33330222QF0010019 Amendment 2.pdf

PDF 173 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity (IDIQ) Multidispline Architect-Engineer Contract Smithsonian Institution
Solicitation number
333302-22QF-0010019
Issued by

View the file

Other files

File Type Posted
33330222QF0010019 Amendment 5.pdf PDF
33330222QF0010019 Amendment 4.pdf PDF
33330222QF0010019 Amendment 3.pdf PDF
33330222QF0010019 Amendment 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

33330222QF0010019

x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

OCON

OCON

Washington DC 20013-7012

MRC 1200

P.O. BOX 37012

SMITHSONIAN INSTITUTION

02/01/20220002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/01/2022

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This is Amendment Number Two to Solicitation Number 333302-22QF-0010019 for Indefinite

Delivery Indefinite Quantity (IDIQ) Multidispline Architect-Engineer Contract for

Smithsonian Institution

I. Additional questions/Answers (See attached spreadsheet)

All questions must be submitted to me by February 22, 2022 via email to grantca@si.edu .

Any questions submitted after that time may not receive a response before the deadline.

All remaining aspects of 333302-22QF-0010019 shall remain unchanged.

The deadline for submission is no later than Tuesday, March 1, 2022 by 2:00PM ET.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Christine Grant

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Number Section Question Answer Source

1 3B Please advise on whether the following consultants should be included as part of the consultant team during this stage of the qualification process:

Yes all of the listed consultant below should be part of the prime or added as a consultant to the IDIQ team. Note the addition of Interior Design.

OPDC

2 3A Projects submitted must be only from the past 10 years…” Please advise if these projects can be in progress or if they need to be completed.

Projects that have completed construction are preffered.

3 3E Firm location in reasonable proximity of Smithsonian Institution facilities, especially Washington, DC.” Please advise if New York City is considered within proximity.

New York City will be considered. Proximity of competing firms to DC is a ranking factor.”

OPDC

4 1 Contract Information “size standard is $8 million” reference. Could you please clarify what this refers to specifically? Is this related to the annual revenue of the Prime responding firm or something else?

To be eligible for government contracts reserved for small businesses, your business must meet size requirements set by the SBA. These size standards define the maximum size that a business — and its affiliates — can be to qualify as a small business for a particular contract.

To determine if your business qualifies as "small" for government contracting purposes, use the SBA’s Size Standards Tool.

https://www.sba.gov/size-standards The NAIC code is 541310, size standard is $8 million

OCON

5 4 For SF 330 Section F. Example Projects, how many projects do you require? Ten project examples are requested. Anything over ten will not be considered. Part I of the SF 330 shall have a page limit of 125 pages.

A page is one side of a sheet. Font size shall not be less than 12 font.

6 2 PROJECT INFORMATION under DESCRIPTIONS mentions “security systems” as one of the services SI may require. Are you referring to the design of electronic security systems such as cameras, lighting, door locking systems or physical security including developing vector studies and the design of bollards or other crash barriers?

SI uses both physical security and electronic security design services Consultants for these security disciplines should be included with your teams initial SF330.

OPDC

7 2/3b PROJECT INFORMATION indicates zoological parks to be a possible project type.

However, the SELECTION CRITERIA section does not include this as a type. Will zoological parks be part of this contract? If so, will we need to include relevant zoological specialty services?

Zoo consultant is required, however, zoo projects don't need to be submitted.

8 4 Since the “brief letter on company letterhead” is to be submitted loosely, shall it also be included in the bound copies as well?

Preface the submission with an attached original and loose copy of a brief letter on company letterhead.

9 4 Can we use an 11x17 size sheet for any part of the Part I submission, i.e. org chart or any graphics?

No, 11X 17 sheets are not permitted. OPDC

10 4 We are presuming the cover page, table of contents and tab pages (both sides to each) will be counted as part of the 125-page count. Please confirm.

Yes, both sides of each page will count towards the 125 page limit, including: cover pages, table of contents and tab pages.

OPDC

11 Would it be permissible (or for any specific reason recommended) to include in a team more than one specialist subconsultant of a certain type (e.g., two different structural engineers)? I imagine this could be done for several reasons: to balance specific types of project experience, to include certain small subconsultant businesses without excluding a larger & trusted collaborator, to provide potential staffing flexibility over the life of the IDIQ contract, etc. I know that the list of required expertise is long, and I’m reluctant to make it too much longer, but it would be helpful to know how Smithsonian might think of this point.

Multiple consultants for the same discipline are allowed, however the firm should specify the role and reason for multiple sub consultants of the same discipline

12 Can the SF330 forms be modified in anyway? Forms should not be modified. OCON

13 4 Is there a maximum # of pages allotted for each project listed in Section F? See answer to question #5 OCON