This is a 95% Design Analysis document prepared by the U.S. Army Corps of Engineers, Baltimore District, for the Gaffney Fitness Center (Building 6330) located at Fort Meade, Maryland. The project encompasses a comprehensive structural assessment and design analysis of the facility's sundeck, prepared by Feliks Plotnikov in July 2019 and updated in August 2026. The analysis evaluates the existing structural capacity of primary beams (W8x10 and W12x36), secondary support members (C3 channels), columns, and foundations supporting the sundeck. The document includes detailed load calculations incorporating dead loads, live loads per ASCE7-16 standards, and mechanical loads from existing ductwork and piping systems. The analysis determines that existing W8 beams are adequate without deterioration or additional mechanical loads, while existing W12 beams are overstressed and require replacement due to excessive deflection and section losses. The recommended solution specifies replacement with W12x45 beams and reduction of W8 beam spacing from 4 feet to 2 feet, with total design loads calculated at 125 psf including mechanical equipment loads.

The structural assessment reveals significant deterioration of existing steel members, particularly bottom flanges of W12 beams, necessitating new primary beam design specifications. Existing columns (tubular steel 4x4x1/4) and foundations are determined adequate under the proposed design loads, with soil bearing pressure at 1,522.28 psf against an allowable minimum of 1,800 psf. The design incorporates deflection limits per ASCE7-16 and AISC standards, with span deflection limits of L/360 and cantilever deflection limits of L/150. The document supports Auburn University's request for a service provider capable of conducting assessment and repair design of the sundeck structure at Fort Meade, Maryland, providing the technical foundation and existing conditions analysis necessary for bid development and construction planning.

View the file

Other files

File Type Posted
1-Gaffney_Fort_Meade_Structural_RFP_8-12-26.pdf PDF
2-Gaffney_drawings_partial_set.pdf PDF
1430264-event.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Analysis – 95% Design

Project Number: 91110

Prepared by:

Fort Meade Repair Gaffney Fitness Center, Building 6330

Fort Meade, Maryland

January 2021

U.S. Army Corps of Engineers, Baltimore District 2 Hopkins Plaza Baltimore, Maryland 21201

U.S. Army Corps of Engineers, Philadelphia District 100 Penn Square East Philadelphia, Pennsylvania 19107

PARTIAL SET

AUGUST 2026

SUNDECK EVALUATION

FORT MEADE

BUILDING 6330

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 1 of 11

CHECKING EXISTING SUNDECK CAPACITY

PARTIAL EXISTING SUNDECK PLAN

Check capacity of the existing W8x10 and W12x36. Do not use (initially) load from pipes and ducts under deck.

Per ASCE7-16, Table 4.3-1, p.14, live load on sun deck LLsd 100psf "sd" means sun deck

Dead load on sun deck per Table C3.1-1a on p.426 from 2" thick timber deck DLsd 5psf

CHECKING W8x10 BEAM

W8 beam length LW8 14.1ft W8 beam spacing SpaW8 4ft

Combined dead and live load on W8 beam wW8 LLsd DLsd SpaW8 420 plf

Bending moment MW8 wW8

LW8

10.44 kip ft

Design date is 1971. Assume W-beam steel Fy 36ksi This is confirmed by notes on existing sheet 22.

Beams are fully braced with timber deck

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 2 of 11

Required beam section modulus SW8.required

MW8

0.6 Fy

5.8 in

3 W8x10 section modulus SW8x10 7.8in

Beam has safety factor redundancy SFW8

SW8x10

SW8.required 1.35

Check deflection Est 29000ksi IW8 30.8in

Allowable Δallow

LW8

0.47 in Actual deflection Δ wW8 LW8

Est IW8

0.42 in Deflection is OK

Conclusion: W8 beams without section losses and without pipes and duct load are adequate.

Field inspection reviled that additional channels, C3, have been installed between W8 beams. The purpose of C3 is to support timber planks for reduction of their deflection.

Distributed load on long C3 wC3 LLsd DLsd SpaW8

210 plf

Check C3 for maximum moment either in long C3 with distributed load or in short C3 with concentrated load.

Top of long C3 is fully braced by deck

MC3.distr wC3

LW8

1.3 kip ft

Exact size of C3 is not known, but the smallest C3x3.5 has section modulus SC3 1.04in

Bending stress in C3 σb.C3

MC3.distr

SC3

15.05 ksi Less than 0.6 36 ksi 21.6 ksi

Concentrated load on short C3

PC3 LLsd DLsd

LW8

SpaW8

1.48 kip Top flange of short C3 is not braced.

