This document is a Group Specification issued by the New York State Office of General Services, Procurement Services for Group 31555 - Liquid Bituminous Materials, specifically targeting the 2025 NYSDOT (New York State Department of Transportation) Specific Projects using Federal and State Funds. The specification, numbered 947 and dated November 14, 2023, supersedes the previous specification from October 30, 2019, and is designed to establish procurement guidelines for liquid bituminous materials.

The specification outlines detailed requirements for materials sourcing, with all liquid bituminous materials mandated to come from a NYS Department of Transportation approved primary source listed on their Approved List. Contractors must meet stringent qualifications, including having an approved manufacturing facility, maintaining proper storage tanks with a minimum 10,000-gallon capacity, ensuring material homogeneity, and implementing precise measurement and documentation protocols. The specification covers asphalt emulsions as defined in NYSDOT Standard Specifications §702, with requirements for scale or meter accuracy, ticket documentation, and quality assurance testing. The contract aims to ensure high-quality bituminous materials for state and non-state agency projects, with provisions for inspection and potential default if contractors fail to meet the specified conditions.

View the file

Other files

File Type Posted
3155523389RPN_Region6.pdf PDF
3155523389regionalmap.pdf PDF
3155523389specialnotes.pdf PDF
31555PriceAdjust23.xlsx XLSX spreadsheet
3155523389NYSDOTWorkZone.pdf PDF
3155523389insurance.pdf PDF
3155523389pricing.pdf PDF
315xxPriceAdjust24.xlsx XLSX spreadsheet
315xxPriceAdjust25.xlsx XLSX spreadsheet
31502PriceAdjust24.xlsx XLSX spreadsheet
3155523389a.pdf PDF
3155523389detailedspecs.pdf PDF
3155523389dimensions.pdf PDF
3155523389federalaidprojectreqs.pdf PDF
3155523389spec950.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Group Specifications #947

AWARD# 23389

GROUP 31555 – LIQUID BITUMINOUS MATERIALS

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds)

23389 - Group Specifications #947

State of New York Executive Department

Office of General Services Procurement Services

Corning Tower - 38th Floor Empire State Plaza

Albany, NY 12242

GROUP SPECIFICATION

COMMODITY GROUPS:

31555

LIQUID BITUMINOUS MATERIALS

DATE OF ISSUE 11/14/2023

NO. OF PAGES 3

SPECIFICATION NO. 947

(Supersedes SPEC-940 dated October 30, 2019)

BIDDERS ARE REQUESTED TO RETAIN THIS SPECIFICATION FOR FUTURE REFERENCE

Contents

GENERAL INFORMATION

MATERIALS:

SAMPLING, TESTING, INSPECTING, AND REPORTING:

REQUIRED QUALIFICATIONS:

GROUP 31555 – LIQUID BITUMINOUS MATERIALS

(2025 VPP NYSDOT Specific Projects) (Federal & State Funds)

23389 - Group Specifications #947

GENERAL INFORMATION

MATERIALS:

Materials supplied must be from a NYS Dept. of Transportation approved location/primary source (listed on the NYS Approved List).

SAMPLING, TESTING, INSPECTING, AND REPORTING:

All liquid bituminous material intended for use on State agency and non-State agency projects shall be sampled, tested, inspected, certified and shipped in accordance with NYSDOT Materials Method 702-2 Asphalt Emulsion Quality Assurance. The State reserves the right to inspect liquid bituminous material supply facilities and the equipment of any successful bidder at any time for conformance with the requirements listed herein; if deficiencies are found, such deficiencies shall be corrected within 10 days or the contractor will be considered in default.

REQUIRED QUALIFICATIONS:

A NYS approved primary source must meet the following conditions:

1. The Contractor’s liquid bituminous materials manufacturing facility shall have been approved by the NYSDOT.

2. The liquid bituminous material shall be obtained from a primary source listed on the NYSDOT approved list of primary sources. An approved primary source is a Contractor that samples, tests, and certifies that the materials are in conformance with the NYSDOT materials specifications.

3. Asphalt emulsions as defined in NYSDOT Standard Specifications §702, shall be stored in an approved facility having a minimum of one permanent storage tank for each type of asphalt emulsion bid. The tank(s) shall have a storage capacity of at least 10,000 gallons each, be capable of maintaining material homogeneity and have equipment capable of heating the material to the proper application temperature prior to shipment.

4. The Contractor shall have evidence available to show that the scale or meter(s) have been tested for accuracy by either a competent scale technician or the County Sealer of Weights and Measures. The scale or meter check shall be performed each calendar year before any material is supplied

5. The quantity of liquid bituminous material shall be measured by truck scale or meter(s) and a ticket shall be printed to document the quantity.

The ticket printed shall meet the following requirements:

a. Storage facility identification

b. Ticket Number

c. Date/time

d. Item Number and Type

e. Quantity ticket printed by machine

f. Quantity in 60° F gallons for emulsions.

6. Truck Scales: The ticket printer shall machine print in digital form a minimum of two of the following:

(1) Tare weight

(2) Gross weight

(3) Net weight

The scale system shall be interlocked to allow printing only when the scale has come to a complete rest.

A truck scale shall be located at the storage facility unless the following conditions are met:

(a) The Contractor owns the truck scale or has full control of the weighing operations. The scale shall be located in close proximity (approximately 1,000 feet or less) to the storage tanks. The acceptability of the distance will be determined by the NYSDOT.

(b) The Contractor provides documentation to the NYSDOT that it has complete access to the truck scale 24 hrs/day, 7 days/week.

7. Meters: The ticket printer shall machine print in digital form:

(1) Beginning meter reading

(2) Ending meter reading

(3) Total gallons at 60° F

C. If a meter is used, it shall be permanently installed to connect it with the approved storage tank(s), and shall be used to measure all quantities.