This document contains two parts - the first part are the CALTRANS specifications for Section 39 Asphalt Concrete, and the second part are the Forest Service specifications for a construction project related to repaving the Deer Mountain Snowmobile Park parking area.
The Forest Service specifications cover various aspects of the project, including terms and definitions, bid award and execution, scope of work, control of work, acceptance of work, legal relations, prosecution and progress, measurement and payment, schedules, public traffic, and soil erosion/sediment control. Key details include:
- This is a solicitation for the Deer Mountain Parking Area Repaving project on the Klamath National Forest, with an estimated construction value between $100,000 and $250,000.
- The project is a total small business set-aside.
- Requests for Information must be submitted by May 28, 2024.
- The project locations can be viewed by prospective offerors, as a pre-proposal site visit will not be held.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6. Davis-Bacon Act WD # CA20240007.pdf | ||
| 2. Schedule.docx | DOCX document | |
| 127EAW24R0032.pdf | ||
| 4. Project Drawings.pdf | ||
| 5. Fire Plan.pdf | ||
| 7. RFI Form.docx | DOCX document | |
| 1. Statement of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUPPLEMENTAL SPECIFICATIONS
FOR
GOOSENEST RANGER DISTRICT
DEER MOUNTAIN
SNOWMOBILE PARK
PARKING AREA REPAVING
Table of Contents A. CALTRANS Specifications
SECTION 39 ASPHALT CONCRETE
39-1 GENERAL
39-1.01 DESCRIPTION
39-1.02 MATERIALS
39-1.02A Geosynthetic Pavement Interlayer
39-1.02B Tack Coat
39-1.02C Asphalt Binder
39-1.02D Aggregate
39-1.09 SUBGRADE, TACK COAT, AND GEOSYNTHETIC PAVEMENT INTERLAYER
39-1.09A General
39-1.09B Subgrade
39-1.09C Tack Coat
B. FOREST SERVICE Specifications
Preface
101 - Terms¸ Format¸ and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 - Bid¸ Award¸ and Execution of Contract
Delete Section 102
103 - Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05
104 - Control of Work
Delete Subsections 104.01, 104.02, 104.04
104.06 Use of Roads by Contractor
106 - Acceptance of Work
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
107 - Legal Relations and Responsibility to the Public
Delete Subsection 107.05
108 - Prosecution and Progress
Delete Section 108
109 - Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09
109.02 Measurement Terms and Definitions
155 - Schedules for Construction Contracts
Delete Section 155
156 - Public Traffic
Section 156. – PUBLIC TRAFIC
157 - Soil Erosion and Sediment Control
157.04 General
411 - Asphalt Prime Coat
411.05 Weather Limitations
412 - Asphalt Tack Coat
412.05 Weather Limitations
703 - Aggregate
703.05 (c) Surface course aggregate. (3) Plastic Index
703.05 Subbase, Base, Surface Course, and Screened Aggregate
A. CALTRANS Specifications
SECTION 39 ASPHALT CONCRETE
(Issued 06-05-09)
Replace Section 39 with: SECTION 39 HOT MIX ASPHALT
39-1 GENERAL
39-1.01 DESCRIPTION
Section 39 includes specifications for producing and placing hot mix asphalt (HMA) by mixing aggregate and asphalt binder at a mixing plant and spreading and compacting the HMA mixture.
The special provisions specify one or more type of HMA, including:
1. Type A
2. Type B
3. Open graded friction course (OGFC). OGFC includes hot mix asphalt (open graded), rubberized hot mix asphalt (open graded) (RHMA-O) and rubberized hot mix asphalt (open graded high binder) (RHMA-O-HB)
4. Rubberized hot mix asphalt (gap graded) (RHMA-G)
The special provisions specify the HMA construction process, including:
1. Standard
2. Method
3. Quality Control / Quality Assurance (QC / QA)
39-1.02 MATERIALS
39-1.02A Geosynthetic Pavement Interlayer
Geosynthetic pavement interlayer must comply with the specifications for pavement fabric or paving mat in Section 88-1.07, "Pavement Interlayer."
39-1.02B Tack Coat
Tack coat must comply with the specifications for asphaltic emulsion in Section 94, "Asphaltic Emulsion," or asphalt binder in Section 92, "Asphalts." Choose the type and grade.
Notify the Engineer if you dilute asphaltic emulsion with water. The weight ratio of added water to asphaltic emulsion must not exceed 1 to 1.
Measure added water either by weight or volume in compliance with the specifications for weighing, measuring, and metering devices under Section 9-1.01, "Measurement of Quantities," or you may use water meters from water districts, cities, or counties. If you measure water by volume, apply a conversion factor to determine the correct weight.
With each dilution, submit in writing:
1. The weight ratio of water to bituminous material in the original asphaltic emulsion
2. The weight of asphaltic emulsion before diluting
3. The weight of added water
4. The final dilution weight ratio of water to asphaltic emulsion
39-1.02C Asphalt Binder
Asphalt binder in HMA must comply with Section 92, "Asphalts," or Section 39-1.02D, "Asphalt Rubber Binder." The special provisions specify the grade.
Asphalt binder for geosynthetic pavement interlayer must comply with Section 92, "Asphalts." Choose from Grades PG 64-10, PG 64-16, or PG 70-10.
Asphalt Binders – Section 92
PG Asphalt Binders
Quality characteristic
Test method
Requirement
PG
58-22a
PG
64-10
PG
64-16
PG
64-28
PG
70-10
Original Binder
Flash point (min, °C) AASHTO T 48
230 230 230 230 230
Solubilityb (min, %) AASHTO T 44
99 99 99 99 99
Viscosity at 135 °Cc
(max, Pa•s)
AASHTO
T 316
3.0
Dynamic shear Test temperature at 10 rad/s (°C) G*/sin(delta) (min, kPa) G*/sin(delta) (max, kPa)
T 315
1.00 2.00
2.00
RTFOf teste mass loss (max, %)
T 240
RTFOf Test Aged Binder
Dynamic shear Test temperature at 10 rad/s (°C) G*/sin(delta) (min, kPa)
2.20
Ductility at 25 °C (min, cm) AASHTO T 51
PAVg
Test temperature (°C)
R 28
RTFOf Test and PAVg Aged Binder
Dynamic shear, Test temperature at 10 rad/s (°C) G*sin(delta) (max, kPa)
22d
31d
28d
22d
34d
Creep stiffness, Test temperature, °C S-value (max, MPa) M-value (min)
T 313
-12
0.300
-6
-18 aUse as asphalt rubber base stock for high mountain and high desert area.
bThe Engineer waives solubility requirements if the supplier is an authorized material source as defined by the
Department's Certification Program for Suppliers of Asphalt.
cThe Engineer waives this specification if the supplier provides written certification the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. dTest the sample at 3 °C higher if it fails at the specified test temperature. G*sin(delta) remains 5000 kPa maximum.
eThe residue from mass change determination may be used for other tests.
fRTFO means rolling thin film oven.
gPAV means Pressure Aging Vessel.
39-1.02D Aggregate
Aggregate must be clean and free from deleterious substances. Aggregate:
1. Retained on the No. 4 sieve is coarse
2. Passing the No. 4 sieve is fine
3. Added and passing the No. 30 sieve is supplemental fine, including:
3.1. Hydrated lime
3.2. Portland cement
3.3. Fines from dust collectors
The special provisions specify the aggregate gradation for each HMA type.
The specified aggregate gradation is before the addition of asphalt binder and includes supplemental fines. The Engineer tests for aggregate grading under California Test 202,modified by California Test 105 if there is a difference in specific gravity of 0.2 or more between the coarse and fine parts of different aggregate blends.
Aggregate Gradation
(Percentage Passing)
HMA Types A and B
3/4–inch HMA Types A and B
Sieve Sizes Target Value Limits
Allowable Tolerance
1" 100 —
3/4" 90 - 100 TV ±5
1/2" 70 - 90 TV ±6
No. 4 45 - 55 TV ±7
No. 8 32 - 40 TV ±5
No. 30 12 - 21 TV ±4
No. 200 2 - 7 TV ±2
1/2–inch HMA Types A and B
Limits
Allowable Tolerance
3/4" 100 —
1/2" 95 - 99 TV ±6
3/8" 75 - 95 TV ±6
No. 4 55 - 66 TV ±7
No. 8 38 - 49 TV ±5
No. 30 15 - 27 TV ±4
No. 200 2 - 8 TV ±2
3/8–inch HMA Types A and B
Limits
Allowable Tolerance
1/2" 100 —
3/8" 95 - 100 TV ±6
No. 4 58 - 72 TV ±7
No. 8 34 - 48 TV ±6
No. 30 18 - 32 TV ±5
No. 200 2 - 9 TV ±2
No. 4 HMA Types A and B
Limits
Allowable Tolerance
3/8" 100 —
No. 4 95 - 100 TV ±7
No. 8 72 - 77 TV ±7
No. 30 37 - 43 TV ±7
No. 200 2 - 12 TV ±4
Rubberized Hot Mix Asphalt - Gap Graded (RHMA-G)
3/4–inch RHMA-G
Limits
Allowable Tolerance
1" 100 —
3/4" 95 - 100 TV ±5
1/2" 83 - 87 TV ±6
3/8" 65 - 70 TV ±6
No. 4 28 - 42 TV ±7
No. 8 14 - 22 TV ±5
No. 200 0 - 6 TV ±2
1/2–inch RHMA-G
Limits
Allowable Tolerance
3/4" 100 —
1/2" 90 - 100 TV ±6
3/8" 83 - 87 TV ±6
No. 4 28 - 42 TV ±7
No. 8 14 - 22 TV ±5
No. 200 0 - 6 TV ±2
Open Graded Friction Course (OGFC)
1–inch OGFC
Limits
Allowable Tolerance
1 1/2" 100 —
1" 99 - 100 TV ±5
3/4" 85 - 96 TV ±5
1/2" 55 - 71 TV ±6
No. 4 10 - 25 TV ±7
No. 8 6 - 16 TV ±5
No. 200 1 - 6 TV ±2
1/2–inch OGFC
Limits
Allowable Tolerance
3/4" 100 —
1/2" 95 - 100 TV ±6
3/8" 78 - 89 TV ±6
No. 4 28 - 37 TV ±7
No. 8 7 - 18 TV ±5
No. 30 0 - 10 TV ±4
No. 200 0 - 3 TV ±2
3/8–inch OGFC
Limits
Allowable Tolerance
1/2" 100 —
3/8" 90 - 100 TV ±6
No. 4 29 - 36 TV ±7
No. 8 7 - 18 TV ±6
No. 30 0 - 10 TV ±5
No. 200 0 - 3 TV ±2
Before the addition of asphalt binder and lime treatment, aggregate must comply with:
Aggregate Quality
Quality Characteristic Test Method HMA Type
A B RHMA-G OGF
C
Percent of crushed particles Coarse aggregate (% min.) One fractured face
Two fractured faces Fine aggregate (% min)
(Passing No. 4 sieve and retained on No. 8 sieve.) One fractured face
CT 205
Los Angeles Rattler (% max.)
Loss at 100 Rev.
Loss at 500 Rev.
CT 211
Sand equivalent (min.) a CT 217 47 42 47 --
Fine aggregate angularity (% min.)
b
AASHTO T 304
Method A
Flat and elongated particles (% max.
by weight @ 5:1)
ASTM D
Notes:
a Reported value must be the average of 3 tests from a single sample.
b The Engineer waives this specification if HMA contains less than 10 percent of nonmanufactured sand by weight of total aggregate. Manufactured sand is fine aggregate produced by crushing rock or gravel.
