PDF 184 KB Posted
- Attached to
- MSC POD 6 Collections Storage Equipment Federal contract opportunity
- Solicitation number
- 33330223RF0010025
- Issued by
- Smithsonian Institution
About this file
This document contains an amendment to a solicitation for collections storage equipment and related federal contract opportunity. The Smithsonian Institution is seeking offers to furnish and install collections storage equipment for Pod 6 at the Museum Support Center in Suitland, Maryland. The estimated value is over $10 million and period of performance is 664 calendar days from notice to proceed. The work includes early fabrication and delivery of high density mobile storage system rails and covers, as well as fabrication, delivery and installation of pallet racks, mobile storage systems, and museum storage cabinets. Offerors must demonstrate minimum qualifications and submission instructions are provided. The amendment provides responses to contractor questions, extends the bid due date to June 29, 2023 at 3PM EST, and requires acknowledgment of all amendments be submitted with proposals.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 33330223RF0010025 Amendment 0004.pdf | ||
| 33330223RF0010025 Amendment 0003.pdf | ||
| 33330223RF0010025 Amendment 0002.pdf | ||
| Final RFP POD 6 Collections Storage Equipment.pdf | ||
| Davis Bacon MD20230044.pdf | ||
| Contractor_COVID-19_Safety Protocols_LOW_3.30.22-eg.pdf | ||
| 1630102 MSC POD 6 Storage Equip Multi-year funding RFP (VHN) V.2.docx | DOCX document | |
| Release of Claim Form.pdf | ||
| 1630102 MSC POD 6 Collection Storage Equipment Bid Sch R.xlsx | XLSX spreadsheet | |
| NONDISCLOSURE AGREEMENT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330223RF0010025
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
163010205/26/20230001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/15/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Willard B. Powell
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. The Solicitation Number cited above, to provide all Smithsonian collections storage equipment for the Museum Support Center (MSC) Pod 6 at the Smithsonian Institution's Museum
Support Center, located in Suitland, MD, is hereby amended as follows:
A.1. Attached hereto and made part of this Amendment One are SI Responses to RFI's for Questions Number 1-3.
A.2. Offerors shall acknowledge receipt of all amendments to this solicitation signed and dated and submit with proposal.
A.3. All questions/clarifications are due June 13, 2023. Questions are to be sent
Continued ...
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
33330223RF0010025/0001
sequentially numbered. For example, first set of questions are to be numbered 1, 2, 3. Second set of questions are to be numbered 4, 5, 6, etc. in
Word format to Chanvc@si.edu.
B. THE BID DUE DATE IS JUNE 29, 2023, AT 3:00PM
EST.
Except as provided herein, all other provisions, terms and conditions of the Solicitation remain unchanged.
END OF AMENDMENT ONE
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Smithsonian Institution Office of Planning Design & Construction
PROJECT: MSC POD 6 Collections Storage Equipment (SF Project # 1630102)
LAST UPDATED: 5/26/2023
Request for Information SI Response
The specification set is solely written around the ‘DNA’ of Spacesaver, we are aware that it also states Approved Equal. But the specifics themselves are not written in any other way but to supply Spacesaver/Viking components, which limits other competitors from providing a qualified proposal . Our ‘DNA’ equals or exceeds but is in fact different as you would expect as each manufacturer has a specific design in regards to the equipment specified. We believe it makes perfect sense for inviting us for a better price/value proposition then Spacesaver/Viking. Are there ANY critical specifications that cannot be compromised and must be absolutely met as we will present the best proposition for the Smithsonian?
The important aspect is the performance criteria, the configuration/use of the systems, configuration of “specialty” and interior cabinets, and testing requirements.
Certification the submitted system will fulfill the performance requirements is required.
Where can we find the Drawings dated 1/13/22 Sheets 1-19 referenced in the solicitation?
All General Contractors are required to sign a Non-Disclosure
Agreement (NDA) and submit their System for Award
Management (SAM.gov) record to Virginia Chan at chanvc@si.edu in pdf format. A link to the Drawings and
Specifications will be emailed to those contractors who have submitted a signed NDA and SAM record. Reference pp. 4 and
81 of the RFP
Where can we find the Specifications dated 1/11/22 pages 1-76 referenced in the solicitation? Neither were included with the solicitation on sam.gov.
See Response to Question #2
| 1RFI Spreadsheet ALL.xlsx.pdf |
| Sheet1 |
| 1RFI Spreadsheet 1.xlsx.pdf |
| Sheet1 |
| 1RFI Spreadsheet 1.xlsx.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .