3-Pricing Sheet.xlsx
XLSX spreadsheet 15 KB Posted
- Attached to
- Hopecrest List Station Improvement
- Solicitation number
- 26-0055-3
- Issued by
- Chatham County, Georgia
About this file
This is a pricing sheet for the Hopecrest Lift Station Improvements project (26-0055-3) in Georgia, detailing the cost structure for rehabilitation work on an existing wastewater lift station. The project encompasses comprehensive improvements including mobilization, site preparation and earthwork, demolition and wetwell rehabilitation, erosion control measures, installation of ductile iron forcemains ranging from 4 to 6 inches with associated valves and fittings, precast concrete structures including a new wetwell top section and valve vault, concrete and gravel pavements, submersible pumps with controls and electrical systems, a spare submersible pump, temporary bypass pumping capabilities, fencing and security bollards, and yard hydrant installation. Additional scope includes unsuitable material removal and replacement with suitable earth material and crushed stone, as well as trench foundation and stabilization work across multiple measured units including linear feet, square yards, square feet, cubic yards, and lump sum items.
The pricing sheet requires bidders to provide unit prices for all line items with the exception of item 9a, which is a cash allowance for construction verification survey and materials testing services fixed at $6,500.00. The sheet explicitly prohibits any alteration to the pricing format, with violation resulting in bid disqualification, and directs all questions to the purchasing department. The current total reflected on the sheet is $6,500.00, representing only the fixed cash allowance, as all other unit price entries are blank pending bidder submission. The final contract value will be subject to adjustment based on actual quantities upon project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 ANY ALTERATION OF THE PRICING SHEET SHALL BE CAUSE FOR DISQUALIFICATION OF BID SUBMISSION.
ANY QUESTIONS REGARDING THE BID SHEET SHALL BE DIRECTED TO THE PURCHASING DEPARTMENT.
PRICE SHEET 26-0055-3
HOPECREST LIFT STATION IMPROVEMENTS
| Item No. | Description | Unit | Estimated | ||
| Quantity | Unit | ||||
| Price | Extended |
Price
| 1a. | Mobilization | LS | 1 | $ - 0 | ||
| 2a. | Site Preparation and Earthwork | LS | 1 | $ - 0 | ||
| 2b. | Demolition and Wetwell Rehabilitation | LS | 1 | $ - 0 | ||
| 3a. | Silt Fence-Type S | LF | 170 | $ - 0 | ||
| 3b. | Temporary and Permanent Grassing (Sod) | SY | 75 | $ - 0 | ||
| 4a. | 6-Inch Ductile Iron Forcemain | |||||
| w/ Fittings | LF | 66 | $ - 0 | |||
| 4b. | 4-Inch Ductile Iron Forcemain w/ Fittings | LF | 67 | $ - 0 | ||
| 5a. | 6-Inch Gate Valve | EA | 2 | $ - 0 | ||
| 5b. | 6-Inch Check Valve | EA | 2 | $ - 0 | ||
| 5c. | 4-Inch Gate Valve | EA | 2 | $ - 0 | ||
| 5d. | 4-Inch Check Valve | EA | 1 | $ - 0 | ||
| 5e. | Valve/Pipe Support | EA | 4 | $ - 0 | ||
| 5f. | Forcemain Brace | EA | 2 | $ - 0 | ||
| 5g. | Clean up and Testing | LF | 133 | $ - 0 | ||
| 6a. | New Precast Concrete Wetwell Top Section with Floor Door | EA | 1 | $ - 0 | ||
| 6b. | New Precast Concrete Valve | |||||
| Vault w/ Floor Door | EA | 1 | $ - 0 | |||
| 6c. | 6-Inch Concrete Pavement | SF | 657 | $ - 0 | ||
| 6d. | 4-Inch Concrete Pavement | SF | 18 | $ - 0 | ||
| 6e. | 8-Inch Concrete Bypass Pump | |||||
| Pad | LS | 1 | $ - 0 | |||
| 7a. | Submersible Pumps, Controls and Electrical | LS | 1 | $ - 0 | ||
| 7b. | Spare Submersible Pump | EA | 1 | $ - 0 | ||
| 7c. | Temporary Bypass Pumping | LS | 1 | $ - 0 | ||
| 7d. | Panel Rack and Sunshade | LS | 1 | $ - 0 | ||
| 7e. | 6-Foot PT Wood Fence and | |||||
| Gates | LF | 160 | $ - 0 | |||
| 7f. | 6-Inch Steel Bollard | EA | 5 | $ - 0 | ||
| 7g. | 6-Inch Gravel Pavement | SF | 900 | $ - 0 | ||
| 7h. | Bypass Pump and Controls | LS | 1 | $ - 0 | ||
| 7i. | Yard Hydrant | EA | 1 | $ - 0 | ||
| 8a. | Remove Unsuitable and Replace with Suitable Earth | |||||
| Material | CY | 10 | $ - 0 | |||
| 8b. | Remove Unsuitable and Replace with Crushed Stone | CY | 10 | $ - 0 | ||
| 8c. | Trench Foundation and Stabilization | CY | 10 | $ - 0 | ||
| 9a. | Cash Allowance – Construction Verification Survey & Materials | |||||
| Testing Services | LS | 1 | $ 6,500.00 | $ 6,500.00 | ||
| Total of all Extended Prices for Unit Price Work | ||||||
| (subject to final adjustment based on actual quantities) | $ 6,500.00 |