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 3 of 11

Modeling in RISA shows that C3 is adequate.

Both C3, short and long, are O.K. if do not have section loses and do not support pipes and ducts under deck

CHECKING W12x36 BEAM

The worst load combination for span moment is when LL exists in span only

W12 beam will be loaded with 6 concentrated forces (DL+LL) from W8 beams in span and only DL concentrated forces on cantilever portion of the beam

Length of W12 beam span LW12 23.66ft Left support is located inside of existing wall

Concentrated load from W8x10 self weight is W8self 10plf LW8 0.14 kip

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 4 of 11

Each concentrated (DL+LL) from typical W8 on typical W12, including W8x10 self weight, equals

PW8 wW8 LW8 W8self 6.06 kip

One W8 beam near a wall left support per sketch above) has narrower load area (by 1ft) and creates a reduced force.

PW8.near.wall PW8

SpaW8 1ft

SpaW8 W8self 4.69 kip

This force located 1.5' from beam support. The support is inside the wall and is not visible

Cantilever portion of W12 is loaded by W8 and C12.

DL from W8 is PW8.DL DLsd SpaW8 LW8 W8self 0.42 kip

Assume handrail weight installed on C12 whandrail 10plf

Concentrated self weight from C12x20.7 C12self 20.7plf LW8 0.29 kip

DL from C12 plus handrail installed on top of C12 is

PC12.DL DLsd

SpaW8

LW8 whandrail LW8 C12self 0.57 kip

Beam is modeled in RISA for load combination DL+LL with the worst load combination when LL located in span only. Self weight of W12 is considered by RISA.

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 5 of 11

RISA moment diagram RISA shear diagram

RISA bending stress code check

W12 beam is overstressed in the span. N.G. Additionally, section loses and load from pipes and ducts make W12 unreparable.

RISA deflection output

Span length is 23.66 ft. Allowable span deflection L/360 =

23.66 12 in

0.79 in

W12 span actual deflection 1.5" is about two times larger than allowable. N.G. Deflection will further increase due to section losses and load from pipes and ducts.

Cantilever portion of W12

Consider load combinations with LL located (a) on cantilever only and (b) on entire beam. After using some conservative assumptions for simplification of load calculations, the load diagrams and bending moments will be the following

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 6 of 11

LL on cantilever only

LL on entire beam (different graphical scale)

RISA bending stress Code check

LL on cantilever only

Bending stress in cantilever portion is OK

RISA deflection results

LL on cantilever only End of cantilever deflection

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 7 of 11

Per ASCE7-16, commentary CC.2, p.801, acceptable cantilever deflection can be 1/150 of cantilever length.

Cantilever length is 5.66'. Allowable deflection is Δallow.cant

5.66 12 in

0.45 in

Actual W12 cantilever deflection is 0.297" - acceptable.

RISA bending stress Code check

LL on entire beam Small overstress in cantilever

RISA deflection results

LL on entire beam

Allowable deflection of 23.66 ft span is Δallow.span

LW12

1.18 in

Actual deflection at the end of cantilever is 1.247" in the mid-span and 0.84" at the end - both deflections N.G.

Existing beams show different degree of deterioration, which reduces their capacity. Photo below shows an example of a deteriorated bottom flange of W12. Deteriorated areas in top and bottom flanges were found during inspection.

Additionally, load from ducts and pipes shall be added. In the worst case all of the following loads apply:

8'x2' duct, 22 GA, galvanized - 34 plf, where applicalbe.

Pipes: 6-8" dia, 2-3.5" dia, 7-1" dia - weight is per Table below

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 8 of 11

Deteriorated W12 bottom flange with W8 beam connection

Additionally, load from ducts and pipes shall be added.

Underside of sun deck

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 9 of 11

CALCULATIONS FOR NEW W12 TO BE USED AS PRIMARY BEAM

Depth of new beam shall be 12" for keeping the existing clearance

In the worst case all of the following loads apply simultaneously:

8'x2' duct, 22 GA, galvanized - 34 plf, where applicalbe.

Pipes: 6-8" dia, 2-3.5" dia, 7-1" dia.

wduct 34plf

Pipes weight per foot equal wpipes 6 50.1 plf 2 13.4 plf 7 2.1 plf 342.1 plf

Area of the deck that support pipes is 23 ft wide. Mechanical load per sq ft = wmech wduct wpipes

23ft

16.35 psf

Due to uneven distribution of pipes and ducts assume increased mechanical load for design wmech.des 20psf

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 10 of 11

Total design load (DL+LL) equal wdeck.total DLsd LLsd wmech.des 125 psf

W8 beam spacing will be reduced from 4ft to 2ft for replacement of the existing C3x3.5. Thus load on each will decrease almost 2 times. W8x10 can be used in the new portion of sun deck.

Calculate required size of major beams for replacement of the existing W12x36. As calculated previously, governing moment for major beam is moment in span

MW12.span wdeck.total LW8 LW12

123.33 kip ft

W12 beam will be braced every 2 ft. SW12.req

MW12.span

0.6 50 ksi

49.33 in

Try W12x45 SW12x45 57.7in 3 IW12x45 348in

Check span deflection

Δallow.span 1.18 in ΔW12x45.span wdeck.total LW8 LW12

29000ksi IW12x45

1.23 in (O.K., approx. same as deflection limit)

Check cantilever deflection

Δallow.cant 0.45 in ΔW12x45.cant wdeck.total LW8 5.66ft( )

24 29000 ksi IW12x45

0.01 in O.K.

CHECKING EXISTING COLUMNS AND FOUNDATION

Load area on a typical steel column supporting sun deck is Acol

LW12

5.66ft

LW8 246.61 ft

Vertical load on foundation is Pfound Acol wdeck.total 30.83 kip

SUNDECK EVALUATION

ANALYSIS BY: Feliks Plotnikov July 2019

CHECKED BY:

Sheet 11 of 11

Column is tubular steel 4x4x1/4. Column height is less than 12 ft. Capacity in concentric load per AISC 7th edition, 1973 with Fy=36ksi is 48kip - O.K.

Foundation size is 4,5' square. Foundation area is Afound 20.25ft

Soil bearing pressure σsoil

Pfound

Afound

1522.28 psf

Allowable soil bearing pressure per notes on sheet 22 is 1800 psf minimum. Existing soil bearing pressure is OK

Appendix C - Structural.pdf
Checking existing roofs
Seismic evaluation
Sun deck
Appendix E - Mechanical.pdf
Consolidated Customer Package - CGAM - CH_1
Consolidated Customer Package - CGAM - CH_2
Consolidated Customer Package - CSAA - AHU_1
Consolidated Customer Package - FANCOIL - FCU_1
Consolidated Customer Package - FANCOIL - FCU_2
Consolidated Customer Package - FANCOIL - FCU_3
Consolidated Customer Package - FANCOIL - FCU_4
Consolidated Customer Package - FANCOIL - FCU_5
Consolidated Customer Package - BCXD - BCU_1
Consolidated Customer Package - BCXD - BCU_2
Consolidated Customer Package - BCXD - BCU_3
Consolidated Customer Package - BCXD - BCU_4
Consolidated Customer Package - BCXD - BCU_5
Consolidated Customer Package - BCXD - BCU_6A
Consolidated Customer Package - BCXD - BCU_6B
Consolidated Customer Package - BCXD - BCU_7A
Consolidated Customer Package - BCXD - BCU_7B
Consolidated Customer Package - BCXD - BCU_8
Consolidated Customer Package - BCXD - BCU_9A
Consolidated Customer Package - BCXD - BCU_9B
Consolidated Customer Package - BCXD - BCU_10
Consolidated Customer Package - BCXD - BCU_11
Consolidated Customer Package - BCXD - BCU_12
Consolidated Customer Package - BCXD - BCU_13
Seresco NP Series Dehumidifier Brochure-2
Seresco Info
Seresco_Submittal_44155.1
Qmark-QFLY_IUH_0518-1
370_MEAD_GAFF_LOAD_CALCS_30PERCENT
Title Page
System Checksums
Zone Checksums
Room Checksums
Design Cooling Load Summary
System Component Selection
Zone Psychrometrics
Room Psychrometrics
Design Airflow
Design Cooling Capacity
Design Heating Capacity
Engineering Checks
Peak Cooling Load (Main System)
Peak Heating Load (Main System)
Load Airflow Summary
Energy Consumption Summary
Energy Cost Budget
Economic Summary
Project Information
Room Information - Proposed Design
System Information - Proposed Design
Room Assignment Tree - Proposed Design
Plant Information - Proposed Design
Economic Information - Proposed Design
Library Members - Proposed Design
Walls by Direction - Proposed Design
Room Information - Pkg DX W/Gas Heat
System Information - Pkg DX W/Gas Heat
Plant Information - Pkg DX W/Gas Heat
Room Assignment Tree - Pkg DX W/Gas Heat
Economic Information - Pkg DX W/Gas Heat
Library Members - Pkg DX W/Gas Heat
Walls by Direction - Pkg DX W/Gas Heat

