Summary

This Invitation to Bid document issued by Carbon School District in Utah seeks competitive bids from qualified asbestos abatement contractors to provide testing, removal, transportation, and disposal services at district-owned facilities in Carbon County, Utah. The solicitation establishes unit pricing for asbestos-related services that will be utilized as maintenance, renovation, repair, and construction projects arise throughout the district, with an initial project scheduled for completion between December 21, 2026, and January 1, 2027, at Sally Mauro Elementary School in Helper, Utah. Services include asbestos sampling and laboratory analysis, removal of thermal system insulation, removal of asbestos-containing floor tile and mastic, containment and cleanup operations, transportation and disposal of asbestos-containing materials, air monitoring, and final clearance testing. The bid submission deadline is December 1, 2026, at 2:00 PM MST, with a questions deadline of November 26, 2026, at 2:00 PM MST. Bids must be submitted to Jared Hansen at the Carbon School District Facilities and Maintenance Department in Price, Utah, or via email to both hansenj@carbonschools.org and berryman@carbonschools.org. The contract award will be made to the responsive and responsible bidder with the lowest cost.

All contractors must maintain required federal, state, and local licenses, certifications, and registrations; employ properly trained and certified personnel; provide proof of applicable liability insurance and workers' compensation coverage; and comply with EPA, OSHA, Utah Department of Environmental Quality, and local regulations, as well as AHERA requirements for school building work. Contractors shall submit unit pricing for ten service categories including trip charges, travel mileage, sample collection and testing, rush testing, thermal system insulation removal (by linear foot and square foot), floor tile and mastic removal, final air clearance testing, additional air monitoring, and asbestos waste transportation and disposal. Additional fees and charges must be identified separately and require prior approval before assessment. All submitted unit prices shall remain firm for twelve months from the date of award unless otherwise agreed in writing. The District reserves the right to reject any or all bids, waive minor irregularities, and request updated pricing or rebid services as necessary.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CARBON SCHOOL DISTRICT

INVITATION TO BID

ASBESTOS TESTING AND ABATEMENT SERVICES

Issue Date: 11/17/2026 Bid Submission Deadline: 12/1/2026 at 2:00 PM MST Questions Deadline: 11/26/2026 at 2:00 PM Submission Location: Carbon School District- Carbon County Utah Contact Person: Jared Hansen Email: hansenj@carbonschools.org Phone: 435-650-9397

1. PURPOSE AND SCOPE

Carbon School District is soliciting competitive bids from qualified and properly licensed asbestos abatement contractors to provide asbestos testing, removal, transportation, and disposal services at District-owned facilities located in Carbon County Utah.

The District intends to establish unit pricing for asbestos-related services that may be requested throughout the District as maintenance, renovation, repair, and construction projects arise. With an initial project to be completed between December 21, 2026 and January 1 2027 at Sally Mauro Elementary School in Helper Utah.

Work may include, but is not limited to:

· Asbestos sampling and laboratory analysis.

· Removal of thermal system insulation (TSI), including pipe and boiler insulation.

· Removal of asbestos-containing floor tile and associated mastic.

· Containment, cleanup, transportation, and disposal of asbestos-containing materials.

· Air monitoring and final clearance testing.

· Other asbestos-related services as requested by the District.

This bid is intended to establish pricing for services as needed. Submission of a bid does not guarantee a minimum amount of work.

2. CONTRACTOR QUALIFICATIONS

All contractors submitting a bid must:

1. Maintain all required federal, state, and local licenses, certifications, and registrations necessary to perform asbestos inspection, testing, and abatement work.

2. Employ properly trained and certified asbestos abatement personnel.

3. Provide proof of applicable liability insurance and workers' compensation coverage.

4. Comply with all applicable EPA, OSHA, Utah Department of Environmental Quality, and local regulations.

5. Follow applicable AHERA requirements for work performed in school buildings.

6. Provide appropriate containment, worker protection, decontamination, and waste disposal procedures.

7. Provide documentation of proper transportation and disposal of asbestos-containing materials.

8. Provide copies of required notifications, permits, licenses, and project documentation upon request.

3. UNIT PRICE BID SCHEDULE

Contractors shall provide unit pricing for each service listed below. All prices shall include labor, equipment, materials, personal protective equipment, and other costs necessary to perform the work unless specifically identified as an additional charge in Section 4.

Item
Description
Unit
Unit Price
1
Trip / Travel Charge – Mobilization to District facility
Per Trip
$________
2
Additional Travel – If applicable
Per Mile
$________
3
Asbestos Sample Collection and Testing, including laboratory fees
Per Sample
$________
4
Rush Sample Testing, including laboratory fees
Per Sample
$________
5
TSI Removal – Pipe, boiler, duct, and other thermal system insulation.
Per Linear Foot
$________
6
TSI Removal – Other surfaces, where measured by area
Per Square Foot
$________
7
Floor Tile and Mastic Removal – Combined
Per Square Foot
$________
8
Final Air Clearance Testing
Per Project
$________
9
Additional Air Monitoring
Per Hour
$________
10
Asbestos Waste Transportation and Disposal
Per Project / Load
$________

Pricing Clarifications:

· TSI removal pricing shall include removal, containment, packaging, transportation, and disposal.

