2-Asbestos Mitigation.pdf
PDF 4 MB Posted
- Solicitation number
- RA27-140
- Issued by
- Cache County, Utah
About this file
This document is a demolition plumbing plan and architectural drawing set for Sally Mauro Elementary School in Helper, Utah, operated by Carbon County School District. The plans depict the first floor demolition scope for Areas A and B of the facility, detailing existing piping systems to be removed, retained, or abandoned. The project involves the systematic removal of galvanized domestic cold water, hot water, hot water return, and tempered water piping throughout multiple classroom spaces, corridors, storage areas, restrooms, kitchen facilities, and administrative areas. Specific demolition notes identify 195 potential asbestos joints in Area A and 112 potential asbestos joints in Area B that require removal or abatement, with annotations suggesting an additional 50 to 75 percent increase in asbestos-containing joints if straight-run insulation joints prove to contain asbestos materials. The architectural finish schedule and general demolition notes outline requirements for field verification of existing conditions, patching and repair protocols, concrete floor grinding specifications (2,000 square feet minimum), and ADA compliance measures. The bid submission deadline is December 1, 2026, at 2:00 PM, with questions due by November 24, 2026, at 2:00 PM MST, directed to Jared Hansen and Wendy Berryman at Carbon School District's Facilities and Maintenance Department in Price, Utah.
The solicitation documentation indicates this is a comprehensive asbestos testing and abatement services contract requiring specialized handling and professional remediation of identified asbestos-containing materials throughout the elementary school facility. Bidders must demonstrate expertise in asbestos identification, safe removal protocols, and regulatory compliance with applicable state and federal environmental standards. The project scope encompasses multiple building systems and materials, including pipe insulation, potential asbestos tile, and mastic materials, requiring detailed assessment and documentation prior to removal. No specific budget allocation, funding source, or contract term information is provided in the available documentation; interested bidders should contact the school district directly for complete solicitation details, specifications, and pricing instructions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-RA27-140-Carbon School District Asbestos Testing and Abatement Services QA.docx | DOCX document | |
| 1-Asbestos Removal Invitation to bid Contractor procurement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
A A
C C
B B
D D
2"(E)
3/4"(E)
1"(E)
3/4"(E)
3/4"(E)
2"(E)
3/4"(E)
1/2"(E)
2"(E)
3"(E)
1 1/4"(E)1 1/4"(E)
1 1/4"(E)
3/4"(E) 1 1/2"(E)
1 1/4"(E)
4"(E) 2 1/2"(E)
2"(E)3"(E)
1/2"(E) 2"(E)
2"(E) 2 1/2"(E)
2 1/2"(E)
2"(E)
3/4"(E)
2"(E)
1 1/2"(E)
1/2"(E) 4"(E)
2"(E)
1/2"(E)
2"(E)
2"(E)
2"(E)
1/2"(E)
1/2"(E)
1/2"(E)
2"(E)
(E) F.H.C
3/4"(E)
2"(E)
3"(E)
3/4"(E)
(E) FCO
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
STORAGE
CLASSROOM
CORRIDOR
STORAGE
VESTIBULE
STORAGE
STORAGE
BOYS RESTROOM
GIRLS RESTROOM
CORRIDOR
KITCHEN
FREEZER
LOCKER ROOM
RESTROOM
CAFETERIA
STORAGE
STORAGE
STORAGE
114 CUSTODIAL
STORAGE
CORRIDOR
CORRIDOR
VESTIBULE
CORRIDOR
128A
CORRIDOR
124A
CLASSROOM POD
CORRIDOR
107A
3/4"(E)
1/2"(E)
3/4"(E) 1/2"(E)
3"(E) 3"(E)
2 1/2"(E)
2 1/2"(E)
3"(E)
3"(E)
3"(E)
CLASSROOM
3"(E)
CAFETERIA
118 STAGE
117B
2"(E)
4"(E)
4"(E)
4"(E)
2"(E)
2"(E)
2"(E) VTR
2"(E)
2"(E) VTR
VTR
2"(E)
DRAWN BY:
P R
O J E
C T
T
IT
L E
CHECKED BY:
DATE:
PROJECT #:
N
O R
T H
M
A I N
S
R
E E
T S
P A
N I S
H
F
O R
K
U
T A
H
W W
W K
M A
A R
C H
I T
E C
T S
C
O M
REVISIONS:
T H
IS
P
R
IN
T A
N D
A L L I N
F O
R M
A T
IO
N
H E
R E
O N
I S
T H
E P
R O
P E
R T
Y O
F K
M A
A R
C H
IT
E
C T
S A
N D
S H
A L L N
O T
B E
U S
E D
O N
A N
Y O
T H
E R
J O
B W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
H E
A R
C H
IT
E
C T
STAFF
JAB
A s i n d ic a te d /1
/2
:2 :3
P
M
S A
L L
Y M
A U
R O
E L E
M E
N T
A R
Y H
E L P
E R
U
T
C A
R B
O N
C O
U N
T Y
S C
H O
O L D
IS
T
R
IC
T
N
D A
V E
174824
APR 2026
P0.1A
1 EXISTING WASTE PIPE UP FROM SUMP PUMP BELOW.
2 EXISTING CONDENSATE DRAIN PIPING TO REMAIN (TYP).
3 DOMESTIC PIPING CONTINUES TO FLOOR BELOW. SEE
P0.0 FOR CONTINUATION.
4 REMOVE EXISTING GALVANIZED DOMESTIC COLD WATER
COMPLETE (TYP).
5 REMOVE EXISTING GALVANIZED DOMESTIC HOT WATER
COMPLETE (TYP).
6 REMOVE EXISTING GALVANIZED DOMESTIC HOT WATER
RETURN COMPLETE (TYP).
7 REMOVE EXISTING GALVANIZED TEMPERED WATER
PIPING COMPLETE (TYP).
8 REMOVE EXISTING FAUCET COMPLETE, BASIN TO
REMAIN INTACT. (TYP).
9 SEE SHEET P0.1B FOR CONTINUATION OF PIPING.
10 PIPING DROPS FROM GYM MEZZANINE ABOVE. SEE
SHEET P0.1D FOR CONTINUATION.
11 REMOVE EXISTING FLOOR CLEANOUT TO BELOW SLAB
(TYPICAL).
12 ABANDON EXISTING DOMESTIC HOT AND COLD WATER IN
BLOCK WALL (TYP).
13 SEE SHEET P0.1C FOR CONTINUATION OF PIPING.
14 EXISTING ROOF DRAIN AND ROOF DRAIN PIPING TO
REMAIN (TYP).
15 REMOVE GALVANIZED PIPING IN EXISTING FURRED OUT
WALL. COORDINATE WITH ARCHITECTURAL PLANS FOR
PATCH AND REPAIR.
16 EXISTING ROOF DRAIN DROPS THRU SOFFIT.
17 EXISTING SINK WITH LEAD FREE FAUCET TO REMAIN
(TYP).
18 ABANDON EXISTING FIRE HOSE CABINET (FHC).
19 EXISTING FLOOR DRAIN TO REMAIN (TYP).
20 ABANDON EXISTING PIPING BELOW FLOOR.
21 REMOVE EXISTING WASTE PIPING TO APPROXIMATELY
THIS LOCATION.
22 REMOVE EXISTING WASTE PIPING COMPLETE (TYP).
23 SEE SHEET P0.1 FOR CONTINUATION OF PIPING.
24 SAWCUT AT APPROXIMATELY THIS LOCATION. LOCATE
EXISTING WASTE PIPE LOCATION PRIOR TO SAW
CUTTING.
25 REMOVE EXISTING FLOOR SINK (TYP).
26 EXISTING BOOSTER WATER HEATER TO REMAIN.
27 EXISTING WALL CASSETTE TO BE RELOCATED.
COORDINATE WITH NEW WORK (TYP).
28 REMOVE EXISTING CONDENSATE DRAIN PIPING (TYP).
29 REMOVE EXISTING CONDENSATE PIPING TO
APPROXIMATELY THIS LOCATION.
REFERENCE NOTES#
N O
R T H
SCALE:1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLUMBING PLAN AREA "A"
3 VE ITEM 7-03-26
4 MEMO#2 8-12-26
https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407934056 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933982 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933932 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933933 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/417049443 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933904 molsen Removed molsen Removed molsen Removed molsen Removed molsen Removed molsen Removed molsen Removed molsen Removed molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint nkerr Cloud+ nkerr Cloud+ Christmas Break molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Legend nkerr Typewritten Text Total to be removed 195 nkerr Typewritten Text In the straight runs of insulation, we don't know if the joints are taped or asbestos. I would think to add another 50% to 75%, if the straight joints are asbestos.
nkerr Typewritten Text Over all for Area A & B Combined = 307
KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
A A
C C
B B
D D
F
FHC (E)
2"(E)
3/4"(E)
2"(E)
1/2"(E)
1/2"(E)
2"(E)
3/4"(E)
2"(E)
4"(E)
4"(E)
4"(E)
3/4"(E)
FHC
1/2"(E)
2"(E)
1/2"(E)
3/4"(E)
1/2"(E)
VESTIBULE
CORRIDOR
CORRIDOR
VESTIBULE
ADMINISTRATION
STORAGE
LIBRARY
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM
CLASSROOM POD
CORRIDOR
128A
OFFICE
WORKROOM
CONFERENCE
OFFICE
NURSE
BATHROOM
STORAGE
STORAGE
135B
BATHROOM
CORRIDOR
107A
2 1/2"(E)
2 1/2"(E)
2"(E)
2"(E)
4"(E)
4"(E)
2"(E)
2"(E)
2"(E)
4"(E)
1516 15
16 17
16 17
DRAWN BY:
P R
O J E
C T
T
IT
L E
CHECKED BY:
DATE:
PROJECT #:
N
O R
R
E E
T S
P A
N I S
H
F
O R
K
U
T A
H
W W
W K
M A
A R
C H
I T
E C
T S
C
O M
REVISIONS:
T H
IS
P
R
IN
T A
N D
A L L I N
F O
R M
A T
IO
N
H E
R E
O N
I S
T H
E P
R O
P E
R T
Y O
F K
M A
A R
C H
IT
E
C T
S A
N D
S H
A L L N
O T
B E
U S
E D
O N
A N
Y O
T H
E R
J O
B W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
H E
A R
C H
IT
E
C T
STAFF
JAB
A s in d ic a te d /6
/2
:3 :0
P
M
S A
L L
Y M
A U
R O
E L E
M E
N T
A R
Y H
E L P
E R
U
T
C A
R B
O N
C O
U N
T Y
S C
H O
O L D
IS
T
R
IC
T
N
D A
V E
174824
APR 2026
P0.1B
1 EXISTING WASTE PIPING TO REMAIN (TYP).
2 EXISTING CONDENSATE DRAIN PIPING TO REMAIN (TYP).
3 REMOVE EXISTING GALVANIZED DOMESTIC COLD WATER
COMPLETE (TYP).
4 REMOVE EXISTING GALVANIZED DOMESTIC HOT WATER
COMPLETE (TYP).
5 EXISTING SINK WITH LEAD FREE FAUCET TO REMAIN
(TYP).
6 REMOVE EXISTING FAUCET COMPLETE, BASIN TO
REMAIN INTACT. (TYP).
7 SEE SHEET P0.1A FOR CONTINUATION OF PIPING.
8 SEE SHEET P0.1C FOR CONTINUATION OF PIPING.
9 EXISTING ROOF DRAIN PIPING TO REMAIN (TYP).
10 EXISTING SECONDARY EMPTIES BELOW SOFFIT.
11 ABANDON EXISTING FIRE HOSE CABINET (FHC).
12 ABANDON EXISTING GALVANIZED DOMESTIC WATER IN
BLOCK WALL (TYP).
13 SEE SHEET P0.1 FOR CONTINUATION OF PIPING.
14 EXISTING CLEANOUT TO GRADE TO REMAIN (TYP).
15 REMOVE EXISTING CONDENSATE DRAIN PIPING (TYP).
16 EXISTING WALL CASSETTE TO BE RELOCATED.
COORDINATE WITH NEW WORK (TYP).
17 REMOVE EXISTING CONDENSATE PIPING TO
APPROXIMATELY THIS LOCATION.
REFERENCE NOTES#
SCALE:1/8" = 1'-0"
FIRST FLOOR DEMOLITION PLUMBING PLAN AREA "B"
N O
R T H
3 VE ITEM 7-03-26
https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/416617785 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933933 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/417049443 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933904 molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint molsen Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Potential Asbestos Joint nkerr Cloud+ nkerr Cloud+ Christmas Break nkerr Cloud+ nkerr Cloud+ Christmas Break nkerr Legend nkerr Typewritten Text Total 112 nkerr Typewritten Text In the straight runs of insulation, we don't know if the joints are taped or asbestos. I would think to add another 50% to 75%, if the straight joints are asbestos.
DN
DN
W
D
C O
O L E
R
TB
MB
TB
TV
TB
TB
TB
MB
MB TV
TV
TB
MB MB
TB
MB TV MB
MB
MB
TV
MB
TB
TB
P
P
P
P
P
P
P
A110
P
A111
A112
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, B4, B6, W5, C1, C3
KINDERGARTEN
F6, F3, B4, B6, W1, W5, C1
REST.
F2, B2, W2, W3, W6, C4
REST.
F2, B2, W2, W3, W6, C4
STORAGE
F6, B6, W1, W5, C1
KITCHEN
F5, B5, W2, W5, C2
POD
F1, F3, F4, B4, W5, C1
A100
A101
A102
A103
A104
A105
A106
A109
A113
A107
A108
P
8'-0"
A114
F3
B4
B4
12 12
F3
B4
B4
F3
B4
F3
B1
'-4
" 5'-7"
3'-0"
1'-0"
F3
B4
F4
B4
KINDERGARTEN
F6, B6, W5, C1
3 2
3 3
STORAGE
F4, B4, W4, C1
STORAGE
F4, B4, W4, C1
STAIR
F4, B4, W1, W5, C5
CORRIDOR
F1, B4, W5, C1
FIRE RISER
F6, B6, W5, C5
STORAGE
F6, B6, W5, C4
STORAGE
F6, B6, W5, C4
STORAGE
F6, B6, W5, C4
F R
E E
Z E
R
STORAGE
F4, B4, W5, C4
REST.
F4, B4, W5, C4
STORAGE
F6, B6, W5, C4
CAFETERIA
F4, B4, W5, C1
MULTI-PURPOSE
F6, B6, W5, C6
STAGE
F6, B6, W5, C6
3 3
3 3
6 6
GIRLS
RESTROOM
F6, B2, W2, W3, W5, C2
BOYS RESTROOM
F6, B2, W2, W3, W5, C2
CORRIDOR
F1, B4, W5, C1
STORAGE
F6, B6, W5, C5
VEST.
F3, B4, W5, C1
6 6
STORAGE
F6, B6, W5, C2
STORAGE
F6, B6, W5, C3
STORAGE
F6, B6, W5, C3
CUST.
F6, B4, W5, C4
6 6
CORRIDOR
F1, B4, W5, C1
STORAGE
F6, B6, W5, C2
13 13
LOBBY
F1, B4, W5, C1
VEST.
F3, B4, W5, C1
CORRIDOR
F1, B4, W5, C1
M
K
R
A1.3
A1.3
CORRIDOR
F1, B4, W5, C1
S3.1
S3.1
S3.1
S3.1
S3.1
S3.1
S3.1
S3.1
S3.1
S3.1
KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
FINISH SCHEDULE
FLOORS:
F1 - GLUE-DOWN CARPET TILE - SEE SPEC
F2 - 2"x2" CERAMIC TILE - SEE SPEC
F3 - HEAVY DUTY ENTRANCE WALK-OFF MAT - SEE SPEC
F4 - LAMINATED VINYL TILE (LVT) - SEE SPEC
F5 - QUARRY TILE - SEE SPEC
F6 - EXISTING FLOORING TO REMAIN (PATCH AND REPAIR)
F7 - EPOXY PAINTED FLOOR - SEE SPECS
BASE:
B1 - NOT USED
B2 - PORCELAIN TILE BASE - SEE SPEC
B3 - NOT USED
B4 - 4" OR 6" RUBBER BASE - SEE SPEC (FIELD VERIFY LOCATIONS)
B5 - QUARRY TILE BASE - SEE SPEC
B6 - EXISTING BASE TO REMAIN (PATCH AND REPAIR)
WALL:
W1 - 5/8" GYPSUM BOARD (TEXTURED & PAINTED) - SEE SPECS
W2 - 5/8" GYPSUM BOARD (TEXTURED & EPOXY PAINTED) - SEE SPECS
W3 - PORCELAIN WALL TILE - SEE SPECS
W4 - CONCRETE BLOCK (SEALED) - SEE SPECS
W5 - EXISTING WALL FINISH TO REMAIN (PATCH AND REPAIR)
W6 - EXISTING WALLS - (PAINTED)
CEILING:
C1 - 2'X4' LAY-IN ACOUSTICAL CEILING PANELS
C2 - 2'X4' LAY-IN ACOUSTICAL CEILING PANELS (WATER RESISTANT
AND WASHABLE)
C3 - 5/8" GYPSUM BOARD (TEXTURED & PAINTED) - SEE SPECS
C4 - 5/8" GYPSUM BOARD (TEXTURED & EPOXY PAINTED) - SEE SPECS
C5 - EXPOSED CEILING STRUCTURE, DUCTWORK, CONDUITS, ETC. TO
BE PAINTED
C6 - EXISTING CEILING TO REMAIN (PATCH AND REPAIR)
GENERAL DEMOLITION NOTES
A - CONTRACTOR IS TO FIELD VERIFY EXISTING
CONDITIONS BEFORE CONSTRUCTION BEGINS.
B - CONTRACTOR IS TO PATCH AND REPAIR
ALL EXISTING CONDITIONS AS REQUIRED DUE
TO CONTRUCTION.
C - ALL PAINTED WALLS AND CEILING IN
RESTROOMS TO BE EPOXY PAINTED
D - ALL ALUMINUM WINDOWS TO HAVE
ROLLING SHAES INSTALLED - SEE WINDOW
TYPES AND SPECS.
CONCRETE GRINDING NOTE
PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR
NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER
THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE
FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN
+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO
PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE
CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN
THE AREA THE CONCRETE GRINDING IS TAKING PLACE.
CONCRETE FLOOR NOTE
CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS
FOR THE INSTALLATION OF ALL FLOOR FINISHES AS
REQUIRED BY THE ARCHITECT AND OWNER.
TILE FLOORING NOTE
LOCATIONS FOR TILE FLOORING IS TO BE RECESSED UNLESS
OTHER WISE NOTED. CONTRACTOR IS TO INSTALL TILE
FLOORING USING THE MORTAR BED METHODS AS IN
ACCORDANCE WITH TCNA (HB) METHOD F112.
ADA COMPLIANCE NOTE
NEW CONSTRUCTION TO COMPLY WITH CURRENT ADA
REQUIREMENTS AS NOTED ON SHEET 7.0. CONTRACTOR TO
REFER TO ADA SHEETS WHEN CONSTRUCTING STAIRS, RAILS,
PLUMBING FIXTURES, ETC.
RUBBER BASE NOTE
1 - CONTRACTOR IS TO FIELD VERIFY EXISTING FLOOR BASE
AND IDENTIFY LOCATIONS OF 6" OR 4" WALL BASE.
2 - CLASSROOMS - NEW 4" RUBBER BASE IS TO BE INSTALLED
ON NEW CONSTRUCTED WALLS.
3 - ADDMINISTRATION & MEDIA CENTER - NEW 6" RUBBER BASE
IS TO BE INSTALLED (CONTRACTOR TO VERIFY EXISTING BASE
HEIGHT)
4 - CORRIDORS - NEW RUBBER BASE IS TO BE INSTALLED TO
MATCH EXISTING RUBBER BASE HEIGHT (CONTRACTOR TO
VERIFY EXISTING CONDITIONS)
DRAWN BY:
P R
O J E
C T
T
IT
L E
CHECKED BY:
DATE:
PROJECT #:
N
O R
R
E E
T S
P A
N I S
H
F
O R
K
U
T A
H
W W
W K
M A
A R
C H
I T
E C
T S
C
O M
REVISIONS:
T H
IS
P
R
IN
T A
N D
A L L I N
F O
R M
A T
IO
N
H E
R E
O N
I S
T H
E P
R O
P E
R T
Y O
F K
M A
A R
C H
IT
E
C T
S A
N D
S H
A L L N
O T
B E
U S
E D
O N
A N
Y O
T H
E R
J O
B W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
H E
A R
C H
IT
E
C T
WESLEY ALLEN
CHRISTENSEN
No. 9469958-0301
S T
A
T E OF UTA
H
L I
C E
N
S E D A R C
H
I T
E C
T
A s i n d ic a te d /2
/2
:0 :4
P
M
S A
L L
Y M
A U
R O
E L E
M E
N T
A R
Y H
E L P
E R
U
T
C A
R B
O N
C O
U N
T Y
S C
H O
O L D
IS
T
R
IC
T
N
D A
V E
174824
BRS
JR
APR 2026
A1.1A
SHEET NOTES
1 - REINSTALL TACK BOARD, TV, OR MARKERBOARD IN EXISTING
LOCATION. PROVIDE BACKING AS REQUIRED
2 - EXISTING MILLWORK AND COUNTER TOP TO BE REMOVED AND
REPLACED ONCE NEW CONSTRCUTION IS COMPLETE.
3 - PLUMBING FIXTURES - SEE PLUMBING SHEETS
4 - EXISTING MILLWORK AND COUNTER TO REMAIN. PATCH AND
REPAIR DUE TO CONSTRUCTION.
5 - EXISTING ALUMINUM WINDOW TO REMAIN.
6 - EXISTING DOOR AND FRAME TO REMAIN.
7 - EXISTING CONSTRUCTION TO REMAIN. CONTRACTOR TO PATCH
AND REPAIR AS REQUIRED DUE TO DEMOLITION AND NEW
CONSTRUCTION.
8 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED
DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO
THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR
AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.
9 - A.D.A. GRAB BARS - SEE SPECS.
10 - FOLDING SHOWER SEAT - SEE SPECS
11 - SHIP LADDER - SEE DETAIL 6/A1.3
12 - EXISTING COLUMN TO REMAIN
13 - NEW STRUCTURAL COLUMN TO BE PAINTED - COORDINATE
WITH STRUCTURAL SHEETS.
14 - (ALTERNATE #1) EXISTING WALL CARPET TO BE REMOVED AND
5/8" GYPSUM BOARD (TEXTURED & PAINTED) TO BE INSTALLED
AS NEEDED
15 - REMOVE AND STORE EXISTING KITCHEN EQUIPMENT (FIELD
VERIFY) PROTECT DURING CONSTRUCTION. ITEMS ARE TO BE
REINSTALLED IN THE SAME LOCATION AFTER NEW
CONSTRUCTION IS COMPLETED.
16 - EXISTING TOILET PARTITIONS TO REMAIN - PATCH AND REPAIR
AS NEEDED.
17 - EXISTING STAIRS, HANDRAIL, AND GUARDRAIL TO REMAIN.
18 - REMOVE EXISTING CONCRETE SIDEWALK AS NEEDED FOR
SEWER CONNCECTION - PATCH AND REPAIR ALL EXISTING
CONDITIONS AFFECTED BY CONSTRUCTION (INSTALL CLEAN
OUTS AS INDICATED BY PLUMBING PLANS)
1/8" = 1'-0"
MAIN FLOOR PLAN AREA "A"
N O
R T
H
7-23-26
1 MEMO #01R1
https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933999 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/408508876 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/408508876 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933904 nkerr Area Measurement 98 sf nkerr Area Measurement 77 sf nkerr Callout May have asbestos mastic nkerr Callout Confirmed Asbestos
TB TB TB
MB
TB
TV
TV
TB
TB
TB
TB
TB
TB
TB
TB
TB
TB
TV
TB
TB
MB
MB
MB
TV
MB
MB
MB
TBMB
MB
MBMBTVMB
MB
MB
MB
MB
TB
TV
TB
TB
TB
MB
TB
P
PP
P
P
P
P
P
P
P
P
P
P
P
5 5
3 3
B108
B110
B109
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASROOM
F1, F3, B4, B6, W1, W5, C1, C3
CLASSROOM
F1, F3, B4, B6, W1, W5, C1, C3
POD
F1, F4, B4, W5, C1
POD
F1, F4, B4, W5, C1
B111
B100
B101 B102
B103
B104
B105
B106
B107
P P
P
TV
LOBBY
F1, B4, W5, C1
VEST.
F3, B4, W5, C1
CORRIDOR
F1, B4, W5, C1
K
CONFERENCE
F1, B4, W5, C1
NURSE
F1, B4, W1, W5, C1
WORK ROOM
F1, B4, W5, C1
PRINCIPAL
F1, B4, W1, W5, C1
RESTROOM
F6, B2, W3, W5, C4
STORAGE
F1, B4, W5, C1
STORAGE
F4, B4, W1, W5, C1
STORAGE
F1, B4, W1, W5, C1
RECEPTION
F1, B4, W1, W5, C1
RESTROOM
F6, B2, W3, W5, C4
STORAGE
F1, B4, W5, C3
STORAGE
F1, B4, W5, C1
MEDIA CENTER
F1, B4, W1, W5, C1
CLASSROOM
F6, B6, W1, W5, C1
VEST.
F1, F3, B4, W5, C1
F3
F3
F3
F3
F3
F3
F3
F4
B4
STAIRS
F4, B4, W1, W5, C5
STAIRS
F4, B4, W1, W5, C5
F4
B4
F3
9 9
10 10
CLASSROOM
F1, B4, B6, W1A, C1, C3
MEDIA CENTER
F1, B4, W1, W5, C1
CORRIDOR
F1, B4, W5, C1
S3.1
1 S3.1
S3.1
S3.1
S3.1
S3.1
S3.1
'-1
KEY PLAN
AREA "A"
AREA "B"
AREA "C"
AREA "D"
FINISH SCHEDULE
FLOORS:
F1 - GLUE-DOWN CARPET TILE - SEE SPEC
F2 - 2"x2" CERAMIC TILE - SEE SPEC
F3 - HEAVY DUTY ENTRANCE WALK-OFF MAT - SEE SPEC
F4 - LAMINATED VINYL TILE (LVT) - SEE SPEC
F5 - QUARRY TILE - SEE SPEC
F6 - EXISTING FLOORING TO REMAIN (PATCH AND REPAIR)
F7 - EPOXY PAINTED FLOOR - SEE SPECS
BASE:
B1 - NOT USED
B2 - PORCELAIN TILE BASE - SEE SPEC
B3 - NOT USED
B4 - 4" OR 6" RUBBER BASE - SEE SPEC (FIELD VERIFY LOCATIONS)
B5 - QUARRY TILE BASE - SEE SPEC
B6 - EXISTING BASE TO REMAIN (PATCH AND REPAIR)
WALL:
W1 - 5/8" GYPSUM BOARD (TEXTURED & PAINTED) - SEE SPECS
W2 - 5/8" GYPSUM BOARD (TEXTURED & EPOXY PAINTED) - SEE SPECS
W3 - PORCELAIN WALL TILE - SEE SPECS
W4 - CONCRETE BLOCK (SEALED) - SEE SPECS
W5 - EXISTING WALL FINISH TO REMAIN (PATCH AND REPAIR)
W6 - EXISTING WALLS - (PAINTED)
CEILING:
C1 - 2'X4' LAY-IN ACOUSTICAL CEILING PANELS
C2 - 2'X4' LAY-IN ACOUSTICAL CEILING PANELS (WATER RESISTANT
AND WASHABLE)
C3 - 5/8" GYPSUM BOARD (TEXTURED & PAINTED) - SEE SPECS
C4 - 5/8" GYPSUM BOARD (TEXTURED & EPOXY PAINTED) - SEE SPECS
C5 - EXPOSED CEILING STRUCTURE, DUCTWORK, CONDUITS, ETC. TO
BE PAINTED
C6 - EXISTING CEILING TO REMAIN (PATCH AND REPAIR)
GENERAL DEMOLITION NOTES
A - CONTRACTOR IS TO FIELD VERIFY EXISTING
CONDITIONS BEFORE CONSTRUCTION BEGINS.
B - CONTRACTOR IS TO PATCH AND REPAIR
ALL EXISTING CONDITIONS AS REQUIRED DUE
TO CONTRUCTION.
C - ALL PAINTED WALLS AND CEILING IN
RESTROOMS TO BE EPOXY PAINTED
D - ALL ALUMINUM WINDOWS TO HAVE
ROLLING SHAES INSTALLED - SEE WINDOW
TYPES AND SPECS.
TILE FLOORING NOTE
LOCATIONS FOR TILE FLOORING IS TO BE RECESSED UNLESS
OTHER WISE NOTED. CONTRACTOR IS TO INSTALL TILE
FLOORING USING THE MORTAR BED METHODS AS IN
ACCORDANCE WITH TCNA (HB) METHOD F112.
ADA COMPLIANCE NOTE
NEW CONSTRUCTION TO COMPLY WITH CURRENT ADA
REQUIREMENTS AS NOTED ON SHEET 7.0. CONTRACTOR TO
REFER TO ADA SHEETS WHEN CONSTRUCTING STAIRS, RAILS,
PLUMBING FIXTURES, ETC.
CONCRETE GRINDING NOTE
PROVIDE 2000 SQ. FT. OF CONCRETE FLOOR GRINDING FOR
NEW CONSTRUCTION. (THIS APPLIES TO ALL FLOORS OTHER
THAN POLISHED CONCRETE FLOOR AREAS.) CONCRETE
FLOORS SHALL BE GROUND SMOOTH AND LEVEL TO WITHIN
+/- 1/8" WITHIN A 10'-0" RADIUS. THE CONTRACTOR SHALL ALSO
PROVIDE A UNIT COST PER SQ. FT. FOR THIS GRINDING. THE
CONTRACTOR SHALL ERECT AND MAINTAIN DUST BARRIERS IN
THE AREA THE CONCRETE GRINDING IS TAKING PLACE.
CONCRETE FLOOR NOTE
CONTRACTOR TO PREPARE THE NEW CONCRETE FLOORS
FOR THE INSTALLATION OF ALL FLOOR FINISHES AS
REQUIRED BY THE ARCHITECT AND OWNER.
RUBBER BASE NOTE
1 - CONTRACTOR IS TO FIELD VERIFY EXISTING FLOOR BASE
AND IDENTIFY LOCATIONS OF 6" OR 4" WALL BASE.
2 - CLASSROOMS - NEW 4" RUBBER BASE IS TO BE INSTALLED
ON NEW CONSTRUCTED WALLS.
3 - ADDMINISTRATION & MEDIA CENTER - NEW 6" RUBBER BASE
IS TO BE INSTALLED (CONTRACTOR TO VERIFY EXISTING BASE
HEIGHT)
4 - CORRIDORS - NEW RUBBER BASE IS TO BE INSTALLED TO
MATCH EXISTING RUBBER BASE HEIGHT (CONTRACTOR TO
VERIFY EXISTING CONDITIONS)
DRAWN BY:
P R
O J E
C T
T
IT
L E
CHECKED BY:
DATE:
PROJECT #:
N
O R
R
E E
T S
P A
N I S
H
F
O R
K
U
T A
H
W W
W K
M A
A R
C H
I T
E C
T S
C
O M
REVISIONS:
T H
IS
P
R
IN
T A
N D
A L L I N
F O
R M
A T
IO
N
H E
R E
O N
I S
T H
E P
R O
P E
R T
Y O
F K
M A
A R
C H
IT
E
C T
S A
N D
S H
A L L N
O T
B E
U S
E D
O N
A N
Y O
T H
E R
J O
B W
IT
H
O U
T W
R
IT
T E
N P
E R
M
IS
S
IO
N O
F T
H E
A R
C H
IT
E
C T
WESLEY ALLEN
CHRISTENSEN
No. 9469958-0301
S T
A
T E OF UTA
H
L I
C E
N
S E D A R C
H
I T
E C
T
A s i n d ic a te d /2
/2
:0 :4
P
M
S A
L L
Y M
A U
R O
E L E
M E
N T
A R
Y H
E L P
E R
U
T
C A
R B
O N
C O
U N
T Y
S C
H O
O L D
IS
T
R
IC
T
N
D A
V E
174824
BRS
JR
APR 2026
A1.1B
SHEET NOTES
1 - REINSTALL TACK BOARD, TV, OR MARKERBOARD IN EXISTING
LOCATION. PROVIDE BACKING AS REQUIRED
2 - EXISTING MILLWORK AND COUNTER TO REMAIN. PATCH AND
REPAIR DUE TO CONSTRUCTION.
3 - PLUMBING FIXTURES - SEE PLUMBING SHEETS
4 - EXISTING CONSTRUCTION TO REMAIN. CONTRACTOR TO PATCH
AND REPAIR AS REQUIRED DUE TO DEMOLITION AND NEW
CONSTRUCTION.
5 - EXISTING DOOR AND FRAME TO REMAIN.
6 - EXISTING DOOR & HARDWARE TO BE REMOVED AND STORED
DURING CONSTRUCTION. PATCH AND REPAIR ANY DAMAGES TO
THE DOOR FRAME DUE TO CONSTRUCTION. REINSTALL DOOR
AND HARDWARE ONCE CONSTRUCTION IS COMPLETED.
7 - SHIP LADDER - SEE DETAIL 6/A1.3
8 - EXISTING COLUMN TO REMAIN
9 - NEW STRUCTURAL COLUMN TO BE PAINTED - COORDINATE
WITH STRUCTURAL SHEETS.
10 - (ALTERNATE #1) EXISTING WALL CARPET TO BE REMOVED AND
5/8" GYPSUM BOARD (TEXTURED & PAINTED) TO BE INSTALLED
AS NEEDED
11 - REMOVE EXISTING CONCRETE SIDEWALK AS NEEDED FOR
SEWER CONNCECTION - PATCH AND REPAIR ALL EXISTING
CONDITIONS AFFECTED BY CONSTRUCTION (INSTALL CLEAN
OUTS AS INDICATED BY PLUMBING PLANS)
12 - EXISTING MILLWORK AND COUNTER TOP TO BE REMOVED AND
REPLACED ONCE NEW CONSTRCUTION IS COMPLETE.
1/8" = 1'-0"
MAIN FLOOR PLAN AREA "B"
N O
R T
H
7-23-26
1 MEMO #01R1
https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/407933904 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/414437609 https://app.procore.com/3483949/project/drawing_areas/3126823/drawing_log/420755129 nkerr Area Measurement 142 sf nkerr Area Measurement 103 sf nkerr Area Measurement 36 sf nkerr Area Measurement 64 sf nkerr Area Measurement 83 sf nkerr Callout May have asbestos mastic nkerr Callout Asbestos tile nkerr Callout We believe this is carpet over asbestos tile. Not sure the full extent.
File details come from the government source that posted it. Updated .