39-1.09 SUBGRADE, TACK COAT, AND GEOSYNTHETIC PAVEMENT INTERLAYER
39-1.09A General
Prepare subgrade or apply tack coat to surfaces receiving HMA. If specified, place geosynthetic pavement interlayer over a coat of asphalt binder.
39-1.09B Subgrade
Subgrade to receive HMA must comply with the compaction and elevation tolerance specifications in the sections for the material involved. Subgrade must be free of loose and extraneous material. If HMA is paved on existing base or pavement, remove loose paving particles, dirt, and other extraneous material by any means including flushing and sweeping.
39-1.09C Tack Coat
Apply tack coat:
1. To existing pavement including planed surfaces
2. Between HMA layers
3. To vertical surfaces of:
3.1. Curbs
3.2. Gutters
3.3. Construction joints
Before placing HMA, apply tack coat in 1 application at the minimum residual rate specified for the condition of the underlying surface:
Tack Coat Application Rates for HMA Type A, Type B, and RHMA-G Minimum Residual Rates (gallons per square yard)
CSS1/CSS1
h, CRS1/CRS
2, Asphalt Binder and
HMA over:
SS1/SS1h and QS1h/CQS1h
RS1/RS2
and
QS1/CQS1
PMRS2/PMCRS2
and
Asphaltic Asphaltic PMRS2h/PMCRS2 h
Emulsion Emulsion Asphaltic Emulsion
New HMA (between layers) 0.02 0.03 0.02
Existing AC and PCC pavement 0.03 0.04 0.03
Planed pavement 0.05 0.06 0.04
Tack Coat Application Rates for OGFC
Minimum Residual Rates (gallons per square yard)
CSS1/CSS1
h, CRS1/CRS
2, Asphalt Binder and
OGFC
over:
SS1/SS1h and QS1h/CQS1h
RS1/RS2 and
QS1/CQS1
PMRS2/PMCRS2
and
Asphaltic Asphaltic PMRS2h/PMCRS2 h
Emulsion Emulsion Asphaltic Emulsion
New HMA 0.03 0.04 0.03
Existing AC and PCC pavement 0.05 0.06 0.04
Planed pavement 0.06 0.07 0.05
If you dilute asphaltic emulsion, mix until homogeneous before application.
Apply to vertical surfaces with a residual tack coat rate that will thoroughly coat the vertical face without running off.
If you request in writing and the Engineer authorizes, you may:
1. Change tack coat rates
2. Omit tack coat between layers of new HMA during the same work shift if:
2.1. No dust, dirt, or extraneous material is present
2.2. The surface is at least 140 °F
Immediately in advance of placing HMA, apply additional tack coat to damaged areas or where loose or extraneous material is removed.
Close areas receiving tack coat to traffic. Do not track tack coat onto pavement surfaces beyond the job site.
Asphalt binder tack coat must be between 285 °F and 350 °F when applied.
B. FOREST SERVICE Specifications
Preface Preface_wo_08_22_2018
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest
System Roads.
101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016
Add the following paragraph to Subsection 101.01:
101.01 Meaning of Terms.
Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.
101.03_National_11_9_2016
Add the following to Subsection 101.03:
101.03 Abbreviations.
(a) Acronyms.
AGAR — Agriculture Acquisition Regulations
AFPA — American Forest and Paper Association
FSAR — Forest Service Acquisition Regulations
MSHA — Mine Safety and Health Administration
NESC — National Electrical Safety Code
WCLIB — West Coast Lumber Inspection Bureau
(f) Miscellaneous unit abbreviations.
MP — milepost location ppm — parts per million volume
STA station location
101.04_National_11_9_2016
Make the following changes to Subsection 101.04:
101.04 Definitions.
Delete these definitions and replace the following:
Bid Schedule — The Schedule of Items.
Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.
Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.
Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.
Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.
Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.
Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line
(including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2)
Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.
Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.
Add the following definitions:
Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.
Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.
Forest Service — The United States of America, acting through the Forest Service, U.S. Department of
Agriculture.
Neat Line — A line defining the proposed or specified limits of an excavation or structure.
Pioneer Road — Temporary construction access built along the route of the project.
Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.
Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.
Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road
Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.
Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.
Utilization Standards — The minimum size and percent soundness of trees described in the specifications to determine merchantable timber.
Add Figure 101-1—Illustration of road structure terms:
Figure 101-1—Illustration of road structure terms.
102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016
Delete Section 102 in its entirety.
Delete Section 102.
103 - Scope of Work 103.00_National_11_9_2016
Delete all of Section 103 except Subsection 103.01 Intent of Contract.
Delete Subsections 103.02, 103.03, 103.04, 103.05.
104 - Control of Work 104.00_National_11_9_2016
Delete Subsections 104.01, 104.02, and 104.04.
Delete Subsections 104.01, 104.02, 104.04.
104.06_National_11_9_2016
Add the following to Subsection 104.06:
104.06 Use of Roads by Contractor.
The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road
Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.
106 - Acceptance of Work 106.01_National_7_18_2017
Delete Subsection 106.01 and replace with the following:
106.01 Conformity with Contract Requirements.
Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.
References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.
Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.
Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.
Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.
When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.
The Government may inspect, sample, or test all work at any time before final acceptance of the project.
When the Government tests work, copies of test reports are furnished to the Contractor upon request.
Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.
Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.
The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.
Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;
providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.
(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:
1. Sampling method;
2. Number of samples;
3. Sample transport;
4. Test procedures;
5. Testing laboratories;
6. Reporting;
7. Estimated time and costs; and
8. Validation process.
If the evaluation requires additional sampling or testing be performed, mutually agree with the
Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.
The CO will review the proposed resolution protocol and may modify it before final approval and execution.
The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.
(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:
1. Have the work accepted at a reduced price; or
2. Be given permission to perform corrective measures to bring the work into conformity.
The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.
106.02_National_11_9_2016
Delete Subsection 106.02 and replace with the following:
106.02 Visual Inspection.
Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.
107 - Legal Relations and Responsibility to the Public 107.05_National_7_18_2017
Delete Subsection 107.05.
Delete Subsection 107.05.
108 - Prosecution and Progress 108.00_National_11_9_2016
Delete Section 108 in its entirety.
Delete Section 108.
109 - Measurement and Payment 109.00_National_11_9_2016
Delete Subsections 109.06, 109.07, 109.08, and 109.09:
Delete Subsections 109.06, 109.07, 109.08, 109.09.
109.02_National_11_9_2016
Add the following sentence to Subsection 109.02(b):
109.02 Measurement Terms and Definitions.
(b) Contract quantity.
Contract quantities will be adjusted only when there are errors in the original design of 15% or more.
155 - Schedules for Construction Contracts 155.00_National_11_9_2016
Delete Section 155 in its entirety.
Delete Section 155.
156 - Public Traffic 156.00_National_11_4_2016
Delete Section 156 in its entirety and replace with the following:
Section 156. – PUBLIC TRAFIC Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed 15 minutes at any one time followed by an open period of no less than 60 minutes. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection
106.07(b).
Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM
7100-15. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the
National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156-1
Temporary Road Closures
Road
Number
From Terminus
(Lat. , Long.)
To Terminus
(Lat. Long.)
Maximum
Consecutive
Days of
Closure
Minimum
Consecutive
Days Open
N/A N/A N/A N/A N/A
Note: The road may be closed for no more than 1 hour without allowing for traffic to pass.
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See
Subsection 109.05.
157 - Soil Erosion and Sediment Control 157.04_National_11_1_2016
Delete Subsection 157.04 and replace with the following:
157.04 General.
Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.
When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.
411 - Asphalt Prime Coat 411.05_National_7_17_2017
Delete Subsection 411.05(d) and replace with the following:
411.05 Weather Limitations.
(d) Weather is not forecasted to be foggy or rainy 24 hours following application.
