33330222QF0010019 Amendment 3.pdf
PDF 321 KB Posted
- Solicitation number
- 333302-22QF-0010019
- Issued by
-
Smithsonian Institution
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 33330222QF0010019 Amendment 5.pdf | ||
| 33330222QF0010019 Amendment 4.pdf | ||
| 33330222QF0010019 Amendment 2.pdf | ||
| 33330222QF0010019 Amendment 1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
33330222QF0010019
x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
OCON
OCON
Washington DC 20013-7012
MRC 1200
P.O. BOX 37012
SMITHSONIAN INSTITUTION
02/01/20220003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/01/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This is Amendment Number Three to Solicitation Number 333302-22QF-0010019 for Indefinite
Delivery Indefinite Quantity (IDIQ) Multidispline Architect-Engineer Contract for
Smithsonian Institution
I. Additional questions/Answers (See attached spreadsheet)
All questions must be submitted to me by February 22, 2022 via email to grantca@si.edu .
Any questions submitted after that time may not receive a response before the deadline.
All remaining aspects of 333302-22QF-0010019 shall remain unchanged.
The deadline for submission is no later than Tuesday, March 1, 2022 by 2:00PM ET.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christine Grant
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Number Section Question Answer Source
1 3B 1. Please advise on whether the following consultants should be included as part of the consultant team during this stage of the qualification process:
a. Zoo Consultant
b. Food Service Consultant
c. Security/Integration
d. Protective Blast Design
e. Commissioning
f. Signage/wayfinding
g. Vertical Transportation
h. Compliance
i. BIM management
j. Data Systems
k. Aquatic Life Support Systems
Yes all of the listed consultant below should be part of the prime or added as a consultant to the IDIQ team. Note the addition of Interior Design.
a. Interior Design
b. Zoo Consultant
c. Food Service Consultant
d. Security/Integration
e. Protective Blast Design
f. Commissioning
g. Signage/wayfinding
h. Vertical Transportation
i. Compliance
j. BIM management
k. Data Systems
l. Aquatic Life Support Systems
OPDC
2 3A Projects submitted must be only from the past 10 years…” Please advise if these projects can be in progress or if they need to be completed.
Projects that have completed construction are preffered.
3 3E Firm location in reasonable proximity of Smithsonian Institution facilities, especially Washington, DC.”
Please advise if New York City is considered within proximity.
New York City will be considered. Proximity of competing firms to DC is a ranking factor.”
OPDC
4 1 Contract Information “size standard is $8 million” reference. Could you please clarify what this refers to specifically? Is this related to the annual revenue of the Prime responding firm or something else?
To be eligible for government contracts reserved for small businesses, your business must meet size requirements set by the SBA. These size standards define the maximum size that a business — and its affiliates — can be to qualify as a small business for a particular contract.
To determine if your business qualifies as "small" for government contracting purposes, use the SBA’s Size Standards Tool. https://www.sba.gov/size-standards The NAIC code is 541310, size standard is $8 million
OCON
5 4 For SF 330 Section F. Example Projects, how many projects do you require? Ten project examples are requested. Anything over ten will not be considered.
Part I of the SF 330 shall have a page limit of 125 pages. A page is one side of a sheet. Font size shall not be less than 12 font.
6 2 PROJECT INFORMATION under DESCRIPTIONS mentions “security systems” as one of the services SI may require. Are you referring to the design of electronic security systems such as cameras, lighting, door locking systems or physical security including developing vector studies and the design of bollards or other crash barriers?
SI uses both physical security and electronic security design services Consultants for these security disciplines should be included with your teams initial SF330.
OPDC
7 2/3b PROJECT INFORMATION indicates zoological parks to be a possible project type. However, the SELECTION CRITERIA section does not include this as a type. Will zoological parks be part of this contract? If so, will we need to include relevant zoological specialty services?
Zoo consultant is required, however, zoo projects don't need to be submitted.
8 4 Since the “brief letter on company letterhead” is to be submitted loosely, shall it also be included in the bound copies as well?
Preface the submission with an attached original and loose copy of a brief letter on company letterhead.
9 4 Can we use an 11x17 size sheet for any part of the Part I submission, i.e. org chart or any graphics? No, 11X 17 sheets are not permitted. OPDC
10 4 We are presuming the cover page, table of contents and tab pages (both sides to each) will be counted as part of the 125-page count. Please confirm.
Yes, both sides of each page will count towards the 125 page limit, including:
cover pages, table of contents and tab pages.
OPDC
11 Would it be permissible (or for any specific reason recommended) to include in a team more than one specialist subconsultant of a certain type (e.g., two different structural engineers)? I imagine this could be done for several reasons: to balance specific types of project experience, to include certain small subconsultant businesses without excluding a larger & trusted collaborator, to provide potential staffing flexibility over the life of the IDIQ contract, etc. I know that the list of required expertise is long, and I’m reluctant to make it too much longer, but it would be helpful to know how Smithsonian might think of this point.
Multiple consultants for the same discipline are allowed, however the firm should specify the role and reason for multiple sub consultants of the same discipline
12 Can the SF330 forms be modified in anyway? Forms should not be modified. OCON
13 4 Is there a maximum # of pages allotted for each project listed in Section F? See answer to question #5 OCON
14 3B Compliance was added as a required consultant/expertise in Addendum 1, Item 1.i. Could you please define the range of expertise being requested more specifically? There is a wide range of definitions for this term. Is this a consultant to be engaged to address conformance with the requirements of Code of Federal Regulations such as CFR Title 2, Subtitle B, Chapter XXXI, Part 3187, for example? Are you looking for experts to confirm that all of the rules, codes and regulations, including ADA and mandates for handling sensitive materials are being followed or does this have more to do with employment issues like equal opportunity and affirmative action compliance? Or are you looking for one team member to affirm compliance with the requirements of the contract and project?
A compliance consultant is not required. To be deleted from required list of consultants.
OPDC
15 3B Can you confirm that the consulting team would not be responsible for compliance with rules, codes and regulations regarding objects/collections that have been or may be acquired or deaccessioned by the Smithsonian Institution.
There is no “Code” for collections. The A/E will not be responsible for “compliance”
OPDC
16 A “Data Systems” consultant is required for this IDIQ. By “Data Systems” do you mean the active electronics? Would the winning team be supplied with the current NASM IT network standards and would the intent be for the data systems consultant to design a new standard, or implement the current standards into the project?
Registered Communications Distribution Designer OPDC
17 I saw that new SF330 forms were released. In the past, we have been permitted to format these forms with our fonts, colors, etc. while retaining the same basic structure and information. So may we use SF330 forms where colors or fonts have been formatted in Microsoft Word to make the package more legible? Or would you prefer the use of the basic fillable form?
Forms should not be modified. The information you put in the form can be formatted. Font size shall not be less than 12 font.
OCON
18 In researching past awardees, it seems Smithsonian has never awarded to a prime engineering firm.
Would the Smithsonian be open to awarding to a small business engineering firm as the prime? Or is an architectural prime preferred?
Engineering firms will not be considered as this solicitation falls under the 541310 Architectural Services
OPDC
19 3D Selection Criteria D – In reference to past performance, is Smithsonian looking for PPQs/CPARS to be submitted for the projects provided in Section F of the SF 330? If so, will these PPQs/CPARS be counted against the 125 page limit?
No past performance forms or information need be submitted. Ensure that contact information on the submitted projects is up to date and accurate.
20 3F Selection Criteria F - how would you like our computer capability shown? Is a narrative explaining our familiarity with the recommended software acceptable?
A list of relevant computer capabilities, accompanied by narative explaining the prime and consultant approach or unique specialty in using them.
OPDC
21 4 Submission Requirements state 2 hard copies and an electronic PDF copy are required. Should the electronic copy be provided via email/CD/or flash drive?
Electronic submissions need to go to the contract specialist: grantca@si.edu OPDC
22 Amendment 1 included a list of additional consultants that should be included as part of the team.
Can you please elaborate on the “Compliance”, “Data Systems”, and “Aquatic Life Support Systems” roles? Are there any specific licenses/registrations required for these roles?
Compliance has been removed.
Data System see item 16 Aquatic Life Support Systems is based on experience
OPDC
23 Monday, 2/21 is a federal holiday and thus gives respondents less business days to coordinate and complete our submissions. Will you consider extending the due date?
The deadline for submission is no later than Tuesday, March 1, 2022 by 2:00PM
ET.
OCON