PkgDX_vs_chilled_water_12yr

Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
General Information

LCC Summary

LCC Summary

Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
Base Case: Pkg DX
Alternative: Chiller
General Information
PV Life-Cycle Cost
Net Savings from Alternative Compared with Base Case
NOTE: Meaningful SIR, AIRR and Payback can not be computed unless incremental savings and total savings are both positive.
Energy Savings Summary (in stated units)
Energy Savings Summary (in MBtu)
Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
General Information
Energy: Electricity
Usage Indices
Escalation Rates
Energy: Natural Gas
Usage Indices
Escalation Rates
Component: Chillers
Initial Investment
Cost-Phasing
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Replacement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Pumps
Initial Investment
Cost-Phasing
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Repalcement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Fan/Blower Coils
Initial Investment
Cost-Phasing
Major Repair and Replacement: 3 month maint
Major Repair and Replacement: 6 month maint
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Replacement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Boilers
Initial Investment
Cost-Phasing
Major Repair and Replacement: Clean Firebox
Major Repair and Replacement: Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Inspect and Test
Usage Indices
Component: AHUs
Initial Investment
Cost-Phasing
Major Repair and Replacement: 3-month Maint
Major Repair and Replacement: AHU Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Energy: Natural Gas
Usage Indices
Escalation Rates
Energy: Electricity
Usage Indices
Escalation Rates
Component: AHUs
Initial Investment
Cost-Phasing
Major Repair and Replacement: Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Annual
Usage Indices

PkgDX_vs_chilled_water_30yr

Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
General Information

LCC Summary

LCC Summary

Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
Base Case: Pkg DX
Alternative: Chiller
General Information
PV Life-Cycle Cost
Net Savings from Alternative Compared with Base Case
Savings-to-Investment Ratio (SIR)
Adjusted Internal Rate of Return
Payback Period
Estimated Years to Payback (from beginning of Beneficial Occupancy Period)
Energy Savings Summary (in stated units)
Energy Savings Summary (in MBtu)
Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
General Information
Energy: Electricity
Usage Indices
Escalation Rates
Energy: Natural Gas
Usage Indices
Escalation Rates
Component: Chillers
Initial Investment
Cost-Phasing
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Replacement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Pumps
Initial Investment
Cost-Phasing
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Repalcement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Fan/Blower Coils
Initial Investment
Cost-Phasing
Major Repair and Replacement: 3 month maint
Major Repair and Replacement: 6 month maint
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Replacement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Boilers
Initial Investment
Cost-Phasing
Major Repair and Replacement: Clean Firebox
Major Repair and Replacement: Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Inspect and Test
Usage Indices
Component: AHUs
Initial Investment
Cost-Phasing
Major Repair and Replacement: 3-month Maint
Major Repair and Replacement: AHU Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Energy: Natural Gas
Usage Indices
Escalation Rates
Energy: Electricity
Usage Indices
Escalation Rates
Component: AHUs
Initial Investment
Cost-Phasing
Major Repair and Replacement: Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Annual
Usage Indices

PkgDX_vs_chilled_water_40yr

Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
General Information

LCC Summary

LCC Summary

Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
Base Case: Pkg DX
Alternative: Chiller
General Information
PV Life-Cycle Cost
Net Savings from Alternative Compared with Base Case
Savings-to-Investment Ratio (SIR)
Adjusted Internal Rate of Return
Payback Period
Estimated Years to Payback (from beginning of Beneficial Occupancy Period)
Energy Savings Summary (in stated units)
Energy Savings Summary (in MBtu)
Consistent with Federal Life Cycle Cost Methodology and Procedures, 10 CFR, Part 436, Subpart A
General Information
Energy: Electricity
Usage Indices
Escalation Rates
Energy: Natural Gas
Usage Indices
Escalation Rates
Component: Chillers
Initial Investment
Cost-Phasing
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Replacement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Pumps
Initial Investment
Cost-Phasing
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Repalcement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Fan/Blower Coils
Initial Investment
Cost-Phasing
Major Repair and Replacement: 3 month maint
Major Repair and Replacement: 6 month maint
Major Repair and Replacement: Major Repair
Major Repair and Replacement: Replacement
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Component: Boilers
Initial Investment
Cost-Phasing
Major Repair and Replacement: Clean Firebox
Major Repair and Replacement: Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Inspect and Test
Usage Indices
Component: AHUs
Initial Investment
Cost-Phasing
Major Repair and Replacement: 3-month Maint
Major Repair and Replacement: AHU Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Annual Maintenance
Usage Indices
Energy: Natural Gas
Usage Indices
Escalation Rates
Energy: Electricity
Usage Indices
Escalation Rates
Component: AHUs
Initial Investment
Cost-Phasing
Major Repair and Replacement: Repair
Major Repair and Replacement: Replace
Routine Recurring OM&R: Annual
Usage Indices
Cost_Data_LCC_Gaff_30per-use
BGE - tariff P3_SCH_GL
Rdr_1
GasScheduleC
Appendix G - Electrical.pdf
LIGHTING ANALYSIS - BSMNT-20190701
LIGHTING ANALYSIS - FF-20190722
LIGHTING ANALYSIS - SF-20190701
CUTSHEET A - Lithonia-JCBL-JCBL-Round-Bay-Round-LED-_pdf
CUTSHEET B - EPANL_recessed lighting
CUTSHEET C - LED-SHOPLIGHT_pdf
CUTSHEET D - Wallpack
CUTSHEET E - wlawc804
Appendix D - Fire Protection.pdf
AppD0_HydrantTest_Gaffney_20190814
AppD1_Calculations_Gaffney_30
AppD2_BreakTank_Gaffney_30
AppD3_Pump_Gaffney_30
AppD4_PumpEncl_Gaffney_30
65% Design Analysis Compiled 8-4-20.pdf
65% Appendix C - Structural.pdf
Seismic evaluation
Checking existing roofs
Existing Sun deck
Mechanical Appendix H - 65%.pdf
Chiller_vs_Pkg-DX
Chiller vs. DX Economic Costs
Chiller vs. DX Monthly Energy Consumption
LCCA_Compare_EIFS_vs_No-EIFS
LCCA_Inputs_EIFS_vs_No-EIFS
EIFS vs None Economic Costs
EIFS vs None Energy Cost Budget
EIFS vs None Equipment Energy Consumption
Mechanical Appendix E - 65%.pdf
M_SUBMITTAL_PVA-A12AA7___PUY-A12NKA7-BS-en.pdf
SUBMITTAL DATA: PVA-A12AA7 & PUY-A12NKA7(-BS)
OVERVIEW
INDOOR UNIT FEATURES
OUTDOOR UNIT FEATURES
SPECIFICATIONS: PVA-A12AA7 & PUY-A12NKA7(-BS)
ACCESSORIES: PVA-A12AA7
ACCESSORIES: PUY-A12NKA7(-BS)
DIMENSIONS: PVA-A12AA7
DIMENSIONS: PUY-A12NKA7(-BS)
M_SUBMITTAL_MLZ-KP09NA-U1_SUZ-KA09NAHZ-en.pdf
SUBMITTAL DATA: MLZ-KP09NA & SUZ-KA09NAHZ
OVERVIEW
INDOOR UNIT FEATURES
OUTDOOR UNIT FEATURES
SPECIFICATIONS: MLZ-KP09NA-U1 & SUZ-KA09NAHZ
ACCESSORIES: MLZ-KP09NA
ACCESSORIES: SUZ-KA09NAHZ
DIMENSIONS: MLZ-KP09NA
DIMENSIONS: SUZ-KA09NAHZ
M_SUBMITTAL_PKA-A12HA7___PUY-A12NKA7-BS-en.pdf
SUBMITTAL DATA: PKA-A12HA7 & PUY-A12NKA7(-BS)
OVERVIEW
INDOOR UNIT FEATURES
OUTDOOR UNIT FEATURES
SPECIFICATIONS: PKA-A12HA7 & PUY-A12NKA7(-BS)
ACCESSORIES: PKA-A12HA7
ACCESSORIES: PUY-A12NKA7(-BS)
DIMENSIONS: PKA-A12HA7
DIMENSIONS: PUY-A12NKA7(-BS)
scd-square-cone-diffuser-submittal.pdf
Section C - Ceiling Diffusers
Square Cone Diffusers
SCD / ASCD - #218772
SDCA / ASCDA - #218779
SCDAS - #244532
Main
Section C Index
Submittal Index
egg-crate-grilles.pdf
Section D - Grilles & Registers
Egg Crate Face Returns
80 Series - Dwg #222015
Mounting and Optional Borders
81 Series - Dwg #228140
Mounting and Optional Borders
82 Series - Dwg #228141
Mounting and Optional Borders
80 - Panel Mounted - Dwg #222064
80 - Quick Release Fasteners QR Border - Dwg #250575
80SR - Dwg #258867
Removable Face
85 Series - Dwg #265215
Core Pattern and Fastening
Main
Section D Index
Submittal Index
90-heavy-duty-return-gym-grille-submittal.pdf
Section D - Grilles & Registers
Gymnasium Return Air Grilles
90 Series (Steel Construction) - Dwg #222007
90FH Series - Dwg #254908
97, 98, 99 Series (Aluminum Construction) - Dwg #222008
910 Series (Steel Construction) - Dwg #239535
920 Series (Steel Construction) - Dwg #239579
Main
Section D Index
Submittal Index
600-aluminum-louvered-grille-submittal.pdf
Section D - Grilles & Registers
500 / 600 Series
Louvered Face Supply and Return Grilles & Registers
600 Series Return - Dwg #269914
600 Series Supply - Dwg #269915
UNT-PRC022A-EN_06062018.pdf
Introduction
Features and Benefits
Energy Efficiency
IAQ Design
Controls
Flexibility
Quality
Serviceability
Components and Options
Motor and Control Board
Model Number Descriptions
General Data
Model A, Vertical Concealed
Model B, Vertical Cabinet
Model C, Horizontal Concealed
Model D, Horizontal Cabinet
Model E, Horizontal Recessed
Model F, Vertical Wall Hung Cabinet
Model H, Vertical Recessed
Model J, Vertical Cabinet Slope Top
Model M, Inverted Vertical Concealed
Model N, Inverted Vertical Recessed
Electric Heat
Factory-Installed Piping Packages
Performance Data
Horizontal Concealed, Horizontal Recessed, Vertical Recessed, Inverted Vertical Recessed
Vertical Concealed
Horizontal Cabinet, Vertical Cabinet, Inverted Vertical Cabinet
Vertical Slope Top Cabinet
Horizontal Concealed, Horizontal Recessed, Vertical Recessed, Horizontal Cabinet
Vertical Concealed
Controls
Why Trane Controls?
Control Options
Fan Speed Control with Standard Adapter Board
Customer Supplied Terminal Interface (CSTI)
Tracer® Controllers
Tracer® ZN520 Controller
Tracer® UC400-B Controller
Sequence of Operation
Zone Sensor Options
Control Features
Tracer® ZN520 and UC400-B Additional Features
End Device Options
Actuators
Control Valves
Selecting the Correct Modulating Valve Size
Electrical Data
MCA and MOP Calculations
Electric Heat
Motors
RPM
Dimensions and Weights
Vertical Concealed, Model A
Vertical Cabinet, Model B
Horizontal Concealed, Model C
Horizontal Cabinet, Model D
Horizontal Recessed, Model E
Vertical Wall Hung Cabinet, Model F
Vertical Recessed, Model H
Vertical Slope Top, Model J
Inverted Vertical Cabinet, Model M
Inverted Vertical Recessed, Model N
Coil Connections
Fresh Air Opening Locations-Horizontal Units Models C, D, and E
Fresh Air Opening Locations-Vertical Units Models A, B, F, and J
Wall Box
Projection Panel
Mechanical Specifications
Force-Flo Cabinet Heater Mechanical Specifications
Piping Package
65% Appendix G - Electrical.pdf
LIGHTING ANALYSIS - BSMNT-20190701
LIGHTING ANALYSIS - FF-20190722
LIGHTING ANALYSIS - SF-20190701
CUTSHEET A - Lithonia-JCBL-JCBL-Round-Bay-Round-LED-_pdf
CUTSHEET B - EPANL_recessed lighting
CUTSHEET C - LED-SHOPLIGHT_pdf
CUTSHEET D - Wallpack
CUTSHEET E - wlawc804
Pool Calc.pdf
Sheet1
Blank Page
Mechanical Appendix E - 95%.pdf
M_SUBMITTAL_PVA-A12AA7___PUY-A12NKA7-BS-en.pdf
SUBMITTAL DATA: PVA-A12AA7 & PUY-A12NKA7(-BS)
OVERVIEW
INDOOR UNIT FEATURES
OUTDOOR UNIT FEATURES
SPECIFICATIONS: PVA-A12AA7 & PUY-A12NKA7(-BS)
ACCESSORIES: PVA-A12AA7
ACCESSORIES: PUY-A12NKA7(-BS)
DIMENSIONS: PVA-A12AA7
DIMENSIONS: PUY-A12NKA7(-BS)
M_SUBMITTAL_MLZ-KP09NA-U1_SUZ-KA09NAHZ-en.pdf
SUBMITTAL DATA: MLZ-KP09NA & SUZ-KA09NAHZ
OVERVIEW
INDOOR UNIT FEATURES
OUTDOOR UNIT FEATURES
SPECIFICATIONS: MLZ-KP09NA-U1 & SUZ-KA09NAHZ
ACCESSORIES: MLZ-KP09NA
ACCESSORIES: SUZ-KA09NAHZ
DIMENSIONS: MLZ-KP09NA
DIMENSIONS: SUZ-KA09NAHZ
M_SUBMITTAL_PKA-A12HA7___PUY-A12NKA7-BS-en.pdf
SUBMITTAL DATA: PKA-A12HA7 & PUY-A12NKA7(-BS)
OVERVIEW
INDOOR UNIT FEATURES
OUTDOOR UNIT FEATURES
SPECIFICATIONS: PKA-A12HA7 & PUY-A12NKA7(-BS)
ACCESSORIES: PKA-A12HA7
ACCESSORIES: PUY-A12NKA7(-BS)
DIMENSIONS: PKA-A12HA7
DIMENSIONS: PUY-A12NKA7(-BS)
scd-square-cone-diffuser-submittal.pdf
Section C - Ceiling Diffusers
Square Cone Diffusers
SCD / ASCD - #218772
SDCA / ASCDA - #218779
SCDAS - #244532
Main
Section C Index
Submittal Index
egg-crate-grilles.pdf
Section D - Grilles & Registers
Egg Crate Face Returns
80 Series - Dwg #222015
Mounting and Optional Borders
81 Series - Dwg #228140
Mounting and Optional Borders
82 Series - Dwg #228141
Mounting and Optional Borders
80 - Panel Mounted - Dwg #222064
80 - Quick Release Fasteners QR Border - Dwg #250575
80SR - Dwg #258867
Removable Face
85 Series - Dwg #265215
Core Pattern and Fastening
Main
Section D Index
Submittal Index
90-heavy-duty-return-gym-grille-submittal.pdf
Section D - Grilles & Registers
Gymnasium Return Air Grilles
90 Series (Steel Construction) - Dwg #222007
90FH Series - Dwg #254908
97, 98, 99 Series (Aluminum Construction) - Dwg #222008
910 Series (Steel Construction) - Dwg #239535
920 Series (Steel Construction) - Dwg #239579
Main
Section D Index
Submittal Index
600-aluminum-louvered-grille-submittal.pdf
Section D - Grilles & Registers
500 / 600 Series
Louvered Face Supply and Return Grilles & Registers
600 Series Return - Dwg #269914
600 Series Supply - Dwg #269915
UNT-PRC022A-EN_06062018.pdf
Introduction
Features and Benefits
Energy Efficiency
IAQ Design
Controls
Flexibility
Quality
Serviceability
Components and Options
Motor and Control Board
Model Number Descriptions
General Data
Model A, Vertical Concealed
Model B, Vertical Cabinet
Model C, Horizontal Concealed
Model D, Horizontal Cabinet
Model E, Horizontal Recessed
Model F, Vertical Wall Hung Cabinet
Model H, Vertical Recessed
Model J, Vertical Cabinet Slope Top
Model M, Inverted Vertical Concealed
Model N, Inverted Vertical Recessed
Electric Heat
