are like, in this case what should be considered?
Refer to reply on RFI 38.
138 Structure C-5-01 There is no detail of the configuration of the joints for the parking area. Refer to the reply on RFI 65.
139 Structure S-1-02 What is the detail of the elevator pit floor slab? SEE FOOTING 43 ON SHEET S-101
140 Structure S-1-02 What is the strength of the concrete for the elevator pit walls? THE STRENGTH IS 280 KG/CM²
141 Structure S-5-01 What is the strength of concrete for stairs? THE STRENGTH IS 280 KG/CM²
142 Structure S-1-04 We are not clear about how the beams fit in the 100 level slab, do they go below the slab or do they go between the slab? since the detail that is on that sheet seems rather from another level
THE TOP LEVEL OF THE BEAM IS THE TOP LEVEL OF THE SLAB AT LEVEL
100; WHERE THIS DOES NOT APPLY IS ON SHEET S-106 AT THE ROOF
LEVEL
143 Structure S-1-01 Do the seismic beams go below floor level? It is not very clear. THE SLAB AT THE MENTIONED LEVEL IS PART OF THE SEISMIC BEAMS
144 Structure S-1-06 At what slab level is the V25x30 beam that is on the roof of the deck? is it not clear?
SEE ARCHITECTURE SECTION A-302. IN THIS CASE, THE BEAM IS
INVERTED BECAUSE THERE IS AN AIR CONDITIONING DUCT BELOW IT,
AND TO AVOID INTERFERENCE, WE ARE DESIGNING THE BEAM IN THIS
WAY
145 Structure S-4-01 What is the resistance of the concrete for the water tank and if it contains special additives such as waterproofing, among others.
THE STRENGTH IS 280 KG/CM², ADDITIONALLY, IT MUST BE
WATERPROOFED
146 Structure General Please specify the waterproofing for the water tank and for the external roof slabs. THE STRENGTH IS 280 KG/CM²
147 Structure General Should roof gutters be waterproofed? If so, please specify which one to use.
THE BEST WATERPROOFING OPTION FOR ROOF GUTTERS WOULD BE A
COMBINATION OF RUBBER OR LIQUID RUBBER COATINGS AND
POLYURETHANE OR SILICONE SEALANTS FOR JOINTS AND
CONNECTIONS
148 Structure General What would be the support details for roof storm gutters?
STRUCTURE SECTION PLANS ARE ATTACHED WHERE THE LAST SHEET
DETAILS ROOF CONNECTIONS, SHEET S-201 @ S-205
148. Sheets S201, S202, S203, S204 & S205 (U)
149 Structure S-5-02 Is the detail of the garbage container the one on sheet S-5-02? YES
150 Structure Several The floor space measurements for the generator area and air conditioning machines do not match the floors according to plans G-1-02, A-5-03 and S-4-01, confirm which floor size you should work with. ?
USE ARCHITECTURAL DIMENSIONS. FOR HVAC EQUIPMENT 5.50 X 4.20
AND FOR GENERATOR AREA 4.20 X 2.35.
151 Structure S-1-01 Can you send a plan indicating the floor edge of the building? We are not sure if the perimeter axis remains along the entire edge.
Refer to attachment. 151.PT-101 Slab Edge
152 Facilities General Should we supply the elevator? If so, please send specifications for it. YES. Refer to attachment 152. ELEVATOR TECHNICAL DATA SHEET.
153 Facilities General Should we supply and install the electric generator? YES
154 Electricity C-1-02 We do not see details of the beams between the generator, the electrical room and the pole in the plans.
DETAIL PL010450 IS ON SHEET E-1-02
155 Facilities General
Should we supply and install this device? If so, please indicate the type of reinforcement required.
IT MUST HAVE REINFORCEMENT AND IT MUST BE INSTALLED.
156 Electricity General Will the parking area have no lighting poles? NOT PART OF THE CONTRACT.
157 Electricity C-1-02 Please send details of the existing pavement for replacement for the beamduct between the main electrical room and the 60x60 junction box.