412 - Asphalt Tack Coat 412.05_National_11_4_2016
Delete Subsection 412.05(b) and replace with the following:
412.05 Weather Limitations.
(b) Ambient air temperature is above 40 °F (5 °C) and rising; and
703 - Aggregate 703.05_National_11_13_2019
Delete Subsection 703.05(c)(3) and Replace with the following:
703.05 (c) Surface course aggregate. (3) Plastic Index
(3) Plastic Index, AASHTO T 90
If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2
703.05_National_11_13_2019
Delete 703.05 and replace with the following:
703.05 Subbase, Base, Surface Course, and Screened Aggregate.
(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-2
(2) Liquid limit, AASHTO T 89 25 max.
(3) Plastic limit, AASHTO T 90 Nonplastic
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 50% min.
(9) Free from organic matter and lumps or balls of clay
Do not use material that breaks up when alternately frozen and thawed or wetted and dried.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:
(1) Gradation Table 703-3
(2) Liquid limit, AASHTO T 89 35 max.
(3) Plastic Index, AASHTO T 90
a) If the percent passing the No. 200 sieve is less than 12% 2 to 9
b) If the percent passing the No. 200 sieve is greater than 12% Less than 2
(4) Los Angeles abrasion, AASHTO T 96 40% max.
(5) Sodium sulfate soundness loss (5 cycles), 12% max.
AASHTO T 104
(6) Durability index (coarse), AASHTO T 210 35 min.
(7) Durability index (fine), AASHTO T 210 35 min.
(8) Fractured faces, ASTM D 5821 75% min.
(9) Free from organic matter and lumps or balls of clay
Do not furnish material that contains asbestos fibers.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.
(c) Screened aggregate – Furnish hard, durable particles or fragments of stone, slag, or gravel conforming the following:
(1) Gradation Table 703-16
(2) Plastic Index, AASHTO T 90 Less than 9
(3) Los Angeles abrasion, AASHTO T 96 55% max.
(4) Free from organic matter and lumps or balls of clay.
Obtain the aggregate gradation by crushing, screening, and blending processes as necessary.
Delete Table 703-2 and replace with the following:
T a b le
-2 rg et
V a lu e
R a n g es f o r
S u b b a se a n d B a se
G ra d a ti o n
P er ce n t b y M a ss
P a ss in g D es ig n a te d
S ie v e
(A A
S H
T O
T a n d
T
G ra d in g D es ig n a ti
E
B a se
.0
.0
T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o fr o m t h e ta rg et v al u es
D
B a
.0
.0
C
B a
.0
.0
B
S u b b a
.0
.0
A
S u b b a se
.0
.0
S ie v e
S iz e
½ i ch i
½ i
/4 i
/2 i
/8 i
N
Delete Table 703-3 and replace with the following:
b le
-3 rg et
V a lu e
R a n g es f o r
S u rf a ce G ra d a ti
P er ce n t b y
M a ss P a ss in g
D es ig n a te d S ie v e (A
A S
H T
O T a n d T
G ra d in g D es ig n a ti
U
.0
.0
T h e v al u e in t h e p ar en th es es i s th e al lo w ab le d ev ia ti o fr o m t h e ta rg et v al u es
I f th e p la st ic it y i n d ex
P I) i s g re at er t h an th e T
V r an g e fo r th e
N o s ie v e si ze i s
-1
.0
.0
S
.0
.0
H
.0
.0
G
.0
.0
F
-1
-8
-6
-5
-3
-2
.0 -1
.0
S ie v e
S iz e
/2 i
/4 i
/2 i
/8 i
Add Table 703-13:
Table 703-13 Gradation Requirements for Screened Aggregate
Sieve Size
Percent by Mass Passing Designated Sieve (AASHTO T 27 and T 11)
Grading Designation
L M N O P Q R
6 inch 100 100
4 inch 100 100
3 inch 100 100
2 inch 100
No. 4 15-45 15-45 15-45
703.09_National_11_13_2019
Make the following changes to Subsection 703.09: