2-20260429 Hopecrest LS Tech Specs IFB.pdf
PDF 2 MB Posted
- Attached to
- Hopecrest List Station Improvement
- Solicitation number
- 26-0055-3
- Issued by
- Chatham County, Georgia
About this file
This is a Technical Specifications document for the Hopecrest Lift Station Improvements project issued by the Chatham County Board of Commissioners in Savannah, Georgia, with a document date of April 29, 2026. The project consists of providing all labor, materials, tools, equipment, services, and incidental items required to rehabilitate an existing wastewater lift station, including temporary bypass pumping, controls, bypass generator receptacle, skid-mounted bypass pump, site piping, grading, landscaping, a spare pump, and erosion and sedimentation control measures. The specifications are organized into 16 divisions covering general requirements, sitework, concrete, equipment, and electrical systems. Key work items include demolition of existing facilities, wetwell rehabilitation, installation of submersible pumps, bypass pumps and controls, precast concrete valve vaults and wetwell sections, concrete and gravel pavements, fencing, yard hydrants, and various site improvements. The contractor is responsible for construction staking, record drawings, shop drawings, product data submissions, and testing laboratory coordination. The contractor must maintain a detailed construction schedule within 10 days of Notice to Proceed and submit regular progress updates and photographs with each payment request.
The contract requires the contractor to provide comprehensive quality control, including coordination with a registered surveyor for construction staking and record drawing surveys. Payment is calculated by extending unit prices by actual quantities based on final record drawings and completed work, with no separate payment authorized for temporary erosion control, dewatering, sheeting, bracing, or backfilling unless specifically noted. The contractor must submit a schedule of values within 10 days of Notice to Proceed and is responsible for all mobilization costs, temporary bypass pumping operations, and material testing to verify compliance with specifications. Cash allowances are provided for construction verification surveying and materials testing by an independent engineering firm selected by the Owner. The specifications establish strict requirements for equipment storage and protection, handling procedures, manufacturer certifications, and warranty provisions. The existing sewer system will continue operating during construction, requiring the contractor to maintain proper temporary bypass pumping and flow management until the new lift station is operational and approved by the Owner.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 5-References 07.15 Fillable.pdf | ||
| 7-Surety Form.pdf | ||
| 6-List of Subcontractors (Fillable).pdf | ||
| 4-Attachments A - I (Fillable) with Notary Fields - 04.21.2023.pdf | ||
| 3-Pricing Sheet.xlsx | XLSX spreadsheet | |
| 1-Invitation to Bid 26-0055-3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
for
HOPECREST LIFT STATION IMPROVEMENTS
CHATHAM COUNTY BOARD OF COMMISSIONERS
124 BULL STREET, SUITE 210
SAVANNAH, GA 31401
APRIL 2026
G045-105 04/29/2026
Section 00010
Table of Contents
TS-00010
SPECIFICATIONS
Section Title
Division 1 - General Requirements
01010 Summary of Work
01016 Occupancy
01025 Measurement and Payment
01026 Schedule of Values
01051 Grades, Lines and Levels
01055 Construction Staking
01060 Regulatory Requirements
01091 Codes and Standards
01200 Project Meetings
01310 Construction Schedules
01320 Construction Videos and Photographs
01340 Shop Drawings, Product Data and Samples
01410 Testing Laboratory Services
01500 Construction Facilities
01540 Job Site Security
01610 Transportation and Handling
01611 Storage and Protection
01630 Substitutions and Options
01640 General Equipment Stipulations
01645 Manufacturer Services
01655 Starting of Systems
01710 Cleaning
01720 Record Documents
01730 Operating and Maintenance Data
01740 Warranties and Bonds
Division 2 - Sitework
02010 Subsurface Conditions
02060 Demolition of Existing Facilities
02110 Clearing and Grubbing
02125 Erosion and Sedimentation Control
02140 Dewatering
02221 Trenching, Backfilling and Earthwork
02730 Sewers and Accessories
02930 Grassing
00010 - 2
Table of Contents
TS-00010
Division 3 – Concrete
03300 Concrete Work
Division 11 – Equipment
11245 Submersible Pumps
Division 16 – Electrical
16000 General Provisions - Electrical
16054 Electrical Submittals
16111 Raceway Systems
16120 Wires and Cables
16125 Wiring Devices
16129 Safety and Disconnect Switches
16130 Electrical Grounding, 600V and Below
16166 Surge Protection Devices
16913 Lift Station Control Panel
Section 01010
Summary of Work
TS-01010
Part 1 General
1.01 Description
A. The Project consists of providing all labor, materials, tools, equipment, services, and incidentals and performing all Work required to provide temporary bypass pumping and construct complete in place and ready to operate the rehabilitation of an existing wastewater lift station, controls, bypass generator receptacle, skid/frame mounted bypass pump, site piping, grading, landscaping, spare pump and erosion and sedimentation control items.
B. All Work described above shall be performed as shown on the Drawings and as specified.
1.02 Project Location
The equipment and materials to be furnished will be installed at the locations shown on the Drawings.
1.03 Quantities
The Owner reserves the right to alter the quantities of work to be performed or to extend or shorten the improvements at any time when and as found necessary, and the Contractor shall perform the work as altered, increased or decreased. Payment for such increased or decreased quantity will be made in accordance with the
Instructions to Bidders. No allowance will be made for any change in anticipated profits nor shall such changes be considered as waiving or invalidating any conditions or provisions of the Contract and Bond.
1.04 Partial Owner Occupancy
The existing sewer system to which these improvements are being made will continue operating during the period of construction.
END OF SECTION
01010 - 2
Summary of Work
TS-01010
THIS PAGE INTENTIONALLY LEFT BLANK.
Section 01016
Occupancy
TS-01016
1.01 Partial Occupancy by Owner
Whenever, in the opinion of the Engineer, any section or portion of the Work or any structure is in suitable condition, it may be put into use upon the written order of the Engineer and such usage will not be held in any way as an acceptance of said
Work or structure, or any part thereof, or as a waiver of any of the provisions of these Specifications and the Contract. Pending final completion and acceptance of the Work, all necessary repairs and replacements, due to defective materials or workmanship or operations of the Contractor, for any section of the Work so put into use shall be performed by the Contractor at Contractor's own expense.
01016 - 2 Occupancy
TS-01016
Section 01025
Measurement and Payment
TS-01025
1.01 Scope
A. The Bid lists each item of the Project for which payment will be made. No payment will be made for any items other than those listed in the Bid.
B. Required items of work and incidentals necessary for the satisfactory completion of the work which are not specifically listed in the Bid, and which are not specified in this Section to be measured or to be included in one of the items listed in the Bid, shall be considered as incidental to the work. All costs thereof, including
Contractor's overhead costs and profit, shall be considered as included in the lump sum or unit prices proposed for the various Bid items. The Contractor shall prepare the Bid accordingly.
C. Work includes furnishing all plant, labor, equipment, tools and materials, which are not furnished by the Owner and performing all operations required to complete the work satisfactorily, in place, as specified and as indicated on the Drawings.
1.02 Descriptions
A. Measurement of an item of work will be by the unit indicated in the Bid.
B. Final payment quantities shall be determined from the record drawings. The record drawing lengths, dimensions, quantities, etc. shall be determined by a survey after the completion of all required work. Said survey shall conform to Sections 01055 and 01720 of these Specifications. The precision of final payment quantities shall match the precision shown for that item in the Bid.
C. Payment will include all necessary and incidental related work not specified to be included in any other item of work listed in the Bid.
D. Unless otherwise stated in individual sections of the Specifications or in the Bid, no separate payment will be made for any item of work, materials, parts, equipment, supplies or related items required to perform and complete the work. The costs for all such items required shall be included in the price proposed for item of which it is a part.
E. Payment will be made by extending unit prices multiplied by quantities provided and then summing the extended prices to reflect actual work. Such price and payment shall constitute full compensation to the Contractor for furnishing all plant, labor, equipment, tools and materials not furnished by the Owner and for performing all operations required to provide to the Owner the entire Project, complete in place, as specified and as indicated on the Drawings.
01025 - 2
TS-01025
F. “Products” shall mean materials or equipment permanently incorporated into the work.
1.03 Mobilization
The lump sum amount for Mobilization will be eligible for payment upon the completion of all related preparatory work and after transportation of the materials and equipment necessary for the first 15 days of the Contract Time.
1.04 Erosion and Sedimentation Control
A. General
1. No separate payment shall be made for temporary and/or permanent erosion and sedimentation controls, except as noted below. All other temporary and/or permanent erosion and sedimentation control costs shall be included in the unit price for the item to which it pertains.
2. No payment will be made for any portion of the Project for which temporary erosion and sedimentation controls are not properly maintained.
3. Quantities for payment shall be based upon actual quantity constructed and authorized by the Engineer.
B. Silt Fence: All costs for silt fence (whichever type is indicated), including installation, maintenance, repair, replacement, and removal, shall be included in the unit price for Silt Fence.
C. Temporary and Permanent Grassing
1. No separate payment will be made for mulching or temporary grassing.
2. Payment shall be made only for the final permanent perennial grassing. All costs for grassing, including sodding, watering, fertilizing, mulching as well as temporary measures, shall be included in the unit price for Temporary and
Permanent Grassing (Sod).
1.05 Site Preparation
A. Clearing and Grubbing: Payment for clearing and grubbing of the Project site shall be made at the lump sum price for Site Preparation. No payment shall be made if proper erosion control devices are not constructed and maintained. Partial payments will be made based on the estimated percentage of the amount of clearing and grubbing which is complete at the time of the payment request. No additional payment will be made for disposal of clearing debris.
01025 - 3
B. Stripping and Stockpiling Topsoil: All cost of stripping and stockpiling of all topsoil for the Project site shall be included in the lump sum price for Site Preparation. No separate payment will be made for stripping and stockpiling of topsoil for areas not on the Project site. Partial payments will be made based on the estimated percentage of the amount of stripping and stockpiling which is complete at the time of the payment request.
1.06 Demolition and Wetwell Rehabilitation
A. Demolition: All cost for demolition of all existing improvements within the Project site shall be included in the lump sum price for Demolition and Wetwell
Rehabilitation. No separate payment will be made for removal of existing electrical conduits, existing piping, miscellaneous utilities, existing pumps, wetwell top section and all other demolition work necessary to facilitate the lift station improvements.
Partial payments will be made based on the estimated percentage of the amount of demolition which is complete at the time of the payment request. No payment shall be made if proper temporary bypass pumping is not in place prior to decommissioning the existing lift station.
B. No separate payment shall be made for proper disposal of demolition debris.
C. Wetwell Rehabilitation: All cost for cleaning the existing wetwell interior and resealing all existing joints shall be included in the lump sum price for Demolition and Wetwell Rehabilitation. No separate payment will be made for removal or disposal of cleaning solutions and/or wastewater resulting from cleaning operations. Partial payments will be made based on the estimated percentage of the amount of cleaning and joint sealing, if required, which is complete at the time of the payment request.
1.07 Earthwork
A. Topsoil Placement: All costs for placement of topsoil on areas to be grassed shall be included in the lump sum price for Earthwork. Partial payment will be made based on the estimated percentage of the amount of total earthwork which is complete at the time of the payment request.
B. Excavation
1. Excavation of on-site soil materials shall include all work associated with excavation of soils within the general site area on the Project. Excavation and backfill of pipelines, stockpile work, borrow area, earthwork associated with structures and unsuitable materials are not excavation and will not be included in quantities for payment as excavation. Partial payment will be made based on the estimated percentage of the amount of total earthwork which is complete at the time of the payment request.
01025 - 4
C. Structural Fill
1. Structural fill materials shall include all work associated with the import and placement of structural fill in the general site area on the Project. Excavation and backfill of pipelines, topsoil, stockpile work, and unsuitable materials are not structural fill and will not be included in quantities for payment as structural fill. Partial payment will be made based on the estimated percentage of the amount of total earthwork which is complete at the time of the payment request.
D. Unsuitable Materials
1. Payment for removal and replacement of soft or excessively wet material which is ordered by the Engineer which is not shown on the Drawings or specified shall be made at the unit price for REMOVAL OF UNSUITABLE
MATERIAL AND REPLACEMENT WITH Suitable Earth Material or Crushed
Stone. No measurement for payment will be made unless all dewatering as specified in Section 02140 has been successfully accomplished.
2. Additional costs of corrective work made necessary by unauthorized excavation shall be borne by the Contractor.
E. Sheeting, Bracing, and Timbering: No separate payment will be made for providing sheeting, bracing and timbering.
F. Dewatering: No separate payment will be made for dewatering required to accomplish the work.
G. Backfilling: No separate payment will be made for backfilling or excavation, hauling and placement of borrow material. The cost of all such work and all costs incidental thereto shall be included in the unit price for the item to which the work pertains.
1.08 Trench Foundation and Stabilization, Excavation, and Backfill
A. No separate or additional payment will be made for any special or unique method, means, techniques or equipment necessary for the Contractor's compliance with these Specifications, regulatory requirements, permits, laws or regulations which govern this Project.
B. Trench Excavation: No separate payment will be made for trench excavation. All costs shall be included in the unit price for the item to which it pertains at the appropriate depth.
C. Sheeting, Bracing and Shoring: No separate payment will be made for providing any sheeting, bracing and shoring.
D. Trench Foundation and Stabilization
01025 - 5
1. No payment for trench stabilization shall be authorized until after the trench has been dewatered. If the pipe is installed in an inadequately prepared trench bottom, the Engineer shall notify the Contractor in writing of the deficiency and will not authorize payment for that portion of that length of pipe which was improperly installed.
2. Payment for trench stabilization shall be made on the basis of the amount authorized and the unit price for Trench Foundation and Stabilization.
Payment shall include all costs for the removal and disposal of the unsuitable material and replacement with crushed stone. No additional payment will be made for material required for specified bedding.
E. Bedding and Haunching
1. The unit price for pipe for leachate lines and forcemains shall include excavation of the trench to the depth below the pipe necessary to provide specified bedding and to lay the sewer to grade.
2. No additional payment will be made for additional trench depth.
3. No separate payment will be made for material used to provide specified bedding. The cost of all bedding materials shall be included in the unit price for the item to which it relates, except for trench stabilization.
4. No additional payment will be made for improved bedding required to compensate for over excavation of the trench.
F. Initial Backfill
1. No separate payment shall be made for initial backfill.
2. No separate payment shall be made for drying out the initial backfill material in order to meet the compaction requirements.
3. No separate payment shall be made for the adding of moisture to the initial backfill materials in order to meet the compaction requirements.
4. No separate payment shall be made for providing select material if the in-situ material cannot meet the compaction requirements.
G. Final Backfilling
1. No additional payment will be made for additional material when excavated materials are used.
2. No separate payment shall be made for drying out the final backfill material
01025 - 6 in order to meet the compaction requirements.
3. No separate payment shall be made for the adding of moisture to the final backfill materials in order to meet the compaction requirements.
4. No additional payment will be made for providing select material if the in-situ material cannot meet the compaction requirements.
1.09 Sewers and Accessories
A. Existing Utilities and Obstructions
1. Horizontal and Vertical Conflict: Payments for conflicts with existing utilities shall be made only where additional fittings and/or additional lengths of pipe are approved by the Engineer. Said payment shall be made at the applicable unit prices in the Bid. No other payment will be made for any delay or extra cost encountered by the Contractor due to protection, avoidance or relocation of existing utilities, mains or services or changing the horizontal alignment of the sewer.
B. Location and Grade
1. No separate payment shall be made for survey work performed by or for the
Contractor in the establishment of reference points, benchmarks, cut sheets, limits of right of way or easement, including their restoration, as well as centerline or baseline points.
2. The “construction verification survey” cash allowance is solely for the use of the Engineer for verification of the Contractor's reference points, centerlines and work performed. The presence of this cash allowance in no way relieves the Contractor of the responsibility of installing reference points, centerlines, temporary benchmarks or verifying that the work has been performed accurately.
C. Construction Along Highways, Streets and Roadways: No separate payment shall be made for traffic control or maintaining highways, streets, roadways, and driveways.
D. Laying and Jointing Pipe and Accessories
1. Forcemains and Accessories
a. Payment for forcemain shall be made for the quantity provided.
Measurement for payment shall be made along the centerline of the pipe, and fittings, exclusive of the valves. No payment shall be made for sections of pipe which are not installed.
01025 - 7
b. The cost of all fittings shall be included in the price bid for pipe.
2. No additional payment will be made for replacement of defective materials.
3. No additional payment, except as allowed by Temporary Bypass Pumping, will be made for maintaining flow while placing the new sewer in service.
4. Valves
a. The unit price bid for valves shall include the cost of providing the valve, hardware, handle or hand wheel, lever arm, and all related items.
b. The cost for providing the flange adapters shall be included in the unit price bid for valves.
5. Payment for valve/pipe support shall be made for the quantity provided. No payment shall be made for valve/pipe stands which are not installed.
6. Payment for forcemain brace shall be made for the quantity provided. No payment shall be made for braces which are not installed.
7. No separate payment shall be made for lining, polyethylene encasement or above ground valve and forcemain painting. The costs for lining, polyethylene encasement and above ground valve and forcemain painting shall be included in the unit price item to which it pertains.
8. No separate payment shall be made for detection tape or tracer wire.
9. No payment will be made for cutting and beveling pipe.
E. Precast Concrete Product Construction
1. All costs for constructing the new wetwell top section, including but not limited to, the precast concrete top, precast riser section, joint material, floor door with integral safety grate, rubber boots, pump grouting, and sealing the penetrations shall be included in the lump sum price bid New Precast
Concrete Wetwell Top Section with Floor Door.
2. All costs for constructing the new valve vault, including but not limited to, the precast concrete top, precast riser sections, joint material, floor door, rubber boots, grouting, and sealing the penetrations shall be included in the lump sum price bid New Precast Concrete Valve Vault with Floor Door.
F. No separate payment will be made for thrust restraint. The cost of all required work shall be included in the unit price bid for related items.
G. Clean up and Testing: Payment for cleanup and testing shall be made at the unit
01025 - 8
TS-01025
price shown for clean up and testing. Any other cost for labor, materials and equipment required for cleanup shall be included in the unit price bid for the item to which it pertains. No payment for cleanup and testing shall be made for any length of line unless both testing and cleanup have been performed satisfactorily for that segment of line for which payment is being requested.
1.10 Concrete Site Work
A. 4-Inch and 6-Inch Concrete Pavement: Payment for 4-Inch and 6-inch concrete pavement shall be made at the unit price bid. All costs shall include concrete, graded aggregate base, fibermesh, formwork, excavation, joints, joint sealant, subgrade preparation and backfill. Measurement shall be made based on record drawing dimensions.
B. 8-Inch Concrete Bypass Pump Pad: Payment for 8-inch concrete bypass pump pad shall be made at the lump sum price bid. All costs shall include concrete, graded aggregate base, fibermesh, formwork, excavation, pump mounting requirements, subgrade preparation and backfill. Measurement shall be made based on a completed pad.
1.11 Pumps and Miscellaneous Items
A. Submersible Pumps, Controls and Electrical: Payment for submersible pumps, controls and electrical shall be made at the lump sum price bid. All costs shall include, but are not limited to, pumps, accessories, base elbows, guide rails, controls, SSTL NEMA 4X enclosures, junction boxes, conduit, grounding, conductors, lighting protection, float switches, ultrasonic level controller, hardware and all other incidental items not included in other pay items. Measurement shall be based on a completed and operational lift station.
B. Bypass Pump and Controls: Payment for bypass pumps and controls shall be made at the lump sum price bid. All costs shall include, but are not limited to, skid mounted pump, accessories, sound attenuating enclosure, powder coating, controls, SSTL NEMA 4X enclosures, junction boxes, conduit, grounding, conductors, lighting protection, float switches, hardware and all other incidental items not included in other pay items. Measurement shall be based on a completed and operational lift station.
C. Spare Submersible Pump: Payment for spare submersible pump shall be made at the unit price bid. All costs shall include pump, cable, pallet, freight charges, storage preparation, hardware and all other incidental items required to provide the spare pump and deliver it to the Chatham County Public Works Department at
7226 Varnedoe Dr, Savannah, GA.
D. Temporary Bypass Pumping: Payment for temporary bypass pumping shall be made at the lump sum price bid. All costs shall include piping, couplings, valves, pipe stand, connection to existing manhole, asphalt pavement removal and
01025 - 9 replacement, steel plating for traffic, traffic control measures, accessories, trenching, excavation and backfill.
E. Panel Rack and Sunshade: Payment for panel rack and sunshade shall be made at the lump sum price bid. All costs shall include aluminum panel rack, sunshade, hardware, and all other incidental items required to construct the panel rack and sunshade to the dimensions required to support the electrical equipment.
F. 6-Inch Gravel Pavement: Payment for 6-inch gravel pavement shall be made at the unit price bid. All costs shall include gravel, filter fabric, subgrade preparation and finishing. Measurement shall be made based on record drawing dimensions.
G. 6-Inch Steel Bollard: Payment for 6-inch steel bollard shall be made at the unit price bid. All costs shall include concrete, Sch. 40 steel pipe, paint, excavation, gravel bedding and backfill. Measurement shall be made based on record drawing quantities.
H. Fencing
1. Payment for 6-foot PT wood fencing shall be made at the unit price bid. Limits eligible for payment shall be based on lengths as shown on the Drawings.
Measurement shall be made based on record drawing dimensions.
3. The unit price bid for 6-foot PT wood fencing shall include, but not be limited to, excavation, backfill, pressure treated lumber, posts, concrete, non-sag steel gate frames, gates, latches, drop rod with sleeve and complete installation as shown on the drawings.
I. Yard Hydrant: Payment for the yard hydrant shall be made at the unit price bid. All costs shall include hose bib, galvanized steel pipe, Sch. 40 PVC pipe, concrete, fittings, connection to existing water service, excavation, and backfill. Measurement shall be based on completed and operational hydrant.
1.12 Cash Allowances
1. The Contractor shall include in the Proposal Total all allowances stated in the
Contract Documents. These allowances shall cover the net cost of the services provided by a firm selected by the Owner. The Contractor's handling costs, labor, overhead, profit, and other expenses contemplated for the original allowance shall be included in the items to which they pertain and not in allowances.
2. No payment will be made for nonproductive time on the part of testing personnel due to the Contractor's failure to properly coordinate testing activities with the work schedule or the Contractor's problems with
01025 - 10
TS-01025
maintaining equipment in good working condition. The Contractor shall make all necessary excavations and shall supply any samples of materials necessary for conducting compaction and density tests.
3. No payment shall be provided for services that fail to verify required results.
B. Should the net cost be more or less than the specified amount of the allowance, the
Contract will be adjusted accordingly by change order. The amount of change order will not recognize any changes in handling costs at the site, labor, overhead, profit, and other expenses caused by the adjustment to the allowance.
C. Documentation
1. Submit copies of the invoices with each periodic payment request from the firm providing the services.
2. Submit results of services provided which verify required results.
D. Schedule of Cash Allowances
1. Construction Verification Surveying
a. Allow the amount provided in the Proposal for construction surveying by an independent surveying firm, selected by the Owner, to perform horizontal and vertical alignment checks at the discretion of the
Engineer.
b. This allowance is solely for the use of the Engineer for verification of the
Contractor's reference points, centerlines and work performed. The presence of this cash allowance in no way relieves the Contractor of the responsibility of installing reference points, centerlines, temporary benchmarks or verifying that the work has been performed accurately.
2. Materials Testing: Allow the amount provided in the Bid for the services of an engineering firm and testing laboratory for the testing of concrete cylinders for poured in place concrete.
Section 01026
Schedule of Values
TS-01026
The work under this Section includes preparation and submittal of a schedule of values.
1.02 General
A. Timing of Submittal: Submit to the Engineer, a schedule of values allocated to the various portions of the Work, within 10 days after Notice to Proceed. The first progress payment will not be made until the next pay cycle following the Engineer's approval of the Contractor's values.
B. Supporting Data: Upon request of the Engineer, support the values with data which will substantiate their correctness.
C. Use of Schedule: The schedule of values, unless objected to by the Engineer, shall be used only as a basis of the Contractor's Application for Payment.
1.03 Form and Content of Schedule of Values
A. Form and Identification
1. Type schedule on 8-1/2 x 11-inch white paper.
2. Contractor's standard forms and automated printout may be used.
3. Identify schedule with:
a. Title of project and location
b. Engineer
c. Name and address of Contractor
d. Contract designation
e. Date of submission
B. Schedule shall list the installed value of the component parts of the Work in sufficient detail to serve as a basis for computing values for progress payments during construction. Breakdown shall be by structure, then by CSI Format, for ease of field verification of quantities completed in each structure.
01026 - 2 Schedule of Values
TS-01026
C. Format
1. Follow the Table of Contents of the Contract Documents as the format for listing the component items.
2. Identify each item with the number and title of the respective major section of the Specifications.
D. For each major line item list sub-values of major products or operations under the item.
E. For the Various Portions of the Work:
1. Each item shall include a directly proportional amount of the Contractor's overhead and profit.
2. For items on which progress payments will be requested for stored materials, break down the value into:
a. The cost of the materials, delivered and unloaded, with taxes paid.
b. The total installed value, including Contractor's overhead and profit, less item a. above.
F. The sum of all values listed in the schedule shall equal the Bid Total.
Section 01051
Grades, Lines and Levels
TS-01051
A. All work under this contract shall be constructed in accordance with the lines and grades on the plans or as given by the Engineer or Owner. The full responsibility for holding to alignment and grade shall rest upon the Contractor.
B. The Owner will provide a benchmark and minimal horizontal control. The
Contractor will be responsible for setting offsets from these points and all other layout and staking.
C. The Contractor shall safeguard all points, stakes, grade marks, benchmarks, and monuments established on the work, shall bear the cost of reestablishing same if disturbed, and shall assume the entire expense of rectifying work improperly constructed due to failure to maintain and protect such established points, stakes, and marks.
01051 - 2 Grades, Lines and Levels.
TS-01051
Section 01055
Construction Staking
TS-01055
A. Construction staking shall include all of the surveying work required to layout the
Work and control the location of the finished Project. The Contractor shall have the full responsibility for constructing the Project to the correct horizontal and vertical alignment, as shown on the Drawings, as specified, or as ordered by the Engineer.
The Contractor shall assume all costs associated with rectifying work constructed in the wrong location and/or elevations.
B. From the information shown on the Drawings and the information to be provided as indicated under Project Conditions below, the Contractor shall:
1. Be responsible for setting reference points and/or offsets, establishment of baselines, and all other layout, staking, and all other surveying required for the construction of the Project.
2. Safeguard all reference points, stakes, grade marks, horizontal and vertical control points, and shall bear the cost of re-establishing same if disturbed.
3. Stake out the permanent and temporary easements or the limits of construction to ensure that the Work is not deviating from the indicated limits.
4. Be responsible for all damage done to reference points, baselines, center lines and temporary benchmarks, and shall be responsible for the cost of re-establishment of reference points, baselines, center lines and temporary benchmarks as a result of the operations.
C. Baselines shall be defined as the line to which the location of the Work is referenced, i.e., edge of pavement, road centerline, property line, right-of-way or survey line.
D. Record drawing surveys shall be performed in accordance with this Section and
Section 01720 of these specifications.
1.02 Project Conditions
A. The Drawings provide the location and/or coordinates of principal components of the Project. The alignment of some components of the Project may be indicated in the Specifications. The Engineer may order changes to the location of some of the components of the Project or provide clarification to questions regarding the correct alignment.
01055 - 2
Construction Staking
TS-01055
B. The survey points, control points, and baseline to be provided to the Contractor shall be limited to only that information shown on the Drawings and which can be found on the Project site by the Contractor.
C. A topographic survey is included on the Drawings.
1.03 Quality Assurance
A. The Contractor shall furnish documentation, prepared by a surveyor currently registered in the State in which the Project is located, confirming that staking is being done to the horizontal and vertical alignment shown in the Contract
Documents. This requires that the Contractor hire, at the Contractor's own expense, a currently registered surveyor, acceptable to the Owner, to provide ongoing construction staking or confirmation of such.
B. Any deviations from the Drawings shall be confirmed by the Engineer prior to construction of that portion of the Project.
C. Quantities for payments measured under this Contract shall be certified by the registered surveyor.
D. Topographical Surveys: The Contractor shall perform all surveying required on the
Project.
1.04 Site Work
A. Staking Precision: The precision of construction staking shall match the precision of a component’s location indicated on the Drawings. If not indicated on the Drawings, staking of utilities shall be done in accordance with generally accepted practice for the type of utility.
B. Paved Surfaces: The Contractor shall establish a reference point for establishing and verifying the paving subgrade and finished grade elevations. Any variance with plan grades shall be identified by the Contractor and confirmed by the Engineer prior to constructing the base.
1.05 As-Built Plans
A. As-built plans shall be provided by the Contractor. These plans must be stamped and signed by a Georgia registered land surveyor and turned over to the
Engineer in a hard copy and computer format as detailed above for review and approval.
Section 01060
Regulatory Requirements
TS-01060
Permits and Responsibilities
The Contractor shall, without additional expense to the Owner, be responsible for obtaining any necessary licenses and permits, and for complying with any applicable Federal, State and municipal laws, Codes and regulations, in connection with the execution of the Work. He shall take proper safety and health precautions to protect the Work, the workers, the public, and the property of others. He shall also be responsible for all materials delivered and work performed until completion and acceptance of the Work, except for any completed unit of construction thereof which may heretofore have been accepted.
01060 - 2
Regulatory Requirements
TS-01060
Section 01091
Codes and Standards
TS-01091
A. Whenever reference is made to conforming to the standards of any technical society, organization, body, code or standard, it shall be construed to mean the latest standard, code, specification, or tentative specification adopted and published at the time of advertisement for Bids. This shall include the furnishing of materials, testing of materials, fabrication, and installation practices. In those cases where the Contractor's quality standards establish more stringent quality requirements, the more stringent requirement shall prevail. Such standards are made a part hereof to the extent which is indicated or intended.
B. The inclusion of an organization under one category does not preclude that organization’s standards from applying to another category.
C. In addition, all work shall comply with the applicable requirements of local codes, utilities and other authorities having jurisdiction.
D. All material and equipment, for which a UL Standard, an AGA or NSF approval or an
ASME requirement is established, shall be so approved and labeled or stamped.
The label or stamp shall be conspicuous and not covered, painted, or otherwise obscured from visual inspection.
E. The standards which apply to this Project are not necessarily restricted to those organizations which are listed in Article 1.02.
1.02 Standard Organizations
A. Piping and Valves
ACPA American Concrete Pipe Association
ANSI American National Standards Institute
API American Petroleum Institute
ASME American Society of Mechanical Engineers
AWWA American Water Works Association
CISPI Cast Iron Soil Pipe Institute
DIPRA Ductile Iron Pipe Research Association
FCI Fluid Controls Institute
MSS Manufacturers Standardization Society
NCPI National Clay Pipe Institute
NSF National Sanitation Foundation
PPI Plastic Pipe Institute
Uni-Bell PVC Pipe Association
01091 - 2
B. Materials
AASHTO American Association of State Highway and Transportation Officials
ANSI American National Standards Institute
ASTM American Society for Testing and Materials
GSI Geosynthetic Institute
C. Painting and Surface Preparation
NACE National Association of Corrosion Engineers
SSPC Steel Structures Painting Council
D. Electrical and Instrumentation
AEIC Association of Edison Illuminating Companies
AIEE American Institute of Electrical Engineers
EIA Electronic Industries Association
ICEA Insulated Cable Engineers Association
IEC International Electrotechnical Commission
IEEE Institute of Electrical and Electronic Engineers
IES Illuminating Engineering Society
IPC Institute of Printed Circuits
IPCEA Insulated Power Cable Engineers Association
ISA ISA – The Instrumentation, Systems, and Automation Society
NEC National Electric Code
NEMA National Electrical Manufacturers Association
NFPA National Fire Protection Association
REA Rural Electrification Administration
TIA Telecommunications Industries Association
UL Underwriter's Laboratories
VRCI Variable Resistive Components Institute
E. Aluminum
AA Aluminum Association
AAMA American Architectural Manufacturers Association
F. Steel and Concrete
ACI American Concrete Institute
AISC American Institute of Steel Construction, Inc.
AISI American Iron and Steel Institute
CRSI Concrete Reinforcing Steel Institute
NRMA National Ready-Mix Association
01091 - 3
PCA Portland Cement Association
PCI Prestressed Concrete Institute
G. Welding
ASME American Society of Mechanical Engineers
AWS American Welding Society
H. Government and Technical Organizations
AIA American Institute of Architects
APHA American Public Health Association
APWA American Public Works Association
ASA American Standards Association
ASAE American Society of Agricultural Engineers
ASCE American Society of Civil Engineers
ASQC American Society of Quality Control
ASSE American Society of Sanitary Engineers
CFR Code of Federal Regulations
CSI Construction Specifications Institute
EDA Economic Development Administration
EPA Environmental Protection Agency
FCC Federal Communications Commission
FmHA Farmers Home Administration
FS Federal Specifications
IAI International Association of Identification
ISEA Industrial Safety Equipment Association
ISO International Organization for Standardization
ITE Institute of Traffic Engineers
NBFU National Board of Fire Underwriters
(NFPA) National Fluid Power Association
NBS National Bureau of Standards
NISO National Information Standards Organization
OSHA Occupational Safety and Health Administration
SI Salt Institute
SPI The Society of the Plastics Industry, Inc.
USDC United States Department of Commerce
USGBC United States Green Building Council
WEF Water Environment Federation
I. General Building Construction
AHA American Hardboard Association
AHAM Association of Home Appliance Manufacturers
AITC American Institute of Timber Construction
01091 - 4
APA American Parquet Association, Inc.
APA American Plywood Association
BHMA Builders Hardware Manufacturers Association
BIFMA Business and Institutional Furniture Manufacturers Association
DHI Door and Hardware Institute
FM Factory Mutual Fire Insurance Company
HPMA Hardwood Plywood Manufacturers Association
HTI Hand Tools Institute
IME Institute of Makers of Explosives
ISANTA International Staple, Nail and Tool Association
ISDSI Insulated Steel Door Systems Institute
IWS Insect Screening Weavers Association
MBMA Metal Building Manufacturers Association
NAAMM National Association of Architectural Metal Manufacturers
NAGDM National Association of Garage Door Manufacturers
NCCLS National Committee for Clinical Laboratory Standards
NFPA National Fire Protection Association
NFSA National Fertilizer Solutions Association
NKCA National Kitchen Cabinet Association
NWMA National Woodwork Manufacturers Association
NWWDA National Wood Window and Door Association
RMA Rubber Manufacturers Association
SBC SBCC Standard Building Code
SDI Steel Door Institute
SIA Scaffold Industry Association
SMA Screen Manufacturers Association
SPRI Single-Ply Roofing Institute
TCA Tile Council of America
UBC Uniform Building Code
J. Roadways
AREA American Railway Engineering Association
GDOT Georgia Department of Transportation
K. Plumbing
AGA American Gas Association
NSF National Sanitation Foundation
PDI Plumbing Drainage Institute
SPC SBCC Standard Plumbing Code
L. Refrigeration, Heating, and Air Conditioning
AMCA Air Movement and Control Association
01091 - 5
ARI American Refrigeration Institute
ASHRAE American Society of Heating, Refrigeration, and Air Conditioning
Engineers
ASME American Society of Mechanical Engineers
CGA Compressed Gas Association
CTI Cooling Tower Institute
HEI Heat Exchange Institute
IIAR International Institute of Ammonia Refrigeration
NB National Board of Boilers and Pressure Vessel Inspectors
PFMA Power Fan Manufacturers Association
SAE Society of Automotive Engineers
SMACNA Sheet Metal and Air Conditioning Contractors National Association
SMC SBCC Standard Mechanical Code
TEMA Tubular Exchangers Manufacturers Association
M. Equipment
AFBMA Anti-Friction Bearing Manufacturers Association, Inc.
AGMA American Gear Manufacturers Association
ALI Automotive Lift Institute
CEMA Conveyor Equipment Manufacturers Association
CMAA Crane Manufacturers Association of America
DEMA Diesel Engine Manufacturers Association
MMA Monorail Manufacturers Association
OPEI Outdoor Power Equipment Institute, Inc.
PTI Power Tool Institute, Inc.
RIA Robotic Industries Association
SAMA Scientific Apparatus Makers Association
1.03 Symbols
Symbols and material legends shall be as scheduled on the Drawings.
01091 - 6
THIS PAGE INTENTIONALLY LEFT BLANK
Section 01200
Project Meetings
TS-01200
A. Work under this Section includes all scheduling and administering of pre-construction and progress meetings as herein specified and necessary for the proper and complete performance of this Work.
B. Scheduling and Administration by Engineer:
1. Prepare agenda.
2. Make physical arrangements for the meetings.
3. Preside at meetings.
4. Record minutes including significant proceedings and decisions.
5. Distribute copies of the minutes to participants.
1.02 Preconstruction Conference
A. The Engineer shall schedule the preconstruction conference prior to the issuance of the Notice to Proceed.
B. Representatives of the following parties are to be in attendance at the meeting:
1. Owner.
2. Engineer.
3. Contractor and superintendent.
4. Major subcontractors.
5. Representatives of governmental or regulatory agencies when appropriate.
C. The agenda for the preconstruction conference shall consist of the following as a minimum:
1. Distribute and discuss a list of major subcontractors and a tentative construction schedule.
2. Critical work sequencing.
3. Designation of responsible personnel and emergency telephone numbers.
4. Processing of field decisions and change orders.
5. Adequacy of distribution of Contract Documents.
01200 - 2
6. Schedule and submittal of shop drawings, product data and samples.
7. Pay request format, submittal cutoff date, pay date and retainage.
8. Procedures for maintaining record documents.
9. Use of premises, including office and storage areas and Owner's requirements.
10. Major equipment deliveries and priorities.
11. Safety and first-aid procedures.
12. Security procedures.
13. Housekeeping procedures.
14. Work hours.
1.03 Project Coordination Meetings
A. Schedule regular monthly meetings as directed by the Engineer.
B. Hold called meetings as the progress of the Work dictates.
C. The meetings shall be held at the location indicated by the Engineer.
D. Representatives of the following parties are to be in attendance at the meetings:
1. Engineer.
2. Contractor and superintendent.
3. Major subcontractors as pertinent to the agenda.
4. Owner's representative as appropriate.
5. Representatives of governmental or other regulatory agencies as appropriate.
E. The minimum agenda for progress meetings shall consist of the following:
1. Review and approve minutes of previous meetings.
2. Review work progress since last meeting.
3. Note field observations, problems and decisions.
4. Identify problems which impede planned progress.
01200 - 3
5. Review Contractor's corrective measures and procedures to regain plan schedule, when applicable.
6. Review Contractor's revision to the construction schedule as outlined in the
Supplementary Conditions.
7. Review submittal schedule; expedite as required to maintain schedule.
8. Maintenance of quality and work standards.
9. Review changes proposed by Owner for their effect on the construction schedule and completion date.
10. Complete other current business.
01200 - 4
Section 01310
Construction Schedules
TS-01310
A. The work under this Section includes preparing, furnishing, distributing, and periodic updating of the construction schedules as specified herein.
B. The purpose of the schedule is to demonstrate that the Contractor can complete the overall Project within the Contract Time and meet all required interim milestones.
1.02 Submittals
A. Overall Project Schedule (OPS)
1. Submit the schedule within 10 days after date of the Notice to Proceed.
2. The Engineer will review the schedule and return it within 10 days after receipt.
3. If required, resubmit within 10 days after receipt of a returned copy.
B. Near Term Schedule (NTS)
1. Submit the first Near Term Schedule within 10 days of the Notice to Proceed.
2. The Engineer will review the schedule and return it within 10 days after receipt.
C. Submit an update of the OPS and NTS with each progress payment request.
1.03 Approval
Approval of the Contractor's detailed construction program and revisions thereto shall in no way relieve the Contractor of any of the Contractor's duties and obligations under the Contract. Approval is limited to the format of the schedule and does not in any way indicate approval of, or concurrence with, the Contractor's means, methods and ability to carry out the Work.
1.04 Overall Project Schedule (OPS)
A. The Contractor shall submit to the Owner for approval a detailed Overall Project
Schedule of the Contractor's proposed operations for the duration of the Project.
The OPS shall be in the form of a Gantt/bar chart.
01310 - 2
B. Gantt/Bar Chart Schedule
1. Each activity with duration of seven or more days shall be identified by a separate bar. Activities with duration of more than 30 days shall be sub-divided into separate activities.
2. The schedule shall include activities for shop drawing preparation and review, fabrication, delivery, and installation of major or critical path materials and equipment items.
3. The schedule shall show the proposed start and completion date for each activity. A separate listing of activity start and stop dates and working day requirements shall be provided unless the information is shown in text form on the Gantt/bar chart.
4. The schedule shall identify the Notice to Proceed date, the Contract
Completion date, major milestone dates, and a critical path.
5. The schedule shall be printed on a maximum 11 x 17-inch size paper. If the
OPS needs to be shown on multiple sheets, a simplified, one page, summary bar chart showing the entire Project shall be provided.
6. The schedule shall have a horizontal time scale based on calendar days and shall identify the Monday of each week.
7. The schedule shall show the precedence relationship for each activity.
1.05 Near Term Schedule (NTS)
A. The Contractor shall develop and refine a detailed Near Term Schedule showing the day to day activities with committed completion dates which must be performed during the upcoming 30 day period. The detailed schedule shall represent the
Contractor's best approach to the Work which must be accomplished to maintain progress consistent with the Overall Project Schedule.
B. The Near Term Schedule shall be in the form of Gantt/bar chart and shall include a written narrative description of all activities to be performed and describe corrective action to be taken for items that are behind schedule.
1.06 Updating
A. Show all changes occurring since previous submission of the updated schedule.
B. Indicate progress of each activity and show actual completion dates.
01310 - 3
TS-01310
C. The Contractor shall be prepared to provide a narrative report at the Project
Coordination Meetings. The report shall include the following:
1. A description of the overall Project status and comparison to the OPS.
2. Identify activities which are behind schedule and describe corrective action to be taken.
3. A description of changes or revisions to the Project and their effect on the
OPS.
4. A description of the Near Term Schedule of the activities to be completed during the next 30 days. The report shall include a description of all activities requiring participation by the Engineer and/or Owner.
01310 - 4
Section 01320
Construction Videos and Photographs
TS-01320
A. The Contractor shall furnish all equipment and labor materials required to provide the Owner with digital construction videos and photographs of the Project.
B. Photo and video files shall become the property of the Owner and none of the videos or photographs herein shall be published without written permission of the
Owner.
1.02 Pre and Post Construction Videos and Photographs
A. Prior to the beginning of any work, the Contractor shall take project videos and photographs of the work area to record existing conditions.
B. Following completion of the work, another video and photos shall be made showing the same areas and features as in the pre-construction video and photographs.
C. All conditions which might later be subject to disagreement shall be shown in sufficient detail to provide a basis for decisions.
D. The pre-construction video and photographs shall be submitted to the Engineer within 25 calendar days after the date of receipt of Notice to Proceed.
Post-construction videos and photographs shall be provided prior to final acceptance of the project.
1.03 Progress Photographs
A. Photo files shall be provided in a .jpg or .tif format.
B. The photographs shall be embedded with a date and time marking. All image files shall be named to indicate date and description of work shown.
C. A minimum of ten photographs shall be submitted with each request for payment.
The view selection will be as agreed to with the Engineer.
1.04 Submittals
A. Photographs and videos shall be submitted electronically via a downloadable link or a flash drive as well as a printed hard copy. Format for the video shall be MPEG or
AVI.
B. Construction photographs shall be submitted with each payment request. Failure to include photographs may be cause for rejection of the payment request.
01320 - 2
Construction Videos…
This is the start of the file's text. The full file is on GovTribe.