This is a question and answer document related to Carbon School District's asbestos testing and abatement services solicitation in Utah. The document addresses clarifications regarding clearance air sampling methodologies, testing responsibilities, and waste disposal pricing for asbestos abatement projects at district-owned facilities in Carbon County. Written questions are due November 24, 2026, at 2:00 p.m. MST, with bids due December 1, 2026, at 2:00 p.m. MST. The initial project involves abatement at Sally Mauro Elementary School in Helper, with completion scheduled between December 21, 2026, and January 1, 2027. The demolition plans identify 195 potential asbestos joints in Area A and 112 in Area B, with possible increases if straight-run insulation joints contain asbestos, along with concrete floor grinding of at least 2,000 square feet. The district anticipates most projects will involve PCM (Phase Contrast Microscopy) clearance samples for smaller areas of 160 square feet or less, or 260 linear feet or less, with TEM (Transmission Electron Microscopy) samples potentially required for larger AHERA projects. Unit prices are to remain firm for twelve months from award unless otherwise agreed in writing.

The document advises that bidders should provide separate unit pricing for friable and non-friable asbestos waste disposal on a per-ton basis rather than full dumpster loads to prevent overpayment on smaller projects. The district prefers that abatement contractors coordinate with third-party consultants to conduct clearance air samples to avoid conflicts of interest, with the contractor's markup fee considered a coordination cost. Bidders must hold all required federal, state, and local licenses and certifications, employ properly trained and certified personnel, and comply with EPA, OSHA, Utah Department of Environmental Quality, local regulations, and AHERA requirements for school buildings. An asbestos assessment has already been completed for the project. Contact information for questions and bid submission is directed to Jared Hansen and Wendy Berryman at Carbon School District's Facilities and Maintenance Department.

View the file

Other files

File Type Posted
2-Asbestos Mitigation.pdf PDF
1-Asbestos Removal Invitation to bid Contractor procurement.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1.

There are 2 types of clearance air samples that are taken at the end of an abatement project. Which type are you referring to?

a. PCM- Permitted for qualifying projects involving 160 square feet or less, or 260 linear feet or less of asbestos-containing building material. Each of the five clearance samples must be ≤0.01 fibers/cc.

b. TEM- Required for larger AHERA projects. Identifies asbestos structures specifically and detects smaller fibers than PCM. A common clearance criterion is an average ≤70 structures/mm², with required sampling volumes; AHERA also provides a statistical comparison procedure.

c. Generally speaking, the PCM samples can be handled at labs here in the state. For TEM samples they will need to be sent to an out-of-state laboratory for processing. TEM sampling is much more involved and about 10 times more expensive. If I were you I would clarify your bid document and ask for pricing for both. If not everyone will just give you the more expensive rate and you will be overpaying for air samples for all of your smaller projects. Just a thought.

For the purposes of this RFP, I think most of the projects we will be considering will be the PCM type. In general it is some quick small area cleanup that we need to address immediately and I want to have a pre-qualified contractor, or list of contractors we can call depending on availability. If we do a larger scale abatement project, that could require TEM, that could be discussed at that time. I suppose some of what we might be asking for on a few projects could push the limits you noted, but a lot of what I foresee is glove bag work. Just a lot of it.

2. Are you wanting the abatement contractor to run these clearance air samples, or would you like us to hire a 3rd Party Consultant to run these clearance samples?

a. Generally speaking, it is considered a conflict of interest to run your own clearance samples. It is common practice to hire a 3rd party consultant to run these clearance samples.

b. If you are looking to save money, you can contract directly through a 3rd party consultant, and you will save yourself the markup. I work with several school districts and have had great success working with R&R Environmental (Stephen Galley 801-971-3988) and AQC (Scott Bainbridge 385-321-9701) .

c.

I prefer to run it under the abatement contractor, with a 3rd party. This way the contractor can help determine if testing is needed, and if so, it can be coordinated with the abatement contractor and I don't end up acting as a go-between if schedules don't always go as planned. I consider the markup fee as a cost of coordination I'd be paying to try and manage it myself. If fees seem excessive, it may deter a contractor from getting a job.

3. Are you looking for pricing for a full dumpster load? A roll-off dumpster with 8 to 10 tons?

a. You will probably save yourself money if you ask for a per ton price for friable and non-friable waste. If you ask for generic pricing, everyone will charge you the higher rate and a full load.

A unit price for dump fees is what we are looking for. Some projects may only be a few TSI joints and others may be a dumpster full.

1. Is there an asbestos report/survey that has been performed for this project or are you also bidding for one to be done?

Yes there has been an assessment done already.