Factory-Installed Piping Packages
Performance Data
Horizontal Concealed, Horizontal Recessed, Vertical Recessed, Inverted Vertical Recessed
Vertical Concealed
Horizontal Cabinet, Vertical Cabinet, Inverted Vertical Cabinet
Vertical Slope Top Cabinet
Horizontal Concealed, Horizontal Recessed, Vertical Recessed, Horizontal Cabinet
Vertical Concealed
Controls
Why Trane Controls?
Control Options
Fan Speed Control with Standard Adapter Board
Customer Supplied Terminal Interface (CSTI)
Tracer® Controllers
Tracer® ZN520 Controller
Tracer® UC400-B Controller
Sequence of Operation
Zone Sensor Options
Control Features
Tracer® ZN520 and UC400-B Additional Features
End Device Options
Actuators
Control Valves
Selecting the Correct Modulating Valve Size
Electrical Data
MCA and MOP Calculations
Electric Heat
Motors
RPM
Dimensions and Weights
Vertical Concealed, Model A
Vertical Cabinet, Model B
Horizontal Concealed, Model C
Horizontal Cabinet, Model D
Horizontal Recessed, Model E
Vertical Wall Hung Cabinet, Model F
Vertical Recessed, Model H
Vertical Slope Top, Model J
Inverted Vertical Cabinet, Model M
Inverted Vertical Recessed, Model N
Coil Connections
Fresh Air Opening Locations-Horizontal Units Models C, D, and E
Fresh Air Opening Locations-Vertical Units Models A, B, F, and J
Wall Box
Projection Panel
Mechanical Specifications
Force-Flo Cabinet Heater Mechanical Specifications
Piping Package
95% Gaffney Plumbing Design Narrative - Cutsheets.pdf
bioshield-uv-sanitizer-manual-english.pdf
960080-i_spec
420_pentair_bioshield_residential_uv_system_manual_960080-i_01
Lighting Product Cut Sheets and Calculations.pdf
Lighting Product Cut Sheets
A - EPANL 2x4
B - EPANL 2x2
B - SURFACE MOUNT KIT
C - HIGH BAY PENDANT
D - Wallpack
E - EMERGENCY LIGHT
EX - EMERGENCY LIGHT AND EXIT SIGN COMBO
F - LED-SHOPLIGHT_pdf
G - NATATORIUM LED
H - 6 INCH ROUND LED
J - WALL LIGHT FOR SAUNA
K - Vanity
L - Stairwell
Gaffney Lighting Calculations
Basement
First Floor
First Floor Gym
Natatorium
Second Floor
Appendix C - Structural Calculations.pdf
DESIGN LOADS & SEISMIC EVALUATION
RISA-3D: MEZZANINE ANALYSIS & DESIGN
RISAFOUNDATION: MEZZANINE ANALYSIS & DESIGN
CHECKING EXISTING ROOF CAPACITY
RISA-3D: HVAC ROOF UNIT EXISTING W12 CHECKAND NEW FRAME DESIGN
SUNDECK EVALUATION
Text Field 2:
Text Field 3:
Text Field 1:
Text Field 16:
Text Field 17:
Text Field 18:
Text Field 19:
Text Field 20:
Text Field 21:
Text Field 5:
Text Field 28:
Text Field 42:
Text Field 43:
Text Field 44:
Text Field 45:
Text Field 22:
Text Field 25:
Text Field 48:
Text Field 55:
Text Field 56:
Lumens 2:
Reflector 2:
Lens 2:
Voltage 2:
Color Rendering Index 2:
Color Temperature 2:
Mounting Configurations 2:
Options 2:
Color Rendering Index 3:
Options 4:
Text Field 29:
Page 1:
Text Field 30:
Page 1:
Text Field 31:
Page 1:
Catalog Number 2:
Notes 2:
Type 2:
Series 2:
Finish 2:
Text Field 4:
Page 1:
Text Field 9:
Text Field 10:
Text Field 11:
Text Field 12:
Text Field 13:
Text Field 14:
Text Field 15:
Text Field 6:
Page 2:
CCT/CRI 9:
CCT/CRI 10:
CCT/CRI 11:
CCT/CRI 12:
CCT/CRI 14:
Text Field 7:
Text Field 8:
Text Field 23:
Text Field 24:
Text Field 26:
Text Field 27:
Text Field 41:
nLight Wired Control Accessories 3:
nLight AIR Control Accessories 3:
Air Function 8:
Lumens 15:
Lumens 16:
Lumens 17:
Air Function 9:

File details come from the government source that posted it. Updated .