· Floor tile and mastic pricing shall identify whether the work includes removal of both materials, adhesive residue, and associated waste disposal.

· Sample testing pricing shall include sample collection, laboratory analysis, and written laboratory results.

· Contractors shall specify whether minimum project charges apply.

· Contractors shall identify any differences in pricing based on material type, condition, accessibility, or project size.

4. ADDITIONAL FEES AND POTENTIAL CHARGES

Contractors shall identify all additional fees that may be incurred during asbestos testing or abatement projects. No additional charges shall be assessed without prior approval from the District's designated representative.

Please identify applicable charges below:

Additional Service / Fee
Pricing Method
Amount
Mobilization / Demobilization
Per Occurrence
$________
Minimum Project Charge
Per Project
$________
After-Hours Work
Per Hour
$________
Weekend / Holiday Work
Per Hour
$________
Emergency Response / Expedited Mobilization
Per Occurrence
$________
Additional Containment Requirements
Per Project
$________
Negative Air Equipment
Per Day
$________
Additional Labor
Per Hour
$________
Additional Disposal / Landfill Fees
Per Load
$________
Final Clearance Air Testing
Per Sample
$________
Additional Laboratory Fees
Per Sample
$________
Floor Preparation / Residue Removal
Per Square Foot
$________
Other (Describe Below)
__________
$________

Additional Fees and Exclusions:

Contractor shall provide a written explanation of any additional costs, exclusions, surcharges, minimum charges, or circumstances that may result in charges beyond the unit prices listed above.

5. PROJECT REQUIREMENTS

For each project authorized by Carbon School District, the contractor shall:

1. Coordinate work schedules with District Facilities and Maintenance personnel.

2. Provide a written scope of work and cost estimate before beginning work.

3. Identify the type and estimated quantity of asbestos-containing materials to be removed.

4. Provide all required notifications and obtain applicable permits before beginning work.

5. Establish appropriate containment and protect students, staff, visitors, and District property.

6. Perform all work in accordance with applicable regulations and approved abatement procedures.

7. Properly package, label, transport, and dispose of asbestos-containing materials at an authorized disposal facility.

8. Provide waste disposal documentation and manifests when applicable.

9. Perform required final inspections and clearance testing.

10. Provide the District with a final project report, including laboratory results, quantities removed, air monitoring results when applicable, and disposal documentation.

IMPORTANT: No asbestos disturbance or removal shall begin without written authorization from Carbon School District.

6. BID SUBMISSION REQUIREMENTS

Bids shall include the following:

· Completed and signed unit price bid schedule.

· Completed additional fees and charges schedule.

· Proof of applicable contractor licenses and certifications.

· Certificate of insurance.

· Description of the contractor's asbestos abatement experience.

· List of references, preferably including public school districts or other public entities.

· Identification of any subcontractors anticipated to perform work.

· Written explanation of any exceptions, exclusions, or conditions associated with the bid.

Bids must be received by the submission deadline listed on the first page.

Carbon School District reserves the right to reject any or all bids, waive minor irregularities, request clarification, and award or decline to award a contract in the best interest of the District.

Award will be made to the responsive and responsible Bidder with the lowest Cost.

7. PRICING VALIDITY AND TERM

All submitted unit prices shall remain firm for a period of twelve (12) months from the date of award unless otherwise agreed to in writing by the District.

Any proposed price adjustments must be submitted in writing and approved by Carbon School District before becoming effective.

The District reserves the right to request updated pricing or rebid services as necessary.

8. CONTRACTOR CERTIFICATION

The undersigned certifies that the information provided in this bid is accurate and that the contractor agrees to comply with the requirements and conditions outlined in this Invitation to Bid.

Company Name: __________________________________ Authorized Representative: ________________________ Title: ___________________________________________ Signature: _______________________________________ Date: ___________________________________________ Phone: __________________________________________ Email: __________________________________________

9. SUBMIT BIDS TO:

Carbon School District Attn: Jared Hansen Facilities and Maintenance Department 65 East 400 North Price Utah, 84501 hansenj@carbonschools.org AND berryman@carbonschools.org

10. Questions:

Questions regarding the project must be submitted in writing to Jared Hansen at hansenj@carbonschools.org and Wendy Berryman at berryman@carbonschools.org no later than 11/24/2026 at 2:00 PM MST.

File details come from the government source that posted it. Updated .