3-Section 004113 - BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT).pdf
PDF 154 KB Posted
- Attached to
- Susquehanna County Recreation Center Site Work
- Solicitation number
- Not on record
- Issued by
- Tioga County, Pennsylvania
About this file
This is a bid form for a stipulated sum, single-prime contract issued by the Susquehanna County Recreation Center, a 501(c)(3) corporation, for site work at a new recreation center located at 29 Outdoor Drive, New Milford, Pennsylvania 18834. The project scope includes site clearing, excavation and earthwork, concrete retaining walls with concrete block facing, gravel parking lot and access road construction, building pad preparation, stormwater and catch basin piping installation, sewer line piping to the road, water line piping, and erosion and sediment control installation with seeding and mulching. An optional pre-bid meeting and site walkthrough is scheduled for June 5, 2026, at 1:00 p.m. at the project location. Prospective bidders must submit electronic bids through PennBid no later than 12:00 p.m. on June 15, 2026. The project team will accept bidder questions until June 11, 2026, with responses provided through PennBid. The contractor must substantially complete all work within 60 calendar days from the project kick-off date. The project architect is Martina Bacarella Architect, with project number 22013.
The bid form requires contractors to submit a base bid lump sum amount with an itemized breakdown including general conditions and seven specific work categories: excavation and earthwork, concrete retaining walls, gravel parking lot and access roads, stormwater piping, sewer line piping, water line piping, and erosion and sediment control. Bidders must also provide unit prices for four line items: removal and replacement of unsatisfactory soil, mass rock excavation and replacement, trench rock excavation and replacement, and paving (all per cubic yard or square foot as applicable). Two alternates are available for bidder consideration: installation of site lighting conduit underneath paved areas and construction of a sediment basin, with each alternate allowing for potential adjustments to contract time. All bidders must be duly licensed contractors in Pennsylvania and submit qualifications as supplemental documentation. Bids will be opened privately, with lump sum amounts made publicly available after review.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6/1/2026 Construction Documents Set
Susquehanna County Recreation Center Site Work
BID FORM - STIPULATED
SUM (SINGLE-PRIME
CONTRACT)
004113 - 1
DOCUMENT 004113 - BID FORM - STIPULATED SUM (SINGLE-PRIME CONTRACT)
Note: Bidders shall complete this Bid Form in addition to the electronic bid form within PennBid (“Prepare Your Submission” tab), inclusive of all pricing items and required supporting documents as identified.
PART 1 - GENERAL
1.1 BID INFORMATION
A. Bidder: ____________________________________________________.
B. Project Name: Susquehanna County Recreation Center.
C. Project Location: 29 Outdoor Drive, New Milford, PA 18834.
D. Owner: Susquehanna County Recreation Center 501 (c) (3) corp.
E. Architect: Martina Bacarella Architect.
F. Architect Project Number: 22013.
G. Bid Due Date: June 15, 2026 at 12:00pm.
1.2 CERTIFICATIONS AND BASE BID
A. Base Bid, Single-Prime (All Trades) Contract: The undersigned Bidder, having carefully examined the Procurement and Contracting Requirements, Conditions of the Contract, Drawings, Specifications, and all subsequent Addenda, as prepared by Martina Bacarella Architect and Architect's consultants, having visited the site, and being familiar with all conditions and requirements of the Work, hereby agrees to furnish all material, labor, equipment and services necessary to complete the construction of the above-named Project, in accordance with the requirements of the Procurement and Contracting Documents, for the stipulated sum of:
1. ________________________________________ Dollars ($______________).
2. The above amount may be modified by amounts indicated by the Bidder under the "Unit Prices" Article and the "Alternates" Article below.
B. Itemized Breakdown: The following is an itemized breakdown of the Base Bid amount (note: sum of the following amounts MUST equal amount listed in 1.2.A.1).
1. General Conditions: $___________________________.
2. Basic Breakdown of construction Work; provide additional categories as necessary:
004113 - 2
a. Excavation and Earthwork: $___________________________.
b. Concrete Retaining Walls with Concrete Block Facing:
c. Gravel Parking Lot, Access Roads, and Building Pad Preparation:
d. Stormwater and Catch Basin Piping: $______________________.
e. Sewer Line Piping up to Road: $________________________.
f. Water Line Piping: $___________________________.
g. Installation and Maintenance of E&S Controls Including Seeding and
Mulching: $___________________________.
