2-20260601 SCRC Site Work Bid Set.pdf

PDF 19 MB Posted

Attached to
Susquehanna County Recreation Center Site Work
Solicitation number
US.238208
Issued by
Tioga County, Pennsylvania

About this file

This is a Scope of Work and civil construction plan set for the Susquehanna County Recreation Center site work project located at 29 Outdoor Drive, New Milford, Pennsylvania 18834. The project encompasses site clearing, earthwork, retaining walls (ranging from 2 to 8 feet in height), a gravel parking lot with 230 general parking spaces (including 7 ADA-accessible spaces) and 21 service parking spaces, access roads, fire access roads, building pad preparation, stormwater and catch basin piping, sanitary sewer line piping, water line piping, landscape seeding, site lighting, and erosion and sediment control measures. The bid submission deadline is June 15, 2026, at 12:00 p.m. via PennBid, with an optional prebid meeting and site walkthrough scheduled for June 1, 2026, at 1:00 p.m. at the project site. Bidders' questions must be submitted by June 11, 2026, with responses provided via PennBid. The finished floor elevation for the building is 1570.0 feet, and the project includes utility infrastructure for water supply from a new well, sanitary sewer connection to R. Heed Pump Station, propane tank installation, electrical transformer installation, and fire suppression water tank and pump house. The drawing set indicates the project is issued for bid as of October 30, 2025, with code review revisions dated that same date.

The project documents include detailed civil construction plans prepared by Tompkins Engineering LLC (civil engineer), Keystone Structural Group (structural engineer), and Design Management Group (MEP engineer). The project is designated as Risk Category III per the 2018 IBC Chapter 16. All work must comply with applicable building codes, OSHA requirements, local zoning ordinances, and state and local regulations. The contractor is responsible for verifying existing site conditions, maintaining the site in a safe and orderly condition, managing all debris and excavated materials removal, providing temporary weather-tight enclosures, and ensuring compliance with all construction and environmental standards. The geotechnical design criteria establishes an allowable bearing pressure of 1.5 tons per square foot (3,000 PSF), and the slab-on-grade design uses a subgrade modulus of 200 PCI with 100 PSF loading. Demolition and site preparation work requires coordination with the project architect, Martina Bacarella Architect, and compliance with detailed site specifications regarding controlled fill placement, field density testing, erosion control, and utility protection during construction operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .