3-Glenwood Subcontractors Fillable.pdf
PDF 847 KB Posted
- Attached to
- SB-FP-11-2526 Glenwood Park Capital Improvements
- Solicitation number
- SB-FP-11-2526 Glenwood Park Capital Improvements
- Issued by
- Kane County, Illinois
About this file
This is a subcontractor disclosure form for the Kane County Forest Preserve District related to contract SB-FP-11-2526 for Glenwood Park Capital Improvements in Illinois. The form requires bidders to identify any subcontractors that will perform work on the project to renovate site amenities and entry driveway for Glenwood Park Forest Preserve. The document provides space to list up to three subcontractors and describe the specific work each will perform, or allows bidders to indicate that no subcontractors will be used for the project. The form requires certification by signature with date and printed name to verify the accuracy of all submitted information.
The document does not contain pricing information, set-asides, funding sources, or other financial terms. It serves solely as a disclosure mechanism for identifying subcontractors involved in the capital improvement project and does not specify contract duration, renewal options, or award details.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To preserve and restore the nature of Kane County
1996 South Kirk Road, Suite 320, Geneva, Illinois 60134
Bill Lenert, President Benjamin Haberthur, Executive Director
(630) 232-5980 Fax: (630) 232-5924 www.kaneforest.com
SUB-CONTRACTORS
The listed Sub-contractors will perform the work indicated herein:
1. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
2. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
3. Sub-Contractor__________________________________________________________________
Work Performed__________________________________________________________________
No Sub-Contractors will be used for this project.
I certify that all information above is correct.
Signed:________________________________________________Date:___________________________
Printed Name:__________________________________________
SB-FP-11-2526
http://www.kaneforest.com/
| 1. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| 2. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| 3. Sub-Contractor__________________________________________________________________ |
| Work Performed__________________________________________________________________ |
| No Sub-Contractors will be used for this project. |
| I certify that all information above is correct. |
| Signed:________________________________________________Date:___________________________ |
| Printed Name:__________________________________________ |
| 1 SubContractor: |
| Work Performed: |
| 2 SubContractor: |
| Work Performed_2: |
| 3 SubContractor: |
| Work Performed_3: |
| I certify that all information above is correct: Off |
| Date: |
| Printed Name: |
File details come from the government source that posted it. Updated .