1.3 UNIT PRICES
A. The undersigned Bidder proposes the amounts below be added to or deducted from the Contract Sum on performance and measurement of the individual items of the Work, as described in Section 012200 "Unit Prices" and if applicable for adjustment of the quantity given in the Unit-Price Allowance for the actual measurement of individual items of the Work.
B. If the Unit Price does not affect the Work of this Contract, the Bidder to indicate "NOT
APPLICABLE."
C. Unit-Price No. 1: Removal of unsatisfactory soil and replacement with satisfactory soil material.
1. ______________________________ dollars ($_____________) per cubic yard.
D. Unit-Price No. 2: Mass rock excavation and replacement with satisfactory soil material.
1. ______________________________ dollars ($_____________) per cubic yard.
E. Unit-Price No. 3: Trench rock excavation and replacement with satisfactory soil material.
1. ______________________________ dollars ($_____________) per cubic yard.
004113 - 3
F. Unit-Price No. 4: Paving.
1. ______________________________ dollars ($_____________) per square foot.
1.4 ALTERNATES
A. The undersigned Bidder proposes the amount below be added to or deducted from the Base Bid if particular Alternates are accepted by Owner. Amounts listed for each Alternate include costs of related coordination, modification, or adjustment.
B. If the Alternate does not affect the Contract Sum, the Bidder to indicate "NO
CHANGE."
C. If the Alternate does not affect the Work of this Contract, the Bidder to indicate "NOT
APPLICABLE."
D. The Bidder is responsible for determining from the Contract Documents the effects of each Alternate on the Contract Time and the Contract Sum.
E. Owner reserves the right to accept or reject any Alternate, in any order, and to award or amend the Contract accordingly within 60 days of the Notice of Award unless otherwise indicated in the Contract Documents.
F. Acceptance or non-acceptance of any Alternates by Owner is to have no effect on the Contract Time unless the Alternate description below provides a formatted space for the adjustment of the Contract Time.
G. Alternate No. 1: Paving areas indicated on the civil drawings. Install site lighting conduit underneath area to be paved:
1. ▢ ADD ▢ DEDUCT ▢ NO CHANGE ▢ NOT APPLICABLE.
2. __________________________________________ Dollars ($_____________).
3. Contract Time: Acceptance of this Alternate will add _________ calendar days to the Contract Time.
H. Alternate No. 2: Construction of Sediment Basin:
1. ▢ ADD ▢ DEDUCT ▢ NO CHANGE ▢ NOT APPLICABLE.
2. __________________________________________ Dollars ($_____________).
3. Contract Time: Acceptance of this Alternate will add _________ calendar days to the Contract Time.
1.5 TIME OF COMPLETION
A. Time of Completion:
1. The undersigned Bidder proposes and agrees hereby to commence the Work of the Contract Documents and to substantially complete the Work within 60
004113 - 4 calendar days from the date of the project kick-off.
1.6 ACKNOWLEDGMENT OF ADDENDA
A. The undersigned Bidder acknowledges receipt of and use of the following Addenda in the preparation of this Bid:
1. Addendum No. 1, dated ____________________.
2. Addendum No. 2, dated ____________________.
3. Addendum No. 3, dated ____________________.
4. Addendum No. 4, dated ____________________.
1.7 BID SUPPLEMENTS
A. The following supplements are a part of this Bid Form and are attached hereto:
1. Bidder’s Qualifications
1.8 CONTRACTOR'S LICENSE
A. The undersigned further states that it is a duly licensed contractor, for the type of work proposed, in Pennsylvania, and that all fees, permits, etc., pursuant to submitting this proposal have been paid in full.
1.9 SUBMISSION OF BID
A. Respectfully submitted this _____ day of _____________,_________.
(Day) (Month) (Year)
B. Submitted by: ____________________________________________.
(Name of bidding firm or corporation)
C. Authorized Signature: ______________________________________.
(Handwritten signature)
D. Signed by: _______________________________________________.
(Type or print name)
E. Title: ___________________________________________________.
(Owner/Partner/President/Vice President)
F. Witnessed by: ____________________________________________.
(Handwritten signature)
G. Attest: __________________________________________________.
(Handwritten signature)
004113 - 5
H. By: _______________________________________________________.
(Type or print name)
I. Attester Title: _______________________________________________.
(Corporate Secretary or Assistant Secretary)
J. Street Address:
K. City, State, Zip:
L. Phone:
M. License No.:
N. Federal ID No.:
O. (Affix Corporate Seal Here)
PART 2 - PRODUCTS (Not Used) PART 3 - EXECUTION (Not Used)
END OF DOCUMENT 004113